Attch 8 L-1 BOE Workbook-draftv2.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Solicitation number
FA461027R0001
Issued by

About this file

This is a pricing template workbook for a Facilities Support Services contract. The file "Attch 8 L-1 BOE Workbook-draftv2.xlsx" serves as the Basis of Estimate (BOE) pricing submission template for the Facility Readiness and Maintenance Execution (FRAME) contract (Solicitation FA461027R0001) at Vandenberg Space Force Base. FRAME is a 100% Small Business Set-Aside contract under NAICS code 561210 with a $47 million small business size standard. The contract provides maintenance, repair, modification, and modernization services for over 130 facilities and property/equipment supporting space mission, defense, and test activities at VSFB and geographically-separated locations, including facility infrastructure systems (water and gas mains, roads, generators, power distribution, HVAC, waste systems, roofing), sustainment projects, standby support for urgent repairs during launch operations, and inspection, testing, and certification of Space Launch Delta 30 cranes and elevators.

Respondents are required to utilize this BOE workbook to submit detailed pricing and cost estimates supporting their proposals. The workbook is structured to capture labor categories, labor rates, overhead rates, materials, equipment, and other direct costs associated with performing the required maintenance and facility support services. Contractors must complete all required sections of the BOE workbook in accordance with the dRFP instructions to provide the Government with transparent, detailed cost breakdowns demonstrating how their proposed pricing aligns with the scope of work. The 30th Contracting Squadron (30 CONS/PKD) released this draft version for industry review and feedback prior to final RFP issuance.

View the file

Other files

File Type Posted
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf PDF
Attch 3 CDRL A014 PE Resp List Draftv2.pdf PDF
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf PDF
TL PM Workload Matrix CLINv2.xlsx XLSX spreadsheet
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf PDF
Attch 8 Cost Price Workbook-draftv2.xlsx XLSX spreadsheet
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf PDF
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx XLSX spreadsheet
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf PDF
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf PDF
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf PDF
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx DOCX document
TL ISWMP Final Sept 2026v2.pdf PDF
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf PDF
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf PDF
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf PDF
Attch 4 FRAME Incentive Plan - draftv2.docx DOCX document
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx K L M N FRAME- draftv2.xlsx XLSX spreadsheet
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf PDF
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf PDF
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf PDF
Attch 10 CRM Template - draftv2.xlsx XLSX spreadsheet
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf PDF
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf PDF
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx XLSX spreadsheet
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf PDF
Attch 3 Consolidated DID Files draftv2.pdf PDF
TL Pillar Point Outfall Drain Insp examplev2.pdf PDF
TL CDRL A014 PE Responsibility List Samplev2.xlsx XLSX spreadsheet
Attch 3 CDRL A025 RCM Plan Draftv2.pdf PDF
TL Service call historical datav2.xlsx XLSX spreadsheet
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf PDF
TL HPGSA-PV-230-VTE-01242024v2.pdf PDF
Attch 9 Section M - draftv2.docx DOCX document
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf PDF
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf PDF
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf PDF
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf PDF
Attch 13 FRAME DD254_RFP - draftv2.pdf PDF
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf PDF
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf PDF
TL Pillar Point Launches or Sys Tests draftv2.pdf PDF
Attch 12 Workload Factors - draftv2.xlsx XLSX spreadsheet
Attch 2 Apdx I PE Inventory - draftv2.xlsx XLSX spreadsheet
TL CES Launch Operations Support Templatev2.pdf PDF
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf PDF
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf PDF
TL CDRL A018 Solid Waste Report Samplev2.pdf PDF
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions The Offeror shall use the Staffing Template (Attachment L-1) to develop its proposed staffing matrix. The following instructions apply to the staffing matrix.

