Attachment_3_-_Bid_Schedule.xls

XLS spreadsheet 68 KB Posted

Attached to
Roofing IDIQ Federal contract opportunity
Solicitation number
FA4855-13-R-0011
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 3 - Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Roofing IDIQ, newest first.
File Type Posted
Attachment_21_-_H204_As_Builts_(1_of_3).pdf PDF
Attachment_23_-_H204_As_Builts_(3_of_3).pdf PDF
Attachment_20_-_Solicitation_Questions_and_Answers.pdf PDF
FA4855-13-R-0011-0005.pdf PDF
Attachment_1A_-_Revised_Specifications_Sections.pdf PDF
Attachment_3_-_Bid_Schedule.xls XLS spreadsheet
Attachment_22_-_H204_As_Builts_(2_of_3).pdf PDF
Attachment_4_-_Joint_Estimate_(JE)_Form.xls XLS spreadsheet
Attachment_20_-_Solicitation_Questions_and_Answers.pdf PDF
Attachment_18_-_Base_Map.pdf PDF
Attachment_14_-_Seed_Project_Drawings.pdf PDF
Attachment_1A_-_Revised_Specifications_Sections.pdf PDF
Attachment_19_-_Solid_Waste_Sheet_Example.pdf PDF
FA4855-13-R-0011-0004.pdf PDF
FA4855-13-R-0011-0003.pdf PDF
FA4855-13-R-0011-0002.pdf PDF
FA4855-13-R-0011-00001.pdf PDF
Attachment_14_-_Seed_Project_Drawings.pdf PDF
Attachment_9_-_MAFR_Contractor_SOPs.pdf PDF
Attachment_5_-_OPSEC_Contract_Addendum.pdf PDF
Attachment_4_-_Joint_Estimate_Form.pdf PDF
Attachment_17_-_PPQ.pdf PDF
Attachment_7_-_CAFB_Sustainable_Landscape_Development_Plan.pdf PDF
Attachment_12_-_Wage_Determination_NM34.pdf PDF
FA4855-13-R-0011.pdf PDF
Attachment_11_-_Wage_Determination_NM23.pdf PDF
Attachment_15_-_Seed_Project_Schedule_of_Material_Submittals.pdf PDF
Attachment_2_-_IDIQ_Schedule_of_Material_Submittals.pdf PDF
Attachment_13_-_Seed_Project_SOW.pdf PDF
Attachment_16_-_PPI.pdf PDF
Attachment_10_-_Climatic_Data_Summary.pdf PDF
Attachment_3_-_Roofing_IDIQ_Bid_Schedule.pdf PDF
Attachment_6_-_CAFB_Electrical_Standards.pdf PDF
Attachment_1_-_Specifications_Manual.pdf PDF
Attachment_8_-_CAFB-MAFR_Environmental_Guide.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

