TL - FY26 12 Month TR list for Tech Libraryv2.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA461027R0001
About this file
This file is a FY26 Task Request (TR) list for a 12-month period (October 1, 2025 through September 30, 2026) detailing planned facility maintenance, repair, and sustainment projects at Vandenberg Space Force Base and associated locations. The list contains approximately 80 line items totaling $14,846,497.57 in funding requests across multiple organizations and cost line item numbers (CLINs).
The sustainment projects (CLIN 3007 and 2007) comprise the majority of the work and include facility infrastructure repairs and modernization efforts such as HVAC system replacements, chiller installations, roofing work (silicone mesh application), electrical upgrades, parking lot repairs, boiler replacements, duct work cleaning, flooring replacement, crane design/build, elevator repairs, and building envelope improvements across various buildings including B765, B1806, B8510, B7011, B21150, and SLC-8. Launch support activities (CLINs 2005 and 3005) represent a secondary category of work totaling approximately $690,000 and include standby support, system testing, and engineering support during scheduled after-hours outages for multiple launch events including SpaceX Starlink missions, Falcon 9 launches, and Strato missions. The task request list serves as baseline planning documentation for the follow-on FRAME (Facility Readiness and Maintenance Execution) contract, which is a 100% small business set-aside acquisition under NAICS code 561210 (Facilities Support Services) with a $47 million small business size standard.
View the file
Other files
Show 40 more
Latest 50 of 124 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY26 TR List
| Task Requests for a 12 month period (1 Oct 25 - 30 Sep 26) | |||
| Organization | Amount | CLIN | CLIN Description |
| 2 SLS | |||
| B765 Silcone Mesh Roof | $320,048.26 | 3007 | Sustainment Projects |
| B765 Flooring Replacement | $83,454.17 | 3007 | Sustainment Projects |
| B765 Duct Work Cleaning | $33,870.25 | 3007 | Sustainment Projects |
| 2ROPS (JON Funded or UFR ) | ||||||
| B1806 Repair Air Compressor | $162,878.64 | 3007 | Sustainment Projects | |||
| B7025 Replace five (5) 160 ton chillers and isolate failing buffer tank. | $1,177,347.45 | 3007 | Sustainment Projects | |||
| Building 1806 current HVAC DDC system is well obsolete, missing licenses, partially inoperable | $211,481.78 | 3007 | Sustainment Projects | |||
| B1806 Repair perimeter fence to extend fence life for at least 10 years | $332,396.93 | 3007 | Sustainment Projects | |||
| Replace B1806 Chiller nearing end of service life with new units, piping, and controls. | $810,365.98 | 3007 | Sustainment Projects | |||
| B8510 Trace out voltage found on neutral bus as well as shared neutral downstream from Panel. | $16,678.13 | 2007 | Sustainment Projects | |||
| TP-01Remove and install TE Pylons | $38,230.47 | 3007 | Sustainment Projects | |||
| SLC 8 Electrical Upgrades | $299,746.44 | 3007 | Sustainment Projects | |||
| SLC-8 Flame Duct Wastewater Transfer | $144,354.71 | 3007 | Sustainment Projects | |||
| B8510 Parking lot above threshold | $49,963.89 | 3007 | Sustainment Projects | |||
| B8510 AWNING REPLACEMENT ABOVE THRESHOLD | $14,685.92 | 3007 | Sustainment Projects | |||
| B1806 HEAT LOAD STUDY | $47,836.43 | 3007 | Sustainment Projects | |||
| B1806 REPLACE RAISED FLOOR | $134,130.89 | 3007 | Sustainment Projects | |||
| SLC-8 Damage Repairs S29A | $242,369.46 | 3007 | Sustainment Projects | |||
| TP-01 Lightning Protection Install | $895,659.28 | 3007 | Sustainment Projects | |||
| B8510 AHU 1-6 DESIGN | $199,689.04 | 3007 | Sustainment Projects | |||
| B8510 Replace 165 Ton Chiller Revision | $322,522.35 | 3007 | Sustainment Projects | |||
| B1806 Crane Design/Build UFR | $1,026,734.39 | 3007 | Sustainment Projects | |||
| SLC-8 Flame Duct Repairs | $939,275.99 | 3007 | Sustainment Projects | |||
| 1806 Boiler Replacement | $177,525.66 | 3007 | Sustainment Projects | |||
| AHU-13 Ducting Modification | $292,157.70 | 3007 | Sustainment Projects | |||
| SLC-8 MAT Trucks and Swinging Door Repairs | $165,583.73 | 3007 | Sustainment Projects | |||
| SLC8 B8510 CC | $95,004.11 | 3007 | Sustainment Projects | |||
| CE | ||||||
| B8401 Replace damaged incoming power feeder | $98,891.79 | 2007 | Sustainment Projects | |||
| Delta | ||||||
