24R0001_GJKZ1135564-Amend01.pdf

PDF 183 KB Posted

Attached to
FY24 Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA462024R0001
Issued by
Department of the Air Force

About this file

This amendment modifies the statement of work for a task order solicitation seeking structural repair services at Fairchild Air Force Base in Washington. The Department of the Air Force seeks to award an indefinite delivery/indefinite quantity task order contract for repairing structural deficiencies in Building 2451. The amendment clarifies that superintendent and quality control responsibilities may be combined; revises the design percentage from 65% to 35%; and updates deliverables to remove the word format and specify all specifications shall be provided as PDFs on a DVD. Offerors are advised to replace the original statement of work with the amended version and contact points of contact with any outstanding questions.

View the file

Other files for this federal contract opportunity

Other files attached to FY24 Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
24R0001_Amend0005-SF30-05DEC2023.pdf PDF
24R0001_Amend0004-SF30-30NOV2023.pdf PDF
24R0001_Atch1A-Amend00042018FAFBIFS26JUN2018.pdf PDF
24R0001_Atch10B-Amend0004SOW29NOV2023.pdf PDF
24R0001_Atch7-Amend03PastPerfCvrLtrQuestionnaire.pdf PDF
24R0001_Amend0003-SF30-22NOV2023.pdf PDF
24R0001_Amend0002-SF30-14NOV2023.pdf PDF
24R0001_Amend0001-SF30-30OCT2023.pdf PDF
24R0001_GJKZ1135564-SiteVisitSignIn-08NOV2023.pdf PDF
24R0001_GJKZ1135564-Atch10B-Amend01SOW30OCT2023.pdf PDF
24R0001_Atch2-MstrBDGSpecs21SEP2022.pdf PDF
24R0001_Atch4-FAFBClimateWeatherData.pdf PDF
24R0001_Atch9-SubKTRTeamingArangementRelease.pdf PDF
24R0001_FOPR_Atch10-GJKZ1135564.pdf PDF
24R0001_Atch6B-WA20230076-Heavy25AUG2023.pdf PDF
24R0001_Atch6C-WA20230001-Highway13OCT2023.pdf PDF
SOWAtchB-BldgLocation.pdf PDF
SOWAtchD-ExistingPictures.pdf PDF
SOWAtchE-ExistingConditionsRpt.pdf PDF
24R0001_Atch11-OrientationSmnrSOW.pdf PDF
24R0001_SF1442-27OCT2023.pdf PDF
24R0001_Atch1-FY24MATOCSpecs10OCT2023.pdf PDF
24R0001_Atch3-MstrBDGDataSheet21SEP2022.pdf PDF
24R0001_Atch6D-WA20230095-Residential06JAN2023.pdf PDF
24R0001_Atch7-PastPerfCvrLtrQuestionare.pdf PDF
24R0001_GJKZ1135564-Atch10A-PriceSchedule.pdf PDF
24R0001_GJKZ1135564-Atch10B-SOW28JUN2023.pdf PDF
SOWAtchA-SiteLocation.pdf PDF
24R0001_Atch5-RealIDActPamphlet.pdf PDF
24R0001_Atch6A-WA20230017-Building25AUG2023.pdf PDF
24R0001_Atch8-PastPerformanceInfo.pdf PDF
SOWAtchC-B2451GovtWorkPlan.pdf PDF
SOWAtchF-HAZMATSrvys.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 92D AIR REFUELING WING (AMC)

FAIRCHILD AIR FORCE BASE WASHINGTON

30 October 2023

MEMORANDUM FOR PROSPECTIVE CONTRACTORS

FROM: 92 CONS/PKB

110 W. Ent Street

Fairchild AFB, WA 99011-8568

SUBJECT: Amendment 01 for Fair Opportunity Proposal Request (FOPR) under the FY24 Multiple

Award Task Order Contract (MATOC): Seed Project GJKZ1135564, Repair (SUS)

Structural Deficiencies Building 2451, Fairchild AFB, WA

A. The purpose of this amendment is to answer questions proposed by prospective contractors for the FY24 MATOC.

1. Question: FOPR says QC/Supt combined, SOW says separate. Which is correct?

Answer: Superintendent/QC responsibilities MAY be combined. SOW Paragraph 2.5 has been revised. Refer to 24R0001_GJKZ1135564-Atch10B-

Amend01SOW30OCT2023.

2. Question: SOW calls for 35% design but deliverables for AutoCAD says 65% design. Which is correct?

Answer: This project will only require a 35% design. SOW Paragraph 4.5 has been revised to reflect the deliverables to be 35%, not 65%. Refer to

24R0001_GJKZ1135564-Atch10B-Amend01SOW30OCT2023.

3. Question: What is the extent of as-built AutoCAD drawings expected?

Answer: The awarded contractor for the Seed Project is expected to provide all new and/or revised connection details and locations. A complete building CAD plan is not necessary.

4. Question: Under SOW 4.5 Submittal Quantities (digital only)

A. Appears the design submittals are all electronic, but not clear sure what you want.

i. Drawings full size – PDF – one copy

ii. Drawings PDF on DVD – one copy

Isn’t that the same thing?

Answer: All PDFs to be delivered on a DVD.

B. Under 35% Design: Specifications – individual PDF files one copy. Under the Electronic

Data: Specifications in Word and PDF. Which is it?

Answer: Specifications to be provided only PDF. Deliverables under SOW Paragraph

4.5 has been revised to removed Word. Refer to 24R0001_GJKZ1135564-Atch10B-

Amend01SOW30OCT2023.

B. 24R0001_GJKZ1135564-Atch10B-SOW28JUN2023 is hereby replaced with

24R0001_GJKZ1135564-Atch10B-Amend01SOW30OCT2023.

C. All other items remain unchanged.

D. Please contact the Mr. Tuyen Nguyen at tuyen.nguyen.2@us.af.mil or Ms. Heather Rogers at heather.rogers.9@us.af.mil with any questions or concerns.

HEATHER D. ROGERS, GS-13, DAF

Contracting Officer

92d Contracting Squadron

Attachments:

1. 24R0001_GJKZ1135564-Atch10B-Amend01SOW30OCT2023 mailto:tuyen.nguyen.2@us.af.mil mailto:heather.rogers.9@us.af.mil

2023-10-30T15:21:33-0700
ROGERS.HEATHER.DAWN.1181403957

File details come from the government source that posted it. Updated .