BOS_RFP_FA4819-16-R-6001.pdf

PDF 1 MB Posted

Attached to
Tyndall AFB FL CE Base Operations Support (BOS) Federal contract opportunity
Solicitation number
FA4819-16-R-6001
Issued by
Department of the Air Force Air Combat Command

About this file

BOS RFP FA4819-16-R-6001

View the file

Other files for this federal contract opportunity

Other files attached to Tyndall AFB FL CE Base Operations Support (BOS), newest first.
File Type Posted
Questions_Answers_2.pdf PDF
Atch_7_New_SCA_WD_2015-4559_R2_12Dec16.pdf PDF
Questions_Answers.pdf PDF
Atch_6_IAM_CBA_2016-2018.pdf PDF
PWS_APPENDIX_B--Real_Property.pdf PDF
Atch_3_RPES_Worksheet.docx DOCX document
Atch_4_Price_Matrix.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Atch_1_BOS_PWS_13_Mar_17.docx DOCX document
Atch_2_Sample_Manpower_Chart.xlsx XLSX spreadsheet
PWS_APPENDIX_C--AF_PMTLs.docx DOCX document
BOS_Past_Performance_Questions.pdf PDF
Atch_4_Revised_Price_Matrix.xlsx XLSX spreadsheet
BOS_RFP_FA4819-16-R-6001_Amend_1.pdf PDF
Pre-Proposal_Slides_2_Feb_17.pdf PDF
Pre-Proposal_Conf_Attendees.pdf PDF
Ktr_Site_Visit_Map.pptx PPTX presentation
TAFB_Draft_RFP_Questions_Answers.pdf PDF
Atch_12_Question_Comment_Form.docx DOCX document
Atch_10_Subcontractor_Consent_Ltr.docx DOCX document
PWS_APPENDIX_L--Support_Agreements.pdf PDF
PWS_APPENDIX_S--CE_Playbooks.pdf PDF
Atch_12_Question_Comment_Form.docx DOCX document
PWS_APPENDIX_C--AF_Preventative_Maintenance_Task_List_Reference.docx DOCX document
PWS_APPENDIX_A--Historical_Workload.docx DOCX document
PWS_APPENDIX_J--Govt-Furnished_Radios.docx DOCX document
PWS_APPENDIX_O--Local_Plans.docx DOCX document
Atch_11_PP_Questionnaire.xlsx XLSX spreadsheet
Atch_2_Sample_Manpower_Chart.xlsx XLSX spreadsheet
Atch_5_Draft_QASP.pdf PDF
PWS_APPENDIX_Q--Definitions.docx DOCX document
PWS_APPENDIX_N--Required_Reports.docx DOCX document
PWS_APPENDIX_H--Govt-Furnished_Facilities.docx DOCX document
PWS_APPENDIX_P--Abbreviations_and_Acronyms.docx DOCX document
Atch_13_ppi_tool.accdb —
PWS_APPENDIX_G--Govt-Furnished_Equip_(Non-EAID).docx DOCX document
PWS_APPENDIX_M--Publications_and_Forms.docx DOCX document
Atch_9_Draft_DD_Form_254.pdf PDF
PWS_APPENDIX_E--Map_and_Work_Area_Layouts.pdf PDF
PWS_APPENDIX_D--Licenses_and_Certifications.docx DOCX document
Atch_6_IAM_CBA_2016-2018.pdf PDF
PWS_APPENDIX_R--Mission_Essential_Services.docx DOCX document
Atch_8_DBA_WD_FL160007_5Aug16.pdf PDF
PWS_APPENDIX_I--Govt-Furnished_ADPE.docx DOCX document
PWS_APPENDIX_K--Govt-Furnished_Training.docx DOCX document
Atch_7_SCA_WD_05-3007_R18.pdf PDF
Atch_3_RPES_Worksheet.docx DOCX document
PWS_APPENDIX_B--Real_Property.docx DOCX document
Atch_4_Price_Matrix.xlsx XLSX spreadsheet
PWS_APPENDIX_F--Govt-Furnished_Equip_(EAID).pdf PDF
Show all 50

Tyndall AFB FL CE Base Operations Support (BOS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR PROSPECTIVE OFFERORS 20 January 2017

FROM: 325th Contracting Squadron/LGCB 501 Airey Ave, Suite 5 Tyndall AFB FL 32403-5549

SUBJECT: Request for Proposal (RFP), FA4819-16-R-6001, Civil Engineering Base Operations Support (BOS) Tyndall AFB FL

1. A pre-proposal site visit has been scheduled for subject solicitation on 2 February2017 at 8:00 AM CST. Potential offerors are limited to three (3) representatives per firm. Offerors seeking attendance are required to submit the following information NLT 1:00 PM on 31 January 2017 to bobbie.davis@us.af.mil and britney.petrina.1@us.af.mil for each of the three attendees:

a. Name of Firm

b. Full name to include middle initial

c. Date of Birth

d. Social Security Number

2. Attendees are to meet at the 325th Contracting Squadron, Bldg 647, NLT 8:00 AM CST on 2 February 2017 to sign in. Individuals not on the attendee list will be denied entry to the site visit. All potential attendees must submit the above information to be eligible to attend the site visit regardless if they require installation access.

3. This posting to FBO consists of this cover letter, the RFP, and 13 attachments identified below.

1. BOS PWS w/Appendices A through S

2. Sample Manpower Chart

3. RPES Worksheet

4. Price Matrix

5. Draft QASP

6. CBA WD

7. SCA WD

8. DBA WD

9. Draft DD Form 254

10. Subcontractor Consent Ltr

11. PP Questionnaire

12. Question Comment Form

13. PPI Tool

4. This requirement will be solicited using competitive procedures as a 100% 8(a) set-aside.

Proposals are required to ensure offerors’ full understanding of the contract requirements and to

DDEPARTMENT OF THE AIR FORCE

325TH FIGHTER WING (ACC)

TYNDALL AIR FORCE BASE FLORIDA

determine technical acceptability. The evaluation approach for this requirement will be a Tradeoff Source Selection Process. This process allows for a tradeoff between non-cost factors and price and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award. The factors to be evaluated are technical, past performance, and price. Past performance is significantly more important than price. The resulting award will be a firm-fixed-price (FFP) contract. The proposed contract performance period will consist of a five-month basic period that includes a 45 day transition period, four 1-year option periods, and a 7-month fifth option period for a total of 5 years.

5. Please read the RFP package carefully and complete all documents in accordance with the instructions provided in the Addenda to FAR Clause 52.212-1 using the Past Performance Information (PPI) Tool database at Attachment 13. Submit the past performance volume by 23 Feb 17, 2:00 PM CST.

6. The remainder of your proposal shall be received no later than 6 Mar 17, 2:00 PM CST. Late receipt of your proposal shall be handled in accordance with FAR provision 52.215-1(c)(3). The proposal shall be mailed or delivered to 325 CONS, Ms. Bobbie Davis or 2d Lt Britney Petrina, at 501 Airey Avenue, Suite 5, Tyndall AFB FL 32403-5549.

7. Offerors are reminded to carefully review their compliance status before submitting their proposals. Ensure that any teaming arrangements or subcontractor agreements with large businesses will not result in the loss of the prime contractor’s small business status. Please consult the Small Business Administration for further guidance.

8. The issuance of the RFP constitutes the initiation of the source selection process. Any questions, clarifications, or concerns regarding this solicitation shall be addressed in writing using the format at Attachment 12, Question Comment Form, via e-mail, mail, or fax (e-mail is the preferred method of communication) to Ms. Davis and 2d Lt Petrina at, fax number 850-283-8491, or e-mail bobbie.davis@us.af.mil and britney.petrina.1@us.af.mil.

