Atch_1_BOS_PWS_10_Nov_16.docx

DOCX document 433 KB Posted

Attached to
Tyndall AFB FL CE Base Operations Support (BOS) Federal contract opportunity
Solicitation number
FA4819-16-R-6001
Issued by
Department of the Air Force Air Combat Command

About this file

BOS PWS

View the file

Other files for this federal contract opportunity

Other files attached to Tyndall AFB FL CE Base Operations Support (BOS), newest first.
File Type Posted
Atch_3_RPES_Worksheet.docx DOCX document
Atch_4_Price_Matrix.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Atch_1_BOS_PWS_13_Mar_17.docx DOCX document
Atch_7_New_SCA_WD_2015-4559_R2_12Dec16.pdf PDF
Questions_Answers.pdf PDF
Atch_6_IAM_CBA_2016-2018.pdf PDF
PWS_APPENDIX_B--Real_Property.pdf PDF
Atch_2_Sample_Manpower_Chart.xlsx XLSX spreadsheet
PWS_APPENDIX_C--AF_PMTLs.docx DOCX document
Atch_4_Revised_Price_Matrix.xlsx XLSX spreadsheet
BOS_Past_Performance_Questions.pdf PDF
BOS_RFP_FA4819-16-R-6001_Amend_1.pdf PDF
Pre-Proposal_Slides_2_Feb_17.pdf PDF
Pre-Proposal_Conf_Attendees.pdf PDF
TAFB_Draft_RFP_Questions_Answers.pdf PDF
Ktr_Site_Visit_Map.pptx PPTX presentation
Atch_12_Question_Comment_Form.docx DOCX document
PWS_APPENDIX_N--Required_Reports.docx DOCX document
PWS_APPENDIX_H--Govt-Furnished_Facilities.docx DOCX document
PWS_APPENDIX_P--Abbreviations_and_Acronyms.docx DOCX document
Atch_13_ppi_tool.accdb —
PWS_APPENDIX_G--Govt-Furnished_Equip_(Non-EAID).docx DOCX document
PWS_APPENDIX_M--Publications_and_Forms.docx DOCX document
BOS_RFP_FA4819-16-R-6001.pdf PDF
Atch_9_Draft_DD_Form_254.pdf PDF
PWS_APPENDIX_E--Map_and_Work_Area_Layouts.pdf PDF
PWS_APPENDIX_D--Licenses_and_Certifications.docx DOCX document
Atch_6_IAM_CBA_2016-2018.pdf PDF
PWS_APPENDIX_R--Mission_Essential_Services.docx DOCX document
Atch_10_Subcontractor_Consent_Ltr.docx DOCX document
PWS_APPENDIX_L--Support_Agreements.pdf PDF
PWS_APPENDIX_S--CE_Playbooks.pdf PDF
Atch_12_Question_Comment_Form.docx DOCX document
PWS_APPENDIX_C--AF_Preventative_Maintenance_Task_List_Reference.docx DOCX document
PWS_APPENDIX_A--Historical_Workload.docx DOCX document
PWS_APPENDIX_J--Govt-Furnished_Radios.docx DOCX document
PWS_APPENDIX_O--Local_Plans.docx DOCX document
Atch_11_PP_Questionnaire.xlsx XLSX spreadsheet
Atch_2_Sample_Manpower_Chart.xlsx XLSX spreadsheet
Atch_5_Draft_QASP.pdf PDF
PWS_APPENDIX_Q--Definitions.docx DOCX document
Atch_8_DBA_WD_FL160007_5Aug16.pdf PDF
PWS_APPENDIX_I--Govt-Furnished_ADPE.docx DOCX document
PWS_APPENDIX_K--Govt-Furnished_Training.docx DOCX document
Atch_7_SCA_WD_05-3007_R18.pdf PDF
Atch_3_RPES_Worksheet.docx DOCX document
PWS_APPENDIX_B--Real_Property.docx DOCX document
Atch_4_Price_Matrix.xlsx XLSX spreadsheet
PWS_APPENDIX_F--Govt-Furnished_Equip_(EAID).pdf PDF
Show all 50

Tyndall AFB FL CE Base Operations Support (BOS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4819-16-R-6001

PERFORMANCE WORK STATEMENT

FOR

TYNDALL AFB FL

BASE OPERATIONS SUPPORT

CONTRACT: FA4819-XX-C-XXXX

10 November 2016

TABLE OF CONTENTS

Section Number and Title Page Number

1.0. DESCRIPTION OF SERVICES4
1.1. Scope4
1.2. Contractor Operations Management4
1.3. Contract Engineering4
1.4. Facility Systems13
1.5. Heavy Repair14
1.6. Infrastructure Systems16
1.7. Specific Operations Processes/Requirements19

2.0. SERVICES SUMMARY 25

3.0. GOVERNMENT-FURNISHED PROPERTY AND SERVICES28
3.1. Government-Furnished Property28
3.2. Government-Furnished Services29
4.0. GENERAL INFORMATION32
4.1. Contractor Personnel32
4.2. Hand Tools33
4.3. Vehicles33
4.4. Security34
4.5. Freedom of Information Act (FOIA) Program37
4.6. Reporting Requirements38
4.7. Physical Security38
4.8. Operating Instructions38
4.9. Controlled/Restricted Areas38
4.10. Key Control39
4.11. Lock Combinations39
4.12. Traffic Laws39
4.13. Base Fire Regulations39
4.14. Hours of Operation39
4.15. Federal Holidays40
4.16. Contractor Training40
4.17. Travel41
4.18. Access to Government Systems42
4.19. Government-Owned Vehicles42
4.20. Air Field Driving42
4.21. Applicable Publications, Forms, and Plans42
4.22. Resumes/Qualified Staffing42
4.23. National Defense Authorization Act (NDAA) Labor Data Reporting42
4.24. Quality Control43
4.25. Quality Assurance43
4.26. Environmental43
4.27. Natural Disaster, Major Accident, and War Response and Recovery44
4.28. Multi-Functional Team Meetings45
4.29. Pre-Performance Conference46
4.30. Transition46

LIST OF APPENDICES

Appendix A--Historical Workload Appendix B--Real Property Appendix C--Air Force Preventative Maintenance Task List Data Appendix D--Licenses and Certifications Appendix E--Maps and Work Area Layouts Appendix F--Government-Furnished Equipment (EAID Government Owned) Appendix G--Government-Furnished Equipment (Non-EAID) Appendix H--Government-Furnished Facilities Appendix I--Government-Furnished Automated Data Processing Equipment (ADPE) Appendix J--Government-Furnished Radios Appendix K--Government-Furnished Training Appendix L--Support Agreements/Memorandum of Agreements Appendix M--Publications and Forms Appendix N--Required Reports Appendix O--Local Plans Appendix P--Abbreviations and Acronyms Appendix Q--Definitions Appendix R--Mission Essential Services Appendix S--CE Playbooks

1.0. DESCRIPTION OF SERVICES

The contractor shall meet all requirements and responsibilities in this document, including providing all necessary management, personnel, labor, tools, equipment, training, and items not expressly identified as government provided within this document. The contractor shall provide all other items and services necessary to perform all Civil Engineering (CE) services, tasks, and functions for Tyndall Air Force Base (TAFB), FL as defined in this performance work statement (PWS). The contractor shall provide and maintain a fully trained, qualified, and knowledgeable workforce that is professional and customer service oriented. The contractor shall ensure that employees possess all necessary certifications to perform work required by this PWS or by documents referenced herein. The contractor is expected to provide guidance and coordination for base CE functions to ensure effective and economical operation of all activities. The contractor is expected to accomplish all work in accordance with (IAW) the objectives and responsibilities outlined in applicable Air Force (AF), Major Command (MAJCOM), and TAFB, directives, instructions, manuals, regulations, plans, and technical orders. The contractor is expected to ensure all work is performed in an orderly and timely manner to enable the 325th Fighter Wing (FW) and associated units to meet mission requirements.

1.1. Scope: The contractor is responsible for managing and providing effective and efficient life-cycle operations and maintenance and repair of facilities, non-privatized infrastructure, real property (RP), accountable real property installed equipment (RPIE) at TAFB, and any attached, or related properties, under the control of TAFB. This includes (1) engineering support; (2) infrastructure systems; (3) heavy repair; and (4) facility systems operations and sustainment. Broad examples of included activities are heating ventilation and air conditioning (HVAC), plumbing and electrical maintenance and repair, fire suppression maintenance, airfield maintenance, service request (SR) management, minor construction, structural, and roof maintenance. This activity also maintains and operates base-wide CE customer interface. Due to recent CE initiatives in facility sustainment and maintenance, the overall workload is expected to increase above historical averages. See Appendix C--Air Force Preventative Maintenance Task List (AF-PMTL) Data.

1.1.1. Utilities Privatization (UP): The primary electrical distribution, potable water (except water wells), and primary natural gas distribution systems are privatized and under the control of the system owners. Contractor is responsible for all secondary and lateral infrastructures throughout TAFB from established points of demarcation (POD). Contractor shall provide engineering and other support services to the government concerning UP systems as defined in paragraphs 1.3.4.1 and 1.3.4.3.

1.2. Contractor Operations Management: Performs all activities and functions related to leading, managing, training, directing people, and resources dedicated to performing operations and maintenance for all RP and RPIE. Provides information and support to the Base Civil Engineer (BCE) and government designated CE representatives as required. Generates, distributes, files, and maintains records of all required inspections, testing, training, certifications, operating instructions, appointments, and policy letters.

1.3. Contract Engineering: Responsible for engineering services and support to analyze, plan, and document current and long-term sustainment of RP and RPIE. Interfaces with customers to gather and validate emergent requirements. Ensures TRIRIGA and sustainment management systems (SMS) are accurate and complete. Performs cost estimating. Determines material requirements and requests materials. Provides customer service functions. Supports contingency and natural disaster plans. Attends meetings with various agencies concerning CE operations such as the Facilities Board.

1.3.1. In-House Engineering Capability: Analyzes, designs, and plans corrective repairs for shop craftsmen execution. Efforts limited to small scale in-house actions within work task (WT) or facility organization customer utilization service (FOCUS) scope such as inadequate facility lightning protection, resize boiler, etc.

1.3.2. Requirements and Optimization: Responsible for proactive systems performance analysis, resource optimization, life-cycle requirements, and customer interface. Areas of responsibility are preventative maintenance (PM), activity management plan (AMP), sub-AMPs, demand maintenance/customer service, TRIRIGA/SMS information technology (IT) data standards and analysis, industrial control systems (ICS) standards and analysis, contract project review integration/warranty management, and contingency planning and response.

1.3.2.1. Preventative Maintenance (PM) Program: Using the PM Playbook, implements an effective PM Program through inventory and condition assessments of PM assets. The PM Program responsibility is a function of contract engineering and focuses on the overall aspects of PM, such as ensuring PM inventory accuracy with the BUILDER database, on-time PM completion, etc. These activities must be executed in concert with facility systems, heavy repair, and infrastructure systems and performed on a continual basis as an integral part of day-to-day operations. Develops PM work plans to efficiently utilize craftsmen’s time and travel. Preventive maintenance for assets in the PM Program must be prioritized over all other forms of work, with the exception of Work Priority 1, Emergency Corrective Maintenance. The contractor must execute greater than (>)95% of the scheduled PM requirements for assets identified in the PM Program, with the exception of government-approved deviations. These deviations are limited to issues outside the contractor’s control, such as lack of access by facility occupants, facility/ equipment under renovation, etc.

1.3.2.1.1. AF Preventative Maintenance Task List (AF-PMTL): Non-commercial or government-specific PM requirements, as determined by the government. The AF-PMTL has been incorporated into TRIRIGA. Appendix C, AF Preventive Maintenance Task List, references TAFB specific information.

1.3.2.1.2. PM Inventory: Ensure RPIE inventory documentation between the BUILDER and TRIRIGA systems is accurate and up to date. Perform complete RPIE data inventory review annually.

1.3.3. AMP Responsibilities: Assigns, gives direction to, and enforces deliverables from sub-AMP subject matter experts (SMEs) for each applicable sub-AMP. Ensures appropriate members from across the squadron and installation are invited to and actively participate in AMP working groups. Chairs quarterly facilities AMP working group to integrate and synchronize any sub-AMP working group efforts. Facilitates integration of AMP plans, requirements, and priorities into the base comprehensive asset management plan (BCAMP). Directs the planning aspect of an activity and integrates the sub-activity requirements and priorities into the AMP to assess the activity, identify requirements, and effectively plan, program, budget, and execute resources necessary for optimal life-cycle operation of the activity using a risk-based approach. Oversees the life-cycle performance and condition of all component inventory management metrics in assigned built and natural infrastructure. Assists in defining/prioritizing projects within the respective activity and identifying and working to resolve issues. Reviews and validates built assets facility condition index and life-cycle requirements generated by SMS (e.g., TRIRIGA, BUILDER, etc.). As required, initiates inspection and root-cause analysis protocols to update compliance inspections (CIs) to reflect actual conditions. Based on inspection protocols, supports inspections, at a frequency to be determined but likely based on mission dependency index (MDI) for non-preventive maintenance condition assessments and ensures related data is entered into SMS for metric development. Ensures inspection protocols are completed and that condition assessment data in the built asset inventory are updated as a result of PM inspections. Works with planners and section craftsmen to review facility projects and in-house projects during initial phase of the review process to evaluate requirement against the BCAMP. Attends the work request review board (WRRB) as applicable.

1.3.3.1. Transportation Networks and Airfield Pavements (TNAP) AMP: SME for the TNAP systems at the installation level. The AMP encompasses the provision and management of infrastructure networks to enable the safe and efficient movement of people, equipment, and material.

1.3.3.2. Utilities AMP: Responsible for the government-owned utilities systems at the installation level. The utilities AMP encompasses the provision and management of water supply, wastewater, energy, and fuels services. This includes infrastructure networks and meeting regulatory requirements IAW applicable laws and regulations. Included in the utilities AMP are RPIE generators and equipment authorized in-use details (EAID) generators, airfield lighting, security lighting, lightning protection systems, grounding/bonding systems, and cathodic protection systems.

1.3.4. Sub-AMP Duties: Ensures appropriate members from across the squadron and installation are invited to, and actively participate, in sub-AMP working groups. Ensures sub-AMP working groups are convened at least quarterly. Maintains accountability of entire asset inventory. Implements higher headquarters (HHQ) standards for RP accounting and linear segmentation to define all sub-AMP assets. HHQ is defined as any functional level above the FW, such as Headquarters Air Force (HAF), Air Force Installation and Mission Support Center (AFIMSC), Air Force Civil Engineering Center (AFCEC), etc. Coordinates mission priorities for each asset through the government. Benchmarks sub-activity with industry/government agencies, continuously improves the processes, suggests changes to playbooks, and incorporates best practices. Reports to the AMP SME to ensure that all sub-AMP investments are coordinated with HHQ programming authorities and programmed into the AMP/investment plan. Coordinates with AMP representative to ensure all issues for sub-AMP are logged in the administrative file (A-File)/next generation (NexGen) IT for inclusion in HHQ AMP reviews. Leads sub-AMP working groups in AMP development. Determines the magnitude and impact of the degraded systems on factors such as energy use, system reliability, mission risk, and plant operations costs. Defines the scope and cost alternatives for solutions/requirements to remedy root cause of abnormality to mitigate risk and maximize return on investment (ROI). Aligns requirement to proper execution method (e.g., PM, in-service work plan (IWP), and AMP). Uses subject matter expertise to inform policy recommendations on how to correct deficiencies/issues. Aligns/deconflicts requirements across all of the squadron’s execution methods. Tracks and evaluates goals, metrics, and trends. Ensures requirements are developed using a balanced risk management approach and prepares sub-activity requirements and priorities. Finds opportunities to maximize funds (e.g., strategic sourcing) and ROI. Develops and maintains a process to ensure all physical features, cost accounting, asset performance, and life-cycle programming data is accurately associated with those specific assets. Performs annual review of applicable SMS database information to maintain accurate inventory within assigned sub-AMP assets. Ensures accurate capitalization of all sub-AMP assets upon receipt of required documentation. Performs semi-annual review of asset inventory with respect to performance data (e.g., failures, service calls, man-hour/material costs, and energy use) to detect any abnormalities affecting expected life-cycle performance. Evaluates and diagnoses the root cause of the abnormalities. Coordinates facility condition inspection visits and makes available appropriate RP data from assessments to real property office. Participates and advocates for sub-activity during AMP and comprehensive asset management plan (CAMP) build.

1.3.4.1. Electrical Sub-AMP: Responsible for all AF-owned electrical power production and secondary systems. Responsibilities include airfield, roadway, area and security lighting, lightning protection, grounding and bonding systems, and cathodic protection. Responsibilities also include arc flash, relay coordination, and electrical system modeling programs as related to the secondary distribution system. In coordination with the government, develops cost estimates, reviews plans, and advises on UP electrical projects. The electrical sub-AMP provides facility ICS inputs to the government facilities AMP manager. Generator fuel supplies to meet emergency electrical requirements are a responsibility of the electrical sub-AMP. Responsible for the 5-year defense plan (FYDP) +2 infrastructure plans to include secondary electrical, cathodic protection, and airfield lighting plans. Airfield and roadway lighting/lightning protection systems and aircraft arresting system (AAS) are also covered in the TNAP AMP which requires coordination of requirements.

