TL CDRL A015 Work Order Status Rpt Samplev2.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

This file is a Contractor Data Requirements List (CDRL) Work Order Status Report sample template, which serves as a tracking document for maintenance and repair work orders executed under a facilities support contract. The template captures essential work order information including work order number, building location, work description, work type, status, requested completion date, actual completion date, start date, assigned project manager, requester, priority level, system closure date, total hours worked, status remarks, Contract Line Item Number (CLIN), Job Order Number (JON), equipment ID, and equipment description. The sample data provided includes two work orders: one for decommissioning pressure vessels at HPGSA (WO #23005827, completed with 200 hours worked under CLIN 100201), and one for emergency power generator preventative maintenance (WO #26006021, completed with 40 hours worked under the same CLIN). Both work orders are marked as "Work Completed, no issues" and reference GWD1000 as the job order number, indicating they are part of ongoing facilities maintenance operations supporting space operations at Vandenberg Space Force Base.

The document correlates directly to the FRAME (Facility Readiness and Maintenance Execution) contract opportunity (Solicitation FA461027R0001), a follow-on to the current Launch Operations Support Contract (LOSC), which is a 100% Small Business Set-Aside for facilities support services at Vandenberg Space Force Base. FRAME encompasses maintenance, repair, modification, and modernization of over 130 facilities and equipment supporting space, defense, and test operations, including infrastructure systems such as water and gas mains, roads, generators, power distribution, HVAC, waste systems, and roofing, as well as inspection, testing, and certification of cranes and elevators. The CDRL Work Order Status Report template demonstrates the type of operational documentation and performance tracking that will be required under the FRAME contract to maintain accountability and visibility of all maintenance activities supporting launch operations.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
TL HPGSA-PV-229-VTE-01242024v2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A015

CDRL A015 Work Order Status Report SAMPLE
Work Order NbrBuildingWO DescriptionWork Order TypeWO StatusShopRequested DateCompletion DateStart DatePM Start DateRequesterWO Priority #Date WO Closed in SystemTotal hours worked per WOWO Status/RemarksClinJONEquip IdEquip Description
23005827HPGSADECOMMISSION IN PLACE PV'S AT HPGSAJOPC202304042024121920230403Doe, John120241219200Work Completed, no issues100201GWD1000ACFBSPV895PRESSURE VESSEL PV 222 GN2
26006021OM051EMERGENCY POWER GENERATOR - 15DPMPC20260625202607292026072920260713Doe, Jane22026072940Work Completed, no issues100201GWD1000O51LVGN001GENERATOR

&22CDRL A015 Work Order Status Report SAMPLE

File details come from the government source that posted it. Updated .