This is an Exterior Pressure Vessel Inspection Report for the LOSC ISI Program, completed on 1/24/2024 by Inspector Brett Strickland (Level II) for client Call Henry Inc. The report documents inspection findings for vessel PV-230, a horizontal pressure vessel manufactured by Taylor Forge with serial number 750400-1V8, rated for 6,000 PSI maximum allowable working pressure and located at the High Pressure Gas Storage Area (HPGSA) on SLC-4 at Space X facility. The vessel stores gaseous nitrogen at temperatures ranging from -25 to 140°F.

The inspection identified multiple deficiencies requiring attention. Significant code violations include: dissimilar metals on bolt/flange assemblies (galvanized steel washers in contact with stainless steel studs and nuts), violating AFSPCMAN 91-710 11.3.1.5.6; relief valves missing system reference designators, violating AFSPCMAN 91-710 LOSC Tailored 11.2.1.7.6.7; and a missing U-bolt on the pipe support. Additional findings include moderate corrosion on the isolation valve, a 7/8-inch offset and 1.25-1.5 inch gap in concrete foundations, replacement gauges missing "No Calibration Required" stickers, relief valves outside the one-year calibration period, and vegetation growth around foundation gaps. Most vessel components including heads, shell, welds, and attachments (except bolts/flanges rated as rejectable) received acceptable or acceptable-with-reservation ratings. The report recommends corrective action for corrosion, gauge registration, vegetation removal, and continued monitoring of the foundation offset.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
TL HPGSA-PV-229-VTE-01242024v2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOSC ISI Program

Bld. Number

N/A

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

N/A

Acceptable

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

A/R/F/O

Rejectable

Acceptable

N/A

Other

Drain

Other Moderate corrosion on isolation valve, pipe support missing

No Comments

Evidence of Leakage

Dents/Deformations

Insulation/CUI

Paint

Condition of Shell No Comments

Comments

No Comments

Welds

Head to Shell Welds

No Comments

Areas of minor corrosion, chipped/cracked paint

No Comments

No Comments

No Comments

No Comments

No CommentsGrayloc Connection

Skirt/Band Welds

Additional Component Welds

Bolts/Flanges

No Comments

No Comments

Comments

Dissimilar metals

Attachments

Longitudinal Weld(s)

Nozzle Welds

Support/Saddle Welds

The vessel was located at the High Pressure Gas Storage Area (HPGSA) on SLC-4. Access must be set up in advance with the facility operator, Space X.

Previous Inspection Documentation

Manufacturer & Year Built

Taylor Forge

Inspector/Level

Brett Strickland / II

Client

Call Henry Inc.

National Board Number

N/A

MAWP Temp. Range

6,000 PSI

Vessel ID

Location/Area

SLC-4/HPGSA

Commodity

Gaseous Nitrogen

Required Equipment

Exterior Pressure Vessel Inspection Report Number: CHI-PV-230-VTE-2024

No Comments

No Comments

Date

1/24/2024

Serial Number

750400-1V8

PV-230

Vessel Type

Horizontal Pressure Vessel

Exam Type

External

Ladder, flashlight, mirror, bubble leak, picks, hammer, ruler, camera

Condition of Heads

Room Number

-25 to 140 °F

VTE: 2023

GP-R-142002 (2010)

Access Notes

Vessel Inspection

CommentsPrimary

N/A

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

N/A

Other

Acceptable

N/A

N/A

N/A

N/A

A/R/F/O

Other

N/A

N/A

Rejectable

Acceptable

N/A

Inspection Findings/Code Violations

No Comments

No Comments

Additional Notes/Recommendations

The vessel isolation valve has areas of moderate corrosion. This item should be addressed before the corrosion impacts the function of the valve. The gauges on the panel were replaces and no longer have "No Calibration Required" (NCR) stickers on them. As these gauges are identical and serving an identical function as the previous gauges that had NCR this item has been listed as "Other". It is still recommended that the site owner register these new gauges as NCR and affix the NCR stickers to them. There was a fair amount of vegetation growing around and in the gaps of the vessel foundations. It is recommended that this be removed and controled as plant life/growth can cause damage to foundations.

Other

There was a slight offset of 7/8" between the concrete foundations and a gap of 1.25"-1.5". It is recommended that this continue to be monitored. There was not notable change in the offset severity from the previous years inspection. The relief valves were missing system reference designators. This is a violation of AFSPCMAN 91-710 LOSC Tailored

11.2.1.7.6.7. There were dissimilar metals on the bolt\flange assemblies that were not mutually isolated from each other.

It appeared that galvanized steel washers were in contact with stainless steel studs and nuts. This is a violation of

AFSPCMAN 91-710 11.3.1.5.6. The pipe support was missing the U-bolt that supports it. The relief valves are outside the traditional one year calibration period.

Comments

Missing CNR sticker, @4,700 PSI

No Comments

No Comments

Vessel Inspection Cont. Vessel SN: 750400-1V8

Missing system designators

Comments

No Comments

No Comments

No Comments

Gauges

Sensors/Transducer

Sight Glass/Liquid Level

Relief Valve

Grounding

Anchor Bolting

Saddle/Steel Support Structure

Supports

Platforms

Grating

Handrails/Kickplates

Auxiliary Equipment

Pedestal/Grouting

Concrete Pad

Foundation

Containment

Ladders/Stairs

No Comments

No Comments

Offset/gap between foundations

No Comments

No Comments

No Comments

No Comments

No Comments

Skirts/Bands

Area Overview Vessel Overview

Nameplate Pressure Gauges/Relief Valves

External Pressure Vessel Inspection

External Photographs Vessel SN: 750400-1V8

Dissimilar Metals Corrosion on Valve

External Pressure Vessel Inspection

External Photographs Vessel SN: 750400-1V8

Offset Foundation Missing U-Bolt