1.3.4.2. Wastewater/Storm Water Sub-AMP: Responsible for industrial wastewater, domestic wastewater, and storm water systems. This includes lift stations, collection lines, manholes, oil/water separators, and other pre-treatment units (storm water pipes, swales, detention/retention areas, and outfalls). Works closely with the government land sub-AMP manager to provide watershed-level storm water planning. The wastewater/storm water sub-AMP has primacy for all related manmade structures and the land sub-AMP manager consults regarding the effects those structures (or the lack thereof) have on the watershed. Coordination between affected sub-AMP representatives is essential. The dividing line is the 5-foot line for facilities under the government facilities AMP manager and paved surfaces for TNAP sub-AMP representatives. Responsible for the FYDP+2 infrastructure wastewater and storm drainage plans.

1.3.4.3. Potable/Non-Potable Water sub-AMP: The potable/non-potable water sub-AMP is responsible for all AF-owned potable water, non-potable water, and fire emergency services (FES) systems up to the UP POD. This includes water wells, secondary distribution lines, pumps, valves, etc. In coordination with the government, develops cost estimates, reviews plans, and advises on privatized utilities water projects. The potable/non-potable water sub-AMP representative is responsible for the FYDP+2 infrastructure water plan. In coordination with the government, develops cost estimates for privatized potable water projects.

1.3.4.4. Mechanical Distribution sub-AMP: Responsible for all facilities providing transmission, monitoring, and maintenance support to the distribution system. This includes all AF-owned and privatized non-electric energy transmission systems (natural gas, hot water, steam) within the base boundary up to the 5-foot line of structures. Responsible for all facility-specific HVAC systems and facility mechanical rooms. Responsible for FYDP+2 infrastructure plans to include natural gas and HVAC plans. In coordination with the government, develops cost estimates, reviews plans, and advises on privatized utilities natural gas projects.

1.3.4.5. Mechanical/HVAC Systems Sub-AMP: Responsible for those systems consistent with commercial standard UNIFORMAT II mechanical systems and conveying systems including cooling, heating, and ventilating. Responsible for the overall operation, maintenance, repair, compliance, sustainment, and recapitalization of facility-related mechanical/HVAC assets and associated FYDP+2 requirements identification. Works closely with technical staff and knowledgeable in the different systems.

1.3.4.6. Facilities Interior Utility Systems sub-AMP: Responsible for those systems consistent with UNIFORMAT II plumbing systems, electrical systems, and FES. This includes interior water and wastewater, fire suppression, lighting, alarms, and interior electrical. Responsible for the overall operation, maintenance, repair, compliance, sustainment, and recapitalization of facility-related assets and associated FYDP+2 requirements identification. Works closely with technical staff and knowledgeable in the different systems.

1.3.5. Demand Maintenance/Customer Service: Using the work management playbook, operates a centralized customer request center 7 days week/24 hours a day, including holidays. Receives and processes draft WTs. Provides customers job status updates. Develops and oversees IWP. Performs IWP analysis and feedback to improve process. Initiates and develops work schedules (daily, weekly, monthly, annually). Enters work task data into NexGen IT (material costs and labor information). Develops project/WT status and other relevant information for briefings. Develops and maintains audit records/files. Tracks, coordinates, and routes SRs and work clearance requests (AF Form 103, locally developed work clearance requests, road closure permits, utilities outages, etc.). Coordinates planned utilities outages with appropriate agencies a minimum of 3 days in advance. Provides coordinated work tasks and/or facility projects for WRRB review and approval. Ensures appropriate shop coordination on planned in-house work orders. Transfers approved WTs and/or facility projects in TRIRIGA for programs relevant execution. Ensures WTs and/or facility projects have been reviewed/ coordinated by the appropriate shop. Coordinates with and ensures WRRB attendance by appropriate agencies (e.g., fire department, safety, environmental, engineering, sub-Amp sections, etc.). Maintains process to develop a weekly, monthly, and quarterly IWP that is balanced to meet AF standards and leadership priorities. Communicates WT decisions, investment plans, and repair timelines to customers. Collects information from each shop on available man-hours. Updates shops on all open work to include type of work, asset criticality (tier), and cost. Gathers shop priorities based on AF-standard prioritization models and adjusts for local logistical/environmental considerations. Coordinates with engineers/sub-AMP personnel to ensure that shop priorities accurately reflect systems investment plan priorities. Obtains government approval of shop priorities. Aligns available man-hours to approved priorities. Ensures cross-shop coordination for any multi-craft work. Executes WT closeout to include coordination with the government to update base maps and applicable floor plans, ensures accurate RP capitalization, and accurately accounts for all costs.

1.3.5.1. Conducts weekly meeting with government. Topics for this meeting include, but are not limited to: status of current/future projects, funding, personnel, service summary, productivity, service quality, and/or other events that impact productivity, such as inspections, VIP visits, exercises, hurricane preparations, etc.

1.3.6. TRIRIGA/SMS Data Standards and Analysis: Maintains data entry quality and accuracy standards based on AF policy, NexGen IT procedures, and technical guidance. Trains personnel on data entry standards (e.g., cost accounting, type of work, prioritization, asset coding, maintenance performed, failure descriptions, direct inspections, etc.). Maintains an active roster of trained data stewards representing each contract shop. Conducts quarterly review of each shop’s data entry quality, timeliness, and accuracy, and addresses corrections through shop leadership or through sub-AMP working groups. Provides reports for all AMP and sub-AMPs to outline and align programmed investments and worst performing assets (e.g., operations and maintenance (O&M) costs, service calls). Develops any unique reports required for local needs or HHQ taskers.

