TL Pillar Point Launches or Sys Tests draftv2.pdf
PDF 72 KB Posted
- Solicitation number
- FA461027R0001
About this file
This is a support requirements document for launch operations at Pillar Point. The 30th Civil Engineering Squadron (30 CES) requires one to two personnel to provide on-site generator back-up support during launches or systems testing at the Pillar Point location. The document includes a table template for tracking support details, including columns for the type of support, assigned personnel, location, on-site time/date, and expected release date. The specific launch designation, operation number, and job order number are redacted in the document. No response dates, pricing information, contract vehicles, set-asides, or other procurement details are provided in this file.
View the file
Other files
Show 40 more
Latest 50 of 124 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Time/Date ONSITE Expected Release
PILLAR POINT
Historically, the 30th Civil Engineering Squadron (30 CES) has requested one (1) to two (2) personnel to support launches or systems testing that require generator back-up support to the site
Support Support Personnel Location
FRAME
Launch XXXXX
OP#: WXXX JON: XXXXXX
PILLAR POINT
File: Pillar Point Support for Launches or Systems Tests Tab: Launch Support to Pillar Point FOR OFFICIAL USE ONLY
Launch Support to Pillar Point
File details come from the government source that posted it. Updated .