| Oak Mtn Replace Fire Pump Control Panel & Pumps | $228,894.50 | 3007 | Sustainment Projects | |||
| Storm Damage Above Threshold | $24,948.60 | 2007 | Sustainment Projects | |||
| B425 Replace Generator | $753,195.50 | 3007 | Sustainment Projects | |||
| SLC-3 Tower CC | $36,957.16 | 3007 | Sustainment Projects | |||
| B542 Door Replacement | $51,145.44 | 3007 | Sustainment Projects | |||
| Indirect UFR | ||||||
| Tran Peak Replace damaged, 50 year-old conductors from B185 serving B175 and B178. | $407,284.91 | 3007 | Sustainment Projects | |||
| DCC | Pillar Point | |||||
| JON | Length in hrs | Length in hrs | ||||
| Launch Support MMIII GT254GM ALCS, W9967 | $35,099.53 | 2005 | Launch | 8.5 | ||
| Launch Support STRATO MAJESTIC FOXTROT, W8807 | $19,695.80 | 2005 | Launch | 4.5 | ||
| Launch Support Space-X SENTINEL-6B, W1334 | $17,262.21 | 2005 | Launch | 7 | ||
| SYSTEM TEST W8455 | $23,277.39 | 2005 | Launch | 7 | 13 | |
| Launch Support Space-X SDA T1TL-E, W6667 | $18,546.26 | 2005 | Launch | 8.5 | ||
| Launch Support SVPP SpaceX W8620 DOL 9 Dec 2025 | $11,498.14 | 2005 | Launch | |||
| LAUNCH SUPPORT STRATO ACHILLES W7242 DOL 20 JAN | $22,522.15 | 2005 | Launch | 8.5 | 15.5 | |
| SVPP Support Twilight W9566 | $10,447.68 | 2005 | Launch | N/A | ||
| SVPP SUPPORT STARLINK G17-30 DOL 21 JAN 2026 W5823 | $11,498.14 | 2005 | Launch | N/A | ||
| LAUNCH SUPPORT STRATO CLEOPATRA W7918 | $22,522.15 | 2005 | Launch | 7.5 | ||
| Launch Support MM III GT W7236 | $34,367.83 | 2005 | Launch | 8.5 | ||
| Launch Support Strato Bella W6389 | $25,530.40 | 2005 | Launch | 17 | ||
| B8401 ENGINEER SUPPORT DURING SCHEDULED AFTER HOURS OUTAGE. | $2,551.97 | 2007 | Sustainment Projects | |||
| Sentinel Elevator Repairs | $106,546.31 | 3007 | Sustainment Projects | |||
| LAUNCH SUPPORT STRAO BOREUS W5421 | $8,250.52 | 3005 | Launch | 10.5 | ||
| LAUNCH SUPPORT MINOTAUR IV STP-S29A W8111 | $16,520.28 | 3005 | Launch | 6.5 | ||
| LAUNCH SUPPORT STRATO CHRONOS | $11,217.43 | 3005 | Launch | 6 | ||
| LAUNCH SUPPORT MMIII GT256 W5688 | $35,717.37 | 3005 | Launch | 8.5 | 6.5 | |
| LAUNCH SUPPORT STARLINK G17-27 W7494 | $12,256.38 | 3005 | Launch | 8 | ||
| LAUNCH SUPPORT STARLINK G17-22 W9764 | $11,280.60 | 3005 | Launch | 8 | ||
| Falcon 9 CAS500-2, W7445 | $18,864.75 | 3005 | Launch | 8 | ||
| Falcon 9 Starlink 17-29, W7188 | $14,463.42 | 3005 | Launch | 6.5 | ||
| LAUNCH SUPPORT FALCON 9 NROL-172 W1302 | $22,166.95 | 3005 | Launch | 8 | ||
| LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-37 | $21,580.74 | 3005 | Launch | 8 | ||
| LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-42 | $23,044.15 | 3005 | Launch | 8 | ||
| LAUNCH SUPPORT SVPP STANDBY & DCC SUPPORT STARLINK 17-41 | $23,044.15 | 3005 | Launch | 8 | ||
| SVPP & DCC SUPPORT STARLINK 17-47 W0205 | $21,957.35 | 3005 | Launch | 8 | ||
| SVPP Standby SpaceX Starlink 17-48 W0733 | $10,007.46 | 3005 | Launch | N/A | ||
| SVPP Standby SpaceX Starlink 15-14 W0827 | $10,007.46 | 3005 | Launch | N/A | ||
| STARLINK 17-53; W1046 | $11,194.88 | 3005 | Launch | |||
| STARLINK 17-38; W1110 | $10,007.46 | 3005 | Launch | |||
| Falcon 9 G17-49 | $11,194.88 | 3005 | Launch | |||
| Strato Geraldine W6557 | $17,129.12 | 3005 | Launch | |||
| Strato Helena W0436 | $17,129.12 | 3005 | Launch | |||
| MDA | ||||||
| Prep and coat ˜44k sq ft roof with silicone mesh product. | $656,875.82 | 3007 | Sustainment Projects | |||
| B1819 Boiler Replacement | $113,783.59 | 3007 | Sustainment Projects | |||
| MDA above threshold | $14,982.67 | 3007 | Sustainment Projects | |||
| Discretionary Corrosion Control | $120,118.65 | 3007 | Sustainment Projects | |||
| OSS | ||||||
| Building 21150 Office Renovation | $269,967.17 | 3007 | Sustainment Projects | |||
| B21150 Entryway Stairs | $27,662.05 | 3007 | Sustainment Projects | |||
| B21150 Chiller replacement | $758,399.53 | 3007 | Sustainment Projects | |||
| RM | ||||||
| B7011 UPS ROOM DEHUMIDIFICATION | $113,161.13 | 2007 | Sustainment Projects | |||
| B7011 Restroom Renovation | $663,860.58 | 3007 | Sustainment Projects | |||
| B6523 Rollup Door Removal | $81,315.76 | 2007 | Sustainment Projects | |||
| SLD30/RM B7011 HVAC | $891,545.18 | 3007 | Sustainment Projects | |||
| B7011 OVERHEAD DOOR REPLACEMENT | $44,781.01 | 3007 | Sustainment Projects | |||
| NRO | ||||||
| LOSC TR26NRC048 NRO CORROSION CONTROL | $566,334.05 | 3007 | Sustainment Projects | |||
| Grand Total | $14,846,497.57 |