1.3.7. Industrial Control Systems (ICS) Standards & Analysis: Maintains ICS standards across all systems/sub-AMPs based on AF policy and technical guidance. Coordinates with the government energy manager to ensure that O&M activities are aligned to installation energy management goals and prioritized to optimally reduce the installations energy consumption. Provides oversight on energy and ICS aspects of O&M activities to include assessment of energy performance of key building systems (e.g., HVAC, controls, lighting, power systems, water systems) to ensure optimal efficiency. Periodically identifies energy systems for re-commissioning or retro-commissioning to improve energy performance and goal attainment. Establishes HVAC and mechanical set points strategy for optimal building operation as determined in coordination with base energy manager. Directs the Energy Management Control Systems (EMCS) Program. Trains personnel on tools provided through transforming ICS technology. Provides on-demand ICS expertise to engineers, craftsmen, and contracting officer’s representatives (CORs). Coordinates with appropriate engineers/sub-AMP chairs to aid in PM planning for ICS. Coordinates with all engineers/sub-AMP chairs to aid in investment planning for ICS. Reviews PWS, contract specifications, and projects to ensure the government receives mission capable/high performing/ warrantied products. Works with the government to develop cost estimates for UP projects. Attends design charrettes to ensure feasible, standard, and aggressive use of ICSs. Performs project design reviews at each contract milestone to ensure quality, maintainable control systems are being implemented. Reviews construction material submittals as applicable to ensure quality/warrantied/maintainable ICS are constructed/installed. Coordinates with base energy manager to spot trends and analyze the root cause of trends in energy use. Coordinates with HHQ SMEs on changing policies and technical guidance to ensure standards are met.

1.3.8. Contract Project Review Integration and Warranty Management: Coordinates with the government to gather information and provide comments for all ongoing/impending contract construction to include: contract specifications, design charrettes, design reviews, materials submittal, meetings, O&M turn-over meetings, training, and warranty inspections. Creates a systematic process to move reviews through engineers/shops/SMEs. Schedules quarterly warranty/design review meetings with engineers/shops/SMEs. Ensures all warranty information is catalogued according to the unit warranty tracking system and/or NexGen IT procedures. Briefs each sub-AMP working group quarterly on contract review and warranty inspection requirements for the next quarter. Creates and maintains a systematic process to manage warranties and fully utilize the terms of all warranties. Holds personnel accountable for meeting suspenses and attending scheduled meetings. Provides on-demand engineering expertise to CORs for any contract project.

1.3.9. Contingency Planning & Response: Provides command/control to perform installation assessment and CE recovery operations after contingency. Directs engineering activities in unit control center (UCC). Performs damage assessment of airfield, facilities, and infrastructure systems. Conducts recovery actions of airfield, facilities, and infrastructure systems. Maintains UCC maps, plans, charts, and other documents and files. Sets up UCC and provides administrative support. Monitors and operates communication equipment. Coordinates annual checklist reviews by all shops. Maintains weekly stand-by roster and stand-by procedures. Provides input to contingency response plan. Familiar with all base emergency plans in the event of real world incidents, natural disasters, and other unforeseen emergencies. Performs functions necessary to minimize loss of personnel, resources, and operational capability. Participates in base exercises as directed.

1.3.9.1. Mission Essential Services. Services determined to be essential for performance during crises according to DoDI 3020.37 are emergency and urgent work requests, disaster preparedness and emergency operations, and infrastructure maintenance. The contractor shall continue providing service to TAFB 24 hours a day until the crisis is over. The contractor shall ensure enough skilled personnel are available during a crisis for any operational emergency due to utility failure, damage control, and damage repair. A crisis management plan and a list of mission-essential personnel shall be submitted to the COR within 30 calendar days after contract award. The mission-essential personnel list shall contain the individual’s name, address, home phone number, cell phone number, security clearance, and duty title. The list shall be updated quarterly for the entire period of the contract.

1.3.9.2. Strike Plan. The service provider shall develop and maintain a strike contingency plan that establishes procedures to cope with labor disputes among its workforce. One copy of the service provider’s Strike Plan shall be provided to the CO for acceptance not later than 30 days after the transition-in start date. Any changes to the plan shall be submitted to the CO within 14 days of occurrence.

1.3.9.3. Hurricane Preparedness: Annually, NLT 1 Jun, the contractor will submit a quote to the CO detailing the projected labor and fuel costs to support the 325 CES Contingency Response Plan 702, Annex B. In addition to estimated fuel costs, the quote shall list hourly labor costs, by required team position (Base Ride-Out or Base Recovery Elements). In the event a hurricane is projected to strike TAFB, the quote will be used to determine funding for the contractor’s initial hurricane response.

1.3.9.4. Administers the 325 FW Plan 31-101, Integrated Defense Plan (IDP), barrier program. In concert with the FW Anti-Terrorism Officer (ATO), updates plans/maps as required and develops/implements improvements to meet changing needs. Tracks condition and location of concrete barriers, bollards, and cables. Performs corrosion control and painting as necessary. Positions barriers and bollards when directed.

1.3.10. Specific Engineering Responsibilities: Inventories and inspects TAFB bridges and provides updates to AFCEC as directed IAW Air Force Instruction (AFI) 32-1001, Operations Management.

1.3.10.1. Facility Manager Program: Administers a customer-focused Facilities Manager’s Program that ensures cost effective expenditures of resources and provides functional and serviceable facilities. Establishes a working relationship with facility managers and provides necessary training to include: work requirements, TRIRIGA Service Requests, identification of facility abuse/misuse, key/lock control, recycling programs, and energy conservation. The program shall facilitate the immediate identification of abnormal or alarming conditions and timely identification of facility damage, outages, and failures. Provides initial and refresher training once a month to all facility managers. Maintains the facility managers listing. Annually updates TAFBH 32-1001, Facility Manager and Facility Coordination, and forwards to the government for approval.

1.3.10.2. Traffic Management Program: Oversees base roadways, streets, parking lots, and driveways for traffic flow, signage, markings, and signaling devices, including time flow analysis. Coordinates with local base agencies, local municipal traffic planners, and/or Florida State Department of Transportation as appropriate. Develops and maintains base parking plans and traffic control processes. Conducts base traffic counts as required. Resolves base parking and traffic sign problems. Prepares crosswalk justifications based on pedestrian traffic and safety. Develops improvements to base traffic IAW the Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD). Presents recommendations to the Tyndall Traffic Safety Working Group for approval.

1.3.10.3. Chillers: Annually develops and provides to the government for approval a chiller replacement plan using BUILDER or other established life cycle/ROI analysis. Plans and executes chiller replacements with minimal impact to facility occupants or mission. For large, specialized, or proprietary chiller units outside the technical capabilities of the contractor, forwards the documentation to the government for a replacement project. Maintains, repairs, transports, and operates EAID portable chiller units as necessary.

1.3.10.4. Refrigerant Management: Develops, maintains, properly staffs, and annually updates the base Refrigerant Management Plan for government approval IAW AF Pamphlet (AFPAM) 32-7089, Refrigerant Management. Contractor is not responsible to recover refrigerant from non-CE owned assets. Exception: provide refrigerant recovery service of household type appliances removed from RP facilities prior to salvage, such as refrigerators, window air conditioning (A/C) units, etc.

1.3.10.4.1. R-22 Refrigerant Replacement: Develops and executes an R-22 refrigerant replacement program. Replaces or upgrades HVAC systems within scale and scope of in-house capabilities. Provides the government the necessary documentation for large or complex HVAC systems.

1.3.10.5. Maintains, inspects, repairs, replaces, certifies, and load tests all RP cranes, trolley rail systems, lifts, and hoists. Conducts fall arrest, hoist certification, etc., inspection frequency IAW with AFI 91-203, Air Force Consolidated Occupational Safety Instruction, and Occupational Safety & Health Administration (OSHA) Code of Federal Regulations (CFR) 1910.179, Overhead and Gantry Cranes.

1.3.10.6. Minor Services: PWS requirements, outside of the contractors’ capabilities, may be contracted to other contractors with approval of contracting officer (CO) and per contract terms. When necessary, the BOS contractor develops PWS, requests cost quotes, conducts site visits, inspects in-progress work, and accepts finished work. This is a cost-reimbursable CLIN. The contractor is required to seek three sources with the capabilities to perform the work. The government will provide approval/non-approval before the work begins. Once approval is provided, the BOS contractor is then responsible for ensuring the outsourced contractor’s work is acceptable and recieves payment for the completed work. Examples of minor services are bathtub refinish versus replacement, chiller repairs requiring specialized expertise or tooling, troubleshooting advanced HVAC or generator electronic controls, proprietary equipment, etc.

1.3.10.7. Real Property Asset Disposal: Coordinates RP disposal through the government to ensure real property records’ accuracy.

1.3.10.7.1. Processes and disposes of RP assets no longer required and functional through the Defense Logistics Agency (DLA) disposition services. Coordinates transportation of assets to the DLA regional location at Eglin AFB, FL through 325 LRS, Vehicle Operations.

1.3.10.7.2. Disposes of RP assets no longer functional but with salvage value through the Base Recycling Center. If necessary, contacts the government for salvage determination.

1.3.10.8. Base Wood Debris Site. Two containers are available for debris; wood only and construction debris. Use of this site is limited to facility occupants or CE service contractors only. Base construction contractors are not authorized. Responds to base customers request for access to the collection site. Verifies customers deposit appropriate type of debris in correct container. Crushes debris to below top of container as needed. Informs Base Refuse COR when container is full. Site shall be secured when unattended. Unauthorized or hazardous material dumping will be immediately reported to the COR.

1.3.11. Materiel Control: Using the Material Control Playbook process, oversees a contractor-operated civil engineer supply store (COCESS) function. Tasks include, but are not limited to, determines requirements and requests materials, maintains and monitors shop stock, manages shop equipment, manages hazardous material (HAZMAT), trains facility managers on HAZMAT, performs materiel acquisition, processes requisitions, receives material, manages holding areas, manages residual storage, retrieves property from vendor, tracks materiel, closes out WTs, maintains supply database, coordinates adjusted levels with craftsmen, provides customer training, and accomplishes end-of-year closeout.

1.3.11.1. U-Fix-It Program: Operates a U-Fix-It store to enable facility mangers to perform minor repairs within their technical capability. Coordinates/approves WTs. Coordinates materials distribution/allocation for approved projects. Coordinates the ordering of materials and supplies. Stocks common facility items such as picture hangars, light bulbs, outlet covers, toilet seats, etc. Stocks and issues common hand tools for facility mangers use. Provides technical oversight and inspection of U-Fix-It WTs to ensure finished work meets building codes.

1.4. Facility Systems: Responsible for inspection, maintenance, and repair of alarms, interior electrical, non-privatized exterior electrical systems, and power production systems. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Oversees the facility system functions of the BUILDER SMS data to ensure accuracy and integrity. Performs PM as directed in TRIRIGA on all facility systems related property. Utility service outages shall be no more than 60 minutes unless scheduled.

1.4.1. Alarms: Inspects, maintains, repairs, replaces, and modifies RPIE alarm control panels, annunciator equipment, initiating devices, notification appliances, and digital alarm transmitters/ receivers. Repairs environmental alarm systems. Provides notification of the inspection/test schedule to the government representative. Allows 2 business days to coordinate with the CE fire department and the facility manager prior to conducting tests. Inspects, tests, operates, and maintains carbon monoxide detection systems, environmental detection alarms, frequency modulated (FM) antennas, lift station controls, and base station and transceivers connected to these alarms IAW manufacturers’ recommendations and local procedures. Oversees alarm functions of the BUILDER SMS data to ensure accuracy and integrity. This requirement does not include non-RPIE security alarms, security cameras, etc.

1.4.2. Electric Shop: Responsible for inspection, maintenance, and repair of secondary electrical service. Performs work IAW AFI 32-1064, Electrical Safe Practices. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Coordinates with the UP system owner prior to performing work that may affect the primary electrical distribution system. Ensures the accuracy and integrity of the BUILDER SMS electrical functions data.

1.4.2.1. Interior Electrical Systems: Inspects, maintains, repairs, replaces, and modifies interior electrical systems and subsystem grounds IAW AFMAN 32-1083_IP, Facilities Engineering Electrical Interior Facilities.

1.4.2.2. Grounding/Lightning Protection: Inspects, maintains, repairs, replaces, and modifies grounding and lightning protection systems. Guidance detailed in AFI 32-1065, Grounding Systems, will be strictly adhered to.

1.4.2.3. Exterior Electrical: Inspects, maintains, repairs, replaces, and modifies secondary electrical systems, exterior lights (other than streetlights or stadium style lights), airfield rotating beacon, and the base traffic signal. NOTE: a small number of overhead lights have not been conveyed to UP contractor (See Appendix B—Real Property). Contractor is responsible for repair until conveyed.

1.4.2.3.1. Active Vehicle Barrier (AVB): Inspects, maintains, repairs, replaces, and modifies the gate AVBs and associated systems. Coordinates gate closures with Security Forces.

1.4.2.3.2. Cathodic Protection: Inspects, maintains, repairs, replaces, and modifies cathodic protections systems IAW AFI 32-1054, Corrosion Control.

1.4.2.3.3. Airfield Lighting: Inspects, maintains, repairs, replaces, and modifies airfield lighting systems IAW AFI 32-1044, Visual Air Navigation Systems.

1.4.3. Power Production: Primary responsibility is inspection, maintenance, and repair of emergency power systems, fire deluge pumps, and airfield arresting systems. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Controls standby/ emergency electrical functions of the BUILDER SMS data to ensure accuracy and integrity.

1.4.3.1. Power Generation: Inspects, troubleshoots, operates, maintains, repairs, replaces, and modifies RPIE and EAID power plants, automatic transfer switches, and associated components IAW AFI 32-1062, Electrical Systems, Power Plants, and Generators. Positions and monitors EAID generators as necessary to provide emergency power for critical repairs or hurricane preparedness. Informs the government of inoperative systems. Provides system operations training to facility mangers for assigned RPIE generators.

1.4.3.1.1. Fire Deluge Pumps: Inspects, maintains, repairs, replaces, and modifies fire deluge pumps and associated components.

1.4.3.1.2. Aircraft Arresting System (AAS): Inspects, maintains, repairs, replaces, certifies, and modifies the various aircraft arresting systems. Manages the contractor technical order (TO) distribution office for required AAS technical orders IAW TO 00-5-1, Air Force Technical Order System. Contractor will perform all power production requirements of AFI 32-1043 and AFI 32-1043 ACC Sup 1, Managing, Operating, and Maintaining Aircraft Arresting Systems, to include developing local instructions, training programs, record keeping, status reporting, etc. In addition, the contractor is responsible for all after-hours requirements, reconfigurations, etc. Respond to after-hours maintenance requests within 60 minutes.

1.5. Heavy Repair: Responsible for the inspection, maintenance, and repair of structures, roofing, locks, signs, storm water, paved/unpaved roads, and airfield pavements/clearance. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Manages functions of the BUILDER SMS data to ensure accuracy and integrity. Coordinates all repair work on the airfield with 325th Operations Support Squadron (OSS) Airfield Operations and the contractor TNAP AMP point of contract.

1.5.1. Structures: Performs minor interior, exterior repair, and alteration to facilities to include: painting, wall covering, roofing, drains/vents, structural repair, masonry, tiles, stucco/plaster, metal work/welding, etc. Carpeting, except for unaccompanied housing, is limited to small sectional repair, not whole room.

1.5.1.1. Roofing: Maintains and repairs roofing distresses, waterproof membranes, insulation, caulking, flashing, decking, gutters, rooftop equipment, coping, debris removal from roof/ gutters, and other structural roof elements IAW AFI 32-1051. Roof Systems Management. Conducts periodic inspections, annotates existing conditions, conducts investigation into failures, inputs data into BUILDER, and maintains the accuracy of roofing data.

1.5.1.2. Locksmith Services: Installs, removes, and maintains General Services Administration (GSA) secure container locks (vaults, safes, etc.). RP key/padlocks, cipher locks, cylinder locks, etc. Performs PM as required. Reviews all key requests to ensure the appropriate facility manager has a valid request. Ensures facility managers sign for keys and annotates a log established for this purpose. Ensures key blanks, master keys, key codes, and duplicates are secured while in possession to avoid misuse or unauthorized access to government facilities. After-duty-hours service call for lockouts will be accomplished jointly with Security Forces. The government will approve mechanical room key requests.

1.5.1.2.1. Secure Container Combination Locks: Locksmiths who work on secure containers will be GSA certified to inspect and repair Federal Standard FF-L-2740 combination locks on vaults, safes, etc. Defective secure container GSA locks will be a Priority 1 Emergency repair.

1.5.1.3. Unaccompanied Housing (UH) Maintenance: Performs maintenance and repair of UH units when the occupant moves out and before the new occupant occupies the room/suites. The maximum number of days authorized for UH unit downtime is 7 calendar days as directed in AFI 32-6005, Unaccompanied Housing Management. Whole room carpet replacement will be accomplished as required and with government approval. Report to the government any damage that may have been caused by abuse or negligence on the part of the occupant.

