SF330 Q and A 21SEP22.pdf
PDF 158 KB Posted
- Attached to
- SF330 Request For A&E Services, Ellsworth AFB, South Dakota Federal contract opportunity
- Solicitation number
- FA469022SF330
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF330 Q and A 26SEP22.pdf | ||
| SF330 Q and A 19SEP22.pdf | ||
| SF330-21.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF330 Request for A&E Services, Ellsworth AFB, South Dakota
***The Government will accept questions in writing until 3:00pm MDT, 23 September 2022. No further questions will be accepted after this date. ***
Questions and Answers 21 September 2022
4. Is it permissible for personnel to have dual roles? For example, could Fire Protection and Life Safety be the same individual?
Answer: A person can have dual roles but must be licensed/certified in each capacity. For example if we have a fire protection system designed and certified, we want a licensed fire protection engineer to stamp the plans not an individual with a life safety certification.
5. Is licensing in South Dakota required or would reciprocity be acceptable?
Answer: Reciprocity would be acceptable. The contractor must comply with South Dakota reciprocity requirements.
Licensure by Comity/Reciprocity Before providing or offering to provide any engineering services on projects located in South Dakota, you must be licensed in South Dakota. In order to apply for licensure, you will need to complete and submit the forms listed below. Refer to the Blue Book (covering ARSD 20:38:34) for specific information regarding comity licensure requirements.
The Comity/Reciprocity Application for engineers can be completed online once you are registered to use our system. If you are not already a registered use, register in our online system now.
Comity Reference Form (Adobe PDF format) (Must be completed by your references, and then submitted to the Board, if such references showing experience gained under direct supervision of licensed professional engineers are not already contained in a NCEES record being submitted to the Board.)
Due Dates for Comity/Reciprocity Applications
The completed application form, along with all of the required supporting documentation, must be received by the Board office by the following deadline for consideration at the respective Board meeting.
January 1 for January Board meeting March 1 for March Board meeting May 1 for May Board meeting July 1 for July Board meeting September 1 for September Board meeting November 1 for November Board meeting
6. Can you please tell us if you are looking for an Industrial Process Engineer that is more B21 / Aviation
Focused or LEAN or other?
Answer: The Government is in need of the industrial/process engineer that is more aviation focused.
7. IS there any possibility of NET ZERO for any of the projects? Or is there a desire to do so?
Answer: There is always the possibility of doing NET ZERO for a project in the future but we have not done one at Ellsworth.