Attachment 3 - Bid Schedule
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| BID SCHEDULE - BASE YEAR | |||||
| ROOFING IDIQ | |||||
| CANNON AIR FORCE BASE | |||||
| 1-ROOFING DEMOLITION | QUANTITY | UNITS | COST per UNIT | COST+ OH+P | |
| 0001AA | Removal & Disposal - Metal Panel Roofing System | 3,210.6 | SQ | $0.00 | |
| 0001AB | Removal & Disposal - Asphalt Built-Up Roofing System (BUR) | 929.48 | SQ | $0.00 | |
| 0001AC | Removal & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System | 89.93 | SQ | $0.00 | |
| 0001AD | Removal & Disposal - Asphalt Shingle Roofing System | 0 | SQ | $0.00 | |
| 0001AE | Removal & Disposal - Gypsum Board or Other Sheathing | 100 | SQ | $0.00 | |
| 0001AF | Removal & Disposal - Gutter and Downspouts | 1,000 | LF | $0.00 | |
| 0001AG | Removal & Disposal - Lighting Protection (Rods, all attachments, and cabling) | 50 | LF | $0.00 | |
| 0001AH | Removal & Disposal - Roof Drain; Cap off drain pipe | 50 | EA | $0.00 | |
| 0001AI | Removal & Disposal - Roof Devices and Equipment (Manual Removal) | 50 | EA | $0.00 | |
| 0001AJ | Removal & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items) | 50 | EA | $0.00 | |
| 0001AK | Storage of Roof Devices and Equipment for Reuse or Salvage | 10 | EA | $0.00 | |
| 0001AL | Site Management: Fencing, Dust and Debris Control, and Site Clean Up | 751,423.19 | LS | $0.00 | |
| 0001AM | Removal - Asbestos/Lead/Mold/HazMat | 40 | SF | $0.00 | |
| 0001AN | Disposal - Asbestos/Lead/Mold/HazMat | 10 | CY | $0.00 | |
| 2-ROOF REPAIRS AND NEW INSTALLATIONS | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 0002AA | Complete Standing Seam Metal Roofing System (SSM) | 3,210.6 | SQ | $0.00 | |
| 0002AB | Complete Thermoplastic Polyolefin Roofing Membrane (TPO) | 1,019.41 | SQ | $0.00 | |
| 0002AC | Complete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only | 100 | SQ | $0.00 | |
| 0002AD | Complete Asphalt Shingle Roofing (for Residential Applications Only) | 0 | SQ | $0.00 | |
| 0002AE | Complete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only) | 0 | SQ | $0.00 | |
| 0002AF | Roof Sheathing - Wood, 5/8" OSB | 10 | SQ | $0.00 | |
| 0002AG | Roof Sheathing - Gypsum Board, Fire Rated | 100 | SQ | $0.00 | |
| 0002AH | Vapor Barrier - Asphalt Felt, Class 1 (for BUR Only) | 10 | SQ | $0.00 | |
| 0002AI | Vapor Barrier - Polyethylene, 6 mil | 100 | SQ | $0.00 | |
| 0002AJ | Roof Insulation - Polyisocyanurate Boards 2" Thick | 1,000 | SF | $0.00 | |
| 0002AK | Roof Insulation - Polyisocyanurate Tapered Insulation | 1,000 | BF | $0.00 | |
| 0002AL | Roof Drain and Cover - Cast Iron, 4" Diameter | 50 | EA | $0.00 | |
| 0002AM | Roof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum) | 10 | EA | $0.00 | |
| 0002AN | Copings at Parapets - 24 ga, Factory Finished Color | 400 | LF | $0.00 | |
| 0002AO | Expansion Joints | 200 | LF | $0.00 | |
| 0002AP | Walking Pads - 3' x 3', Compatibile with Roofing System | 1,000 | SF | $0.00 | |
| 0002AQ | Snow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws | 200 | EA | $0.00 | |