9. We appreciate your interest in this requirement and look forward to your proposal.

NORMA B. MYERS, GS-13, DAFC

Procuring Contracting Officer

Attachment:

RFP FA4819-16-R-6001, SF 1449 w/Continuation Pages

MYERS.NORM

A.B.10132736

Digitally signed by

MYERS.NORMA.B.1013273690

DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=MYERS.NORMA.B.1013273690 Date: 2017.01.20 14:21:03 -06'00'

SEE ADDENDUM

(No Collect Calls)

FA4819-16-R-6001 20-Jan-2017

b. TELEPHONE NUMBER

850 283-8665

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 06 Mar 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

FA48199. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

BOBBIE DAVIS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

325 CONS/LGCB ATTN: BOBBIE DAVIS

501 AIREY AVE, STE 5

TYNDALL AFB FL 32403-5526

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE F4A360 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

325 CES/CCQ STOP/42 - F4A360

LAWRENCE MROCZKOWSKI

119 ALABAMA AVE, STE 1,BLDG 421

TYNDALL AFB FL 32403

TEL: 850-283-3074 FAX:

(850) 283-8491FAX:

TEL: (850) 283-8665 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$38,500,000

NAICS:

561210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

FA4819-16-R-6001

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 3.50 Months Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 1 Jan 18 to 16 Apr 18.

FOB: Destination

SIGNAL CODE: A

NET AMT

Facilities Support Services

0002 3.50 Months Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 1 Jan 18 to 16 Apr 18.

0003 3.50 Months Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 1 Jan 18 to 16 Apr 18.

0004 3.50 Months U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 1 Jan 18 to 16 Apr 18.

0005 3.50 Months Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 1 Jan 18 to 16 Apr 18.

0006 3.50 Months Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 1 Jan 18 to 16 Apr 18.

0007 3.50 Months Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 1 Jan 18 to 16 Apr 18.

0008 3.50 Months Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS paragraph 1.5.1. PoP is 1 Jan 18 to 16 Apr 18.

0009 3.50 Months Pavement Clearance (Sweeping)

FFP

Provides removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 1 Jan 18 to 16 Apr 18.

0010 3.50 Months Pavement Repair

FFP

Inspects, maintains, and repairs linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2.

PoP is 1 Jan 18 to 16 Apr 18.

0011 3.50 Months Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental management control systems and associated components. PWS paragraph 1.6.1. PoP is 1 Jan 18 to 16 Apr 18.

0012 3.50 Months Entomology

FFP

Provides pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 1 Jan 18 to 16 Apr 18.

0013 3.50 Months Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 1 Jan 18 to 16 Apr 18.

0014 3.50 Months

HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 1 Jan 18 to 16 Apr 18.

0015 1 Lot Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraph 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $4,166.67.

0016 1 Lot Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. PWS paragraph

1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $10,416.67.

0017 1 Lot Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $838,541.67.

0018 1 Lot Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $6,250.00.

0019 1 Lot AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $625,000.00.

0020 1 Lot

TRIRIGA

FFP

NOT TO EXCEED (NTE)

Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS paragraph 1.7.3. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $125,000.00.

0021 1 Lot TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 1 Jan 18 to 16 Apr 18.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $208,333.33.

0022 1.50 Months Transition Period

FFP

All duties required to effectively accomplish mobilization and changeover. The transition period shall not exceed 45 days. PWS paragraph 4.29. PoP is 16 Nov 17 to 31 Dec 17.

1001 12 Months OPTION Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 17 Apr 18 to 16 Apr 19.

1002 12 Months OPTION Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 17 Apr 18 to 16 Apr 19.

1003 12 Months OPTION Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 17 Apr 18 to 16 Apr 19.

1004 12 Months OPTION U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 17 Apr 18 to 16 Apr 19.

1005 12 Months OPTION Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 17 Apr 18 to 16 Apr 19.

1006 12 Months OPTION Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 17 Apr 18 to 16 Apr 19.

