Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc

DOC document 244 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4855-10-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 02 - Cannon AFB Standards Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 16 - Seed Project Statement of Objective.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Attachment 9 - UNC-13 Tech Data Sheet.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 26 - AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Attachment 3 - Cannon AFB Architectural Compatibility Plan for Draft Solicitation.pdf PDF
Attachment 37 - Past Performance Project Data.doc DOC document
Attachment 25 - AF Form 3064 Contract Progress Schedule.xls XLS spreadsheet
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 23 - Cannon AFB Bldg 206 Communications Inputs.pdf PDF
Attachment 12 - 27 SOW ETL02-12 and 27 SOCS COMM Standards.pdf PDF
Attachment 36 - Letter of Instruction to Reference for PPQ.doc DOC document
Attachment 11 - Cannon AFB Contractor Security Handbook March 2009.pdf PDF
Attachment 10 - Sound Curtains Hanging Options.pdf PDF
Attachment 8 - Unified Facilities Criteria.pdf PDF
Attachment 29 - Form 1477 Construction Inspection Record.pdf PDF
MACC Draft RFP.zip ZIP file
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

FA4855-10-R-0006
May 2010

BASE STANDARDIZATION

OF

BUILDING/UTILITY DISTRIBUTION SYSTEMS

FOR

CANNON AFB

May 2010

PREPARED BY: 27 SOCES/CEP

27TH SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON

506 N D.L. INGRAM BLVD.

CANNON AFB, NM 88103

INDEX

3A.

ARCHITECTURAL:

8B.

CIVIL/STRUCTURAL:

9C.

MECHANICAL (HVAC, PLUMBING/GAS & EMCS):

9HEATING, VENTILATION & AIR CONDITIONING (HVAC):

10PLUMBING/GAS:

12ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS):

12D.

ELECTRICAL (INTERIOR, LIGHTING & EXTERIOR):

12INTERIOR:

13LIGHTING:

14EXTERIOR:

15LIGHTNING PROTECTION:

15E.

FIRE PROTECTION:

1F.

ATTACHMENT I

1G.

ATTACHMENT II

H. ATTACHMENT III……………………………….………………………………………...1

27 SOCES Instruction 10-1

May 2010

DEPARTMENT OF THE AIR FORCE

27th Special Operations Civil Engineer Squadron Cannon AFB, New Mexico 88103 Civil Engineering-General

BASE STANDARDIZATION OF BUILDING/UTILITY DISTRIBUTION SYSTEMS

This policy letter establishes uniformity in the materials of building construction and utility distribution systems for Cannon AFB, NM.

(1) Responsibility: The Chief of the Programs Flight is assigned primary responsibility for implementing this policy letter on all Cannon AFB project designs and all applicable contract work. Normally, the base project manager will ensure that the standard building materials as stated in this regulation are used on Cannon AFB construction projects and that this information is incorporated in all Military Construction Project (MCP) and Architectural Engineering (A/E) and in-house designed projects. The Chief of Operations Flight must assure materials ordered and contract works executed by Operation & Maintenance (O&M) comply with this standardization policy.

(2) Procedures: The following items and policies shall provide for the standardization of building and utility construction materials on Cannon AFB. These items shall be in conjunction with the standardization of systems as defined by MIL HDBK 1190, Engineering Technical Letters (ETL's), and HQ AETC Construction Policies.

A. ARCHITECTURAL: (Refer to Attachment III for additional information)

(1) All architectural work shall comply with the latest edition of the International Building Code as described in UFC 1-200-01.

(2) All exterior architectural finishes shall be chosen to match/be compatible with the Base Architectural Compatibility Plan (ACP). All facility finishes shall be coordinated through the Base and AETC project managers. All office interiors/administrative spaces shall comply with the Cannon AFB Basewide Color Schemes. These approved color schemes are available for review at the Base Civil Engineer Office (Programs Flight Chief, 575-784-1307). Exterior Finishes: Brick and split-faced CMU are preferred to the greatest extent possible; stucco and External Insulating Finishing System (EFIS) are to be used only in special circumstances with the prior approval of the Base Civil Engineer Office (Programs Flight Chief). Face brick shall be modular in size. Face brick for additions and/or new facilities shall match the prevailing brick of facilities in the immediate vicinity and be in conformance with the recommendations of the Base Architectural Compatibility Guide. All face brick shall be sealed with a water repellant equal to, or better than the existing brick sealant/repellant currently used on Cannon AFB.

(3) All exterior signage shall be designed in accordance with AFSOC policies and UFC 3-120-01 (paint backside dark bronze), minimize free standing signs and use anodized aluminum lettering mounted on face of facility. All utility/transformer/dumpster enclosures/screening shall have dark bronze colored panels both outside/exposed side and inside/backside face. All roof appurtenances (vent stacks, exposed utilities, etc.) shall be painted to match the color of the roof.

(4) To the greatest extent possible asbestos-containing material (ACM) floor covering and mastic shall be removed prior to carpet installation. Carpeting and floor tile shall be chosen in accordance with guidelines set forth by current AFSOC policies (Carpet ETL dated 07-4) and/or the Cannon base wide color schemes where applicable. All carpet/flooring shall comply with Base Flooring Indefinite Delivery Indefinite Quantity (IDIQ) specifications and design drawings. Refer to the Tech Library for additional information.

(5) Interior and exterior design of facilities and the surrounding site shall incorporate features included in the latest edition of the Cannon AFB Architectural Compatibility Plan (ACP). The ACP is available at the Base Civil Engineer Office (Programs Flight Chief, 575-784-1307)

(6) ELECTRONIC CARD ACCESS LOCKING SYSTEM (ECALS): The Base standard lock system is ECALS, unless otherwise wavered. All ECALS shall be equal to, and software must be 100% compatible to and interface with the existing ECALS, BEST Corp. manufacturer equipment and software currently used on Cannon AFB.

(APPLICABLE ONLY IF ECALS HAS BEEN WAVERED)

(6.1) Locking: Lock cores shall be removable type keyed in sets or subsets as scheduled. Lock cores shall be seven (7) pin. Cores shall be pinned for an A-4 (.018 differential) type system. Lock cores shall be keyed to existing base master keying system in sets or subsets in accordance with the approved schedule. Locks shall be furnished with the manufacturer’s standard construction cores and key system. Permanent cores and keys including a typewritten key codes/biting schedule shall be sent by the lock manufacturer directly to Cannon Air Force Base by registered mail or other approved means. The addresses are as follows:

Base Projects

Military Construction Projects

27 SOCONS/B FLT

Base Civil Engineer Office Attn: Contracting Officer

Attn: Locksmith

110 East Sextant Ave.

506 N D.L. Ingram Blvd.

Cannon AFB, NM 88103

Cannon AFB, NM 88103 a.

Keys for the locks shall be stamped with change number and the inscription “U.S. Property – Do Not Duplicate”. Cannon uses an “R” (and “M” only for the commissary) type key way. Keys shall be supplied as follows:

Locks:

2 change keys each lock

Master Keyed Sets:

2 keys each set

Construction Keys:

6 total

Blank Keys:

1 per lock set provided b.

Keying Schedule: All keying schedules must be approved by the Base Locksmith. The base locksmith shall be contacted (address above) to secure existing key codes if necessary to successfully master key new work.

c.

Lock Sets and Latch Sets: Lock sets and latch sets shall meet ANSI/BHMA A156.2, series 4000, grade 1, bored type with levers. Lock sets and latch sets shall be capable of accepting “Best” removable cores.

(7) Exterior doors and frames shall consist of 18 gauge, galvanized, 1 ¾” thick, hollow metal doors with 16 gauge, galvanized, 2”x5 ¾” throat depth, hollow metal frames with a minimum of three hinges per door and door R value minimum 5.

(8) Interior openings requiring fire rated doors [i.e. Communication, Mechanical and/or Electrical Rooms] shall consist of 18 gauge, 1 ¾” thick hollow metal doors with 16 gauge, 2”x5 ¾” throat depth, hollow metal frames with three hinges per door, minimum.

(9) Interior Doors: Solid Core Wood doors [SCW] shall be 1 ¾” thick, solid core, 5-ply construction (fire-rated, as required); conform to NWWDA I.S.-1 [the one year acclimatization requirement shall not apply] and conform to WDMA TM-7, 8 & 10. Stiles shall be 1 3/8” hardwood, minimum [same species as face veneer] with no visible joints and rails shall be 1 1/8” solid wood, minimum. Cores shall be NWWDA I.S.-1 glued block with faces, stiles and rails bonded to the cores and suitable for transparent finish. Provide 5” wide solid blocking for hardware. SCW doors shall be AWI custom quality, rotary-cut, birch veneer, throughout; in accordance with NWWDA I.S.-1 [running match face veneers for doors shall consist of uniform effect of color and grain with no color/grain splotches-large or small]. All exposed rail and stile edges shall be sealed prior to shipment. Facing adhesive shall be Type II, water resistant in accordance with NWWDA I.S.-1. SCW doors shall be factory sealed with filled finish grain effect and satin semi-gloss sheen, and shall receive transparent ultraviolet cured catalyzed polyurethane natural field finish. All doors shall have a minimum of 3 hinges. Frames for solid-core wood doors shall be 16 gauge, 2”x5 ¾” throat depth, hollow metal frames.

(10) Where hollow metal doors are used, use 16 ga frame and 18 ga door as listed under Steel Door Institute SDI-100. Fire rated doors and frames shall bear the fire rated label. Hollow metal door frames shall be 2”x5 ¾” throat depth, to the greatest extent possible.

(11) Insulation: All ceiling insulation shall have a minimum overall value of R-30 and wall insulation a minimum overall value of R-19.

(12) Base: Rubber base shall be continuous roll, 1/8"x4” thick base. Vinyl base is not allowed under any circumstances.

(13) Aluminum store front doors shall be dark bronze anodized medium commercial grade with medium (min 3") stiles storefront. Storefront glazing shall be IAW paragraph (14) below. Provide chair rail height mulls at all aluminum storefronts. Public-access storefront doors and frames shall be anodized dark bronze aluminum with laminated thermal pane glazing.

(14) Windows shall be fixed-pane, blast-resistant. Glazing shall be fixed pane anodized bronze aluminum with laminated thermal pane. Provide the inclusion of fragment retention film for all new windows. Exterior glass pane shall be Type I annealed flat glass, Class 2-tinted, Quality q3-glazing select, color bronze with Low-E anti-reflective low-emissivity coating on the number 2 surface (interior surface of exterior pane). Interior glass pane shall be clear laminated glass consisting of two layers of Type I transparent float glass bonded together with 0.030-inch thick PVB interlayer under pressure. Class 1-clear Quality q3-glazing select.

(15) Architectural floor plan numbering of rooms shall match final room numbering sequence for the facility and all door and finish schedules. The designer/(A/E) are responsible for determining the final room numbering sequence. Room numbering shall be coordinated with the Base Civil Engineer Office (Programs Flight Chief).

(16) To achieve architectural compatibility throughout the base, designers shall use the, Cannon AFB ACP Base Color schemes, and the AFPAM 32-1097 as design guidelines. All design elements, interior and exterior, will strictly adhere to the Cannon AFB ACP; SID/CID presentation shall comply with Air Force Interior Design Guide: Chapter 12 Presentation Format [Ref: www.afcee.brooks.af.mil]. All color board submittals shall be organized in a 3 ring binder with an adequate product description and proposed facility location.

(17) Handicapped Accessibility: Facilities will accommodate the handicapped in accordance with the latest edition of the Uniform Federal Accessibility Standards, the American Disabilities Act and ANSI 117.1. No knobs will be allowed for door hardware, handles only.

(18) Suspended Ceilings: All suspended grid ceiling systems shall be as follows for the indicated locations: The suspended grid ceiling system for all wet areas shall be 2’x 2’ ceiling tile equal to Armstrong ½” Gridstone fire resistive, white, stipple finish and vinyl faced tile set in a suspension system equal to Armstrong AL Prelude Plus with 15/16” white tees. The suspended grid ceiling system for all other areas shall be 2’x2’ white ceiling tile equal to Armstrong ¾” Cirrus #577, fire resistive, tegular, beveled, tiles set in a suspension system equal to Armstrong Suprafine 9/16” white tees. Coordinate special sound transmission classification (STC) ratings with project manager for particular project.

