Attch 12 Workload Factors - draftv2.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

This is a workload factors spreadsheet (draft version 2) that appears to be a supporting document for cost estimation and resource allocation under the FRAME contract.

The spreadsheet serves as a tool for analyzing and calculating workload distribution across the various maintenance, repair, modification, and modernization activities required for over 130 facilities, property, and equipment at Vandenberg Space Force Base and associated geographically-separated locations. As a draft document, it likely contains preliminary factors and metrics used to estimate labor hours, staffing levels, or cost allocations for different facility categories and sustainment project types covered under the FRAME contract scope. The workload factors would inform proposal pricing, resource planning, and performance metrics for the 100% small business set-aside contract opportunity (NAICS 561210, small business size standard $47M) being solicited by the 30th Contracting Squadron at Vandenberg Space Force Base. Without access to the specific spreadsheet contents, the exact structure and calculation methodologies cannot be detailed, but such workload factor documents typically establish baseline requirements for estimating contractor labor and resource needs across the contract performance period.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
TL HPGSA-PV-229-VTE-01242024v2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

The Workload Factors listed below represent the Government’s best estimate of the level of effort associated with the defined activity. These factors do not represent the totality of activities required to meet the requirements in the PWS, but provide the Offerors with the anticipated workload for the Base Year and relative changes over the contract period of performance.
PWS ParagraphWorkLoad FactorCLIN(s)Baseline Workload
(Annual Unless Otherwise Noted)NotesFor Reference:
2.2.1.2.Emergency ProposalsX00112SLD 30
X00322 ROPS
X0052MDAResponse Time:1 Calendar Day
X0062S4S
X0072Sentinel
X008118SDS
Urgent ProposalsX00120SLD 30
X00352 ROPS
X0052MDAResponse Time:5 Business Days
X0062S4S
X0072Sentinel
X008118SDS
Routine ProposalsX00133SLD 30
X003162 ROPS
X0055MDAResponse Time:10 Business Days
X0062S4S
X0075Sentinel
X008418SDS
2.3.10.Rough Orders of Measure (ROMs)X00115SLD 30
X003102 ROPS
X0055MDA
X0062S4S
X0072Sentinel
X008218SDS
4Work OrdersX002525SLD 30
X0041952 ROPS
X005200MDA
X006120S4S
X00710Sentinel
X0089018SDS
4Preventative Maintenance ActionsX0022850SLD 30
X0046752 ROPS
X0051000MDA
X006200S4S
X00730Sentinel
X00835018SDS
6Corrosion ControlX00112,000 hoursSLD 30
4.15.6Temporary Generator AvailabilityX00221 days per yearTriple Shift (24/7)SLD 30
4.29.Non-FRAME Project SupportX002320 hoursSLD 30