Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf

PDF 55 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

This document is a PDF viewer error message, not a federal contract opportunity file. The page contains only technical troubleshooting information directing users to upgrade Adobe Reader software to properly display PDF content. No contract information, solicitation details, requirements, timelines, or acquisition data are present in this document.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
TL HPGSA-PV-229-VTE-01242024v2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of (Updated 20250617)

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List"

CurrentPage:
PageCount:
Select Classification from drop-down list.: 1
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER:
exhibit: A
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 0
C. CATEGORY: Enter specification for "Other.": FNCL
System: Facility Readiness and Maintenance Execution
ContractNum:
Contractor:
1. DATA ITEM NUMBER: A006
titleDataItem: Consolidated Cost, Labor, and Funding Status Report (CCLFSR)
subtitle: Integrated Cost, Labor, Reimbursable, and Invoicing Rpt
4. AUTHORITY (Data Acquisition Document Number): See BLK 16
contractRef: PWS 2.3.2.4
reqOffice: SLD 30/PM
7. DD 250 REQUIREMENT: NO
8. APPROVAL CODE : N/A
9. DISTRIBUTION STATEMENT REQUIRED: F
freq: MTHLY
asOfDate: See BLK 16
dateFirstSub: See BLK 16
dateSubseqSub: See BLK 16
16. REMARKS: 1. Scope & Integration: The Contractor shall deliver a single, consolidated monthly workbook in Microsoft Excel format that contains six (6) integrated worksheets. The workbook shall be fully editable, searchable, sortable, and filterable. All formulas, calculations, assumptions, and supporting data necessary to understand and reproduce reported results shall be retained and accessible to the Government. The workbook shall not be flattened, password-protected or otherwise restricted in a manner that prevents government review, query, analysis, calculation or modification. This workbook shall act as a unified financial database for all Task Orders (TOs) issued under this IDIQ contract.

2. Worksheet Requirements:

Tab 1: IDIQ Master Summary Dashboard. This tab shall provide a roll-up of all active Task Orders, summarizing period of performance (PoP) dates, total contract value, funded values, cumulative amount invoiced, remaining funds, cumulative payments.

Tab 2: CFSR Funding Status. This tab shall report funding status segregated by Task Order ID, CLIN/WBS element, and Appropriation Identification. It must include funding authorized to date, accrued expenditures, open commitments, definitized and undefinitized work, funds carryover, and net funds required.

Tab 3: Labor & Expenditures Summary. This tab shall detail direct labor categories, labor hours, and labor rates/costs, comparing current-month and cumulative actuals against original baseline budgets and latest negotiated changes, grouped by Task Order ID.

Variance & Sufficiency: The Contractor must include explicit statements for each Task Order on whether remaining hours and funds are sufficient to complete the work, accompanied by a detailed narrative explaining all cost and man-hour variances.

Tab 4: Purchases & Other Direct Costs (ODCs). This tab shall log all monthly ODC transactions under specific categories (IT Costs, Travel Costs, and Miscellaneous Material Costs, etc.) tagged with the corresponding Task Order ID.

Tab 5: Invoicing, Payments, & ACRN Tracking. This tab shall track billings and receipts broken down by Task Order ID, CLIN/SLIN, and Accounting Classification Reference Number (ACRN). It must report contract values, funded values, cumulative invoiced amounts, remaining funds, percent invoiced, period/cumulative performance-based deductions, and payments received. (NOTE: PM/CONS Team- this is normally information reflected in the invoice attachment in WAWF)

Tab 6: Cost Adjustments & Prior FY Tracing. This tab shall isolate any current-month rate adjustments, labor transfers, or reallocations affecting prior fiscal years (prior FYs).

Block 4 - DI-FNCL-80331A / DI-FNCL-80912A / DI-FNCL-81866 / DI-MGMT-81468B / DI-MGMT-81651 (Consolidated & Tailored)

Block 11 - Last day of the contractor's monthly accounting period

Block 12 - 15 calendar days after the last day of the contractor's first full monthly accounting period following contract award

Block 13 - Within 15 calendar days after the end of each subsequent reporting period

Block 14 - All submissions in electronic format ONLY shall be delivered to the SLD 30/PM via e-mail to: SLD30.PM.FRAME@spaceforce.mil.

16. REMARKS: Business/financial information. Not subject to DFARS technical data or computer software rights clauses. Treat as proprietary financial data to the extent permitted by the contract and applicable cost principles.
Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: SLD 30/PM
15.TOTAL - Total draft copies is automatically calculated.: 0
15.TOTAL - Total draft copies is automatically calculated.: 0
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 0
15.TOTAL - Total final reproducible copies is automatically calculated.: 0
15.TOTAL - Total final reproducible copies is automatically calculated.: 0
priceGrp:
estTotalPrice:
remarks:
preparedBy: Sharonjoy S. Cui
J. SIGNATURE: H. SIGNATURE
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
approvedBy:
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .