Attachment 16 - Seed Project Statement of Objective Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc DOC document
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Attachment 9 - UNC-13 Tech Data Sheet.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 26 - AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Attachment 3 - Cannon AFB Architectural Compatibility Plan for Draft Solicitation.pdf PDF
Attachment 37 - Past Performance Project Data.doc DOC document
Attachment 25 - AF Form 3064 Contract Progress Schedule.xls XLS spreadsheet
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 23 - Cannon AFB Bldg 206 Communications Inputs.pdf PDF
Attachment 12 - 27 SOW ETL02-12 and 27 SOCS COMM Standards.pdf PDF
Attachment 36 - Letter of Instruction to Reference for PPQ.doc DOC document
Attachment 11 - Cannon AFB Contractor Security Handbook March 2009.pdf PDF
Attachment 10 - Sound Curtains Hanging Options.pdf PDF
Attachment 8 - Unified Facilities Criteria.pdf PDF
Attachment 29 - Form 1477 Construction Inspection Record.pdf PDF
MACC Draft RFP.zip ZIP file
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 16 FA4855-10-R-0006 13 April 2010

STATEMENT OF OBJECTIVE

REPAIR B206

PROJECT No. CZQZ09-0013

CANNON AFB NM

13 April 2010

1. DESCRIPTION OF WORK:

1.1. The following is a description of the work required for Project No. CZQZ09-0013; Repair B206. The Request for Proposal (RFP) requires all procurement, installation and construction relating to the repair/renovation of B206, at Cannon Air Force Base, New Mexico. Furnishing of all personnel, equipment, tools, materials, services and supervision to provide a complete and usable end product to the government. The work for the project will include, but not limited to the following tasks:

1.1.1. Construction

1.1.1.1. OVERALL BUILDING

1.1.1.1.1. Construction to be phased due to building occupancy. Government recommends construction of Area 1 first. Then Area 2 to include restrooms and break rooms in that area. Lastly, Area 3.

1.1.1.1.2. Asbestos abatement of B206.

1.1.1.1.3. Lead based paint abatement of B206.

1.1.1.1.4. Demo existing modular offices located through the facility.

1.1.1.1.5. Carpet all office areas per Engineering Technical Letter 07-4: Air Force Carpet Standard.

1.1.1.1.6. Re-tile all existing bathrooms and break rooms with ceramic tile.

1.1.1.1.7. Re-paint all walls of B206.

1.1.1.1.8. Re-surface and re-seal concrete floors in the entire facility.

1.1.1.1.9. Replace entire roof on facility with a standing seam metal roof.

1.1.1.1.10. Replace all ceiling tiles.

1.1.1.1.11. Ensure new construction meets fire codes.

1.1.1.1.12. Upgrade existing EMCS system, must be compatible with the Cannon AFB Allerton system.

1.1.1.1.13. Design/Construct a support system for hanging curtains. Curtains weigh approximately 90 pounds per section and will hang as shown on the attached floor plan. (see Attachment 19).

1.1.1.1.13.1. Install Government Furnished Equipment:

1.1.1.1.13.1.1. Hanging sound curtains to be installed in Area 3, around the Wood Shop (see Attachment 19).

1.1.1.1.14. Design Heating Ventilating and Conditioning (HVAC) system with the following conditions

1.1.1.1.14.1. OFFICE AREA 1:

1.1.1.1.14.1.1. Occupancy approximately 27 people

1.1.1.1.14.1.2. Constant temperature of 72◦F

1.1.1.1.14.2. OFFICE AREA 2:

1.1.1.1.14.2.1. Occupancy approximately 35 people

1.1.1.1.14.2.2. Maintain constant temperature of 72◦F

1.1.1.1.14.3. OFFICE AREA 3:

1.1.1.1.14.3.1. Occupancy approximately 9 people

1.1.1.1.14.3.2. Maintain constant temperature of 72◦F

1.1.1.1.14.4. COMMUNICATIONS ROOM

1.1.1.1.14.4.1. Maintain constant temperature of 68◦F

1.1.1.1.14.4.2. Must have independent temperature control

1.1.1.2. AREA 1

1.1.1.2.1. Construct a wall between Office Area 1 and Office Area 2, to match existing height of walls.

1.1.1.2.2. Construct a wall on the outside of Office Area 1 and Office Area 2 creating a hallway to match existing height of walls.