BID SCHEDULE - BASE YEAR
ROOFING IDIQ
CANNON AIR FORCE BASE
1-ROOFING DEMOLITIONQUANTITYUNITSCOST per UNITCOST+ OH+P
0001AARemoval & Disposal - Metal Panel Roofing System3210.6SQ
0001ABRemoval & Disposal - Asphalt Built-Up Roofing System (BUR)929.48SQ
0001ACRemoval & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System89.93SQ
0001ADRemoval & Disposal - Asphalt Shingle Roofing System0SQ
0001AERemoval & Disposal - Gypsum Board or Other Sheathing100SQ
0001AFRemoval & Disposal - Gutter and Downspouts1000LF
0001AGRemoval & Disposal - Lighting Protection Rods (and all attachments and cabling)50EA
0001AHRemoval & Disposal - Roof Drain; Cap off drain pipe50EA
0001AIRemoval & Disposal - Roof Devices and Equipment (Manual Removal)50EA
0001AJRemoval & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items)50EA
0001AKStorage of Roof Devices and Equipment for Reuse or Salvage10EA
0001ALSite Management: Fencing, Dust and Debris Control, and Site Clean Up751423.19LS
0001AMAbatement/Encapsulation - Asbestos/Lead/Mold40SF
0001ANRemoval & Disposal - HazMat10CY
2-ROOF REPAIRS AND NEW INSTALLATIONSQUANTITYUNITSCOST per UNITCOST
0002AAComplete Standing Seam Metal Roofing System (SSM)3210.6SQ
0002ABComplete Thermoplastic Polyolefin Roofing Membrane (TPO)1019.41SQ
0002ACComplete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only100SQ
0002ADComplete Asphalt Shingle Roofing (for Residential Applications Only)0SQ
0002AEComplete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only)0SQ
0002AFRoof Sheathing - Wood, 5/8" OSB10SQ
0002AGRoof Sheathing - Gypsum Board, Fire Rated100SQ
0002AHVapor Barrier - Asphalt Felt, Class 1 (for BUR Only)10SQ
0002AIVapor Barrier - Polyethylene, 6 mil100SQ
0002AJRoof Insulation - Polyisocyanurate Boards 2" Thick1000SF
0002AKRoof Insulation - Polyisocyanurate Tapered Insulation1000BF
0002ALRoof Drain and Cover - Cast Iron, 4" Diameter50EA
0002AMRoof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum)10EA
0002ANCopings at Parapets - 24 ga, Factory Finished Color400LF
0002AOExpansion Joints200LF
0002APWalking Pads - 3' x 3', Compatibile with Roofing System1000SF
0002AQSnow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws200EA
0002ARGutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color1000LF
0002ASDownspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color200LF
0002ATLightning Protection, Air Terminal & Base50EA
0002AULightning Protection, Cable30000LF
0002AVLightning Protection, Arrester, Grounding50EA
3-ROOF INVESTIGATIONS AND TESTINGQUANTITYUNITSCOST per UNITCOST
0003AAAsbestos Abatement Testing and Remediation Plan10EA
0003ABLead Content Testing (X-ray or AAS analysis)10EA
0003ACLead Abatement Remediation Plan10EA
0003ADRoofing Insulation/Membrane Testing (07 51 00, para. 1.5.B.3)10EA
Base Year Total:

&R&"Times New Roman,Regular"&8FA4855-13-R-0011 Attachment 3 &L&"Times New Roman,Regular"&8Revised 26 July 2013&R&"Times New Roman,Regular"&8&P of &N (3 Total Pages)

Option 1

BID SCHEDULE - OPTION YEAR 1
ROOFING IDIQ
CANNON AIR FORCE BASE
1-ROOFING DEMOLITIONQUANTITYUNITSCOST per UNITCOST+OH+P
1001AARemoval & Disposal - Metal Panel Roofing System4178.66SQ
1001ABRemoval & Disposal - Asphalt Built-Up Roofing System (BUR)259.62SQ
1001ACRemoval & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System99.95SQ
1001ADRemoval & Disposal - Asphalt Shingle Roofing System103.58SQ
1001AERemoval & Disposal - Gypsum Board or Other Sheathing100SQ
1001AFRemoval & Disposal - Gutter and Downspouts1000LF
1001AGRemoval & Disposal - Lighting Protection Rods (and all attachments and cabling)50EA
1001AHRemoval & Disposal - Roof Drain; Cap off drain pipe50EA
1001AIRemoval & Disposal - Roof Devices and Equipment (Manual Removal)50EA
1001AJRemoval & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items)50EA
1001AKStorage of Roof Devices and Equipment for Reuse or Salvage10EA
1001ALSite Management: Fencing, Dust and Debris Control, and Site Clean Up757655.69LS
1001AMAbatement/Encapsulation - Asbestos/Lead/Mold40SF
1001ANRemoval & Disposal - HazMat5CY
2-ROOF REPAIRS AND NEW INSTALLATIONSQUANTITYUNITSCOST per UNITCOST
1002AAComplete Standing Seam Metal Roofing System (SSM)4178.66SQ
1002ABComplete Thermoplastic Polyolefin Roofing Membrane (TPO)359.57SQ
1002ACComplete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only100SQ
1002ADComplete Asphalt Shingle Roofing (for Residential Applications Only)SQ
1002AEComplete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only)SQ
1002AFRoof Sheathing - Wood, 5/8" OSB10SQ
1002AGRoof Sheathing - Gypsum Board, Fire Rated100SQ
1002AHVapor Barrier - Asphalt Felt, Class 1 (for BUR Only)10SQ
1002AIVapor Barrier - Polyethylene, 6 mil100SQ
1002AJRoof Insulation - Polyisocyanurate Boards 2" Thick1000BF
1002AKRoof Insulation - Polyisocyanurate Tapered Insulation1000BF
1002ALRoof Drain and Cover - Cast Iron, 4" Diameter50EA
1002AMRoof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum)10EA
1002ANCopings at Parapets - 24 ga, Factory Finished Color400LF
1002AOExpansion Joints200LF
1002APWalking Pads - 3' x 3', Compatibile with Roofing System1000SF
1002AQSnow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws200EA
1002ARGutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color1000LF
1002ASDownspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color200LF
1002ATLightning Protection, Air Terminal & Base50EA
1002AULightning Protection, Cable30000LF
1002AVLightning Protection, Arrester, Grounding50EA
3-ROOF INVESTIGATIONS AND TESTINGQUANTITYUNITSCOST per UNITCOST
1003AAAsbestos Abatement Remediation Plan10EA
1003ABLead Content Testing (X-ray or AAS analysis)10EA
1003ACLead Abatement Remediation Plan10EA
1003ADNOT USED
Option Year 1 Total:

&R&"Times New Roman,Regular"&8FA4855-13-R-0011 Attachment 3 &L&"Times New Roman,Regular"&8Revised 26 July 2013&R&"Times New Roman,Regular"&8&P of &N (3 Total Pages)

Option 2

BID SCHEDULE - OPTION YEAR 2
ROOFING IDIQ
CANNON AIR FORCE BASE
1-ROOFING DEMOLITIONQUANTITYUNITSCOST per UNITCOST
2001AARemoval & Disposal - Metal Panel Roofing System2764.51SQ
2001ABRemoval & Disposal - Asphalt Built-Up Roofing System (BUR)180.36SQ
2001ACRemoval & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System460.85SQ
2001ADRemoval & Disposal - Asphalt Shingle Roofing System0SQ
2001AERemoval & Disposal - Gypsum Board or Other Sheathing100SQ
2001AFRemoval & Disposal - Gutter and Downspouts1000LF
2001AGRemoval & Disposal - Lighting Protection Rods (and all attachments and cabling)50EA
2001AHRemoval & Disposal - Roof Drain; Cap off drain pipe50EA
2001AIRemoval & Disposal - Roof Devices and Equipment (Manual Removal)50EA
2001AJRemoval & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items)50EA
2001AKStorage of Roof Devices and Equipment for Reuse or Salvage10EA
2001ALSite Management: Fencing, Dust and Debris Control, and Site Clean Up575935.77LS
2001AMAbatement/Encapsulation - Asbestos/Lead/Mold40SF
2001ANRemoval & Disposal - HazMat5CY
2-ROOF REPAIRS AND NEW INSTALLATIONSQUANTITYUNITSCOST per UNITCOST
2002AAComplete Standing Seam Metal Roofing System (SSM)2764.51SQ
2002ABComplete Thermoplastic Polyolefin Roofing Membrane (TPO)641.21SQ
2002ACComplete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only100SQ
2002ADComplete Asphalt Shingle Roofing (for Residential Applications Only)SQ
2002AEComplete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only)SQ
2002AFRoof Sheathing - Wood, 5/8" OSB10SQ
2002AGRoof Sheathing - Gypsum Board, Fire Rated100SQ
2002AHVapor Barrier - Asphalt Felt, Class 1 (for BUR Only)10SQ
2002AIVapor Barrier - Polyethylene, 6 mil100SQ
2002AJRoof Insulation - Polyisocyanurate Boards 2" Thick1000BF
2002AKRoof Insulation - Polyisocyanurate Tapered Insulation1000BF
2002ALRoof Drain and Cover - Cast Iron, 4" Diameter50EA
2002AMRoof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum)10EA
2002ANCopings at Parapets - 24 ga, Factory Finished Color400LF
2002AOExpansion Joints200LF
2002APWalking Pads - 3' x 3', Compatibile with Roofing System1000SF
2002AQSnow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws200EA
2002ARGutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color1000LF
2002ASDownspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color200LF
2002ATLightning Protection, Air Terminal & Base50EA
2002AULightning Protection, Cable25000LF
2002AVLightning Protection, Arrester, Grounding50EA
3-ROOF INVESTIGATIONS AND TESTINGQUANTITYUNITSCOST per UNITCOST
2003AAAsbestos Abatement Remediation Plan10EA
2003ABLead Content Testing (X-ray or AAS analysis)10EA
2003ACLead Abatement Remediation Plan10EA
0003ADNOT USED
Option Year 2 Total: