USAMS II Questions and Answers on Final RFP as of 22 Feb 08
1. On Pg 117 of the draft RFP, paragraph M32.2, there was a requirement for a total compensation plan (to be submitted with the price proposal). On Pg 115 of the final RFP, paragraph M32.2, the requirement for the total compensation plan has been removed. However, on Pg 104 of the final RFP, paragraph L3.2, it states that the total compensation plan will be evaluated. Can you please clarify whether or not a total compensation plan is required as part of our proposal?
Answer: See Section L for price volume instructions. Section L3.2 states that the Offeror’s total compensation plan will be assessed in accordance with FAR 52.222-46. All required data of the price proposal volume shall be evaluated.
2. On Pg 102, Table L2.1 indicates 2 CDs are required for each Volume, while Pg 104, paragraph L2.2.9 implies that one CD with all the volumes would be preferred. Can you please clarify the number of CDs required/preferred?
Answer: Per Table L2.1, we are requesting 2 CD-ROMS per volume. You may put all volumes on one original CD with a copy for a total of two CDs, or you may submit one volume per CD with copies of each for a total of 8 CDs.
3. Reference Section L4.3.2: “Identify key positions with contract responsibilities. Discuss the rationale for the proposed staffing, to include extent and depth of relevant technical expertise/qualifications, security clearances, etc. This may be accomplished through submission of resumes and organizational charts.” What criteria will be used to evaluate this requirement? (Note: it does not appear in Section M3.3.2.2.)
Answer: The resumes shall reflect key personnel IAW M.3.3.2.1
4. Exhibit A – CDRLS: Data Item A006 is missing. Is this by design or will it be released at a later date?
Answer: This was eliminated by design.
5. Will you please provide to me an excel (not protected) that has the Labor Categories and skill levels? Attachment J-3 is protected and I need to develop a rate buildup sheet and I sure don't want to type 135 category titles, if I don't have to...
Answer: NO, please use the final J-3 attachment to submit your price schedule.