| 0002AR | Gutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color | 1,000 | LF | $0.00 | |
| 0002AS | Downspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color | 200 | LF | $0.00 | |
| 0002AT | Lightning Protection, Air Terminal & Base | 50 | EA | $0.00 | |
| 0002AU | Lightning Protection, Cable | 30,000 | LF | $0.00 | |
| 0002AV | Lightning Protection, Arrester, Grounding | 50 | EA | $0.00 | |
| 3-ROOF INVESTIGATIONS AND TESTING | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 0003AA | Asbestos Abatement Testing and Remediation Plan | 10 | EA | $0.00 | |
| 0003AB | Lead Content Testing (X-ray or AAS analysis) | 10 | EA | $0.00 | |
| 0003AC | Lead Abatement Remediation Plan | 10 | EA | $0.00 | |
| 0003AD | (Line Item Reserved) | 10 | EA | $0.00 | |
| 4-MELROSE AIR FORCE RANGE | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 0004AA | MAFR Work Factor (Reference Solicitation Section L, Para. M.2.4.1.1) | % | |||
| Base Year Total: |
&R&"Times New Roman,Regular"&8FA4855-13-R-0011 Attachment 3 &L&"Times New Roman,Regular"&8Revised 1 August 2013&R&"Times New Roman,Regular"&8&P of &N (3 Total Pages)
Option 1
| BID SCHEDULE - OPTION YEAR 1 | |||||
| ROOFING IDIQ | |||||
| CANNON AIR FORCE BASE | |||||
| 1-ROOFING DEMOLITION | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 1001AA | Removal & Disposal - Metal Panel Roofing System | 4,178.66 | SQ | $0.00 | |
| 1001AB | Removal & Disposal - Asphalt Built-Up Roofing System (BUR) | 259.62 | SQ | $0.00 | |
| 1001AC | Removal & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System | 99.95 | SQ | $0.00 | |
| 1001AD | Removal & Disposal - Asphalt Shingle Roofing System | 103.58 | SQ | $0.00 | |
| 1001AE | Removal & Disposal - Gypsum Board or Other Sheathing | 100 | SQ | $0.00 | |
| 1001AF | Removal & Disposal - Gutter and Downspouts | 1,000 | LF | $0.00 | |
| 1001AG | Removal & Disposal - Lighting Protection (Rods, all attachments, and cabling) | 50 | LF | $0.00 | |
| 1001AH | Removal & Disposal - Roof Drain; Cap off drain pipe | 50 | EA | $0.00 | |
| 1001AI | Removal & Disposal - Roof Devices and Equipment (Manual Removal) | 50 | EA | $0.00 | |
| 1001AJ | Removal & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items) | 50 | EA | $0.00 | |
| 1001AK | Storage of Roof Devices and Equipment for Reuse or Salvage | 10 | EA | $0.00 | |
| 1001AL | Site Management: Fencing, Dust and Debris Control, and Site Clean Up | 757,655.69 | LS | $0.00 | |
| 1001AM | Removal - Asbestos/Lead/Mold/HazMat | 40 | SF | $0.00 | |
| 1001AN | Disposal - Asbestos/Lead/Mold/HazMat | 5 | CY | $0.00 | |
| 2-ROOF REPAIRS AND NEW INSTALLATIONS | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 1002AA | Complete Standing Seam Metal Roofing System (SSM) | 4,178.66 | SQ | $0.00 | |
| 1002AB | Complete Thermoplastic Polyolefin Roofing Membrane (TPO) | 359.57 | SQ | $0.00 | |
| 1002AC | Complete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only | 100 | SQ | $0.00 | |
| 1002AD | Complete Asphalt Shingle Roofing (for Residential Applications Only) | 104 | SQ | $0.00 | |
| 1002AE | Complete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only) | SQ | $0.00 | ||
