Instructions
| ELECTRONIC SECTION B INSTRUCTIONS |
| General Instructions |
| Proposed prices should be based on the offeror's own technical approach as submitted in their Technical Proposal based on the Government's Performance Work Statement requirements. |
| Instructions regarding "Worksheet" Tab: |
| The "Worksheet" spreadsheet is intended to provide minimal supporting documentation for Schedule B prices. Enter offeror name where indicated; the offeror's name will automatically be copied from the worksheet to the Schedule B tab for each period of performance. |
| Instructions regarding "Sched B" Tabs: |
| Please enter unit prices rounded to the nearest penny (rounded to two decimal places) in the blue colored cells. Cells that do not require input are protected from accidental overtyping. Hit "Tab" to move between cells requiring input. Worksheet Tabs labeled "6-mos Extension" and "Total Sched B" are completely protected as they contain formula cells that will automatically fill based on data from previous worksheets. |
| Note: Refer to RFP Addendum to 52-212-2 for an explanation of how the Total Evaluated Price will be calculated by the Government. |
| Please ensure Total Evaluated Price as calculated on Schedule B for each year is as intended. |
Worksheet
SCHEDULE B WORKSHEET
| Available Hours: | | | | | | | |
| Basic (3.5 mos) | Option 1 (12 mos) | Option 2 (12 mos) | Option 3 (12 mos) | Option 4 (12 mos) | Option 5 (7 mos) | Total |
| CLIN X001 OPERATIONS FLIGHT MANAGEMENT | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X002 FINANCIAL MANAGEMENT | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X003 OPERATIONS ENGINEERING STAFF | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X004 U-FIX-IT OPERATIONS | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X005 FACILITY SYSTEMS - ELECTRICAL | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X006 FACILITY SYSTEMS - ALARMS | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X007 FACILITY SYSTEMS - POWERPRO | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X008 HEAVY REPAIR - STRUCTURES | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X009 PAVEMENT CLEARANCE (SWEEPING) | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X010 PAVEMENT REPAIR | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X011 ENERGY MANAGEMENT CONTROL SYSTEMS | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X012 ENTOMOLOGY | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X013 WATER AND FUELS | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN X014 HVAC | | | | | | | |
| Labor Hours | | | | | | | 0.00 |
| Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Non-Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN 0022 TRANSITION | 45 days |
| Labor Hours | |
| Labor Dollars | $ - 0 |
| Non-Labor Dollars | $ - 0 |
| Total | $ - 0 |
&P
Transition & Base Sched B
| Section B - Supplies or Services and Prices | TRANSITION & BASE PERIOD |
| 16 Nov 17 - 16 Apr 18 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 0001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 0002 | FINANCIAL MANAGEMENT - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 0003 | OPERATIONS ENGINEERING STAFF - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 0004 | U-FIX-IT - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 0005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove and repair electrical systems. PWS 1.4.2 | | | | | |
| 0006 | FACILITY SYSTEMS - ALARMS - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 0007 | FACILITY SYSTEMS - POWER PRO - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 0008 | HEAVY REPAIR - STRUCTURES - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy, signs. PWS 1.5.1 | | | | | |
| 0009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 0010 | PAVEMENT REPAIR - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 0011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 0012 | ENTOMOLOGY - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 0013 | WATER AND FUELS - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater and secondary water, and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 0014 | HVAC - FFP - 1 Jan 18 to 16 Apr 18 | 3.5 | MO | $ - 0 | $ - 0 |
| Maintain, Inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 0015 | TRAVEL/TRAINING - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 4,166.67 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 0016 | MINOR SERVICES - NTE FFP- 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 10,416.67 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 0017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 838,541.67 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 0018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 6,250.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | | |
| 0019 | AFPMLT SUPPORT - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 625,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 0020 | TRIRIGA - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 125,000.00 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 0021 | TRIRIGA INCREASE - NTE FFP - 1 Jan 18 to 16 Apr 18 | Lot | NTE | $ 208,333.33 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| 0022 | TRANSITION - FFP - 16 Nov 17 to 31 Dec 17 | 1.5 | MO | $ - 0 |
| All duties required to effectively accomplish mobilization and changeover. PWS 4.29 | | | | |
| Total Evaluated Price, Basic Period | $ - 0 |
| Total Contract Price, Base Period | $ 1,817,708.34 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Opt 1 Sched B
| Section B - Supplies or Services and Prices | OPTION PERIOD 1 |
| 17 Apr 18 - 16 Apr 19 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 1001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 1002 | FINANCIAL MANAGEMENT - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 1003 | OPERATIONS ENGINEERING STAFF - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 1004 | U-FIX-IT - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 1005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 1006 | FACILITY SYSTEMS - ALARMS - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 1007 | FACILITY SYSTEMS - POWER PRO - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 1008 | HEAVY REPAIR - STRUCTURES - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 1009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 1010 | PAVEMENT REPAIR - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 1011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 1012 | ENTOMOLOGY - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 1013 | WATER AND FUELS - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 1014 | HVAC - FFP - 17 Apr 18 to 16 Apr 19 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 1015 | TRAVEL/TRAINING - NTE FFP 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 10,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 1016 | MINOR SERVICES - NTE FFP - 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 25,000.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 1017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 2,300,000.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 1018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 15,000.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | | |
| 1019 | AFPMTL SUPPORT - NTE FFP - 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 1,500,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 1020 | TRIRIGA - NTE FFP - 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 150,000.00 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 1021 | TRIRIGA INCREASE - NTE FFP - 17 Apr 18 to 16 Apr 19 | Lot | NTE | $ 500,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, Option 1 | $ - 0 |
| Total Contract Price, Option 1 | $ 4,500,000.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Opt 2 Sched B
| Section B - Supplies or Services and Prices | OPTION PERIOD 2 |
| 17 Apr 19 - 16 Apr 20 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 2001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 2002 | FINANCIAL MANAGEMENT - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 2003 | OPERATIONS ENGINEERING STAFF - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 2004 | U-FIX-IT - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 2005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 2006 | FACILITY SYSTEMS - ALARMS - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 2007 | FACILITY SYSTEMS - POWER PRO - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 2008 | HEAVY REPAIR - STRUCTURES - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 2009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 2010 | PAVEMENT REPAIR - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 2011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 2012 | ENTOMOLOGY - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 2013 | WATER AND FUELS - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 2014 | HVAC - FFP - 17 Apr 19 to 16 Apr 20 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 2015 | TRAVEL/TRAINING - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 10,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 2016 | MINOR SERVICES - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 25,000.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 2017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 2,300,000.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 2018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 15,000.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | | |
| 2019 | AFPMTL SUPPORT - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 1,500,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 2020 | TRIRIGA - NTE FFP -17 Apr 19 to 16 Apr 20 (RESERVED) | Lot | NTE | $ - 0 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 2021 | TRIRIGA INCREASE - NTE FFP - 17 Apr 19 to 16 Apr 20 | Lot | NTE | $ 500,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, Option 2 | $ - 0 |
| Total Contract Price, Option 2 | $ 4,350,000.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Opt 3 Sched B
| Section B - Supplies or Services and Prices | OPTION PERIOD 3 |
| 17 Apr 20 - 16 Apr 21 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 3001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 3002 | FINANCIAL MANAGEMENT - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 3003 | OPERATIONS ENGINEERING STAFF - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 3004 | U-FIX-IT - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 3005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 3006 | FACILITY SYSTEMS - ALARMS - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 3007 | FACILITY SYSTEMS - POWER PRO - FFP -17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 3008 | HEAVY REPAIR - STRUCTURES - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 3009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 3010 | PAVEMENT REPAIR - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 3011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 3012 | ENTOMOLOGY - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 3013 | WATER AND FUELS - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 3014 | HVAC - FFP - 17 Apr 20 to 16 Apr 21 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 3015 | TRAVEL/TRAINING - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 10,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 3016 | MINOR SERVICES - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 25,000.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 3017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 2,300,000.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 3018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 15,000.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | | |
| 3019 | AFPMTL SUPPORT - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 1,500,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 3020 | TRIRIGA - NTE FFP - 17 Apr 20 to 16 Apr 21 RESERVED | Lot | NTE | $ - 0 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 3021 | TRIRIGA INCREASE - NTE FFP - 17 Apr 20 to 16 Apr 21 | Lot | NTE | $ 500,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, Option 3 | $ - 0 |
| Total Contract Price, Option 3 | $ 4,350,000.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Opt 4 Sched B
| Section B - Supplies or Services and Prices | OPTION PERIOD 4 |
| 17 Apr 21 - 16 Apr 22 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 4001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 4002 | FINANCIAL MANAGEMENT - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 4003 | OPERATIONS ENGINEERING STAFF - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 4004 | U-FIX-IT - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 4005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 4006 | FACILITY SYSTEMS - ALARMS - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 4007 | FACILITY SYSTEMS - POWER PRO - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 4008 | HEAVY REPAIR - STRUCTURES - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 4009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 4010 | PAVEMENT REPAIR - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 4011 | ENNERGY MANAGEMENT CONTROL SYSTEMS - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 4012 | ENTOMOLOGY - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 4013 | WATER AND FUELS - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 4014 | HVAC - FFP - 17 Apr 21 to 16 Apr 22 | 12 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 4015 | TRAVEL/TRAINING - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 10,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 4016 | MINOR SERVICES - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 25,000.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 4017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 2,300,000.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 4018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 15,000.00 |
| Repair, replace, service or new/added Government furnished property if approved. PWS 3.1 | | | | |
| 4019 | AFPMTL SUPPORT - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 1,500,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 4020 | TRIRIGA - NTE FFP - 17 Apr 21 to 16 Apr 22 RESERVED | Lot | NTE | $ - 0 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 4021 | TRIRIGA INCREASE - NTE FFP - 17 Apr 21 to 16 Apr 22 | Lot | NTE | $ 500,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, Option 4 | $ - 0 |
| Total Contract Price, Option 4 | $ 4,350,000.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Opt 5 Sched B
| Section B - Supplies or Services and Prices | OPTION PERIOD 4 |
| 17 Apr 21 - 13 Nov 22 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 5001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 5002 | FINANCIAL MANAGEMENT - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | |
| 5003 | OPERATIONS ENGINEERING STAFF - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 5004 | U-FIX-IT - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 5005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 5006 | FACILITY SYSTEMS - ALARMS - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 5007 | FACILITY SYSTEMS - POWER PRO - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 5008 | HEAVY REPAIR - STRUCTURES - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 5009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 5010 | PAVEMENT REPAIR - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 5011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 5012 | ENTOMOLOGY - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 5013 | WATER AND FUELS - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 5014 | HVAC - FFP - 17 Apr 22 to 13 Nov 22 | 7 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 5015 | TRAVEL/TRAINING - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 5,833.33 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 5016 | MINOR SERVICES - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 14,583.33 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 5017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 1,173,958.33 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 5018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 8,750.00 |
| Repair, replace, service or new/added Government furnished property if approved. PWS 3.1 | | | | |
| 5019 | AFPMTL SUPPORT - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 875,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 5020 | TRIRIGA - NTE FFP - 17 Apr 22 to 13 Nov 22 RESERVED | Lot | NTE | $0.00 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 5021 | TRIRIGA INCREASE - NTE FFP - 17 Apr 22 to 13 Nov 22 | Lot | NTE | $ 291,666.67 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, Option 5 | $ - 0 |
| Total Contract Price, Option 5 | $ 2,369,791.66 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
6-mos Extension
| Section B - Supplies or Services and Prices | OPTIONAL 6-MONTH EXTENSION |
| 14 Nov 22 - 5 May 23 |
| CLIN | SERVICE | QTY | UNIT | UNIT COST | TOTAL |
| 6001 | OPERATIONS FLIGHT MANAGEMENT - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | | | | |
| 6002 | FINANCIAL MANAGEMENT - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | | | | |
| 6003 | OPERATIONS ENGINEERING STAFF - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | | | | |
| 6004 | U-FIX-IT - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | | | | |
| 6005 | FACILITY SYSTEMS - ELECTRICAL - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | | | | |
| 6006 | FACILITY SYSTEMS - ALARMS - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | | | | |
| 6007 | FACILITY SYSTEMS - POWER PRO - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | | | | |
| 6008 | HEAVY REPAIR - STRUCTURES - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | | | | |
| 6009 | PAVEMENT CLEARANCE (SWEEPING) - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | | | | |
| 6010 | PAVEMENT REPAIR - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | | | | |
| 6011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | | | | |
| 6012 | ENTOMOLOGY - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | | | | |
| 6013 | WATER AND FUELS - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | | | | |
| 6014 | HVAC - FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | 6 | MO | $ - 0 | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | | | | |
| 6015 | TRAVEL/TRAINING - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 5,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | | |
| 6016 | MINOR SERVICES - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 12,500.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | | |
| 6017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 1,150,000.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | | |
| 6018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 7,500.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | | |
| 6019 | AFPMTL SUPPORT - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 750,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | | |
| 6020 | TRIRIGA - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 RESERVED | Lot | NTE | $ - 0 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | | |
| 6021 | TRIRIGA INCREASE - NTE FFP - 14 Nov 22 to 5 May 23, if used after Option 5 | Lot | NTE | $ 250,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | | |
| Total Evaluated Price, 6-Month Extension | $ - 0 |
| Total Contract Price, 6-Month Extension | $ 2,175,000.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government
&P
Total Sched B
| Section B - Supplies or Services and Prices | BASIC, ALL OPTION YEARS, & 6-MOS EXTENSION |
| 16 November 2017 to 5 May 2023 |
| CLIN | SERVICE | TOTAL |
| X001 | OPERATIONS FLIGHT MANAGEMENT - FFP | $ - 0 |
| Manage and perform all activities and functions related to leading, managing, training, and directing people and resources dedicated to performing operations and maintenance activities. PWS 1.2 | | |
| X002 | FINANCIAL MANAGEMENT - FFP | $ - 0 |
| Provide financial management documentation for operations and maintenance budgets, minor construction, and other operations associated with this contract. PWS 1.7.2 | | |
| X003 | OPERATIONS ENGINEERING STAFF - FFP | $ - 0 |
| Manage, train, and perform all activities related to contract engineering, customer service, and operate the contractor-operated Civil Engineer Supply Store function. PWS 1.3 all inclusive except para 1.3.11.1 | | |
| X004 | U-FIX-IT - FFP | $ - 0 |
| Manage and operate the U-Fix-It program. PWS 1.3.11.1 | | |
| X005 | FACILITY SYSTEMS - ELECTRICAL - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, install, remove, and repair electrical systems. PWS 1.4.2 | | |
| X006 | FACILITY SYSTEMS - ALARMS - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, modify, repair, and replace alarms systems. PWS 1.4.1 | | |
| X007 | FACILITY SYSTEMS - POWER PRO - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and operate power generation, fire pumps and aircraft arresting systems. PWS 1.4.3 | | |
| X008 | HEAVY REPAIR - STRUCTURES - FFP | $ - 0 |
| Maintain, inspect, repair facility structures, roof, locks, unaccompanied housing change of occupancy signs. PWS 1.5.1 | | |
| X009 | PAVEMENT CLEARANCE (SWEEPING) - FFP | $ - 0 |
| Provide removal of debris from paved areas including streets, airfields, walkways, parking lots, and other similar surfaces. PWS 1.5.2.6 | | |
| X010 | PAVEMENT REPAIR - FFP | $ - 0 |
| Inspect, maintain, and repair linear infrastructure such as recreational paths, storm water control, paved/unpaved surfaces, fences, etc. PWS 1.5.2 | | |
| X011 | ENERGY MANAGEMENT CONTROL SYSTEMS - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, monitor, repair, replace, modify, and calibrate environmental controls management systems and associated components. PWS 1.6.1 | | |
| X012 | ENTOMOLOGY - FFP | $ - 0 |
| Provide pest control activities to include domestic and wild animal control services, monitoring, response, removal, and education programs for installation personnel. PWS 1.6.3 | | |
| X013 | WATER AND FUELS - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify fire suppression systems, liquid fuel systems, liquid petroleum systems, wastewater, and secondary water and natural gas distribution systems. PWS 1.6.2 | | |
| X014 | HVAC - FFP | $ - 0 |
| Maintain, inspect, troubleshoot, repair, replace, and modify HVAC system chillers, steam/condensate units, air handers, heating units, air conditioners, coils, condensers, boilers/furnaces, compressed air, piping, valves control systems, etc. PWS 1.6.4 | | |
| X015 | TRAVEL/TRAINING - NTE FFP | EST | $ 55,000.00 |
| Travel for approved training, conferences, etc. PWS 4.17 | | | |
| X016 | MINOR SERVICES - NTE FFP | EST | $ 137,500.00 |
| Services performed by outside contractors when approved. PWS 1.3.10.6 | | | |
| X017 | WORK ORDER SUPPLIES/MATERIALS - NTE FFP | EST | $ 12,362,500.00 |
| Supplies and materials necessary for work within the scope of the contract. PWS 3.2.8 | | | |
| X018 | GOVERNMENT FURNISHED PROPERTY - NTE FFP | EST | $ 82,500.00 |
| Repair, replace, service or new/added government-furnished property if approved. PWS 3.1 | | | |
| X019 | AFPMTL SUPPORT - NTE FFP | NTE | $ 8,250,000.00 |
| Support for upcoming implementation of Air Force Preventative Maintenance Task List workload increase upon deployment of TRIRIGA referenced in Appendix C. PWS 1.3.2.1.1 | | | |
| X020 | TRIRIGA - NTE FFP | NTE | $ 275,000.00 |
| Service workload increase to support TRIRIGA deployment through stabilization period; data entry, training, provide facility manager training on system, etc. PWS 1.7.3 | | | |
| X021 | TRIRIGA INCREASE - NTE FFP | NTE | $ 2,750,000.00 |
| Service increase to support additional preventative maintenance requirements as determined by TRIRIGA after deployment. PWS 1.3.2.1 | | | |
| X022 | TRANSITION - FFP | $ - 0 |
| All duties required to effectively accomplish mobilization and changeover. PWS 4.29 | | |
| Total Evaluated Price, All Years | $ - 0 |
| Total Contract Price, All Years | $ 23,912,589.00 |
Note: Refer to the RFP for an explanation of how the Total Evaluated Price will be calculated by the Government