1007 12 Months OPTION Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 17 Apr 18 to 16 Apr 19.

1008 12 Months OPTION Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy, signs. PWS paragraph 1.5.1. PoP is 17 Apr 18 to 16 Apr 19.

PoP is 17 Apr 18 to 16 Apr 19.

1009 12 Months OPTION Pavement Clearance (Sweeping)

FFP

Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 17 Apr 18 to 16 Apr 19.

1010 12 Months OPTION Pavement Repair

FFP

Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2. PoP is 17 Apr 18 to 16 Apr 19.

1011 12 Months OPTION Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental management control systems and associated components. PWS paragraph 1.6.1. PoP is 17 Apr 18 to 16 Apr 19.

1012 12 Months OPTION Entomology

FFP

Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 17 Apr 18 to 16 Apr 19.

1013 12 Months OPTION Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 17 Apr 18 to 16 Apr 19.

1014 12 Months

OPTION HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 17 Apr 18 to 16 Apr 19.

1015 1 Lot OPTION Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraph 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $10,000.00.

1016 1 Lot OPTION Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. PWS paragraph

1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $25,000.00.

1017 1 Lot OPTION Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $2,300,000.00.

1018 1 Lot OPTION Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $15,000.00.

1019 1 Lot OPTION AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $1,500,000.00.

1020 1 Lot

OPTION TRIRIGA

FFP

NOT TO EXCEED (NTE)

Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS paragraph 1.7.3. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $150,000.00.

1021 1 Lot OPTION TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 18 to 16 Apr 19.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $500,000.00.

2001 12 Months OPTION Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 17 Apr 19 to 16 Apr 20.

2002 12 Months OPTION Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 17 Apr 19 to 16 Apr 20.

2003 12 Months OPTION Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 17 Apr 19 to 16 Apr 20.

2004 12 Months OPTION U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 17 Apr 19 to 16 Apr 20.

2005 12 Months OPTION Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 17 Apr 19 to 16 Apr 20.

2006 12 Months OPTION Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 17 Apr 19 to 16 Apr 20.

2007 12 Months OPTION Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 17 Apr 19 to 16 Apr 20.

2008 12 Months OPTION Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy, signs. PWS paragraph 1.5.1. PoP is 17 Apr 19 to 16 Apr 20.

2009 12 Months OPTION Pavement Clearance (Sweeping)

FFP

Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 17 Apr 19 to 16 Apr 20.

2010 12 Months OPTION Pavement Repair

FFP

Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2. PoP is 17 Apr 19 to 16 Apr 20.

2011 12 Months OPTION Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS paragraph 1.6.1. PoP is 17 Apr 19 to 16 Apr 20.

2012 12 Months OPTION Entomology

FFP

Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 17 Apr 19 to 16 Apr 20.

2013 12 Months OPTION Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 17 Apr 19 to 16 Apr 20.

2014 12 Months

OPTION HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 17 Apr 19 to 16 Apr 20.

2015 1 Lot OPTION Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraph 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $10,000.00.

2016 1 Lot OPTION Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. Cost Reimbursable.

PWS paragraph 1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $25,000.00.

2017 1 Lot OPTION Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $2,300,000.00.

2018 1 Lot OPTION Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $15,000.00.

2019 1 Lot OPTION AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $1,500,000.00.

OPTION Reserved

FFP

Reserved

2021 1 Lot OPTION TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 19 to 16 Apr 20.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $500,000.00.

3001 12 Months OPTION Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 17 Apr 20 to 16 Apr 21.

3002 12 Months OPTION Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 17 Apr 20 to 16 Apr 21.

3003 12 Months OPTION Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 17 Apr 20 to 16 Apr 21.

3004 12 Months OPTION U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 17 Apr 20 to 16 Apr 21.

3005 12 Months OPTION Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 17 Apr 20 to 16 Apr 21.

3006 12 Months OPTION Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 17 Apr 20 to 16 Apr 21.

3007 12 Months OPTION Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 17 Apr 20 to 16 Apr 21.

3008 12 Months OPTION Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS paragraph 1.5.1. PoP is 17 Apr 20 to 16 Apr 21.

3009 12 Months OPTION Pavement Clearance (Sweeping)

FFP

Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 17 Apr 20 to 16 Apr 21.

3010 12 Months OPTION Pavement Repair

FFP

Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2. PoP is 17 Apr 20 to 16 Apr 21.

3011 12 Months OPTION Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS paragraph 1.6.1. PoP is 17 Apr 20 to 16 Apr 21.

3012 12 Months OPTION Entomology

FFP

Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 17 Apr 20 to 16 Apr 21.

3013 12 Months OPTION Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 17 Apr 20 to 16 Apr 21.

3014 12 Months

OPTION HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 17 Apr 20 to 16 Apr 21.

3015 1 Lot OPTION Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraph 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $10,000.00.

3016 1 Lot OPTION Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. PWS paragraph

1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $25,000.00.

3017 1 Lot OPTION Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $2,300,000.00.

3018 1 Lot OPTION Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $15,000.00.

3019 1 Lot OPTION AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $1,500,000.00.

OPTION Reserved

FFP

Reserved

3021 1 Lot OPTION TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 20 to 16 Apr 21.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $500,000.00.

4001 12 Months OPTION Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 17 Apr 21 to 16 Apr 22.

4002 12 Months OPTION Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 17 Apr 21 to 16 Apr 22.

4003 12 Months OPTION Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 17 Apr 21 to 16 Apr 22.

4004 12 Months OPTION U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 17 Apr 21 to 16 Apr 22.

4005 12 Months OPTION Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 17 Apr 21 to 16 Apr 22.

4006 12 Months OPTION Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 17 Apr 21 to 16 Apr 22.

4007 12 Months OPTION Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 17 Apr 21 to 16 Apr 22.

4008 12 Months OPTION Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS paragraph 1.5.1. PoP is 17 Apr 21 to 16 Apr 22.

4009 12 Months OPTION Pavement Clearance (Sweeping)

FFP

Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 17 Apr 21 to 16 Apr 22.

4010 12 Months OPTION Pavement Repair

FFP

Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2. PoP is 17 Apr 21 to 16 Apr 22.

4011 12 Months OPTION Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS paragraph 1.6.1. PoP is 17 Apr 21 to 16 Apr 22.

4012 12 Months OPTION Entomology

FFP

Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 17 Apr 21 to 16 Apr 22.

4013 12 Months OPTION Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 17 Apr 21 to 16 Apr 22.

4014 12 Months

OPTION HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 17 Apr 21 to 16 Apr 22.

4015 1 Lot OPTION Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraphs 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $10,000.00.

4016 1 Lot OPTION Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. PWS paragraph

1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $25,000.00.

4017 1 Lot OPTION Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $2,300,000.00.

4018 1 Lot OPTION Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $15,000.00.

4019 1 Lot OPTION AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $1,500,000.00.

OPTION Reserved

FFP

Reserved

4021 1 Lot OPTION TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 21 to 16 Apr 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $500,000.00.

5001 7 Months OPTION Operations Flight Management

FFP

Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS paragraph 1.2. PoP is 17 Apr 22 to 13 Nov 22.

5002 7 Months OPTION Financial Management

FFP

Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract.

PWS paragraph 1.7.2. PoP is 17 Apr 22 to 13 Nov 22.

5003 7 Months OPTION Operations Engineering Staff

FFP

Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function.

PWS paragraphs 1.3 thru 1.3.11. PoP is 17 Apr 22 to 13 Nov 22.

5004 7 Months OPTION U-Fix-It Operations

FFP

Manage and operate the U-Fix-It program. PWS paragraph 1.3.11.1. PoP is 17 Apr 22 to 13 Nov 22.

5005 7 Months OPTION Facility Systems - Electrical

FFP

Maintain, inspect, troubleshoot, install, remove, and repair electrical systems.

