DID Technical Solution OT-14-37507.docx

DOCX document 29 KB Posted

Attached to
Information Technology Capabilities Contract (ITCC) II
Solicitation number
FA4600-14-R-0017
Issued by

About this file

This document contains a Data Item Description (DID) and related federal contract opportunity. The DID provides a template for technical solutions deliverables under contract FA4600-14-R-0017 with the Air Force Air Combat Command. It outlines the required format, including a title page with project details, sequentially numbered pages, and appendices as needed. The content section lists the elements to address, such as the requirement description, solution statement, costs, implementation tasks, required equipment, risks and mitigations.

The related federal contract opportunity is solicitation FA4600-14-R-0017 for Information Technology Capabilities Contract II support services for United States Strategic Command. The RFP contains all proposal instructions. An updated technical read library is available for interested companies that previously received the draft version or those that did not receive it and follow the document's directions. The opportunity type is listed as an award notice.

Not Listed

View the file

Other files

File Type Posted
FA4600-14-R-0017-0006.pdf PDF
20141112_Q A.pdf PDF
20141110_Q A.pdf PDF
FA4600-14-R-0017-0005.pdf PDF
FA4600-14-R-0017-0004.pdf PDF
20141106_Q A.pdf PDF
Section_J _Attachment_15 _Contractor_Cost_Price_Model_v5.2.xls XLS spreadsheet
FA4600-14-R-0017-0003.pdf PDF
20141104_Q A.pdf PDF
20141031_Q A.pdf PDF
FA4600-14-R-0017-0002.pdf PDF
Section_J _Attachment_15 _Contractor_Cost_Price_Model.xls XLS spreadsheet
ITCC__II_Q A_20141028.pdf PDF
ITCC__II_Q A_20141021.pdf PDF
Section_J _Attachment_15 _Contractor_Cost_Price_Model.xls XLS spreadsheet
Section_J _Attachment_20 _Wage_Determination.pdf PDF
FA4600-14-R-0017-0001.pdf PDF
Section_J _Attachment_10 _PPQ_cover_ltr.docx DOCX document
ITCC__II_Q A_20141017.pdf PDF
Section_J _Attachment_9 _PP_Information_Doc_(tables).docx DOCX document
technical_library_notification_for_the_ITCC_II_20141001.docx DOCX document
DD1423-2__CDRLs_A025_A026_ITCC_II.pdf PDF
DID Transition Plan OT-14-37513.docx DOCX document
DD1423-2__CDRLs_A021_A022_ITCC_II.pdf PDF
DID Config Mangament Plan OT-14-37502.docx DOCX document
DD1423-2__CDRLs_A005_A006_ITCC_II.pdf PDF
Section_J _Attachment_16 _OFCCP_clearance_request_documentation.doc DOC document
DID Tech Refresh Plan OT-14-37503.docx DOCX document
DD1423-2__CDRLs_A011_A012_ITCC_II.pdf PDF
DID Cybersecurity Documentation OT-14-37508.docx DOCX document
DID Contr Prop Mgmt Plan CCSS OT-14-37511.docx DOCX document
DID_CCSS__Other_Tech_Reports_OT-14-37506.docx DOCX document
Section_J _Attachment_20 _Wage_Determination.pdf PDF
ITCC_II_synopsis.docx DOCX document
DD1423-2__CDRLs_A001_A002_ITCC_II.pdf PDF
DD1423-2__CDRLs_A027_A028_ITCC_II.pdf PDF
DID Cyber Defense Report OT-14-37500.docx DOCX document
Section_J _Attachment_11 _PP_Questionnaire_(table).docx DOCX document
DID_Config_Mangament_Drawings_OT-14-37505.docx DOCX document
DD1423-2__CDRLs_A003_A004_ITCC_II.pdf PDF
DD1423-2__CDRLs_A019_A020_ITCC_II.pdf PDF
FA4600-14-R-0017.doc DOC document
Section_J _Attachment_9 _PP_Information_Doc_(tables).docx DOCX document
DD1423-2__CDRLs_A023_A024_ITCC_II.pdf PDF
ITCC_II_Technical_Library_NDA_20141001.docx DOCX document
DD1423-2__CDRLs_A015_A016_ITCC_II.pdf PDF
DD1423-2__CDRLs_A007_A008_ITCC_II.pdf PDF
DID_CCSS__Security_and_Training_OT-14-37504.docx DOCX document
Section_J _Attachment_1 _Appendix_A _CPIF_Workbook.xlsx XLSX spreadsheet
DID SD Invoice and Payment Report OT-14-37512.docx DOCX document
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OT-14-37507

DATA ITEM DESCRIPTION

Title: Technical Solutions

Number: OT-14-37507Approval Date: 20140721
AMSC Number: N/ALimitation: FA4600-14-R-0017
DTIC Applicable: N/AGIDEP Applicable: N/A

Office of Primary Responsibility: F/ACC Applicable Forms: N/A

Use/relationship: The technical solutions deliverable documents the solution for a project and includes all resources required to implement and maintain the system, software, or hardware. This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract PWS. This DID is for one-time use for solicitation FA4600-14-R-0017.

Requirements:

1. Reference documents. None

2. Format. The Technical Solutions deliverable shall be in contractor’s format

2.1 Identification. The data indicated below shall be contained on the title page or on the first page of the report.

a. Title of the Report

b. Name of the Project

c. Project Number

d. Date

e. Prepared by name

f. Data Item Number listed on the CDRL DD Form 1423-2

2.2 Page size: The reports shall be on 8 ½ by 11 inch (metric A4) paper. The pages shall be sequentially numbered. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.

2.3 Appendices: Appendices where applicable, for table, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

3. Content. The report shall address following:

a. Introduction

b. The Project Solution. The solution narrative shall include:

i. the requirement description

ii. customer or submitters information (name, phone number and office symbol)

iii. the solution statement

iv. cost (include labor, required purchases, training, and operations and maintenance costs for the out years)

v. implementation and integration tasks

vi. testing resources required

vii. list and description of equipment (hardware and software)

viii. work days estimate

ix. drawings

x. power, facilities and environmental requirements

xi. security requirements

xii. risks

xiii. mitigations to risk

4. End of OT-14-37507.

File details come from the government source that posted it. Updated .