FA4600-08-F-8500 TECH EVAL SUPPORT PROTOCOL TESTING FOR SYSTEM CERT

View the file

Other files

File Type Posted
PWS FA4600-04-F-8001.doc DOC document
SOW FA4600-05-F-8402.doc DOC document
SOW FA4600-05-F-8000.doc DOC document
PWS FA4600-06-F-8405.doc DOC document
PWS FA4600-08-F-8001.doc DOC document
PWS FA4600-06-F-8307.doc DOC document
SOW FA4600-06-F-8001.doc DOC document
SOW FA4600-05-F-8302.doc DOC document
PWS FA4600-05-F-8505.doc DOC document
PWS FA4600-08-F-8500.doc DOC document
PWS FA4600-06-F-8307.doc DOC document
PWS FA4600-06-F-8405.doc DOC document
SOW FA4600-05-F-8000.doc DOC document
SOW FA4600-06-F-8001.doc DOC document
PWS FA4600-04-F-8001.doc DOC document
SOW FA4600-05-F-8402.doc DOC document
PWS FA4600-08-F-8001.doc DOC document
SOW FA4600-05-F-8302.doc DOC document
PWS FA4600-05-F-8505.doc DOC document
MILESTONEV2 USAMS II 23 Jul FBO.xls XLS spreadsheet
USAMS II Milestones 28 Jun 08.pdf PDF
USAMSIIQ AMAR282008.doc DOC document
USAMSIIQ AMAR282008.docx DOCX document
07-R-00050001.pdf PDF
USAMSIIQAsonFinalRFP25Mar08FBO.doc DOC document
USAMSIIQAonFinalRFP25Mar2008.doc DOC document
USAMSIIQ AsonFinalRFP13Mar08.doc DOC document
USAMSIIQAsonFinalRFP4Mar08FBO.doc DOC document
USAMSIIQ AsonFinalRFP29Feb08FBO.doc DOC document
USAMSIIQAsonFinalRFP22Feb08FBO.doc DOC document
1_J11-Pre-AwardAudit.doc DOC document
J-1-DD254(2).doc DOC document
1_J10-ClientAuthorizationLtr.doc DOC document
J-14-EEOCClearanceRequestInfo.doc DOC document
J5-PPQuestionnaireCoverLetter.pdf PDF
1_J9-ConsentLetter.doc DOC document
J-ExhibitA-CDRLSA001thruA009(2).doc DOC document
1_J-2WageDetermination.pdf PDF
1_J-13InsuranceRequirementsCertificate.doc DOC document
1_J12-SubcontractingPlanReviewChecklist.xls XLS spreadsheet
1_J6-PPQuestionnaire.doc DOC document
FA4600-07-R-0005FINALRFPFBO.doc DOC document
J3-PricingProposalver2-1.xls XLS spreadsheet
1_J8-PPIDocument.doc DOC document
1_J7-PPTrackingRecord.doc DOC document
1_J4-PricingInstructions.doc DOC document
USAMSIIDraftRFPQuestions25Jan08(2)FBOClarification(2).doc DOC document
USAMSIIStatusasof8Feb08MemoFBO.pdf PDF
UpdatedListingofUSAMSTaskOrdersFBO.pdf PDF
USAMSIIDRAFTQuestions31Jan08FBO.doc DOC document
Show 40 more

Latest 50 of 102 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For

Technical Evaluation and Knowledge Management Support

For System Certification

1.0

DESCRIPTION OF SERVICES

1.1 Scope: The scope of this PWS is six-fold.

1.1.1 To provide Advisory and Assistance Services (A&AS) for technical support to the System Certification staff in the daily conduct of the system certification process for multiple missions systems to include the following: Integrated Tactical Warning and Attack Assessment (ITW/AA) System, Theater Event System (TES), Shared Early Warning System (SEWS), and Ballistic Missile Defense System (BMDS).

1.1.1.1 To provide technical support to maintain integrity of the atmospheric warning mission.

1.1.1.2 To provide technical support to maintain integrity of the space surveillance mission (e.g., dedicated, collateral, and contributing space surveillance network assets).

1.1.1.3 To provide technical support to maintain integrity of the enterprise mission (e.g., Survivable Communication Integrated System, Communications Processing System, Advanced Data Communications Control Procedures (ADCCP), and other ITW/AA communication systems).

1.1.1.4 To provide technical support to maintain integrity of the strategic missile warning mission (e.g., missile warning radars, Space Based Infrared System (SBIRS), Correlation Centers, Forward Users, the National Military Command Center, the Missile Analysis and Reporting System (MARS), and the Mobile Ground System).

