Vandenberg Space Force Base Framelight Policy Memorandum

This memorandum issued by Space Launch Delta 30 on January 8, 2024, establishes guidance for the Framelight Policy at Vandenberg Space Force Base, superseding SLD30I10-1203. Framelight is defined as a configuration control period beginning 48 hours before launch (L-48 hours) and ending upon release by the Launch Decision Authority or Interim Safety Board President. During Framelight, a stop-work order applies to all non-critical work that could impact Range mission networks or launch instrumentation. Work critical to launch support is exempt from Framelight restrictions. Commercial payload missions utilizing an Autonomous Flight Safety System with minimal range support (no Command Destruct, Telemetry, or Radar supersystem support) are excluded from Framelight requirements and follow nominal maintenance coordination processes instead.

Entities requesting work during Framelight must submit a 2 ROPS Form 1 waiver two weeks prior to Framelight initiation to allow time for risk assessment. Waivers involving excavation near communications lines or power outages route to the 30th Civil Engineer Squadron (CES), those involving communications infrastructure route to Space Communications Squadron (SCS), and others route to 2 ROPS/DOR Range Engineer (RE) flight. Approval authority rests with the Squadron Commander or designee based on risk assessment. Certain recurring operations and maintenance activities are pre-coordinated as "no risk" and do not require waivers, including specific contractor-supported Range communications maintenance, SCS operations outside Range equipment areas, and CES scheduled high-voltage switching without critical facility power outages. Emergency situations permitting immediate action without waiver approval must be documented on 2 ROPS Form 2. Launch slips extending Framelight require submission of new waivers with updated date ranges. The point of contact is 2 ROPS/DOR at 30rms.re@us.af.mil or DSN 276-1299.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

UNITED STATES SPACE FORCE

SPACE LAUNCH DELTA 30

SLD30GM1

8 January 2024

MEMORANDUM FOR SLD 30

FROM: SLD 30/CV

SUBJECT: Vandenberg Space Force Base Framelight Policy

1. Effective immediately, this guidance memorandum supercedes SLD30I10-1203.

2. “Framelight” is a term used to define a time-period which begins 48 hours prior to launch (L- 48 hours). Framelight ends when released by the Launch Decision Authority (LDA) or equivalent, or by the Interim Safety Board President in the event of an anomaly. Framelight maintains configuration control of launch-associated communications and Range infrastructure to minimize risk of disruption. Framelight is essentially a stop-work order for all work that is non-critical to the launch which might have an impact on the Range mission network or on instrumentation required for the launch. If work must be performed to support the launch, then Framelight does not apply to that work. If work is non-critical to the launch, then a Framelight waiver can be requested.

3. Framelight does not apply to commercial payload missions that fly with an Autonomous Flight Safety System (AFSS) in which minimal range support is required. Minimal range support is defined as no Command Destruct supersystem, no Telemetry supersystem, and no Radar supersystem support from the Range or as otherwise defined by 2 ROPS. This memo does not allow entities to perform work without standard permissions under Framelight conditions. In these cases, work on the Range will follow nominal maintenance coordination processes for risk to launch operations. All mission requirements in Universal Documentation System are still expected to be met.

4. When a waiver (2 ROPS Form 1) is requested it should be submitted two weeks prior to the start of Framelight. This allows subject matter experts time to review the requested work and perform a risk assessment. If the work requested involves excavation near communications lines or power outages, then a 2 ROPS Form 1 should be submitted to 30th Civil Engineer Squadron (CES), specifically the CE Mission Engineering section. If the work requested involves communication infrastructure, then a 2 ROPS Form 1 should be submittted to Space Communications Squadron (SCS). If the work requested doesn’t fall strictly under CES or SCS, then a 2 ROPS Form 1 should be submitted to 2 ROPS/DOR Range Engineer (RE) flight.

Depending on the risk of the requested work the 2 ROPS Form 1 will either be approved by the Squadron Commander or designee, or disapproved.

5. Certain recurring operations and maintenance requests are considered no risk and have been coordinated with 2 ROPS RE without the need to submit a waiver. Work that falls within the criteria below do not require a waiver.

a. No Risk Operations (Contractor supported Range communications): Range system programming changes/modifications, preventive/corrective level 1 or 2 maintenance that will not interfere or conflict with launch configurations of supporting range systems. Additional exemptions will be considered on a case-by-case basis.

b. No Risk Operations (SCS): Operations and maintenance requests for work that is not performed in racks containing Range equipment nor on patch panels through which Range circuits connect.

c. No Risk Operations (CES): Scheduled high-voltage switching which does not result in power outages to facilities required to satisfy Operational Directive (OD) requirements, such as bringing the South Vandenberg Power Plant (SVPP) on-line the day of launch. Excavation near water, natural gas, sewer, and drainage infrastructure is also considered no risk operations.

6. Launch slips affect operations and sometimes extend the Framelight period. It is the requestor’s responsibility to fill out a date range when submitting a waiver (2 ROPS Form 1). If a launch slip causes Framelight to extend, and the original waiver does not cover those dates, then a new waiver must be submitted. This process does not guarantee subsequent approval. The requestor must update the work requested and dates of that work in follow-on waiver submissions.

7. Emergency Waivers: Emergency situations are defined as those situations where failure to take action could result in risk to human life or public safety, system damage, impact to launch readinesss or other serious mission impacts. Agencies are authorized to take immediate action to address emergencies without a Framelight waiver. However, emergency actions shall be documented on 2 ROPS Form 2 at the earliest possible opportunity by the agency taking the emergency action. The 2 ROPS RE section must have situational awareness of all emergency actions to ensure their ability to properly assess mission risk in real time.

8. My point of contact on this matter is 2 ROPS/DOR, 30rms.re@us.af.mil DSN: 276-1299.

BRYAN M. TITUS, Colonel, USSF Vice Commander

TITUS.BRYAN.

M.1239756014

Digitally signed by

TITUS.BRYAN.M.1239756014

Date: 2024.01.16 15:36:20 -08'00'