24R0001_Atch6B-WA20230076-Heavy25AUG2023.pdf

PDF 678 KB Posted

Attached to
FY24 Multiple Award Task Order Contract (MATOC) Federal contract opportunity
Solicitation number
FA462024R0001
Issued by
Department of the Air Force

About this file

This document provides a wage determination applicable to federal construction contract FA462024R0001 for the Department of the Air Force. The wage determination specifies prevailing wage rates for various construction crafts involved in heavy construction, including water and sewer line work, for Spokane County, Washington. Crafts covered include bricklayers, carpenters, electricians, operating engineers, ironworkers, laborers, painters, cement masons, plumbers, truck drivers, and welders. The wage determination outlines applicable wage rates by craft classification and includes details such as fringe benefits, zone differentials, and hazard pay requirements.

View the file

Other files for this federal contract opportunity

Other files attached to FY24 Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
24R0001_Amend0005-SF30-05DEC2023.pdf PDF
24R0001_Amend0004-SF30-30NOV2023.pdf PDF
24R0001_Atch10B-Amend0004SOW29NOV2023.pdf PDF
24R0001_Atch1A-Amend00042018FAFBIFS26JUN2018.pdf PDF
24R0001_Amend0003-SF30-22NOV2023.pdf PDF
24R0001_Atch7-Amend03PastPerfCvrLtrQuestionnaire.pdf PDF
24R0001_Amend0002-SF30-14NOV2023.pdf PDF
24R0001_Amend0001-SF30-30OCT2023.pdf PDF
24R0001_GJKZ1135564-SiteVisitSignIn-08NOV2023.pdf PDF
24R0001_GJKZ1135564-Amend01.pdf PDF
24R0001_GJKZ1135564-Atch10B-Amend01SOW30OCT2023.pdf PDF
24R0001_Atch2-MstrBDGSpecs21SEP2022.pdf PDF
24R0001_Atch4-FAFBClimateWeatherData.pdf PDF
24R0001_Atch9-SubKTRTeamingArangementRelease.pdf PDF
24R0001_FOPR_Atch10-GJKZ1135564.pdf PDF
24R0001_Atch5-RealIDActPamphlet.pdf PDF
24R0001_Atch6A-WA20230017-Building25AUG2023.pdf PDF
24R0001_Atch8-PastPerformanceInfo.pdf PDF
SOWAtchC-B2451GovtWorkPlan.pdf PDF
SOWAtchF-HAZMATSrvys.zip ZIP file
24R0001_SF1442-27OCT2023.pdf PDF
24R0001_Atch1-FY24MATOCSpecs10OCT2023.pdf PDF
24R0001_Atch3-MstrBDGDataSheet21SEP2022.pdf PDF
24R0001_Atch6D-WA20230095-Residential06JAN2023.pdf PDF
24R0001_Atch7-PastPerfCvrLtrQuestionare.pdf PDF
24R0001_GJKZ1135564-Atch10A-PriceSchedule.pdf PDF
24R0001_GJKZ1135564-Atch10B-SOW28JUN2023.pdf PDF
SOWAtchA-SiteLocation.pdf PDF
24R0001_Atch6C-WA20230001-Highway13OCT2023.pdf PDF
SOWAtchB-BldgLocation.pdf PDF
SOWAtchD-ExistingPictures.pdf PDF
SOWAtchE-ExistingConditionsRpt.pdf PDF
24R0001_Atch11-OrientationSmnrSOW.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/27/23, 6:59 AM SAM.gov https://sam.gov/wage-determination/WA20230076/1 1/8

"General Decision Number: WA20230076 08/25/2023

Superseded General Decision Number: WA20220076

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Spokane County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 08/25/2023

BRWA0001-002 06/01/2021

Rates Fringes

FA462024R0001

Attachment 6B - Wage Determination (WA20230076-Heavy) https://sam.gov/wage-determination/WA20230076/1 2/8

BRICKLAYER.......................$ 33.95 19.33

CARP0059-007 06/01/2021

Rates Fringes

CARPENTER (Form Work Only).......$ 38.87 17.84

PILEDRIVERMAN....................$ 40.17 17.84

ZONE PAY:

ZONE 1 0-45 MILES FREE

ZONE 2 45-100 MILES $4.00 PER HOUR

ZONE 3 OVER 100 MILES $6.00 PER HOUR

DISPATCH POINTS:

CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

HAZMAT PROJECTS:

Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows:

LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal.

LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical ""splash suit.""

LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line.

ELEC0073-003 07/01/2022

Rates Fringes

ELECTRICIAN......................$ 41.30 20.09

ENGI0370-025 07/01/2019

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 28.46 17.25

GROUP 2.....................$ 28.78 17.25

GROUP 3.....................$ 29.39 17.25

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 3/8

GROUP 4.....................$ 29.55 17.25

GROUP 5.....................$ 29.71 17.25

GROUP 6.....................$ 29.99 17.25

GROUP 7.....................$ 30.26 17.25

GROUP 8.....................$ 31.36 17.25

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Drill Assistant; Rollers, all types on subgrade, including seal and chip coating

GROUP 2: Fork Lift; Broom/Sweeper

GROUP 3: Boring Machine

GROUP 4: Oiler; Drill (churn, core, calyx or diamond);

GROUP 5: Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver; Cranes (25 tons & under); Boom Truck (Under 25 tons); Backhoe (under 45,000 gw)

GROUP 6: Trackhoe/Excavator (3/4 yd. to 3 yd.), Paver;

Scraper; Screed; Cranes (over 25 tons, to and including 45 tons); Backhoe (45,000 gw and over to 110,000 gw);

Mechanic, Asphalt Roller

GROUP 7: Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Grader/Blade; Backhoe (over 110,000 gw)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

* IRON0014-012 01/02/2023

Rates Fringes

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 37.11 31.57

LABO0238-014 06/01/2020

Rates Fringes

LABORER: Mason Tender - Brick...$ 29.06 13.65

LABO0238-026 06/01/2021

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 4/8

Rates Fringes

LABORER

GROUP 1....................$ 27.34 14.50

GROUP 2....................$ 29.44 14.50

GROUP 3....................$ 29.71 14.50

GROUP 4....................$ 29.98 14.50

GROUP 5....................$ 30.26 14.50

GROUP 10....................$ 31.97 14.50

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Form-Stripping

GROUP 3: Mason Tender-Cement/Concrete

GROUP 4: High Scaler; Asphalt Raker

GROUP 5: Driller

GROUP 10: Grade Checker

PAIN0005-003 07/01/2022

Rates Fringes

PAINTER (Brush, Roller, and Spray.)..........................$ 28.41 14.50

* PLAS0072-008 06/01/2022

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 36.04 16.79

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0 - 45 radius miles from the main post office

Zone 2: 45 radius miles from the main post office

PLUM0044-001 06/01/2022

Rates Fringes

Plumbers and Pipefitters.........$ 45.36 25.44

* TEAM0690-007 06/01/2022

Rates Fringes

Truck drivers: (ANYONE

WORKING ON HAZMAT JOBS SEE

FOOTNOTE A BELOW)

ZONE 1: SPOKANE ZONE CENTER

GROUP 3....................$ 33.93 20.03

GROUP 4....................$ 34.26 20.03

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 5/8

GROUP 5....................$ 34.37 20.03

GROUP 6....................$ 34.57 20.03

GROUP 7....................$ 34.91 20.03

GROUP 8....................$ 35.23 20.03

Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)

BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office

TRUCK DRIVERS CLASSIFICATIONS

GROUP 3: Trucks, side, end, bottom and articulated end dump (3 yards to and including 6 yds.)

GROUP 4: Trucks, side, end, bottom and articulated end dump (over 6 yds. to & including 12 yds.)

GROUP 5: Trucks, side, end, bottom and articulated end dump (over 12 yds. to & including 20 yds.); Semi-Trailer Truck

GROUP 6: Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.)

GROUP 7: Truck, side, end, bottom and articulated end dump (over 40 yds. to & including 100 yds.)

GROUP 8: Trucks, side, end, bottom and articulated end dump (over 100 yds.)

FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.

LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.

Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.

* SUWA2009-067 08/07/2009

Rates Fringes

CARPENTER, Excludes Form Work....$ 22.51 6.00

LABORER: Common or General......$ 19.33 4.63

LABORER: Landscape & Irrigation.......................$ 12.27 ** 2.73

LABORER: Pipelayer..............$ 20.04 4.78

OPERATOR: Asphalt Plant.........$ 34.14 0.68

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 ** 0.00

OPERATOR: Bulldozer.............$ 25.78 0.00

OPERATOR: Loader................$ 22.83 5.71

OPERATOR: Power Shovel..........$ 25.12 7.83

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 6/8

TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29

TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72

TRUCK DRIVER: Water Truck.......$ 22.67 5.66

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 7/8

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

FA462024R0001

https://sam.gov/wage-determination/WA20230076/1 8/8

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

FA462024R0001

File details come from the government source that posted it. Updated .