1.1.1.2.3. Provide electrical/comm. risers to facilitate location of office furniture in middle Office Area 1 and Office Area 2, as needed. (dependent on furniture layout to be provided at a later date)

1.1.1.2.3.1. OFFICE AREA 1

1.1.1.2.3.1.1. Demo wall.

1.1.1.2.3.1.2. Demo Cabinet.

1.1.1.2.3.1.3. Install (1) 6’ x 4’ window.

1.1.1.2.3.1.4. Construct two offices.

1.1.1.2.3.2. OFFICE AREA 2

1.1.1.2.3.2.1. Install (1) 6’ x 4’ window.

1.1.1.2.3.2.2. Demo wall.

1.1.1.3. AREA 2

1.1.1.3.1. GENERAL AREA

1.1.1.3.1.1.Demo cabinet located next to existing modular offices.

1.1.1.3.1.2.Install a new cabinet to accommodate customer service computers and supplies, needs to support approximately 0lbs to 60lbs and at least 3’ deep with storage underneath.

1.1.1.3.1.3.Construct a wall on existing mechanical room.

1.1.1.3.1.4.Demo mobile storage racks on east side.

1.1.1.3.1.5.Demo existing interior chain link fence.

1.1.1.3.1.6.Re-design south side bathrooms to be ADA compliant.

1.1.1.3.2. BREAK ROOM

1.1.1.3.2.1.Install upper and lower cabinets with backsplash and sink.

1.1.1.3.2.2.Install plumbing for new sink and a water line for a refrigerator in south break room.

1.1.1.3.2.3.Demo upper and lower cabinets.

1.1.1.3.2.4. Replace current windows in break room.

1.1.1.4. AREA 3

1.1.1.4.1. Demo cabinet located next to the break room.

1.1.1.4.2. Re-paint walls of existing offices.

1.1.1.4.3. Install electrical roll up door with a manual pull chain on north side of B206.

1.1.1.5. COMMUNICATIONS REQUIREMENTS

1.1.1.5.1. Communications to include NIPR and SIPR connections.

1.1.1.5.1.1. Install duplex electrical outlets and quad communications receptacles (2 Data/2 Voice) every 6 feet in new office area. (Attachment 23)

1.1.1.5.2. Construct a communications room

1.2. REQUIREMENTS

1.2.1. Contractor must comply with the current UFC 1-200-01 dated 27 November 2007, conforming with the 2006 International Building Code (IBC-2006), ref: UFC 1-200-01, Chapter 1, Section 2.

1.2.2. All construction must be in compliance with all Public Laws, Executive Orders, Code of Federal Regulations, Department of Defense Instructions and Department of Defense Directives or other higher authority documents as applicable as listed in MIL-STD-3007F Appendix B, referenced under the UFC 1-200-01 Chapter 1.

1.2.3. All construction must be in compliance with Antiterrorism Force Protection requirements referenced under UFC 4-010-01, UFC 4-010-02 and Combatant Commander Antiterrorism construction standards.

1.3. APPLICABLE GOVERNMENT CRITERIA AND STANDARDS:

1.3.1. Engineering Technical Letters (ETL):

1.3.1.1. ETL 07-4 Air Force Carpet Standard, 28 March 2007

1.3.1.2. ETL 99-4 Fire Protection Engineering Criteria and Technical Guidance - Emergency Lighting and Marking of Exits, 9 Nov 1999

1.3.1.3. ETL 98-4 Building Manager Energy Conservation Handbook, with Change 1, 16 January 1998

1.3.1.4. ETL 86-16 Direct Digital Control of Heating, Ventilation and Air Conditioning Systems, 9 December 1986

1.3.1.5. ETL 83-1 Design of Control Systems for Heating, Ventilation and Air Conditioning Systems, 16 February 1983

1.3.1.6. ETL 02-12 Communications and Information System Criteria for Air Force Facilities, 27 June 2002

1.3.2. ASHRAE Guide and Data Books 2009

1.3.3. Unified Facilities criteria (UFC):

1.3.3.1. UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design

1.3.3.2. UFC 4-010-1 DoD Minimum Antiterrorism Standards For Buildings

1.3.3.3. UFC 3-600-01 Fire Protection Engineering for Facilities 26 September 2006, Change 1

1.3.4. AFSOCI 33-105 AFSOC Comm. Specifications For Facility Construction and Alterations

1.3.5. AFSSI 7703 Communications Security: Protected Distribution Systems (PDS)

1.3.6. AFSOCI 33-105 CANNONAFBSUP

1.3.7. Cannon AFB Labeling Standards 2009 Rev1

1.3.8. Lock Down Brochure_0808

1.3.9. Americans with Disabilities Act Accessibility Guidelines (ADAAG)

1.4. UTILITIES: Water will be made available to the Contractor by the Government as necessary.

1.5. CONSTRUCTION PERMITS: A properly approved and coordinated AF Form 103, Base Civil Engineering Work Clearance Request will be required by the Base Civil Engineer prior to start of project construction.

1.6. EXISTING FACILITIES: The existing dimensions and locations shown on the applicable drawings are for approximation purposes only. Contractor will verify all dimensions and locations.

1.7. ENVIRONMENTAL IMPACT: All waste materials generated by any work under the contract performed on a Government installation shall be handled, transported, stored and disposed of by the Contractor at any time in accordance with all applicable Federal, state and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of the law, including, but not limited to Executive Order 12 088, 13 October 1978; the Federal Water Pollution Control Act, as amended (33 USC Sec 1251 ET SEQ); the Clean Air Act as amended (42 USC Sec1857 ET SEQ); the Endangered Species Act, as amended (16 USC Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 USC Sec 2601, ET SEQ); the Solid Waste Disposal Act, as amended (42 USC 6901, ET SEQ); incorporating Sustainable Design and Development (SDD, ETL 08-13) including:

Sustainment, Restoration and Modernization (S/R&M), DOD Facility Metering Installation Initiative dated 27 April 2006, and Water Conservation including Xeriscape Landscaping, and Landscape Irrigation Systems .

1.8. LEAD AND ASBESTOS: Lead and asbestos will need to be abated prior to new construction.

1.9. AIRFIELD PRECAUTIONS: Any use of cranes will require an FAA notification (Form 7460-1 Notice of Proposed Construction or Alteration). Cranes larger than 125’ will require a Cannon Air Force Base airfield waiver.

1.10. AS-BUILT DRAWINGS: Contractor will be required to provide As-Built, red line drawings upon completion of construction.

1.11. MATERIALS: All materials will be industrial/commercial grade and meet the “Buy American Act”.

1.12. COLOR SELECTIONS: All color selections need to be submitted to the Contracting Officer for Government approval.

STATEMENT OF OBJECTIVE
REPAIR B206
PROJECT No. CZQZ09-0013
CANNON AFB NM
13 April 2010
1. DESCRIPTION OF WORK:
1.1. The following is a description of the work required for Project No. CZQZ09-0013; Repair B206. The Request for Proposal (RFP) requires all procurement, installation and construction relating to the repair/renovation of B206, at Cannon Air Force Base, New Mexico. Furnishing of all personnel, equipment, tools, materials, services and supervision to provide a complete and usable end product to the government. The work for the project will include, but not limited to the following tasks:
1.1.1. Construction
1.1.1.1. OVERALL BUILDING
1.1.1.1.1. Construction to be phased due to building occupancy. Government recommends construction of Area 1 first. Then Area 2 to include restrooms and break rooms in that area. Lastly, Area 3.
1.1.1.1.2. Asbestos abatement of B206.
1.1.1.1.3. Lead based paint abatement of B206.
1.1.1.1.4. Demo existing modular offices located through the facility.
1.1.1.1.5. Carpet all office areas per Engineering Technical Letter 07-4: Air Force Carpet Standard.
1.1.1.1.6. Re-tile all existing bathrooms and break rooms with ceramic tile.
1.1.1.1.7. Re-paint all walls of B206.
1.1.1.1.8. Re-surface and re-seal concrete floors in the entire facility.
1.1.1.1.9. Replace entire roof on facility with a standing seam metal roof.
1.1.1.1.10. Replace all ceiling tiles.
1.1.1.1.11. Ensure new construction meets fire codes.
1.1.1.1.12. Upgrade existing EMCS system, must be compatible with the Cannon AFB Allerton system.
1.1.1.1.13. Design/Construct a support system for hanging curtains. Curtains weigh approximately 90 pounds per section and will hang as shown on the attached floor plan. (see Attachment 19).
1.1.1.1.13.1. Install Government Furnished Equipment:
1.1.1.1.13.1.1. Hanging sound curtains to be installed in Area 3, around the Wood Shop (see Attachment 19).
1.1.1.1.14. Design Heating Ventilating and Conditioning (HVAC) system with the following conditions
1.1.1.1.14.1. OFFICE AREA 1:
1.1.1.1.14.1.1. Occupancy approximately 27 people
1.1.1.1.14.1.2. Constant temperature of 72◦F
1.1.1.1.14.2. OFFICE AREA 2:
1.1.1.1.14.2.1. Occupancy approximately 35 people
1.1.1.1.14.2.2. Maintain constant temperature of 72◦F
1.1.1.1.14.3. OFFICE AREA 3:
1.1.1.1.14.3.1. Occupancy approximately 9 people
1.1.1.1.14.3.2. Maintain constant temperature of 72◦F
1.1.1.1.14.4. COMMUNICATIONS ROOM
1.1.1.1.14.4.1. Maintain constant temperature of 68◦F
1.1.1.1.14.4.2. Must have independent temperature control
1.1.1.2. AREA 1
1.1.1.2.1. Construct a wall between Office Area 1 and Office Area 2, to match existing height of walls.
1.1.1.2.2. Construct a wall on the outside of Office Area 1 and Office Area 2 creating a hallway to match existing height of walls.
1.1.1.2.3. Provide electrical/comm. risers to facilitate location of office furniture in middle Office Area 1 and Office Area 2, as needed. (dependent on furniture layout to be provided at a later date)
1.1.1.2.3.1. OFFICE AREA 1
1.1.1.2.3.1.1. Demo wall.
1.1.1.2.3.1.2. Demo Cabinet.
1.1.1.2.3.1.3. Install (1) 6’ x 4’ window.
1.1.1.2.3.1.4. Construct two offices.
1.1.1.2.3.2. OFFICE AREA 2
1.1.1.2.3.2.1. Install (1) 6’ x 4’ window.
1.1.1.2.3.2.2. Demo wall.
1.1.1.3. AREA 2
1.1.1.3.1. GENERAL AREA
1.1.1.3.1.1. Demo cabinet located next to existing modular offices.
1.1.1.3.1.2. Install a new cabinet to accommodate customer service computers and supplies, needs to support approximately 0lbs to 60lbs and at least 3’ deep with storage underneath.
1.1.1.3.1.3. Construct a wall on existing mechanical room.
1.1.1.3.1.4. Demo mobile storage racks on east side.
1.1.1.3.1.5. Demo existing interior chain link fence.
1.1.1.3.1.6. Re-design south side bathrooms to be ADA compliant.
1.1.1.3.2. BREAK ROOM
1.1.1.3.2.1. Install upper and lower cabinets with backsplash and sink.
1.1.1.3.2.2. Install plumbing for new sink and a water line for a refrigerator in south break room.
1.1.1.3.2.3. Demo upper and lower cabinets.
1.1.1.3.2.4. Replace current windows in break room.
1.1.1.4. AREA 3
1.1.1.4.1. Demo cabinet located next to the break room.
1.1.1.4.2. Re-paint walls of existing offices.
1.1.1.4.3. Install electrical roll up door with a manual pull chain on north side of B206.
1.1.1.5. COMMUNICATIONS REQUIREMENTS
1.1.1.5.1. Communications to include NIPR and SIPR connections.
1.1.1.5.1.1. Install duplex electrical outlets and quad communications receptacles (2 Data/2 Voice) every 6 feet in new office area. (Attachment 23)
1.1.1.5.2. Construct a communications room
1.2. REQUIREMENTS
1.2.1. Contractor must comply with the current UFC 1-200-01 dated 27 November 2007, conforming with the 2006 International Building Code (IBC-2006), ref: UFC 1-200-01, Chapter 1, Section 2.
1.2.2. All construction must be in compliance with all Public Laws, Executive Orders, Code of Federal Regulations, Department of Defense Instructions and Department of Defense Directives or other higher authority documents as applicable as listed in MIL-STD-3007F Appendix B, referenced under the UFC 1-200-01 Chapter 1.
1.2.3. All construction must be in compliance with Antiterrorism Force Protection requirements referenced under UFC 4-010-01, UFC 4-010-02 and Combatant Commander Antiterrorism construction standards.
1.3. APPLICABLE GOVERNMENT CRITERIA AND STANDARDS:
1.3.1. Engineering Technical Letters (ETL):
1.3.1.1. ETL 07-4 Air Force Carpet Standard, 28 March 2007
1.3.1.2. ETL 99-4 Fire Protection Engineering Criteria and Technical Guidance - Emergency Lighting and Marking of Exits, 9 Nov 1999
1.3.1.3. ETL 98-4 Building Manager Energy Conservation Handbook, with Change 1, 16 January 1998
1.3.1.4. ETL 86-16 Direct Digital Control of Heating, Ventilation and Air Conditioning Systems, 9 December 1986
1.3.1.5. ETL 83-1 Design of Control Systems for Heating, Ventilation and Air Conditioning Systems, 16 February 1983
1.3.1.6. ETL 02-12 Communications and Information System Criteria for Air Force Facilities, 27 June 2002
1.3.2. ASHRAE Guide and Data Books 2009
1.3.3. Unified Facilities criteria (UFC):
1.3.3.1. UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design
1.3.3.2. UFC 4-010-1 DoD Minimum Antiterrorism Standards For Buildings
1.3.3.3. UFC 3-600-01 Fire Protection Engineering for Facilities 26 September 2006, Change 1
1.3.4. AFSOCI 33-105 AFSOC Comm. Specifications For Facility Construction and Alterations
1.3.5. AFSSI 7703 Communications Security: Protected Distribution Systems (PDS)
1.3.6. AFSOCI 33-105 CANNONAFBSUP
1.3.7. Cannon AFB Labeling Standards 2009 Rev1
1.3.8. Lock Down Brochure_0808
1.3.9. Americans with Disabilities Act Accessibility Guidelines (ADAAG)
1.4. UTILITIES: Water will be made available to the Contractor by the Government as necessary.
1.5. CONSTRUCTION PERMITS: A properly approved and coordinated AF Form 103, Base Civil Engineering Work Clearance Request will be required by the Base Civil Engineer prior to start of project construction.
1.6. EXISTING FACILITIES: The existing dimensions and locations shown on the applicable drawings are for approximation purposes only. Contractor will verify all dimensions and locations.
1.7. ENVIRONMENTAL IMPACT: All waste materials generated by any work under the contract performed on a Government installation shall be handled, transported, stored and disposed of by the Contractor at any time in accordance with all applicable Federal, state and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of the law, including, but not limited to Executive Order 12 088, 13 October 1978; the Federal Water Pollution Control Act, as amended (33 USC Sec 1251 ET SEQ); the Clean Air Act as amended (42 USC Sec1857 ET SEQ); the Endangered Species Act, as amended (16 USC Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 USC Sec 2601, ET SEQ); the Solid Waste Disposal Act, as amended (42 USC 6901, ET SEQ); incorporating Sustainable Design and Development (SDD, ETL 08-13) including: Sustainment, Restoration and Modernization (S/R&M), DOD Facility Metering Installation Initiative dated 27 April 2006, and Water Conservation including Xeriscape Landscaping, and Landscape Irrigation Systems .
1.8. LEAD AND ASBESTOS: Lead and asbestos will need to be abated prior to new construction.
1.9. AIRFIELD PRECAUTIONS: Any use of cranes will require an FAA notification (Form 7460-1 Notice of Proposed Construction or Alteration). Cranes larger than 125’ will require a Cannon Air Force Base airfield waiver.
1.10. AS-BUILT DRAWINGS: Contractor will be required to provide As-Built, red line drawings upon completion of construction.
1.11. MATERIALS: All materials will be industrial/commercial grade and meet the “Buy American Act”.
1.12. COLOR SELECTIONS: All color selections need to be submitted to the Contracting Officer for Government approval.