1. General Instructions:
a. The Offeror may add supplemental worksheet tabs, rows, or columns as necessary to support its proposed staffing approach; however, the Offeror shall not delete, rename, reorder, relocate, or otherwise modify any Government-provided worksheet tab, row, column, header, required data field, formula, or formatting. All information required by Attachment L-1 shall be entered in the corresponding Government-provided columns. Any supplemental information shall be added in a manner that preserves the original workbook layout and allows the Government to compare, consolidate, and analyze data consistently across proposals.
b. The Government may elect not to evaluate a staffing matrix that omits required information or alters the Government-provided workbook structure.
c. Do not identify proposed personnel by name. Describe the education, experience, certifications, and other qualifications required for each proposed position.
d. For positions proposed at less than one FTE, the Offeror may allocate the partial FTE across multiple rows when the positions require substantially similar competencies. The aggregate FTE proposed for each job title and organizational unit shall remain consistent with the organizational chart and Attachment L-3, Cost/Price Workbook.
e. The Offeror shall provide a narrative immediately following each CLIN staffing table. The narrative shall explain the methodology used to determine the quantity, type, organizational alignment, and location of proposed personnel. The narrative shall identify any unique or complicating factors, key assumptions, staffing phase-in or phase-out considerations, and proposed cross-utilization of personnel. The narrative shall also explain any information necessary to demonstrate consistency among the proposed staffing approach, Attachment L-1, Basis of Estimate Workbook, and Attachment L-3, Cost/Price Workbook.
f. Detailed staffing is required for CLINs X001 - X008, X013 and CLIN 0098 (Phase-In). Detailed staffing is not required for CLINs X009 - X012. The Offeror shall complete a separate staffing table for CLIN 0098 using the same column structure provided for CLINs X001 - X008 and X013. Any Phase-In or Phase-Out staffing considerations shall also be explained in the narrative that follows each applicable table.
2. Specific Column Instructions:
a. Location of Performance – Enter the proposed location of performance for the position(s)
b. Organizational Unit – Identify the proposed organizational unit, department, directorate, functional area, or other organizational element to which the position will be assigned. Use the same organizational-unit name in the Offeror’s organizational chart and Attachment L-3, Cost/Price Workbook. Do not use alternate names, abbreviations, or organizational labels for the same unit across proposal volumes.
c. Labor Category – Enter the proposed labor category/job title for the position(s). The labor category/job title must match the applicable position title shown on the organizational chart and in Attachment L-3, Cost/Price Workbook.
d. Company - Enter the name of the company proposing to provide the position(s).
e. Classification(SCA, CBA, DBA, Exempt) - Identify the applicable labor classification for the position(s) (i.e. Service Contract Act [SCA], collective bargaining agreement [CBA], Davis-Bacon Act [DBA], or exempt).
f. PWS Paragraphs Supported – Identify the applicable Performance Work Statement (PWS) paragraph(s) supported by the position(s). The PWS paragraph references should align with those shown for the position or group of positions on the organizational chart.
g. Education - In 100 words or fewer, describe the education required for the position(s), if applicable. Provide sufficient detail for the Government to determine how the education requirements support successful performance of the identified PWS requirements.
h. Experience - In 100 words or fewer, describe the experience required for the position(s), if applicable. Include the type and level of experience necessary to perform the identified PWS requirements.
i. Certification(s) – In 100 words or fewer, identify and describe any certifications, licenses, credentials, or other qualifications required for the position(s), if applicable. Provide sufficient detail for the Government to determine how the requirement supports successful performance of the identified PWS requirements.
j. Will this position be staffed on day 1 of Full Performance – Enter “Yes” if the position will be staffed on the first day of Full Performance (i.e. immediately after phase-in is complete). Enter “No” if the position will not be staffed on the first day of Ordering Year 1. Does not apply CLINs 0098 and 8099.
k. FTE – Enter the proposed FTE for each position, rounded to the nearest tenth. The FTE quantity for each job title and organizational unit, and the total FTE proposed, shall match the organizational chart and Attachment L-3, Cost/Price Workbook.
l. Labor Hours – Enter the proposed productive labor hours associated with the total proposed FTE for the position(s).
m. CLIN(s) supported through cross-utilization – If the position(s) will perform work under more than one CLIN, identify each additional CLIN supported. Clearly identify cross-utilization among CLINs X001 - X008 and X013. To the extent known at the time of proposal submission, also identify anticipated cross-utilization with any other CLINs. If not applicable, enter “N/A.”
n. PWS section(s) supported through cross-utilization – For each CLIN identified in Column M, identify the associated PWS paragraph(s) the position(s) will support. If not applicable, enter “N/A.”
o. Rationale - Immediately following each CLIN staffing table, provide a narrative under the heading “Rationale”. Explain the methodology used to determine the quantity and type of the proposed personnel for that CLIN, including any unique or complicating factors, key assumptions, and proposed cross-utilization of personnel across CLINs. Do not repeat the education, experience, or certification details already entered in the table columns. The narrative shall be no more than 400 words per CLIN.

CLIN X098

CLIN X098 Phase-In
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN 0001

CLIN X001 SLD 30 Program Management
Location of PerformanceOrganizational UnitPWS Paragraphs SupportedCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)FTE
(round to the nearest tenth)Labor Hours

Rationale:

0.0

CLIN X002

CLIN X002 SLD 30 Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X003

CLIN X003 2 ROPS Program Management
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X004

CLIN X004 2 ROPS Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X005

CLIN X005 MDA Program Management, Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X006

CLIN X006 S4S Program Management, Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X007

CLIN X007 Sentinel Program Management, Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X008

CLIN X008 18 SDS Program Management, Maintenance and Repair
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

CLIN X013

CLIN X013 Corrosion Control
Location of PerformanceOrganizational UnitLabor CategoryCompanyClassification
(SCA, CBA, DBA, Exempt)PWS Paragraphs SupportedEducationExperienceCertification(s)Will this position be staffed on day 1 of Full Performance (Yes/No)FTE
(round to the nearest tenth)Labor HoursCLIN(s) supported through cross-utilizationPWS section(s) supported through cross-utilization

Rationale:

0.0

Proposed Changes

Change
#PWS SectionCLIN(s)Organizational UnitLabor CategoryFTE Change OY2FTE Change OY3FTE Change OY4FTE Change OY5FTE Change OY6FTE Change OY7FTE Change OY8FTE Change OY9FTE Change OY10Rationale for Change

File details come from the government source that posted it. Updated .