Renovate Latrines Hanger Fac 711.pdf

PDF 1 MB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4497-12-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

W4962_051052_Renovate Latrines Hnager Fac 711

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Font Size.docx DOCX document
Title Block.dwg DWG drawing
Amend 0002.pdf PDF
Attach 1 DAFB Specs —
Exhibit 1 SOW Bldg 711 9 Mar 12.pdf PDF
Responses to Questions-5A.pdf PDF
Responses to Questions-5.pdf PDF
Eletrical Riser Diagram Door Wiring.pdf PDF
W5104.pdf PDF
W4698_981011_Install New Equipment Mechanical Room Facility.pdf PDF
Maintain Hangar Floors.pdf PDF
Rpr Doors Main Hanger.pdf PDF
Rpr Hangar Doors.pdf PDF
Rpl Hanger Door Stops.pdf PDF
Modify Lighting.pdf PDF
Local Control Panel Wiring Diagram.pdf PDF
Rpr HVAC System.pdf PDF
Const Fuel Sys Maint. Dock.pdf PDF
Modification Of Receptacles.pdf PDF
RprHangar Doors Two Facs.pdf PDF
Rpr Heating Sys.pdf PDF
Rpr Hangar Shops.pdf PDF
Rpr Doors.pdf PDF
New Roof.pdf PDF
Rpr Doors.pdf PDF
Rpr Heat Air Cond Maint Hanger Fac.pdf PDF
W5070.pdf PDF
Rpl Unit Heaters.pdf PDF
Alter Latrines.pdf PDF
Rpr Doors.pdf PDF
Pipe Layout Heating Sys.pdf PDF
Responses to Questions-4.pdf PDF
as builts - BUILDING 711- 4 nov 05 acad 2000 lt.dwg DWG drawing
Site Visit Minutes- 28 Feb.pdf PDF
Site Visit Minutes- 23 Feb.pdf PDF
Amend 0001.pdf PDF
Attach 6 —
Responses to Questions-3.pdf PDF
Responses to Questions-2.docx DOCX document
Attach 6 —
Site Visit Information.pdf PDF
Responses to Questions- 1.pdf PDF
Attach 1 DAFB Specs —
FA4497-12-R-0002.pdf PDF
Exhibit 1 Seed Project Docs.pdf PDF
Attach 5 Climate Data.pdf PDF
Attach 4 Ext Color Scheme.pdf PDF
Attach 3 Architectural Compatibility Plan.pdf PDF
Attach 2 Local Design Guide —
Attach 6 Past Perf Survey.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P A R K I N G

P A R K I N G

PARKING

P A R K I N G

PA

RK

IN

G

P A R K I N G

PARKING

PARKING

MA

RS

HA

LI

NG

A

RE

A

PA

RK

IN

G

PA

RK

IN

G

PARKING

P A R K I N G

P A R K I N G

P K N G

MAIN RAMP

MA

IN

GA

TE

T A N K S

TA

NK

T

TA

NK

TA

NK

TA

NK

TA

NK

PO

OL

OPEN STORAGE

AI

R

FENCE ON BOUNDARY

ST

AT

IO

N

SU

B

T A X I W A Y

C

TAXIWAY "A"

FU

EL

TA

NK

S

67501 67483

67484

64503

611 6

69615

65003

64504

67413

65002

67409

8 6

65001

67519

65000

66223

65011

65061

64512

ST.

T H

S T

T H

S T

T H

S T

TH

S T.

PARIS ST

T H

S T

M A I N

G A T E

W A Y

T H

S T

E A G L E

W A Y

T H

S T

T H

S T

RAMP ROAD

C L E A R

Z O N E

AS

PH

DR

A B O V E

G R O U N D

F U E L

T A N K

R Q P O N M L J I H G F EK D2

D1

C H E V R O N

A V E

B A S K E T B A L L

C O U R T S

67585

RA

IL

RO

AD

S

PI

KE

N 0, 9.

E 0, 7.

EL

.7

H

AR

TM

AN

N

AS

SO

C.

EL

.4

E 0, 9.

N 9, 1.

PK

N

AI

L

PK

N

AI

L

EL

.7

E 0, 1.

N 0, 9.

68525

68525

68525

68525

68525

051052 / DO# 5039

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskegee Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

COVER SHEET

SHEET 1 OF 10MJZ

DRAWN BY:

G1DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

04 NOV 05 AS BUILT MJZ

N O R T H

BUILDING 711

DOVER AIR FORCE BASE

DOVER, DELAWARE

G1 COVER SHEET

A1 FLOOR PLAN

A2 EQUIPMENT LAYOUT

A3 ELEVATIONS & SECTIONS

A4 REFLECTIVE CEILING PLAN

F1 FIRE PROTECTION PLAN

P1 PLUMBING - DRAINS & EQUIPMENT

P2 PLUMBING - DOMESTIC WATER PLAN

E1 ELECTRICAL LIGHTING PLAN

E2 ELECTRICAL PLAN

DRAWING INDEX

RENOVATE LATRINES HANGAR 711

PLOT SCALE:AS BUILT DATE:

04 NOV 2005 1=1 FOR 24x36

"AS BUILT"

ABBREVIATIONS

A/C AIR CONDITION

ACT ACOUSTIC

AFF ABOVE FINISHED FLOOR

ALUM ALUMINUM

APPROX APPROXIMATELY

CB CIRCUIT BREAKER

CFM CUBIC FEET A MINUTE

CO CLEAN OUT

COM/LAN COMMUNICATION / LOCAL AREA NETWORK

CONC CONCRETE

CONT CONTINUOS

DW/PTD DRYWALL, PAINTED

ELEC ELECTRICAL

EW EYE WASH

EX EXHAUST

FD FLOOR DRAIN

FIN GR FINISH GRADE

GFI GROUND FAULT INTERRUPT

GYP GYPSUM

HM HOLLOW METAL

MAX MAXIMUM

MIN MINIMUM

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

PLS PLACES

PNL PANEL

RECP RECEPTACLE

REF REFERENCE

RM ROOM

SQ SQUARE

TYP TYPICAL

VCT VINYL COMPOSITION TILE

1 2

1 2

4'

EXISTING DOOR

9'

1 2

9'-6"

05 8

COUNTER TOPS &

CABINETS

3' R E F

2'-734"

REF

8'

COUNTER & CABINETS WITH

ELECTRICAL OUTLETS AND CASH

DRAWER

36'-101532"

3' D O O R

1 2

3' D O O R

EXISTING OPENING WITH

NEW DOOR

5'-118"

03 8

R E F

27'-412"

3'-658"

4"

3'-258"

3'-1"

3'

18" SINK

2'-612"

TYP WALL CONSTRUCTION

WITH PLUMBING:

1/2" GYPSUM BOARD

2x6 METAL STUD

1/2" GYPSYM BOARD

3'-11516"

5/8" FINISH

GYPSUM BOARD

EXISTING METAL STUD

1'-51732"

8"

5/8" FINISH

GYPSUM BOARD

5/8" FINISH

GYPSUM BOARD

A1 A3

A1 A3

A1 A3

A1 A3

R11 INSULATION LENGTH

OF THIS WALL AS SHOWN

3'-912" 4'-338"

14'-11"

1'-714"

8'-11516"

21'-21316"

9'-678"

1'-714"

5'-6"

7 1

14'-1158"

1 2

1 2

5'-018"

3'-658"

E S T P A R A

E S T M I S C

E S T C O D E

THIS DOORWAY AND TWO

WINDOW OPENINGS SEALED

WITH METAL SIDING MATCHING

THE EXISTING BUILDING.

SEE FOR ENLARGE DETAIL

A1 A3

051052 / DO# 5039

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskegee Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

FLOOR PLAN

SHEET 2 OF 10H. Shaw

DRAWN BY:

A1DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

18JUN04 GENERAL UPDATE MJZ

MJZDESIGN CHANGE BASE ON SABER SK20 DEC 04

MJZRELEASE FOR CONSTRUCTION07 FEB 05

MJZREDESIGNED03 MAR 05

N O R T H

PLOT SCALE:

SCALE: 3/8" = 1'-0"

D

D

D

D

FLOOR PLAN

30 SEP 05 ADJUSTED DIM. FOR AS BUILT MJZ

AS BUILT DATE:

04 NOV 2005 1=1 FOR 24x36

"AS BUILT"

ICE MACHINE

REF.