| 1002AF | Roof Sheathing - Wood, 5/8" OSB | 10 | SQ | $0.00 | |
| 1002AG | Roof Sheathing - Gypsum Board, Fire Rated | 100 | SQ | $0.00 | |
| 1002AH | Vapor Barrier - Asphalt Felt, Class 1 (for BUR Only) | 10 | SQ | $0.00 | |
| 1002AI | Vapor Barrier - Polyethylene, 6 mil | 100 | SQ | $0.00 | |
| 1002AJ | Roof Insulation - Polyisocyanurate Boards 2" Thick | 1,000 | BF | $0.00 | |
| 1002AK | Roof Insulation - Polyisocyanurate Tapered Insulation | 1,000 | BF | $0.00 | |
| 1002AL | Roof Drain and Cover - Cast Iron, 4" Diameter | 50 | EA | $0.00 | |
| 1002AM | Roof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum) | 10 | EA | $0.00 | |
| 1002AN | Copings at Parapets - 24 ga, Factory Finished Color | 400 | LF | $0.00 | |
| 1002AO | Expansion Joints | 200 | LF | $0.00 | |
| 1002AP | Walking Pads - 3' x 3', Compatibile with Roofing System | 1,000 | SF | $0.00 | |
| 1002AQ | Snow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws | 200 | EA | $0.00 | |
| 1002AR | Gutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color | 1,000 | LF | $0.00 | |
| 1002AS | Downspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color | 200 | LF | $0.00 | |
| 1002AT | Lightning Protection, Air Terminal & Base | 50 | EA | $0.00 | |
| 1002AU | Lightning Protection, Cable | 30,000 | LF | $0.00 | |
| 1002AV | Lightning Protection, Arrester, Grounding | 50 | EA | $0.00 | |
| 3-ROOF INVESTIGATIONS AND TESTING | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 1003AA | Asbestos Abatement Remediation Plan | 10 | EA | $0.00 | |
| 1003AB | Lead Content Testing (X-ray or AAS analysis) | 10 | EA | $0.00 | |
| 1003AC | Lead Abatement Remediation Plan | 10 | EA | $0.00 | |
| 1003AD | (Line Item Reserved) | 10 | EA | $0.00 | |
| 4-MELROSE AIR FORCE RANGE | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 1004AA | MAFR Work Factor (Reference Solicitation Section L, Para. M.2.4.1.1) | % | |||
| Option Year 1 Total: |
&R&"Times New Roman,Regular"&8FA4855-13-R-0011 Attachment 3 &L&"Times New Roman,Regular"&8Revised 1 August 2013&R&"Times New Roman,Regular"&8&P of &N (3 Total Pages)
Option 2
| BID SCHEDULE - OPTION YEAR 2 | |||||
| ROOFING IDIQ | |||||
| CANNON AIR FORCE BASE | |||||
| 1-ROOFING DEMOLITION | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 2001AA | Removal & Disposal - Metal Panel Roofing System | 2,764.51 | SQ | $0.00 | |
| 2001AB | Removal & Disposal - Asphalt Built-Up Roofing System (BUR) | 180.36 | SQ | $0.00 | |
| 2001AC | Removal & Disposal - Modified Bitumen or Single-Ply Membrane Roofing System | 460.85 | SQ | $0.00 | |
| 2001AD | Removal & Disposal - Asphalt Shingle Roofing System | 0 | SQ | $0.00 | |
| 2001AE | Removal & Disposal - Gypsum Board or Other Sheathing | 100 | SQ | $0.00 | |
| 2001AF | Removal & Disposal - Gutter and Downspouts | 1,000 | LF | $0.00 | |
| 2001AG | Removal & Disposal - Lighting Protection (Rods, all attachments, and cabling) | 50 | LF | $0.00 | |
| 2001AH | Removal & Disposal - Roof Drain; Cap off drain pipe | 50 | EA | $0.00 | |
| 2001AI | Removal & Disposal - Roof Devices and Equipment (Manual Removal) | 50 | EA | $0.00 | |
| 2001AJ | Removal & Disposal - Roof Devices and Equipment (Machine Assisted Removal of Large Items) | 50 | EA | $0.00 | |
| 2001AK | Storage of Roof Devices and Equipment for Reuse or Salvage | 10 | EA | $0.00 | |
| 2001AL | Site Management: Fencing, Dust and Debris Control, and Site Clean Up | 575,935.77 | LS | $0.00 | |
| 2001AM | Removal - Asbestos/Lead/Mold/HazMat | 40 | SF | $0.00 | |
| 2001AN | Disposal - Asbestos/Lead/Mold/HazMat | 5 | CY | $0.00 | |
| 2-ROOF REPAIRS AND NEW INSTALLATIONS | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 2002AA | Complete Standing Seam Metal Roofing System (SSM) | 2,764.51 | SQ | $0.00 | |
| 2002AB | Complete Thermoplastic Polyolefin Roofing Membrane (TPO) | 641.21 | SQ | $0.00 | |
| 2002AC | Complete Built-Up Roofing System (BUR) for Roof Repairs and Patches Only | 100 | SQ | $0.00 | |
| 2002AD | Complete Asphalt Shingle Roofing (for Residential Applications Only) | 0 | SQ | $0.00 | |
| 2002AE | Complete Asphalt Roll Roofing (1-Ply for Short Term Installations and Repairs Only) | SQ | $0.00 | ||
| 2002AF | Roof Sheathing - Wood, 5/8" OSB | 10 | SQ | $0.00 | |
| 2002AG | Roof Sheathing - Gypsum Board, Fire Rated | 100 | SQ | $0.00 | |
| 2002AH | Vapor Barrier - Asphalt Felt, Class 1 (for BUR Only) | 10 | SQ | $0.00 | |
| 2002AI | Vapor Barrier - Polyethylene, 6 mil | 100 | SQ | $0.00 | |
| 2002AJ | Roof Insulation - Polyisocyanurate Boards 2" Thick | 1,000 | BF | $0.00 | |
| 2002AK | Roof Insulation - Polyisocyanurate Tapered Insulation | 1,000 | BF | $0.00 | |
| 2002AL | Roof Drain and Cover - Cast Iron, 4" Diameter | 50 | EA | $0.00 | |
| 2002AM | Roof Hatch - Insulated and lockable, Galvanized Steel Curb and Cover (3' x 3' Minimum) | 10 | EA | $0.00 | |
| 2002AN | Copings at Parapets - 24 ga, Factory Finished Color | 400 | LF | $0.00 | |
| 2002AO | Expansion Joints | 200 | LF | $0.00 | |
| 2002AP | Walking Pads - 3' x 3', Compatibile with Roofing System | 1,000 | SF | $0.00 | |
| 2002AQ | Snow Guards for SSM Roofs - Prefinished Brackets Fastened with Set Screws | 200 | EA | $0.00 | |
| 2002AR | Gutters - Galvanized Steel, 28 ga, 5" Wide, Factory Applied Color | 1,000 | LF | $0.00 | |
| 2002AS | Downspouts - Galvanized Steel, 28 ga, Rectangular 3" x 4", Factory Applied Color | 200 | LF | $0.00 | |
| 2002AT | Lightning Protection, Air Terminal & Base | 50 | EA | $0.00 | |
| 2002AU | Lightning Protection, Cable | 25,000 | LF | $0.00 | |
| 2002AV | Lightning Protection, Arrester, Grounding | 50 | EA | $0.00 | |
| 3-ROOF INVESTIGATIONS AND TESTING | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 2003AA | Asbestos Abatement Remediation Plan | 10 | EA | $0.00 | |
| 2003AB | Lead Content Testing (X-ray or AAS analysis) | 10 | EA | $0.00 | |
| 2003AC | Lead Abatement Remediation Plan | 10 | EA | $0.00 | |
| 2003AD | (Line Item Reserved) | 10 | EA | $0.00 | |
| 4-MELROSE AIR FORCE RANGE | QUANTITY | UNITS | COST per UNIT | COST+OH+P | |
| 2004AA | MAFR Work Factor (Reference Solicitation Section L, Para. M.2.4.1.1) | % | |||
| Option Year 2 Total: |