PWS paragraph 1.4.2. PoP is 17 Apr 22 to 13 Nov 22.

5006 7 Months OPTION Facility Systems - Alarms

FFP

Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS paragraph 1.4.1. PoP is 17 Apr 22 to 13 Nov 22.

5007 7 Months OPTION Facility Systems - PowerPro

FFP

Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps, and aircraft arresting systems. PWS paragraph 1.4.3. PoP is 17 Apr 22 to 13 Nov 22.

5008 7 Months OPTION Heavy Repair - Structures

FFP

Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS paragraph 1.5.1. PoP is 17 Apr 22 to 13 Nov 22.

5009 7 Months OPTION Pavement Clearance (Sweeping)

FFP

Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS paragraph 1.5.2.6. PoP is 17 Apr 22 to 13 Nov 22.

5010 7 Months OPTION Pavement Repair

FFP

Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS paragraph 1.5.2. PoP is 17 Apr 22 to 13 Nov 22.

5011 7 Months OPTION Energy Management Control Systems

FFP

Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS paragraph 1.6.1 PoP is 17 Apr 22 to 13 Nov 22.

5012 7 Months OPTION Entomology

FFP

Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS paragraph 1.6.3. PoP is 17 Apr 22 to 13 Nov 22.

5013 7 Months OPTION Water and Fuels

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS paragraph 1.6.2. PoP is 17 Apr 22 to 13 Nov 22.

5014 7 Months

OPTION HVAC

FFP

Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc.

PWS paragraph 1.6.4. PoP is 17 Apr 22 to 13 Nov 22.

5015 1 Lot OPTION Travel/Training

FFP

NOT TO EXCEED (NTE)

Travel for approved training, conferences, etc. PWS paragraph 4.17. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $5,833.33.

5016 1 Lot OPTION Minor Services

FFP

NOT TO EXCEED (NTE)

Services performed by outside contractors when approved. PWS paragraph

1.3.10.6. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $14,583.33.

5017 1 Lot OPTION Work Order Supplies/Materials

FFP

NOT TO EXCEED (NTE)

Supplies and materials necessary for work within the scope of the contract. PWS paragraph 3.2.8. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $1,173,958.33.

5018 1 Lot OPTION Government-Furnished Property

FFP

NOT TO EXCEED (NTE)

Repair, replace, service or new/added government-furnished property if approved.

PWS paragraph 3.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $8,750.00.

5019 1 Lot OPTION AFPMLT Support

FFP

NOT TO EXCEED (NTE)

Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C.

PWS paragraph 1.3.2.1.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $875,000.00.

OPTION Reserved

FFP

Reserved

5021 1 Lot OPTION TRIGRIA Increase

FFP

NOT TO EXCEED (NTE)

Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS paragraph 1.3.2.1. Contractor is NOT required to provide a proposal amount on this CLIN, and any amount identified on this CLIN will not be used during evaluation of the total evaluated price. PoP is 17 Apr 22 to 13 Nov 22.

(TO BE COMPLETED BY GOVERNMENT) Estimated Budget: $291,666.67.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government

0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 1018 Destination Government Destination Government 1019 Destination Government Destination Government 1020 Destination Government Destination Government 1021 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination Government Destination Government 2012 Destination Government Destination Government 2013 Destination Government Destination Government 2014 Destination Government Destination Government 2015 Destination Government Destination Government 2016 Destination Government Destination Government 2017 Destination Government Destination Government 2018 Destination Government Destination Government 2019 Destination Government Destination Government 2020 Destination Government Destination Government 2021 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government

3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 3011 Destination Government Destination Government 3012 Destination Government Destination Government 3013 Destination Government Destination Government 3014 Destination Government Destination Government 3015 Destination Government Destination Government 3016 Destination Government Destination Government 3017 Destination Government Destination Government 3018 Destination Government Destination Government 3019 Destination Government Destination Government 3020 Destination Government Destination Government 3021 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .