TL - FY26 12 Month TR list for Tech Libraryv2.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

This file is a FY26 Task Request (TR) list for a 12-month period (October 1, 2025 through September 30, 2026) detailing planned facility maintenance, repair, and sustainment projects at Vandenberg Space Force Base and associated locations. The list contains approximately 80 line items totaling $14,846,497.57 in funding requests across multiple organizations and cost line item numbers (CLINs).

The sustainment projects (CLIN 3007 and 2007) comprise the majority of the work and include facility infrastructure repairs and modernization efforts such as HVAC system replacements, chiller installations, roofing work (silicone mesh application), electrical upgrades, parking lot repairs, boiler replacements, duct work cleaning, flooring replacement, crane design/build, elevator repairs, and building envelope improvements across various buildings including B765, B1806, B8510, B7011, B21150, and SLC-8. Launch support activities (CLINs 2005 and 3005) represent a secondary category of work totaling approximately $690,000 and include standby support, system testing, and engineering support during scheduled after-hours outages for multiple launch events including SpaceX Starlink missions, Falcon 9 launches, and Strato missions. The task request list serves as baseline planning documentation for the follow-on FRAME (Facility Readiness and Maintenance Execution) contract, which is a 100% small business set-aside acquisition under NAICS code 561210 (Facilities Support Services) with a $47 million small business size standard.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26 TR List

Task Requests for a 12 month period (1 Oct 25 - 30 Sep 26)
OrganizationAmountCLINCLIN Description
2 SLS
B765 Silcone Mesh Roof$320,048.263007Sustainment Projects
B765 Flooring Replacement$83,454.173007Sustainment Projects
B765 Duct Work Cleaning$33,870.253007Sustainment Projects
2ROPS (JON Funded or UFR )
B1806 Repair Air Compressor$162,878.643007Sustainment Projects
B7025 Replace five (5) 160 ton chillers and isolate failing buffer tank.$1,177,347.453007Sustainment Projects
Building 1806 current HVAC DDC system is well obsolete, missing licenses, partially inoperable$211,481.783007Sustainment Projects
B1806 Repair perimeter fence to extend fence life for at least 10 years$332,396.933007Sustainment Projects
Replace B1806 Chiller nearing end of service life with new units, piping, and controls.$810,365.983007Sustainment Projects
B8510 Trace out voltage found on neutral bus as well as shared neutral downstream from Panel.$16,678.132007Sustainment Projects
TP-01Remove and install TE Pylons$38,230.473007Sustainment Projects
SLC 8 Electrical Upgrades$299,746.443007Sustainment Projects
SLC-8 Flame Duct Wastewater Transfer$144,354.713007Sustainment Projects
B8510 Parking lot above threshold$49,963.893007Sustainment Projects
B8510 AWNING REPLACEMENT ABOVE THRESHOLD$14,685.923007Sustainment Projects
B1806 HEAT LOAD STUDY$47,836.433007Sustainment Projects
B1806 REPLACE RAISED FLOOR$134,130.893007Sustainment Projects
SLC-8 Damage Repairs S29A$242,369.463007Sustainment Projects
TP-01 Lightning Protection Install$895,659.283007Sustainment Projects
B8510 AHU 1-6 DESIGN$199,689.043007Sustainment Projects
B8510 Replace 165 Ton Chiller Revision$322,522.353007Sustainment Projects
B1806 Crane Design/Build UFR$1,026,734.393007Sustainment Projects
SLC-8 Flame Duct Repairs$939,275.993007Sustainment Projects
1806 Boiler Replacement$177,525.663007Sustainment Projects
AHU-13 Ducting Modification$292,157.703007Sustainment Projects
SLC-8 MAT Trucks and Swinging Door Repairs$165,583.733007Sustainment Projects
SLC8 B8510 CC$95,004.113007Sustainment Projects
CE
B8401 Replace damaged incoming power feeder$98,891.792007Sustainment Projects
Delta
Oak Mtn Replace Fire Pump Control Panel & Pumps$228,894.503007Sustainment Projects
Storm Damage Above Threshold$24,948.602007Sustainment Projects
B425 Replace Generator$753,195.503007Sustainment Projects
SLC-3 Tower CC$36,957.163007Sustainment Projects
B542 Door Replacement$51,145.443007Sustainment Projects
Indirect UFR
Tran Peak Replace damaged, 50 year-old conductors from B185 serving B175 and B178.$407,284.913007Sustainment Projects
DCCPillar Point
JONLength in hrsLength in hrs
Launch Support MMIII GT254GM ALCS, W9967$35,099.532005Launch8.5
Launch Support STRATO MAJESTIC FOXTROT, W8807$19,695.802005Launch4.5
Launch Support Space-X SENTINEL-6B, W1334$17,262.212005Launch7
SYSTEM TEST W8455$23,277.392005Launch713
Launch Support Space-X SDA T1TL-E, W6667$18,546.262005Launch8.5
Launch Support SVPP SpaceX W8620 DOL 9 Dec 2025$11,498.142005Launch
LAUNCH SUPPORT STRATO ACHILLES W7242 DOL 20 JAN$22,522.152005Launch8.515.5
SVPP Support Twilight W9566$10,447.682005LaunchN/A
SVPP SUPPORT STARLINK G17-30 DOL 21 JAN 2026 W5823$11,498.142005LaunchN/A
LAUNCH SUPPORT STRATO CLEOPATRA W7918$22,522.152005Launch7.5
Launch Support MM III GT W7236$34,367.832005Launch8.5
Launch Support Strato Bella W6389$25,530.402005Launch17
B8401 ENGINEER SUPPORT DURING SCHEDULED AFTER HOURS OUTAGE.$2,551.972007Sustainment Projects
Sentinel Elevator Repairs$106,546.313007Sustainment Projects
LAUNCH SUPPORT STRAO BOREUS W5421$8,250.523005Launch10.5
LAUNCH SUPPORT MINOTAUR IV STP-S29A W8111$16,520.283005Launch6.5
LAUNCH SUPPORT STRATO CHRONOS$11,217.433005Launch6
LAUNCH SUPPORT MMIII GT256 W5688$35,717.373005Launch8.56.5
LAUNCH SUPPORT STARLINK G17-27 W7494$12,256.383005Launch8
LAUNCH SUPPORT STARLINK G17-22 W9764$11,280.603005Launch8
Falcon 9 CAS500-2, W7445$18,864.753005Launch8
Falcon 9 Starlink 17-29, W7188$14,463.423005Launch6.5
LAUNCH SUPPORT FALCON 9 NROL-172 W1302$22,166.953005Launch8
LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-37$21,580.743005Launch8
LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-42$23,044.153005Launch8
LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-41$23,044.153005Launch8
SVPP & DCC SUPPORT STARLINK 17-47 W0205$21,957.353005Launch8
SVPP Standby SpaceX Starlink 17-48 W0733$10,007.463005LaunchN/A
SVPP Standby SpaceX Starlink 15-14 W0827$10,007.463005LaunchN/A
STARLINK 17-53; W1046$11,194.883005Launch
STARLINK 17-38; W1110$10,007.463005Launch
Falcon 9 G17-49$11,194.883005Launch
Strato Geraldine W6557$17,129.123005Launch
Strato Helena W0436$17,129.123005Launch
MDA
Prep and coat ˜44k sq ft roof with silicone mesh product.$656,875.823007Sustainment Projects
B1819 Boiler Replacement$113,783.593007Sustainment Projects
MDA above threshold$14,982.673007Sustainment Projects
Discretionary Corrosion Control$120,118.653007Sustainment Projects
OSS
Building 21150 Office Renovation$269,967.173007Sustainment Projects
B21150 Entryway Stairs$27,662.053007Sustainment Projects
B21150 Chiller replacement$758,399.533007Sustainment Projects
RM
B7011 UPS ROOM DEHUMIDIFICATION$113,161.132007Sustainment Projects
B7011 Restroom Renovation$663,860.583007Sustainment Projects
B6523 Rollup Door Removal$81,315.762007Sustainment Projects
SLD30/RM B7011 HVAC$891,545.183007Sustainment Projects
B7011 OVERHEAD DOOR REPLACEMENT$44,781.013007Sustainment Projects
NRO
LOSC TR26NRC048 NRO CORROSION CONTROL$566,334.053007Sustainment Projects
Grand Total$14,846,497.57