1.5.1.4. Signs: Installs, replaces, updates, and maintains exterior signs throughout TAFB following guidance in Unified Facilities Criteria (UFC) 3-120-01, Design: Sign Standards. Coordinates traffic signage with Base Traffic Engineer. Coordinates with the base architect as necessary to ensure compliance with Base Facilities Excellence Plan. Conflicts between customer requests and guidance will be addressed by the government.

1.5.2. Pavements/Repair: Inspects, maintains, and repairs linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, and pavement clearance operations IAW AFI 32-1041, Pavement Evaluation Program. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Documents linear infrastructure systems functions in local database or future SMS system.

1.5.2.1. Recreational Paths: Inspects and performs minor repairs to sidewalks, biking paths, jogging paths, and boardwalks to include boardwalk gazebos. Maintains records of inspection/condition in local database or future linear infrastructure data system.

1.5.2.2. Storm Drainage: Maintains and repairs storm water drainage systems such as drains, inlets, culverts, headwalls, weirs, ditches, swales, etc. Inspects and cleans drainage systems per TRIRIGA intervals. For open drainage ditches, scrapes debris, sediment, and overfill as necessary to return to free flowing condition.

1.5.2.2.1. All storm water control infrastructure requiring ground disturbance will be coordinated through the government prior to work.

1.5.2.2.2. Storm Water Ponds (Dry/Wet): Inspects and maintains storm water ponds (wet or dry) or swales as directed in the issued permits to include applicable soil testing, scarifying, material fill, etc. No ponds are currently in “permitted” status. Ponds in permit compliance at the time of contract award will be the contractor’s responsibility. Ponds not in permit compliance will be addressed by the government. Ponds returned to permitted conditions will be added as a contractor responsibility with corresponding workload increase. A request for proposal will be issued to the contractor for those maintenance requirements.

1.5.2.3. Paved Roads: Inspects and repairs paved roads, curbs, gutters, drainages and culverts, guardrails, and other road components including pavement markings. Contractor is limited to minor repairs of road surface defined as no larger than 200 sq. ft. per WT. Prioritizes roadway damage as 1-Emergency if fire response routes are affected or 3A (High) repair priority if normal traffic flow is impacted.

1.5.2.3.1. Unpaved Roads: As identified on base maps. Inspects, maintains, and repairs unpaved roads. Grades primary unpaved roads on a semi-annual basis. Grades secondary unpaved roads on an annual basis. Impassable unpaved roads will initially be scheduled as a 3A (High) repair priority. Contractor is not responsible for hunting or fire access roads.

1.5.2.3.2. Driveways, Parking Lots, and Storage Areas: Inspects, repairs, and maintains driveways, parking lots, and storage areas. Restripes parking lines as needed when requested through a WT.

1.5.2.4. Fences: Annually inspects base perimeter, security, and safety fences, gates, anti-intrusion wire, other fence components and performs repairs as necessary. Performs installation and repair to fences (wooden and/or chain link style) around 10 historical cemeteries. Repair of damage to base perimeter or facility security fencing which allows unimpeded access will be a Priority 1 Emergency repair. All other types of damage will be considered a 3A (High) repair priority.

1.5.2.5. Airfields: Inspects and repairs airfield pavements, markings, joints and maintains shoulders to prevent erosion. Ensures the airfield and adjoining assets are always capable of supporting mission and transient aircraft, unless previously approved by airfield management or other governmental agency. Coordinates airfield work through 325 OSS, Airfield Management.

1.5.2.6. Sweeping Operations: Provides removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. Sweeps streets, parking lots, airfield pavements, and walkways. Ensures the airfield and adjoining assets are always capable of supporting mission and transient aircraft, unless previously approved by airfield management or other governmental agency. Airfield sweeping operations will commence not later than (NLT) 0600L on FW flying days. Responds to after-hours maintenance requests within 60 minutes. Coordinates airfield sweeping operations through 325 OSS, Airfield Management.

1.6. Infrastructure Systems: Inspects, maintains, and repairs the EMCS, fire suppression, potable/non-potable water, wastewater, liquid fuels, natural gas, entomology, and HVAC. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Oversees functions of the BUILDER SMS data to ensure accuracy and integrity. Performs PM as directed in TRIRIGA on all infrastructure related property. Utility service outages shall be no more than 60 minutes unless scheduled.

1.6.1. Environmental Control Systems: Using the EMCS Playbook, maintains, monitors, installs, removes, operates, calibrates, and repairs EMCS/controls systems and associated components. Establishes an effective PM Program using the playbook maintenance section as a guide. Operates the EMCS 24 hours a day, 7 days a week, including federal holidays. Assists the base in meeting DoD energy targets by ensuring equipment is maintained at peak efficiency and any new equipment installed meets or exceeds Federal Energy Management Program standards. Maintains and updates the EMCS master plan. Develops quarterly EMCS saving reports within 15 days after the reporting quarter. Provides quarterly information for the Defense Utility Energy Reporting System (DUERS) report to the base energy manager. Maintains operational logs of all actions taken to correct any EMCS alarms or operational conditions or occurrences. Performs load shedding. Ensures information assurance compliance.

1.6.2. Water and Fuels Systems Maintenance: Inspects, maintains, repairs, and modifies fire suppression systems, liquid fuel systems, natural gas and liquid petroleum systems, wastewater, and secondary water distributions IAW AFI 32-1067, Water and Fuels Systems, and AFI 32-7044, Storage Tank Environmental Compliance. Performs corrosion control as necessary IAW AFI 32-1054, Corrosion Control. Coordinates with the UP system owner prior to performing work that may affect the primary water distribution system. Reviews plans and drawings to verify code compliance, functionality, and maintainability. Oversees the water and fuels functions of the BUILDER SMS data to ensure accuracy and integrity.

1.6.2.1. Fire…