(19) Gypsum Ceiling and/or Wall Finish shall be orange-peel textured, Semi-Gloss Latex paint.

(20) Painting shall conform to the standards contained in the Master Painters Institute (MPI) Architectural Painting Specification Manual, latest edition. Refer to www.paintinfo.com for more information painting standards.

(21) The use of organic adhesives is prohibited.

(22) Use cement backer board behind all ceramic tile on walls. Specify mildew resistant grout for all tile surfaces exposed to moisture. Marine grade sheetrock (Green Board) should be used on all wet walls where finish is not ceramic tile.

(23) Bathroom partitions shall be floor mounted, solid plastic, (High Density Polyethylene (HDPE) resins with homogenous color throughout.

(24) The use of particle board for any woodwork, millwork, or casework is prohibited. Underlayment for plastic laminate [i.e. counter tops, vanity tops, etc.] shall be either ¾” thick Medium Density Fiberboard or ¾” thick plywood, only. All other components for Millwork/Casework shall be ¾” thick plywood or hardwood, only. The Millwork/Casework standard shall be ANSI/KCMA A161.1 – Performance and Construction Standards for Kitchen and Vanity Cabinets.

(25) Landscape Irrigation: Lawn sprinkler piping and fittings shall be schedule 40 PVC. Use flexible PVC tubing from mains and laterals to all sprinkler heads or swing joints. Sprinkler heads shall be of the flow type; impact heads are prohibited. Lawn sprinkler systems shall be designed by a New Mexico Licensed Irrigator. Use the following sprinkler materials/products: for controller. Install resilient wedge valve ahead of backflow prevention to allow system isolation. Atmospheric Vacuum breaker shall be 6” above highest head. Pressure Vacuum Breaker for multi system shall be 12” above head. Reduce pressure zone (RPZ) backflow prevention devices are permitted for use. Valve boxes shall be installed 1”-2” above grade for easy location of valve box.

(26) Landscape Plants: Refer to Attachment I and Base Landscape IDIQ for list of acceptable landscape plants. Xeriscaping should be used to the greatest extent possible.

(27) Landscape Weed Barrier: All locations that require weed barrier shall be provided with two layers. Each layer shall have min. weight of 1.9oz per square yard.

(28) Roofing: All applicable new facilities shall employ Standing Seam Metal Roof Systems with a minimum slope of 3:12. BUR designs shall be standard 3-ply SBS, refer to Base Roofing IDIQ (specifications and design drawings) for additional information. All metal roofing shall smooth fascia panels and striate field panels to mitigate any oil canning effects.

B. CIVIL/STRUCTURAL: (Refer to Attachment III for additional information)

(1) All new and/or rehabbed paved surfaces shall include curbing IAW AETC policy. For all paving refer to Base Pavements IDIQ.

(2) Screened pads shall be provided for all Dumpsters, Transformers, Generators, and Switches. Provide a concrete approach apron at each location. Fence shall be tall enough to conceal equipment and be constructed of masonry for new buildings and bronze ribbed metal panels (both sides) with steel post and framing painted color currently used at Cannon AFB for renovation and all other projects. All exterior exposed (not behind a screen) conduit, gas lines, water lines, cable TV boxes, telephone boxes, gas regulators / meters, and exposed electrical panels / breaker boxes and conduit shall be painted to match the color currently used at Cannon AFB.

(3) All utility road and driveway crossings shall be bored and sleeved with single schedule 80 PVC or 1/4" wall steel sleeve. Roads and driveways shall not be crossed by open cut unless approved in advance and only under special circumstances.

(4) Mechanical thrust restrainers shall be used on all utilities that require thrust restraint, if concrete thrust blocks are used in conjunction with mechanical restrainers the joint shall be first covered in plastic before pouring of the thrust block. All components of the restrainers, including the gland, bolts, and restraint segments shall be high strength ductile iron, ASTM A536, Grade 65-45-12. Restraining devices shall be UL listed/FM approved on AWWA C 900 PVC pipe and complies with ASTM F 1674. Restraining ring segments shall be actuated by bolts featuring twist off heads to ensure proper installation torque is applied.

(5) Minimum utility line burial depths shall be as follows:

a. gas mains/service lines

24 inches

b. electrical*

30 inches

c. water lines

36 inches

d. communications

36 inches (in conduit)

(cable TV/telephone in conduit) 24 inches and 30 inches for areas requiring vehicle loading

*Note: All electric utilities shall be in conduit, encased in concrete and shall have metallic strip caution tape installed per NEC. Concrete over primary ducts shall also have red markings.

(6) Sidewalks crossing roads shall have handicap ramps and crosswalks that comply with the American Disability Act (ADA). New handicap ramps shall be installed to the greatest extent possible.

(7) Troopwalk: A unique architectural feature of Cannon is the troopwalk, which traverses the base. Since many of the students do not have auto transportation, this network of walks aids in getting from place to place on-foot and also assists in marching/training exercises. Exposed aggregate shall be washed and graded natural river rock 3/8in to 3/4in round (color TBD) and pavers (color TBD).

(8) All petroleum storage tanks shall be rated Aboveground Storage Tanks (AST) and installed in an approved concrete vault.

(9) All structural design work shall comply with the latest edition of the International Building Code as described in UFC 1-200-01.

(10) Poles for all pole mounted signage shall be painted to match the currently used color on Cannon. The back of all signs shall be coated.

(11) Removable bollards shall be painted to match the specifications of the Cannon AFB ACP.

MECHANICAL (HVAC, PLUMBING/GAS & EMCS): (Refer to Attachment III for additional information)

HEATING, VENTILATION & AIR CONDITIONING (HVAC):

(1) All mechanical work shall comply with the latest edition of the International Mechanical Code as described in UFC 1-200-01.

(2) Chilled water and dual temperature water piping 4” and less shall be rigid copper type K or L. Attachment II, Table II lists where to use Type K and L pipe and fitting materials. Type K pipe and fittings shall be used underground and type L shall be used in above ground applications.

(3) All underground chilled/hot water piping shall be factory pre-insulated piping.

(4) Hot and chilled water pumps less than 8 hp shall be of the in-line or end suction close-coupled type and shall be of brass construction.

(5) Chilled water systems shall use air cooled chillers for total cooling plant cooling loads of 350 tons or less and for loads greater than 350 tons multiple air cooled chillers shall be used. Central Mechanical plants shall be with multiple boilers and chillers IAW Cannon AFB’s Master Heating/Cooling Plant Zones.

(6) All air-cooled condensing coils shall be protected from hail by appropriate screens. Screens shall be by the manufacturer of the equipment protected.

(7) All diffusers and registers in humid areas (i.e. bathrooms) shall be constructed of aluminum. Special precautions shall be taken (make-up air, etc.) in providing adequate ventilation. Refer to ETL 03-2.

(8) All outside air control dampers shall be of the low leakage type rated at 5 CFM maximum leakage at 4 inches water gauge static pressure when closed.

(9) All duct work shall be aluminum, stainless steel, or galvanized sheet metal. Duct board shall not be used. Internally lined/insulated duct shall not be used. Flex duct shall not be used for runs greater than 6’-6 ¾ in.

(10) To the greatest extent possible include energy recovery systems during the design phase of all building renovations and new construction.

(11) All exterior mechanical equipment shall be screened from view. Screen type shall be as directed by Cannon AFB ACP. Mechanical equipment that cannot be screened from view such as wall mounted exhaust fans and louvers shall be painted to match the color currently used at Cannon AFB. Use of roof top mechanical equipment is prohibited.

(12) Refer to Base CADD detail for typical chemical feeder. [Do we have this??]

(13) All commercial refrigeration, comfort cooling equipment and appliances (any capacity) shall use non ozone depleting refrigerants such as R-134A and R-410A. There shall be no ozone depleting refrigerant allowed.

(14) For all large HVAC systems, isolation valves shall be provided to facilitate ease of maintenance without the shutdown of the entire system.

C. PLUMBING/GAS: (Refer to Attachment III for additional information)

(15) All plumbing work shall comply with the latest edition of the Uniform Plumbing Code (UPC) as described in AFI 32-1066. Install proper backflow prevention on all service lines per UPC. Ensure that backflow prevention devices are in concrete vaults or otherwise aboveground, and are testable.

(16) Pipe and fitting materials for drainage, waste, and vent (DWV) piping and interior rainwater conductor (interior roof drains) systems shall be schedule 40 PVC. Use cast iron pipe for firewall penetrations.

(17) Pipe and fitting materials for pressure piping systems inside the building to a point 5 ft outside the building: As listed in Attachment II.

(18) No pipe, fitting, or solder shall contain lead.

(19) Water heaters/recirculating potable water boilers with tanks shall be natural gas type, and shall be State or equal, with high recovery. Hot water temperature at lavatories shall not exceed 120°F.

(20) Refer to the Cannon AFB Dormitory Domestic Hot Water Heating Study for information on existing dormitory hot water systems and required engineering methodology for calculating hot water requirements to preclude underestimating demand requirements.

(21) Bath shower fixtures shall include bathtub spout, shower head, valves, and diverters. Shower heads mounting shall be via a ball joint mount. All shower drain rough-ins shall be at finished concrete floor height. A water proof membrane with smooth concrete substrate, PVC shower pan liner, shall be applied to the shower pan and turned up a minimum of 12 inches. Refer to Cannon’s Existing Equipment/Material attachment for product information.

(22) Water service lines 3 inches in diameter and less shall be copper or PVC schedule 80.

(23) All new water meters shall read in gallons and have a pulse initiator for interface with the base Energy Monitoring Control System (EMCS).

(24) Water-free urinals, low flow water closets shall be used to the greatest extent possible.

(25) All metallic valves and fittings shall be provided with a 32 pound magnesium sacrificial anode connected by an exothermic weld through a No. 12 AWG copper wire. All valves in water mains 2” or larger shall be resilient wedge type.

(26) Exterior underground water distribution or service piping 4 inches through 12 inches shall be PVC elastrometric gasket joint type with a DR of 14, pressure class 200, and conform to AWWA C-900. Piping greater than 12 inches shall be PVC in conformance with AWWA C-905 or concrete encased steel in conformance with AWWA 300, 301, or 303 rated at 150 psi. Where required to connect the east and west base water systems an automatic control valve, to match existing on site, shall be installed in a concrete vault with all applicable EMCS controls and wires.

(27) Underground gas piping shall be polyethylene, SDR-11, with all welded joints meeting ASTM D3350 and ASTM 2513 with pipe designation 2306, 2406, or 3406. Socket fusion fittings shall comply with ASTM D2683.

(28) Interior and above grade gas piping shall be black steel with malleable iron or steel fittings in conformance with ANSI B16.3 and ANSI B16.11, respectively.

(29) Gas service: gas service, valves, and meters shall be installed in compliance with local utility company requirements. All gas piping shall be polyethylene SDR-11 for the external part of the building, including isolation valves, (2” nut on main valve or slots on service) with anodeless type risers. Refer to Base CADD detail for typical gas meter installation.

D. ENERGY MANAGEMENT CONTROL SYSTEMS (EMCS): (Refer to Attachment III for additional information)

(30) Direct Digital Control (DDC) shall be a complete system suitable for the heating, ventilating, and air conditioning (HVAC). DDC shall be 100% fully compatible/integrated with the existing base wide front-end EMCS currently used on Cannon AFB.

(31) Microprocessor controls on VAV boxes shall be fully 100% compatible with the Base EMCS vendor of the existing central system.

(32) Fiber optic transmission lines shall be used for base wide transmission of EMCS data, unless otherwise directed. New fiber optic lines shall be tied into the existing system with a fiber optic to copper interface.

E. ELECTRICAL (INTERIOR, LIGHTING & EXTERIOR):

INTERIOR: (Refer to Attachment III for additional information)

(1) All electrical work shall comply with the latest edition of the National Electric Code.

(2) Cables: Conductors in cables shall be of copper only. Conductors #12 AWG and larger shall be stranded. Minimum acceptable size for power cables shall be #12 AWG.

(3) Interior Wiring Conduit: No rigid nonmetallic conduit or electrical nonmetallic tubing shall be allowed. Aluminum conduit shall not be embedded in concrete or masonry, buried in earth, or used to penetrate firewalls. If conduit runs penetrate firewalls, steel conduit shall be used a minimum of three feet on each side. Metal-clad (type MC) cable is not acceptable and shall be so stated in the specifications under “wiring methods”. Aluminum conduit shall be used for all 400 Hz applications. No exposed conduit or piping shall be permitted on exterior of building surface. Exterior disconnect switches shall be a maximum of 42” above grade. Set-screw connectors and couplings shall not be used.

(4) 4” X 4” normal size and smaller cast-metal hub type boxes shall not be used when flush mounted on outside of exterior surfaces.

(5) No equipment grounding conductor shall be installed in empty or low voltage conduits.

(6) Communication Systems: All new facilities shall be tied into the base wide communications manhole/duct system with a minimum of 4-4” PVC conduits from mechanical/telephone room. All communication work shall be in accordance with Engineering Technical Letter (ETL) 02-12: Communications and Information System Criteria for Air Force Facilities, Air Force Systems Security Instruction 7703 (AFSSI 703) 26 August 2008, Air Force Special Operations Command Instruction 33-105 (AFSOCI 33-105) 12 November 2009, and AFSOCI 33-105 SUP for AFSOC Communications Specifications for Facility Construction and Alterations.

(7) Low Voltage Dry Type Distribution Transformers: All new low voltage dry type distribution transformers 15 KVA and larger shall comply with NEMA TP-1 2002 standards for energy efficiency.

LIGHTING:

(8) Exit lights: All EXIT lights shall be of the high intensity L.E.D. type with the following standard features: die cast aluminum housing, canopy and faceplate with black powder coated finish; dual voltage (120/277V); polymeric diffuser; white face with 6” red high letters; single face of double face and directional arrows as required; 3 watts maximum (for either single or double face version). The emergency features shall include: maintenance-free nickel cadmium battery; automatic low-voltage disconnect; reverse polarity and short-circuit protection; AC indicator light; push-to-test switch; constant current charger. The nickel cadmium battery shall carry a minimum of a 5-year full warranty. Exterior EXIT lights shall be vandal resistant.

(9) Fluorescent Lamps: All 4’, T8 with matching rapid start electronic ballasts, rapid start fluorescent lamps, 32 watt. Also, compact fluorescents lights shall be given consideration as well for use in hallway lighting. Fluorescent lamps shall be low mercury content.

(10) Fluorescent Fixtures: Lighting for general office areas, classrooms, corridors, conference rooms, and lobbies shall be provided by 2’ x 4’ recessed fluorescent fixtures incorporating an aluminum parabolic louver with 27 cell, low iridescent, specular silver, parabolic louver.

(11) Emergency Lighting: Emergency lighting must be provided IAW the latest Edition NFPA 101. Normally, emergency lighting is required only for designated stairs, aisles, corridors, ramps, escalator, and passageways leading to an exit. Unit equipment must be circuited to comply with NEC. Do not use fixtures with wall-mounted battery packs.

Lighting Levels: General illuminations levels shall not exceed the intensities shown in Mil-Hdbk 1190, Chapter 9, Table 9-1 through 9-4 and Illuminating Engineering Society of North America (IESNA) Handbook. Design of rooms (particularly areas with fluorescent troffer lighting) shall include evaluation of multi-level switching to provide user-adjustable levels of lighting, as well as dimming and work area lighting. Design Analysis shall address all options considered to minimize energy consumption while providing effective lighting, and document the reasons for choices made. Multi-level switching, using multiple ballasts and separately switched circuits to provide adjustable levels of lighting, is the minimum standard for all facilities. An example is having one tube on a ballast and two tubes on another ballast in a 2’x 4’ troffer, so either one, two or all three bulbs in a 3-bulb system can be selected. Another design tool, is to provide additional switches to sectionalize the room in addition to level control. Other design considerations include task lighting, strategically placed down lights, dimmers, photoelectric controls, occupancy sensors, LED, solar lighting and day-lighting design, all of which give users flexible control of their workspace lighting and save money.

EXTERIOR:

(12) Medium Voltage Cable: Medium voltage cables shall be copper, 15KV, XLP 133% insulation, concentric neutral with PVC jacket (#2 minimum size). No cable installation plan shall be included in the specifications.

(13) Medium Voltage cable terminations and splices shall be of the preformed type only, tape type are not acceptable.

(14) Lighting Poles shall be 30’ anodized bronze aluminum with shoe box fixture to match existing base standard. Troopwalk/sidewalk lighting shall be accomplished using High Pressure Sodium (HPS) luminaries not to exceed 70 watts. Bollard fixtures shall not be used unless specifically so stated in project definition. Area lighting (where required) shall be accomplished using HPS luminaries not to exceed 150 watt on 30’ (typically) anodized bronze tubular aluminum poles. High mast lighting shall be considered for large square parking lots.

(15) Transformers: New building service transformer shall be pad mounted served by an underground concrete encased duct bank. Transformer fusing shall be current limiting fuses combined with load sensing Bay-O-Net fuses. Transformers shall be provided with a no-load tap changer with two 2-1/2% above and 2-1/2% below rated voltage taps. The high-voltage compartment shall be a dead-front construction with load break switching. All transformers shall be feed-through unless otherwise approved. Switches shall be mounted inside the transformer tank with switch operating handles located in the high voltage compartment and equipped with metal loops for hook stick operation. Adjacent to switches, nameplates shall identify switch operating handles and “ON” and “OFF” positions.

(16) All pad-mounted transformers shall be screened from view. Screen type shall adhere to the Cannon AFB ACP. For additional information on screens refer to page 6, para B (2). All transformers shall have main breakers to buildings.

(17) Manholes: All electrical concrete manholes, handholes and pull boxes shall be of the precast type and shall be designed for adequate drainage and waterproofing. The use of load junctions and separable splices shall not be permitted. Terminations shall be made above ground.

(18) Aerial to Underground Medium Voltage Connections shall be made in accordance with Air Force Joint Manual (AFJMAN) 32-1080. Pole risers shall be intermediate metal conduit in conformance with National Electrical Code.

(19) Metering: All electrical shall be metered utilizing EPACT 2005 meters. All meters shall contain a separate indicator for measuring maximum kilowatt demand and pulse initiator. Pulse I initiators shall be solid state and factory installed. Meters shall be installed with shorting blocks or test switches to allow removal of the meter. Meters shall be compatible and able to communicate with the Base EMCS system.

(20) All secondary and primary service shall be in PVC ducts using type URD cable with concentric neutral compatible with base system. All duct banks containing voltage over 50 volts shall be concrete encased.

(21) All lighting by exterior doors shall have photo cells.

LIGHTNING PROTECTION:

(22) Lightning protection should be considered on all new facilities. Rods are preferred on all facilities that are not in remote locations on the base. Where rods are not applicable or allowed trapeze systems will be considered.

F. FIRE PROTECTION: (Refer to Attachment III for additional information)

(1) Facility construction shall be in accordance with UFC 3-600-01, Fire Protection Engineering for Facilities, NFPA 101, and all applicable National Fire Codes. Emergency lighting shall be in accordance with NFPA 70.

(2) Fire department vehicles must have unimpeded access to the building for emergency response, IAW UFC 3-600-01.

(3) Fire alarms shall be audible and/or audiovisual installed in accordance with NFPA 72. Manual fire alarm pull stations will be of the brushed metal type. Fire alarm conduit shall be ½” minimum diameter. The narrowband FACP shall locally define the detector and shall uniquely notify the Base Fire Department by building. UFC 3-600-01 and NFPA will be strictly adhered to this design of the fire alarm system. Refer to attachment III for additional information on FACP.

(4) Each floor of multi-story buildings shall be zoned separately for fire alarms and sprinkler systems.

(5) Fire extinguisher cabinets shall be recessed and installed in accordance with NFPA-10. Fire Extinguishers and cabinets will be contractor provided. Fire extinguishers will be 10 pound, 4A: 60B: C rechargeable.

(6) All fire hydrants shall be painted to match the color scheme currently used in the Cannon AFB ACP. The top cap painted IAW NFPA 291 marking and color standards for the rated capacity at the time of installation.

(7) Double check or reduced pressure type backflow protection shall be installed as part of the fire protection system. Post Indicator Valves (PIV) shall be installed with an electronic tamper proof switch, physical locks, and a permanently attached 6”x4” brown sign with white text identifying the building or buildings served. OS & Y valves shall have a dual tamper switch located on valves. The (PIV) shall be painted to match the color currently used on Cannon AFB.

(8) Fire protection piping under buildings shall be ductile iron to a point 5 ft outside the building. Ductile iron fire protection risers and fire hydrant hubs shall be provided with a sacrificial anode to conform to UFC 3-570-06 and MIL HDBK 1136.

(9) Sprinkler Heads: Semi-recessed or fully recessed sprinkler heads shall be used to the greatest extent possible. All sprinkler conduit shall be black steel pipe IAW NFPA 13.

(10) Heat Detectors: Automatic heat detectors shall be fixed temperature rated at 135 degrees Fahrenheit (58 Celsius) for areas where ambient temperatures do not exceed 100 degrees (37.7 Celsius), and 200 degrees (93.33 Celsius) for areas where the temperature does not exceed 150 degrees (65.5 Celsius) (Chemetronics 603 or equal). Automatic heat detectors shall be a low profile, ceiling mount type with positive indication of activation. Heat detectors shall be addressable. Intelligent thermal detectors shall be devices rated at 135 degrees Fahrenheit (58 degrees Celsius) (Notifier FST-851 or equal). It shall connect via two wires to the fire alarm control panel signaling line circuit.

3 Attachments:

1. Landscape Plants List

2. Pipe and Fitting Materials for Pressure Piping Systems

3. Cannon’s Existing Equipment/Material

ATTACHMENT I

Table I – Landscape Plants List: The following plants are the “approved” list for use at Cannon AFB. This list is from the base Integrated Natural Resource Plan.

TREES

Afghan Pine
Bald Cypress
Bur Oak
Cedar Elm
Chinquapin Oak
Desert Willow
Goldenball Lead Tree
Golden Raintree
Italian Cypress
Live Oak
Pecan
Pinion Pine (Mexican)
Texas Ash
Texas Red Oak
Texas Redbud

Winged Elm

Regular Shrubs up to 4’ tall, Evergreen (retainS leaves in winter)

Burford Holly
Hawthorn
Japanese Boxwood
Mint Junipers
Nandina
Yaupon Holly (Dwarf)

Regular Shrubs up to 4’ tall, deciduous (loses leaves in winter)

Cassia
Flame Acanthus
Lantana
Mealy Blue Sage
Texas Sage
Yellow Bells

Large Shrubs or small trees up to 12’ tall, Evergreen

Glossy Privet
Texas Mountain Laurel
Yaupon Holly

Large Shrubs or small trees up to 12’ tall, deciduous

Buckeye
Crepe Myrtle (No Dwarf)
Red Tip Photinia

BOARDERS, GROUNDCOVERS, & TURF

Annual Rye Grass
Asiatic Jasmine
Buffalo Grass
Burmuda Grass
Lirope
Mondo Grass
St. Augustine Grass
Trailing (carpet) Junipers
Vinca

CACTUSES

Blue Sotol
Green Sotol
Octallia (Devils walking stick)
Prickly Pear (thornless)
Red Yucca
Yucca

Landscape Notes:

1. The use of ground cover plants shall not be a substitute for turf. Proper lawn maintenance requires weed control to promote a healthy turf.

2. Currently, vines are not used extensively in base landscaping.

ATTACHMENT II

Table II - Pipe and Fitting Materials for Pressure Piping Systems

SERVICE

Item No Pipe and Fittings Materials

A B C D

1.

Steel Pipe Seamless, Black

X

Seamless copper water tube, ASTM B 88 X** X** X** X**

Seamless and welded copper distribution tube (Type D) ASTM B641

4.

Wrought copper and bronze

Solder-joint pressure fittings, ANSI B16.22

Cast copper alloy solder-joint pressure fittings, ANSI B16.18

Unions: brass or bronze, Fed. Spec. WW-U-516

Nipples, pipe threaded

Fed Spec WW-N-351

A - Cold Water Aboveground, 6" or less

B - Hot Water 180 F Maximum Aboveground, 6" or less

C - Compressed Air Non-oil-Free

D - Water Service Belowground

Indicated types are minimum wall thickness

**- Type L – Hard Table II – Pipe and Fitting material for Drainage, Waste, and Vent Piping Systems

SERVICE

Item No. Pipe and Fitting Materials A B C D E

1 Cast iron soil pipe and fittings X X X X X hub and spigot, ASTM A74 with compression gaskets

2 Cast iron soil pipe and fittings X X hubless, CISPI 301

3 Cast copper alloy solder joint X X pressure fittings, ANSI B16.18

4 Seamless copper pipe, ASTM B42 X X

5 Cast Bronze Threaded Fittings X X

6 Copper Drainage Tube, (DWV) X X X

ASTM B 306

7 Wrought copper and wrought copper X X X

Alloy solder-joint drainage

Fittings. ANSI B16.29

8 Cast copper alloy solder joint X X X drainage fittings, DWV, ANSI B16.23

9 Cast bronze threaded fittings X X

10 PVC (Schedule 40) X X

A - Underground Building Soil, Waste and Storm Drain

B - Aboveground Soil, Waste, Drain In Buildings

C - Underground Vent

D - Aboveground Vent

E - Interior Rainwater Conductors Aboveground

ATTACHMENT III

CANNON’S EXISTING MATERIAL/EQUIPMENT

PRODUCT
MANUFACTURE
SPECIFICATION
1. Prime-A-Pell 200 brick sealant/repellant
ChemProbe Coating Systems
VOLATILE ORGANIC 6.1 lbs/gal

ACTIVE INGREDIENT Oligomeric Alkylalkoxy Siloxane/Diffused Quartz Carbide

ACTIVE CONTENT 7%

FLASH POINT - SETA 102°F (39°C)

SOLUBILITY IN WATER None APPEARANCE Clear liquid

2. Door ECALS, Card reader and other ECALS electrical equipment

3. Aluminum Storefront

Best “B.A.S.I.S. G series” Kawneer, Corp.

Best cylindrical 9K Series 93KG7DV15MS-S3-626-EXBB

Best BASD-MSE Mag-stripe encoder

Best BASD-CAB Programming cable

Best BAS-SES-G Software

Best BASD-PDA Transport device including cable for personal computer connection.

ANSI A156.2, Series 4000, Grade 1 Mortise lock case, meeting or exceeding ANSI A156.13, Series 1000 Cannon existing master key system is by “Best”.

Kawneer 350 medium duty door, Tri-Fab 451 storefront system (1 ¾” x 4 ½”)

4. Windows

EFCO, Corp.
EFCO 5600 System, fixed-pane, blast-resistant

5. Suspended Ceilings

Armstrong, Corp.
Wet Areas: 2’ x 2’, Armstrong Gridstone fire resistive, white, stipple finish and vinyl faced tile set with Armstrong AL Prelude Plus 15/16” white ceiling tile suspension system.

All other areas: Armstrong ¾” Cirrus #577, fire resistive, tegular, beveled, tiles set in a suspension system equal to Armstrong Suprafine 9/16” white tees

6. Cement backer board

US Gypsum
1/2” Dura-Rock

7. Bathroom Stall Partitions

Santana
Toilet enclosures shall conform to CID A-A-60003, Type I, Style C, overhead braced. Panels shall be solid polyethylene, Finish 5.

8. Landscape Irrigation equipment

Rain Dial; for fix spray, use Toro; for gears, use Nelson or Rain Bird; Controllers: Toro and Rain Bird
Capable of covering 10 feet radius at 25 psi with a discharge rate of 2 gpm. Sprinkler body, nozzle, and screen constructed of heavy-duty, ultra-violet resistant plastic with wiper seal.

Brass nozzle with matched precipitation rate and an adjustable screw capable of regulating the radius and flow.

Controller, NEMA ICS 2 with 120-volt single phase service, operating with indicated station, and grounded chassis. Provide enclosure NEMA ICS 6 Type 3R], with locking hinge cover, wall mounted.

9. Landscape Weed Barrier

ACF West Geo-Synthetic Products
PolySpun 350: Resist degradation due to ultraviolet exposure and resistant to commonly encountered soil chemicals, mildew and insects, and is non-biodegradable.

10. Standing Seam Metal Roof Systems

AEP Roofing, Corp. (for retrofits flat to sloped)

Berridge (New roofs)

5-year Warranty for Non-Structural Metal Roofing System, 20-year Manufacturer's Material (finish and rust) and Weathertightness Warranty. Zinc-coated steel conforming to ASTM A 653/A 653M; aluminum-zinc alloy coated steel conforming to ASTM A 792/A 792M, AZ 55 coating; or aluminum-coated steel conforming to ASTM A 463/A 463M, Type 2, coating designation T2 65.

UL 580, Class 90 tested roof system Seams 16” OC with 24 gage material minimum panel thickness

Color: medium bronze to match color currently used on Cannon AFB.

11. Exterior Paint (for back of street signs, removable bollards, dumpster screens, transformer screens, mechanical equipment, fire hydrants, PIV, roof VTR’s and all other site appurtenances.

Sherwin-Williams, Corp.
New Slate Bronze, Sherwin-Williams #

12. Troopwalk: Brick Pavers with exposed aggregate

Acme Brick, Corp.
Acme (Eureka) #260 solid modular brick pavers with minimum 1800psi compressive strength, ASTM C270. Aggregate (Exposed Aggregate Finish): Washed and graded Colorado river natural gravel. Gravel gradation shall be min. one-eight inch (3/8”) to max. one-half inch (1/2”).
13. Sidewalks
Propex Concrete Systems
Synthetic Fibermesh Reinforcement: Synthetic fibers shall conform to ASTM C1116, Type III, Synthetic Fiber, and as follows. Fibers shall be 100% virgin polypropylene fibrillated fibers containing no reprocessed olefin materials. Fibers shall have a specific gravity of 0.9, a minimum tensile strength of 70 ksi graded per manufacturer, and specifically manufactured to an optimum gradation for use as concrete secondary reinforcement.

14. Street Bollards

Wausau Tile, Corp.
Model T6010 reinforced concrete, 12” diameter x 30” height, color A-1-Exposed Aggregate [Tan Exposed]

15. Chillers

Trane or Carrier, Corp.
Air cooled and water cooled

10 year parts and labor (includes refrigerant) compressor(s) manufacturer's warranty. Must have storage capacity within the pipe loop.

The control system shall be capable of being reprogrammed directly at the unit. The control system shall be capable of communicating all data to a remote integrated DDC processor through a single shielded cable. ASHRAE 15 Safety Code for Mechanical Refrigeration

ASHRAE 34

Number Designation and Safety Classification of Refrigerants

ASHRAE 64

Methods of Testing Remote Mechanical-Draft Evaporative Refrigerant Condensers

16. Condensing Units

Carrier, Trane or Arco
High Efficiency SEER 14

ARI 210/240

Unitary Air-Conditioning and Air-Source Heat Pump Equipment

ARI 410 Forced-Circulation Air-Cooling and Air-Heating Coils

ARI 460 Remote Mechanical-Draft Air-Cooled Refrigerant Condensers

ARI 495 Refrigerant Liquid Receivers

17. Air Handlers/ Furnaces

Carrier, Trane or Arco
High Efficiency SEER 14

IAW ARI 430

The sound power level values shall be obtained according to AMCA 300 or ASHRAE 68.

18. Boilers

Ajax, Teledyne-Laars or Raypak
High Efficiency Gas-Fired

IAW ASME BPVC SEC IV

19. Package units

Carrier, Trane or Arco

High Efficiency SEER 14

20. Pumps

Peerless or Wienman
Domestic hot water circulating pumps shall be electrically driven, single-stage, centrifugal, with mechanical seals, suitable for the intended service. Pump and motor shall be integrally mounted on a cast-iron or steel subbase, close-coupled with an overhung impeller. The shaft shall be one-piece, heat-treated, corrosion-resisting steel with impeller and smooth-surfaced housing of bronze. Motor shall be totally enclosed, fan-cooled and shall have sufficient horsepower for the service required. Pump shall conform to HI 1.1-1.5. Each pump motor shall be equipped with an across-the-line magnetic controller in a NEMA 250, Type 1 enclosure with "START-STOP" switch in cover. Pump motors smaller than fractional horsepower pump motors shall have an integral thermal overload protection

21. Bathroom Shower Heads and Shower Pan Liners

Leonard Valve Company

Oatey Leonard H-07 Shower heads, CID A-A-240 other than emergency showers, shall include a non-removable, tamperproof device to limit water flow to 1.5 gpm when tested in accordance with ASME A112.18.1M.

Oatey PVC Shower Pan Liner, Vendor Part # 41597 as a waterproof membrane at the bottom of the shower. Must go up shower wall at least 12” above bottom of shower.

22. Plumbing Sinks Kohler cast iron/enameled

Kohler
Enameled cast iron ASME A112.19.1M countertop, oval with built-in overflow.

23. All plumbing faucets

American Standard or Delta Faucet (low flow)
Faucets shall have replaceable seats and washers. Valves and handles shall be copper alloy. Connection between valve and spout for center-set faucet shall be of rigid metal tubing. Flow shall be limited to 0.5 gpm at a flowing water pressure of 80 psi.

Diverter shall be integral with single mixing valves and all parts shall be completely front replaceable as Delta T13220-DPE with Delta R10000-UNWS valve.

24. Water-free urinals

Sloan WES-1000 ,vitreous china fixtures
Touch-free operation

• Uses no water

• Patented, Sealed Locking Cartridge

• Smooth, non-porous surfaces

• Reduced water and sewer costs

• Water supply piping not required

• Odor-free

• Vandal resistant

• Reduced size makes for easy cleaning

• One-piece wall bracket with anchors included [Wall hanging urinal shall be in accordance with IAPMO Z124.9 and be a waterless, non-flushing type, with replaceable trap insert having circular outer rim opening for flow. The replaceable trap insert shall contain a low specific gravity immiscible barrier liquid. The liquid shall be biodegradable. The urinal shall not require chair carrier. The urinal and trap assembly shall maintain a sufficient barrier of immiscible liquid necessary to inhibit backflow of sewer gases.

25.Water Closets

American Standard or Kohler
Siphon-jet, elongated bowl, top supply spud, ASME A112.19.2M, floor mounted. Floor flange shall be copper alloy, cast iron, or plastic.

Gasket shall be wax type.

Seat - IAPMO Z124.5, Type A, white plastic, elongated, open front.

Flush Tank - An adequate quantity of water shall be provided to flush and clean the fixture served. The water supply to flush tanks equipped for manual flushing shall be controlled by a float valve or other automatic device designed to refill the tank after each discharge, and to completely shut off the water flow to the tank when the tank is filled to operational capacity. Water closets having their flush valve seat located below the flood level rim of the closet bowl shall have a float valve installed within a sheath or in a separate and isolated compartment of the tank, both to have visible discharge onto the floor in case of failure. Provision shall be made to automatically supply water to the fixture so as to refill the trap seal after each flushing. The water supply to flush tanks equipped for automatic flushing shall be controlled by a suitable timing device. Float valve shall meet ASSE 1002. Water closet shall be equal to American Standard 2174.139, Standard height, tank type, elongated bowl (low consumption 1.6 gallon).

26. Energy Monitoring Control System (EMCS)Fire Alarm Control Panels (narrow band)

Automated Logic Corporation, Marietta, Georgia

The direct digital control (DDC) shall be a complete system suitable for the heating, ventilating and air conditioning (HVAC) system. This direct digital (DDC) control system shall be fully 100% compatible with the existing base wide front-end Energy Monitoring and Control System (EMCS) currently installed on Cannon. The existing EMCS system is not BACnet compatible. The DDC panels shall be equipped with software drivers and handlers which allow for communication with an existing base-wide EMCS. The software drivers shall allow for communications via the existing energy management EMNET communication network. The software shall be structured to support this existing communication network with star, ring, radial, or a combination of topologies as required. Each communication program module shall be functionally independent to allow for future upgrade or replacement of communication modules without affecting other application programs and other software modules. Communication protocol for communication shall conform to a standard communication protocol.

27. Fire Alarm Control Panels
Monaco Enterprises
Monaco M-2 integrated narrowband control panel and transceiver.

The Control Panel shall be integrated; addressable Fire Alarm Control/Transceiver panel Monaco M-2 functioning as an extension of the base central fire alarm system: Monaco D21 Supervising Station Receiving Equipment. Control Panel shall comply with these specifications and the applicable requirements of UL 864.