1.1.1.5 To provide technical support to maintain integrity of the theater missile warning mission (e.g., the Shared Early Warning System, the Theater Event System, the Processing and Display System Migration, and the Joint Tactical Ground Station).

1.1.1.6 To provide technical support to maintain integrity of the Ballistic Missile Defense Systems (e.g., the Command and Control Battle Management and Communications System, and Ground-based Midcourse Defense System).

1.1.2 To provide compliance testing and evaluation of ADCCP protocol used within the ITW/AA System.

1.1.3 To conduct the annual ITW/AA and TES Technical Performance Evaluation (TPE). TPE is an integrated end-to-end test of the missile, space and atmospheric warning strings and TES conducted on the operational hardware/software in a simulation over live environment.

1.1.4 To develop automated data collection from sensors, correlation center, and forward users, web-based presentation and reports tools and create test and evaluation data warehouse (central repository) to support reporting for ITW/AA, TES and BMDS.

1.1.5 To provide network/systems administration of databases.

1.2 Background: The System Certification process has been in existence since 1981. Certification is a requirement and is an independent validation to the Commander USSTRATCOM of system integrity. The guides and instructions that support this requirement can be found in Appendix A.

1.3 Objective:

1.3.1 Objective 1 (System Certification): Perform integrity and technical performance analysis to ensure current and future systems conform with Integrated Tactical Warning and Attack Assessment (ITW/AA) System, Theater Event System (TES), Shared Early Warning (SEW), and Ballistic Missile Defense System (BMDS) operational, architectural, integrity and technical performance requirements. Identify technical deficiencies within the ITW/AA System, TES, SEWS, and BMDS to assure end-to-end integrity and technical performance. Provide technical engineering support for the evaluation and testing of changes to new or existing systems of the ITW/AA, BMDS, SEW and TES. Once changes to the ITW/AA, BMDS, SEW and TES have been effected, ensure adequate subsystem and end-to-end testing is accomplished to ensure operability and compatibility with other subsystems.

1.3.2 Objective 2 (ADCCP): Ensure the proper ADCCP planning and testing of ITW/AA System communications data circuits and verify the designs and implementations of protocols and message conversion methods used on ITW/AA System interfaces are in accordance with the governing standards.

1.3.3 Objective 3 (Technical Performance Evaluation (TPE)): Provide technical support for the TPE Program to include planning, coordination, execution, data collection and analysis and reporting of results for the periodic End-to-End (ETE) ITW/AA System TPE, TES TPE testing and periodic simulation media development and technical reviews. Periodically review TPE documentation/procedures and update as required to maintain currency with overall systems architectures.

1.3.4 Objective 4 (Air and Missile Defense Operational Test Suite (AMDOTS)): Provide support for technical performance analysis of ITW/AA Systems, BMDS, SEW, TES, and other STRATCOM required mission areas using data warehouse techniques to develop automated data collection from sensors, correlation centers, and forward users; develop web-based presentation and reports tools; and create test and evaluation data warehouse (central repository) to support reporting for ITW/AA and TES.

1.3.5 Objective 5 (System/Network Administration): Provide support by managing and controlling Automated Data Processing Equipment using the latest server operating system.

1.4 Place of Performance: System/network administrator, AMDOTS and Knowledge Management personnel shall work in government facilities. Remainder of the personnel will be housed in contractor facilities in Colorado Springs, CO.

1.5 Tasks:

1.5.1 Document Review (Certification).

1.5.1.1 Contractor shall review Development Test and Evaluation and Operational Test (OT, OUE, FDE) test plans and procedures, Test Objective Worksheets (TOWs), other test documentation, and various requirements documents (e.g., Operational Requirements Document, Capabilities Design Documents) for determination of impact to the technical integrity of the ITW/AA System, BMDS, SEW and TES.

1.5.1.2 Contractor shall review ITW/AA System Incident Reports, as they occur, to monitor trend analysis and to identify certification/integrity issues.

1.5.1.3 Contractor shall evaluate scenarios and simulations designed to test BMDS, SEW, TES and ITW/AA systems as required by the QAP. Scenarios will demonstrate that integrity of the system(s) has not degraded and modified system(s) function properly.

1.5.1.4 Contractor shall submit comments (ref. 1.5.1.1, 1.5.1.2, and 1.5.1.3) to the government in writing, as redlined notes, or verbally, as necessitated by expediency and complexity. Document review comments shall be delivered as technical reports and shall be delivered five (5) working days after receipt of document. (CDRL A003)

1.5.2 Test Preparation (Certification).

1.5.2.1 Contractor shall attend test-related meetings identified by the QAP to ensure test methods and scenarios are adequate to demonstrate integrity of the ITW/AA System, BMDS, SEW and TES will not be degraded.

1.5.2.2 Contractor shall participate in development of simulation requirements as required by the QAP. Identification of data reduction and recording requirements will be provided for the appropriate sources and users within the ITW/AA System, BMDS, SEW and TES. Travel to support this subtask (1.5.2.1 and 1.5.2.2) is expected. Trip reports and/or meeting minutes are required for travel outside the local area, and may be required for local area trips at the government’s discretion. Meeting minutes shall be delivered five (5) working days following completion of the meeting/ conference. (CDRL A002)

1.5.3 Test Support (Certification).

1.5.3.1 Contractor shall attend test events as identified by the QAP. These events will include pre-test briefs, actual tests and post-test briefs. Quick Look Evaluation Reports will include a discussion of abnormalities, correct processing and planned retest dates (if known). Contractor will notify the Action Officer/QAP verbally of the results of each test at the conclusion of the tests. Quick Look Evaluation Reports shall be delivered by 1600 hours the next working day following tests observed within the local area. A combined Trip Report/Quick Look Evaluation Report may result using this same delivery schedule for those tests successfully completed on their primary date and for which travel was authorized. (CDRL A002, A003)

1.5.4 Test Data Collection and Analysis (Certification).

1.5.4.1 Contractor shall analyze data from various system tests, as required by the Government. The Contractor shall identify data collection requirements to the government. Problem Reports or other documentation will be used to present discrepancies or anomalies observed during testing, or as a result of data analysis. Critical problems may require partial or draft analysis reports to be delivered earlier. Report formats will be as agreed upon by the government and contractor. When critical items are identified during analysis, verbal updates will be provided to the government. Travel to participate in test data reviews and/or data analysis efforts is expected. Formal data analysis reports shall be delivered five (5) working days after all requested data reductions are received. Problem reports/ Standard Change Forms (SCF) shall be delivered as attachments to Quick Look Evaluation Reports and Formal Data Analysis Reports. Information requirements will be established to create new reports when necessary. (CDRL A003, A004)

1.5.5 Technical Support (Certification).

1.5.5.1 Contractor shall attend ITW/AA, BMDS, SEW and TES design reviews, Integrated Product Team meetings, Integrated Test Team meetings, status, and/or working group meetings as required by the QAP to provide technical support to the government certification team. Contractor shall identify any potential certification issues to include analysis of proposed design, test capability, redundancy and any other issues that might affect certification of the system. Travel to support this subtask is expected. A trip report is required for travel outside the local area, and may be required for trips within the local area at the government’s discretion. Trip Report and meeting minutes may be combined into one report as appropriate. Meeting minutes and/or trip reports shall be delivered five (5) working days following attendance at the meeting or following completion of the travel. Meeting minutes will be delivered for every meeting unless otherwise required by the QAP. (CDRL A002)

1.5.6 Technical Support for USSTRATCOM/J65 End-to-End (ETE) Technical Performance Evaluation (TPE) Program for the ITW/AA System and/or TES.

1.5.6.1 Contractor shall plan, execute, analyze data from and report on ITW/AA and/or TES End-to-End (ETE) technical performance for USSTRATCOM/J65 in accordance with the ITW/AA System End-to-End Master Test Plan and provide periodic simulation media requirements and technical reviews as required by the QAP.(CDRL A003)

1.5.6.2 Contractor shall develop a draft test concept for each specific evaluation. The evaluation concept shall include: System configurations, evaluation participants, type of data (scenarios or real world) to be used, an execution plan, proposed additions, deletions, and changes to the Master Evaluation Plan Measures of Performance, and identify any potential issues with the evaluation plan. To prepare the evaluation plan, the Contractor shall review changes made to the ITW/AA system and/or TES since the last ETE evaluation, findings of the last evaluation, and trends. Draft evaluation plan shall be reviewed and approved by USSTRATCOM/J65 staff. Upon approval, plan becomes an official annex to the Master Evaluation Plan. (Every annex is unique containing only the evaluation configuration, participants and any deviations from the master evaluation plan for that specific evaluation, the compilation of which documents a complete history of the Technical Performance Evaluation Program.) The draft test concept shall be delivered 90 days prior to test execution and the final test concept shall be delivered 10 days after QAP approval. (CDRL A003)

1.5.6.3 Contractor shall lead evaluation planning working group meetings and develop detailed procedures for all evaluation participants. Draft detailed procedures shall be delivered 60 days prior to test execution and final detailed procedures shall be delivered 10 days after QAP approval.

(CDRL A003, A005)

1.5.6.4 Contractor shall develop Test Objective Worksheets (TOWs) for each evaluation that requires participation by 721st Test Control for the ITW/AA System and/or Exercise Checklists for TES compliant with the approved evaluation concept. Draft TOWs and/or Exercise Checklists shall be delivered 60 days prior to test execution and final TOWs and/or Exercise Checklists shall be delivered 45 days prior to the test. (CDRL A003)

1.5.6.5 Contractor shall update data collection checklists for each evaluation participant (ITW/AA System and TES) to ensure consistency with the approved evaluation concept and each participant’s data collection capabilities. Data collection checklists shall be provided to the participants as part of the test coordination process.

1.5.6.6 Contractor shall, in concert with 721st Test Control, execute the ITW/AA System and/or TES

ETE test. Contractor shall retrieve and quality-control all post-test data collection material.

1.5.6.7 Contractor shall perform analysis of data in accordance with the evaluation concept and master evaluation plan. Submit reports on problems as they are identified during evaluation execution and data analysis. Problem reports shall be delivered within 72 hours of discovery.

(CDRL A003, A004)

1.5.6.8 Contractor shall prepare draft and final evaluation report to include recommendations for system corrections and/or improvements based on evaluation observations and analysis results. Draft report shall be delivered 90 days after last day of test execution. Final evaluation report shall be delivered 10 days after QAP approval. (CDRL A003)

1.5.6.9 Contractor shall develop briefings to present TPE findings and recommendations to the operational community upon request of the QAP. (CDRL A003, A005)

1.5.6.10 Contractor shall participate in reviews of the Technical Performance Evaluation Master Plan. When review determines update is needed, develop a new Evaluation Master Plan for the Technical Performance Program incorporating all aspects of the evaluation program. (CDRL A003)

1.5.6.11 Contractor shall develop simulation requirements to support the evaluation program. Simulation support will include the development of requirements to support TPE data analysis and participation in the fielding of new simulations for the test community. (CDRL A003)

1.5.6.12 Contractor shall provide reviews and reports of technical documents in support of the TPE program to include scenario and simulation media. Reviews and reports shall be delivered 5 days after receipt of document. (CDRL A003, A005)

1.5.7 AMDOTS.

1.5.7.1 Contractor shall work with various organizations to get hardware and software installed to support automated data collection and retrieval for the data warehouse, set up, configure and support internal and external network; continue to develop and maintain all systems, applications, security and network configurations; troubleshoot network performance issues; identify potential problems and provide recommendations to resolve those problems. Periodically update and maintain AMDOTS disaster recovery and contingency plans; recommend upgrades, patches, new applications and equipment; and provide technical support and guidance to users as required. Contractor shall update and maintain system configuration documentation to include internal and external interfaces, and the configuration control and management plan.

(CDRL A003)

1.5.7.2 Contractor shall evaluate and update site “As Built” documentation/tech solutions of installation of remote monitoring units as site modifications are identified. Amendments to the “As Built” shall be delivered 5 days after receipt of final tech solution. (CDRL A003)

1.5.7.3 Contractor shall support the operating system installation and maintenance of remote monitoring units. Contractor shall continue to update and provide the data loading and transforming functions documentation and source code. (CDRL A003)

1.5.7.4 Contractor shall continue to automate and maintain data transmission from source to warehouse (end-to-end) to include disaster recovery and contingency plan. (CDRL A003)

1.5.7.5 Contractor shall develop and deliver all software and documentation for data collection, data retrieval, data processing and data warehouse (CDRL A003)

1.5.8 Communications Test Unit (CTU) Maintenance (ADCCP).

1.5.8.1 Contractor shall, upon QAP approval, develop software modules to maintain the CTU, as determined by the test results. Revisions to the CTU Users Guide will be made if maintenance actions are performed. The softcopy format of the revised software and/or CTU Users Guide shall be delivered on magnetic media (3.5 diskette/Zip250/CD) or e-mailed as an attachment in Government approved document format. (CDRL A003)

1.5.9 Integrated Tactical Warning and Attack Assessment (ITW/AA) Protocol Evaluation and Test Set Update. (ADCCP) 1.5.9.1 Contractor shall determine whether ITW/AA protocols are in accordance with the governing standards or interface control drawings. The Contractor shall analyze all protocols (both design and implementation) for which the CTU and other testers will be used to test. Test sets shall be developed or alternate test capabilities shall be evaluated as required by introduction of new systems or system changes to properly test and evaluate the protocols for the various ITW/AA System interfaces. The Contractor shall maintain configuration control over changes to the CTU protocol test suites. The contractor shall obtain QAP approval prior to making changes to the CTU protocol test suites. Test set updates and protocol analysis are due five (5) working days after receipt of request. (CDRL A003)

1.5.9.2 Contractor shall be required to deliver test set reports to include test set descriptions and will be delivered as circumstances warrant. The softcopy format shall be an addendum to the operator’s manual, or if extensive enough, will be included in a rewrite of the operator’s manual. They shall be delivered via email as an attachment in Government approved document format and are due fifteen (15) working days after receipt of request. (CDRL A003)

1.5.9.3 Contractor shall deliver technical reports providing analysis, conclusions and recommendations of protocol design and implementations as circumstances warrant.

The softcopy format shall be delivered via email as an attachment in Government approved document format and are due fifteen (15) working days after receipt of request. (CDRL A003)

1.5.10 Protocol Testing (ADCCP)

1.5.10.1 The contractor shall travel to various sites, 1-2 sites per year, with the pertinent tester and perform testing of the legacy protocols in the ITW/AA system. The purpose of the testing will be to ensure that the ITW/AA System interfaces are implementing and retaining the protocols IAW the applicable standards or documents. Contractor shall travel to 1-2 sites per year in support of new IP-based protocols. The contractor shall store the test results on disk and email a soft copy to the proper Government POCs. The contractor shall make preliminary evaluations on the effects of improperly implemented protocols and possible impact to ITW/AA system integrity. The contractor shall also be required to troubleshoot and repair, when possible, connectivity problems encountered while connecting to the different systems for testing. Contract support for ADCCP testing must be available when required by the QAP.

(CDRL A002, A003)

1.5.10.2 Contractor shall deliver test reports providing assessments, conclusions and recommendations based on results of tests performed at sites visited. If problems or incompatibilities exist, the contractor shall address the problems in a test report. When test results indicate a more detailed analysis is necessary, the contractor shall prepare a technical report in addition to the test report. Reports in softcopy format shall be delivered via email as an attachment in Government approved document format. The test reports are due five (5) working days after testing has been completed and the technical reports are due within fifteen (15) working days after testing has been completed. (CDRL A003)

1.5.11 Systems/Network Administration.

1.5.11.1 Using the latest server operating system, contractor shall provide system/network administrative functions to include:

1.5.11.1.1 System recoverability, creating and testing backups of the data.

1.5.11.1.2 System integrity, verifying and/or helping to verify data integrity.

1.5.11.1.3 Database security, defining and/or implementing access controls to the data.

1.5.11.1.4 System availability, ensuring maximum uptime of the network.

1.5.11.1.5 System performance, ensuring maximum performance of the network given budgetary constraints.

1.5.11.1.6 Enforce system security to allow users to efficiently access the data and enforce full system security without compromise to data access.

1.5.11.2 Contractor shall provide reports on the systems at the request of the Gov. (CDRL A003)

1.5.11.3 Contractor shall maintain a data dictionary, a system administrator policy, a configuration control and management plan, and a disaster recovery and contingency plan for management of the systems. (CDRL A003)

1.5.11.4 Contractor shall maintain a system schema by mission functionality for the systems. (CDRL A003)

1.5.11.5 Contractor shall perform system-wide integrity tests to verify maximum throughput and efficiency is being obtained.

1.6 Deliverables. Deliverables are also indicated with each requirement that they support. Government may require briefings as well as soft copies of any/all deliverables.

1.6.1 Conference Minutes/ Meeting Minutes and Trip Reports. These reports are required to document the results of trips, studies, and analyses as required by the Government.

(CDRL A002)

1.6.2 Technical Reports. Studies, Technical Reports, Quick Look Evaluation Reports, and Information Papers are required to document the results of studies and analyses as required by the Government. (CDRL A003)

1.6.3 Standard Change Forms (SCF). Review and evaluate design, integration, and test documents for the proposed subsystem upgrades to ensure compliance with applicable USSTRATCOM test standards. Write SCF wherever subsystem deficiencies are identified which adversely impact system integrity or system performance. (CDRL A004)

1.6.4 Presentational Material / Briefing Material. Draft shall be delivered within two working days after government request, unless specified differently. Final copy shall be delivered within two working days after government approval of the draft, unless otherwise specified.

(CDRL A005)

1.6.5 USAMS Socio-Economic Report. An annual USAMS socio-economic report is required, summarizing the category, total dollars executed, and percentage of total dollars awarded small business, small disadvantaged, woman-owned and hub zone businesses. (CDRL A008)

1.6.6 Funds and Man-Hour Expenditure Report. A monthly status report is required to document activities accomplished, agreements reached, and resources expended man-hours and funds expended by system, both budgeted and actual. Submit a quarterly progress report and provide a briefing that summarizes the results of all work performed, the type and amount of effort (man-hours), expenses incurred (funds expended), deliverables completed, work in process, percentage of annual effort expended so far (both man-hours and funds, budgeted and actual), problems encountered, recommended solutions and work planned during the next reporting period. (CDRL A009)

2.0

SERVICES SUMMARY

PERFORMANCE

OBJECTIVE

PWS

PARAGRAPH

REFERENCE

PERFORMANCE

THRESHOLD

Perform integrity and technical performance analysis to ensure current and future systems conform with ITW/AA, TES, BMDS, and SEW systems
1.3.1
As required by Gov schedule with 99% accuracy and no more than 1 customer complaint for rework or redelivery
ADCCP planning and testing of ITW/AA system communications data circuits
1.3.2
As required by Gov schedule with 99% accuracy and no more than 1 customer complaint
Technical support for TPE program
1.3.3
As required by Gov with 99% accuracy and no more than 1 customer complaint
Support for technical performance analysis of systems with AMDOTS
1.3.4
As required by Gov schedule with 99% accuracy and no more than 1 customer complaint for redelivery
Support for managing and controlling Automated Data Processing Equipment
1.3.5
As required by Gov schedule with 99% accuracy and no more than 1 customer complaint
Technical reports, test reports, documentation, incident reports, test set updates, protocol analysis, evaluate scenarios, attend test meetings, develop briefings, develop new TPE Evaluation Master Plan
1.5.1, 1.5.2, 1.5.3, 1.5.4, 1.5.5, 1.5.6.9, 1.5.6.10, 1.5.6.12, 1.5.7.2, 1.5.9.1, 1.5.10
Reports due 5 working days after request or completion of event with 98% accuracy and no more than 2 customer complaints for redelivery
Provide simulation requirements, develop a draft test concept for each specific evaluation and prepare draft and final evaluation reports
1.5.6.1, 1.5.6.2, 1.5.6.8
Draft due 90 days prior to test execution, final test concept due 10 days after draft approval with 98% accuracy and no more than 2 customer complaints for redelivery
Support working group meetings and develop detailed procedures
1.5.6.3
Draft due 60 days prior to test execution and final reports due 10 days after approval of draft with 98% accuracy and no more than 2 customer complaints for redelivery
Develop TOWs, exercise checklists, and update data collection checklists
1.5.6.4, 1.5.6.5
Drafts due 60 days prior to test execution and final reports due 45 days prior to test with 98% accuracy and no more than 2 customer complaints for redelivery
Execute ITW/AA system and/or TES ETE tests, retrieve and quality control post-test data, and analyze data with master evaluation plan
1.5.6.6, 1.5.6.7
Problem reports due within 72 hours of discovery with 98% accuracy and no more than 2 customer complaints
Maintain AMDOTS disaster recovery and contingency plans, support operating system, automate and maintain data transmissions, develop and deliver software and documentation
1.5.7.1, 1.5.7.3, 1.5.7.4, 1.5.7.5
As required by Gov schedule with 98% accuracy and no more than 2 customer complaints for redelivery
For ADCCP, maintain Software Module Design and revise CTU Users Guide
1.5.8
CTU Users Guide delivered on magnetic media with 99% accuracy and no more than 1 customer complaint for redelivery
ADCCP test set and technical reports
1.5.9.2, 1.5.9.3
Due within 15 working days after receipt of request with 98% accuracy and no more than 2 customer complaints for redelivery
Provide system/network administrative and system security functions
1.5.11
As required by Gov schedule with 99% accuracy and no more than 1 customer complaint for rework or redelivery

3.0

WORKING SPACE/MATERIAL/EQUIPMENT.

3.1 The Government will provide access to relevant government organizations, information, and documentation, manuals, text briefs, and associated materials as required and available.

3.2 The Government will provide access to facilities, office space, supplies and services, to include workstations, computers and phones. Access will be granted to classified and unclassified military local area network (LAN) services, LAN support, telephones, and reproduction facilities. If the contractor determines additional equipment is required, the contractor shall notify the government, in writing, of the applicable information/equipment required to accomplish the required task(s).

3.2 The Government will provide equipment for use in ADCCP testing as listed in Appendix B.

4.0 GENERAL INFORMATION

4.1 Personnel Qualifications. The contractor shall possess the necessary training, qualifications, experience, and clearances to accomplish all tasks identified in this PWS. The contractor shall demonstrate a full understanding of the USSTRATCOM missions, operational requirements, and testing mission. Resumes may be submitted for validation of skill sets. The government reserves the right to accept or reject proposed personnel.

4.1.1 Technical Staff Project Lead

4.1.1.1 The contractor shall have extensive experience in computer science, engineering, space systems management, communications, mathematics, physical sciences, physics, space operations, systems engineering, engineering management, systems management, or systems analysis.

4.1.1.2 The contractor shall have extensive experience in planning, operations, analytical studies, or systems development related to military space programs, simulations and systems.

4.1.1.3 The contractor shall have staff experience for coordination with NORAD, USSTRATCOM, and/or their component/support headquarters.

4.1.2 Technical Staff

4.1.2.1 The contractor shall have extensive experience in computer science, engineering, space systems management, communications, mathematics, physical sciences, physics, space operations, systems engineering, engineering management, systems management, systems analysis or extensive experience with studies in related fields, including strategic studies.

4.1.2.2 The contractor shall have extensive experience in planning, operations, analytical studies, or systems development related to military space programs, simulations and systems.

4.1.2.3 The contractor shall have experience in automated data collection and retrieval; internal and external network set up, configuration and support; network performance issues; operating system installation and maintenance, application installation and maintenance. Contractor shall have experience in network/system administration using Windows Server 2003.

4.2 Travel. The contractor shall be required to attend meetings, briefings, or perform other related travel. Travel will be performed as stated in the requirement, approved and authorized by the QAP. All travel will be performed on a reimbursable basis. A trip/test report will be provided to the QAP within five (5) workdays after completion of the trip. The contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required for approximately 130 trips a year consisting of 1-2 days duration. The contractor shall be responsible for tracking travel expenditures and reporting usage rates in the funds and man-hour expenditure report. Travel shall be reimbursed using the current volume of the Joint Travel Regulations (JTR).

4.3 Period of Performance. Reserved.

4.4 Security. All contractor personnel planning to work with the Space Control Center, Space Based Infrared System, Ballistic Missile Defense System, Shared Early Warning, and the Theater Event System shall possess a Top Secret/Sensitive Compartmented Information (TS/SCI) security clearance at time of Task Order award. Contractor personnel shall follow and meet the security requirements as given in the DD Form 254. The contractor shall not divulge any information about files, data, processing activities or functions, user ID’s, passwords or other knowledge that may be gained to anyone who is not authorized to have access to such information. Contractor personnel shall abide by all USSTRATCOM rules, procedures and standards of conduct.

4.5 Quality Control. The contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices. At a minimum, the contractor shall develop quality control procedures that address the areas identified in section 2, Services Summary. The contractor’s quality control plan shall be submitted to the government within 30 days of contract award.

4.6 Quality Assurance. The government will evaluate the contractor’s performance by appointing a Quality Assurance Personnel (QAP), to monitor performance to ensure services are received. The QAP will evaluate the contractor’s performance through intermittent inspections of the contractor’s quality control program and receipt of complaints from base personnel.

4.7 Data Rights and Classified Materials.

4.7.1 The contractor shall be provided access to information required to accomplish assigned tasks commensurate with security clearance and on a need to know basis.

4.7.2 During the contract period, all data pertaining to this contract shall be returned to the Government upon contract expiration. The contractor shall not retain classified or unclassified material generated or received under this contract after the contract ends without approval of the appropriate office of primary responsibility.

4.7.3 The Government has unlimited rights to all deliverables developed under this contract. The Government shall retain custody of all records associated with contractor deliverables and shall have exclusive control in the distribution of all written deliverables. The contractor shall not use any materials pertaining to this contract for business development or any other vendor strategic purposes.

5.0

APPENDICES:

Appendix A:

1.2 The following are guides and instructions:

1.2.1 Unified Command Plan (UCP) 2004, 1 Mar 05.

1.2.2 AFI 99-103, Capabilities Based Test and Evaluation, 8 Mar 04.

1.2.3 SI 508-10, Mission Integrity, Change Control Management, and Test Control for the ITW/AA System, 12 Jul 06.

1.2.4 NI 10-3, Mission Integrity, Change Control Management, and Test Control for the ITW/AA System, 3 Apr 06

1.2.5 NORAD/USSPACECOM Instruction 10-12, NORAD/USSPACECOM System Certification

Process, 1 Aug 01.

1.2.6 ITW/AA-STD-3000, Test Demonstration Standard (To be replaced by USSTRATCOM-STD-

3300), 24 October 1991.

1.2.7 ITW/AA-STD-3200, System Test Capability Standard (To be replaced by USSTRATCOM-

STD-3300), 1 March 1991.

1.2.8 NUPD 99-1, Integrated Tactical Warning and Attack Assessment (ITW/AA) System

Technical Performance Evaluation, 22 July 1996.

1.2.9 SD 523-02, Tactical Event System (TES) Architecture and OPS, 3 May 04

1.2.10 Strategic Command Directive (SD) 505-7, Change Control Management for Theater Missile

Warning, 26 May 05

1.2.11 SD 505-01V1, 13 Feb 04, Space Surveillance Operations – Basic Ops (S)

1.2.12 SD 505-01V2, 13 Feb 04, Space Surveillance Ops – Event Processing (S)

1.2.13 CJCSI 6210.02A, 15 Jan 05, Attack/Defense Information and Operational Architecture of the

Integrated Tactical Warning and Attack Assessment System (S)

1.2.14 CJCSI 6811.01A, series “Nuclear Command and Control System Technical

Performance Criteria”, 9 Jun 2000 (S)

1.2.15 CJCSI 5119.01B, 19 Jul 04, Charter for the Centralized Direction, Management, Operation, and Technical Support of Nuclear Command, Control and Communications System.

1.2.16 NORAD/USSTRATCOM Standard, Advanced Data Communication Control Procedures

(ADCCP) within the Integrated Tactical Warning/Attack Assessment (ITW/AA) System

(N/SP-STD-1200B), 23 June 1998.

1.2.17 ANSI X3.66-1979, American National Standard for Advanced Data Communication

Control Procedures (ADCCP), 9 Jan 79.

1.2.18 Federal Standard 1003A, Telecommunications: Synchronous Bit Oriented Data Control

Procedure (Advanced Data Communication Control Procedures), 19 Aug 81.

Appendix B:

Government will provide the following equipment for use in ADCCP testing:

Nomenclature
Make
Model
Serial #
Software
Value
Remarks
Portable Computer
NEC
AFC-H702
9503687UB
MS DOS 3.2; CTU s/w version 2.2N; Norton utilities 4.5
$2,899.00
Atcomm4 serial communications controller card installed. Padded nylon carrying case.
Protocol Analyzer
Hewlett Packard
HP 4951C
2647A02818
None
$5,999.00
None
Protocol Analyzer
Hewlett Packard
HP J2301A
3432A01042
MS-DOS 6.0; HP J2301A Internet Advisor s/w version A.02.00 and upgrade version A.02.01; CTU s/w version 3.0; MS Windows 3.1
$16,899.00
Atcomm4 serial communications controller card installed. Hard polyethylene carrying case.
PC Undercradle
Hewlett Packard
HP J2295A
None
None
$2,000.00
Attached to the HP J2301A and houses the Atcomm4 communications card.
Portable Computer
NEC
APC-H702
0504014UB
MS-DOS 3.2; CTU s/w version 2.2N; Norton utilities 4.5
$2,899.00
Atcomm4 serial communications controller card installed. Padded nylon carrying case.
Data Set Adapter
Versitron
R42M
C14357C1V6
None
$199.00
None
RS-232 to RS422 Interface Converter
Black Box
IC456A-R2
95013363219
None
$459.00
None
Memory Card
KMS
None
10564399
None
$399.00
None
Memory Card
Suntek
None
PA603091
None
$299.00
None
Serial Communications Card
Metacomp
Atcomm4
None
None
$1,199.00
None
Serial Communications Card
Metacomp
Atcomm4
None
None
$1,199.00
None
Serial Communications Card
Metacomp
Atcomm4
None
None
$1,199.00
None
Luggage Cart
None
Concorde III
None
None
$99.00
None
Total Value of Equipment
$35,748.00