W/LOCK

ON SIDE

REF.

W/LOCK

ON SIDE

REF.

W/LOCK

ON SIDE

REF.

W/LOCK

ON SIDE

REF.

W/LOCK

ON SIDE

REF.

W/LOCK

ON SIDETRASH CAN

CEILING

MOUNTED

TV

HIGH LOW

WATER

FOUNTAIN

PLASTIC CAN

ALUM. CAN

TV MOUNT

E S T P A R A

E S T M I S C

E S T C O D E

THESE ITEMS SUPPLIED BY OTHERS

DESCRIPTIONDATE

PROJECT MANAGER

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

EQUIPMENT LAYOUT

SHEET 3 OF 10MJZ

DRAWN BY:

A2DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

MJZGENERAL UPDATE18jUN04

20 DEC 04 DESIGN CHANGE BASE ON SABER SK MJZ

051052 / DO# 5039

WILLIAM KROSEL DATE

07 FEB 05 RELEASE FOR CONSTRUCTION MJZ

03 MAR 05 REDESIGNED MJZ

PLOT SCALE:

N O R T H

SCALE: 3/8" = 1'-0"

EQUIPMENT LAYOUT

AS BUILT13 OCT 05 MJZ

AS BUILT DATE:

4'-6"

2'-2"

1'

1"

3' 3'-8"

3'-10"

4'-3"

6'

11'-5"

8'

112"

2"

2'-7"

EXISTING

BEAM

EXISTING CMU

WALL

METAL STUD

1-5/84" x 6" x 20 GAGE

R-11 INSULATION

1/2" GYPSUM

BOARD

SUSPENDED

CEILING

3'

5' 3'

1'-8"

1"

3'6"

2"

6'

1"

4" 4"

1"

3'

7"10" 2'-2"10" 2'-2"2'-2"3"

6 "

METAL STUD

1-3/4"x 3-5/8" x 20 GAGE

1/2" GYPSUM

BOARD

1/2" GYPSUM

BOARD

1/2" GYPSUM

BOARD

5/8" GYPSUM

BOARD

METAL STUD

1-3/4"x 3-5/8" x 20 GAGE

1/2" GYPSUM

BOARD

METAL STUD

1-3/4"x 10" x

20 GAGE

1/2" GYPSUM

BOARD

EXISTING CMU WALL

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

ELEVATIONS & SECTIONS

SHEET 4 OF 10MJZ

DRAWN BY:

A3DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

A1 A3 SCALE: 3/4"=1'-0"

PLAN OF LATRINE STALLS

ELEVATION @ BEAM

SCALE: 1"=1'-0"

A1 A3

A1 A3 SCALE: 1-1/2"=1'-0"

TYP. WALL SECTION WALL SECTION

SCALE: 1-1/2"=1'-0"

A1 A3

A1 A3 SCALE: 1-1/2"=1'-0"

EXISTING CMU WALL SECTION

03 MAR 05 REDESIGNED MJZ

PLOT SCALE:

N O R T H

15 OCT 05 ADJUSTED FOR AS BUILT MJZ

AS BUILT DATE:

TV MOUNT

E S T P A R A

E S T M I S C

E S T C O D E

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

REFLECTIVE CEILING PLAN

SHEET 5 OF 10MJZ

DRAWN BY:

A4DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

02 FEB 05 DESIGN CHANGE BASE ON SABER SK MJZ

EXIT LIGHT, SINGLE FACE

RECESS LIGHT FOR DROP CEILING, 2'x4'

RECESS LIGHT FOR DROP CEILING, EMERGENCY, 2'x4'

LEGEND:

07 FEB 05 RELEASE FOR CONSTRUCTION MJZ

03 MAR 05 REDESIGNED MJZ

PLOT SCALE:

SCALE: 3/8" = 1'-0"

INCANDESCENT LIGHTING

HVAC SUPPLY

HVAC RETURN

EXHAUST FAN

21 AUG 05 ADJUSTED LIGHTS AND DIFFUSERS PER SABER MJZ

REFLECTIVE CEILING PLAN

SPRINKLER HEAD

ADJUSTED CEILING PLAN FOR AS-BUILT31 0CT 05 MJZ

N O R T H

AS BUILT DATE:

FROM FIRE PANEL

TO FIRE PANEL

E S T P A R A

E S T M I S C

E S T C O D E

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

FIRE PROTECTION PLAN

SHEET 6 OF 10MJZ

DRAWN BY:

F1DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

07 FEB 05 RELEASE FOR CONSTRUCTION MJZ

LEGEND:

STROBE & HORN

PULL STATION

STROBE ONLY

NOTE:

1. WIRING PER NEC/NFPA 72 CODE FOR REDUNDANCY.

2. RUN ALL WIRE IN 3/4"EMT.

03 MAR 05 REDESIGNED MJZ

PLOT SCALE:

N O R T H

FIRE PROTECTION PLAN

SCALE: 3/8" = 1'-0"

SPRINKLER HEADS

15 OCT 05 AS BUILT MJZ

AS BUILT DATE:

5'-7"

8'-9"

11'-10"

14'-11"

5'

8'-3"

11'-5"

14'-6"

16'-11"

18'-9516"

20'-4"

" 2 " 4 " 6 " 8 " 1

1'-3"

3'-9"

6'-4"

8'-9"

11'-4"

35 8

6'-4"

FD

EXISTING

FD

EXISTING

9'-1"

4" WALL C.O.

3" WALL C.O.

3" MAIN C.O.

VERT. 'Y' TO DRAIN PIPE

VENT

VENT & 3" C.O.

HIGH LOW

DRINKING

FOUNTAIN

E S T P A R A

E S T M I S C

E S T C O D E

FD

2" DRAIN

3" DRAIN

2" DRAIN

4" DRAIN

1-1/2" DRAIN

FROM SINKS TYP.

2" DRAIN

2" DRAIN

4" DRAIN

4" DRAIN

FROM TOILETS TYP.

3" DRAIN 3" DRAIN

FROM

URINALS

3" DRAIN

3" DRAIN

4" EXISTING DRAIN

2" DRAIN

2" DRAIN

2" VENT

3" VENT

4" VENT THRU ROOF

2" VENT THRU ROOF

1-1/2" VENT

1-1/2" VENT

2" VENT

4" VENT

THIS DOORWAY AND TWO

WINDOW OPENINGS SEALED

WITH METAL SIDING MATCHING

THE EXISTING BUILDING.

VENT LINE

2" VENT

CONNECT TO

EXISTING

1-1/2" DRAIN

FROM SINKS TYP.

2" VENT

3" VENT

2" VENT

C.O.

DESCRIPTIONDATE

QC MANAGER

David Neal DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

PLUMBING - DRAINS & EQUIPMENT PLAN

SHEET 7 OF 10MJZ

DRAWN BY:

P1DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

03 OCT 05 CREATED FOR AS BUILT MJZ

PLOT SCALE:

N O R T H

PLUMBING PLAN

SCALE: 3/8" = 1'-0"

AS BUILT DATE:

04 NOV 2005 1=1 FOR 24x36

"AS BUILT"

11 NOV 05 ADDED DRAIN SIZES FOR AS BUILT MJZ

MJZADDED VENTS & FIXED DRAINS PER SABER16 NOV 05

FD

1"

HOT

1"

COLD

1/2" COLD

1/2" HIOT1-1/2"

HOT

1-1/2"

COLD

1-1/2"

COLD

1-1/2"

HOT

EXISTING 2"

MAIN WATER

SUPPLY

HOT WATER HEATER

RHEEM-RUUD,

120 GALLON MODEL # ES120-36-G

ELECTRICAL CIRCUIT - MMC #1

1-1/2"

COLD

1-1/2"

HOT

E S T P A R A

E S T M I S C

E S T C O D E

1/2" HIOT

1/2" COLD

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

PLUMBING - DOMESTIC WATER PLAN

SHEET 8 OF 10MJZ

DRAWN BY:

P2DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

01 NOV 05 CREATED FOR AS BUILT MJZ

1=1 FOR 24x36

PLOT SCALE:

N O R T H

PLUMBING DOMESTIC WATER PLAN

SCALE: 3/8" = 1'-0"

AS BUILT DATE:

04 NOV 2005

S3

S

S3

S

S

S3

S3

S3

S3S

S

E S T P A R A

E S T M I S C

E S T C O D E

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

LIGHTING PLAN

SHEET 9 OF 10MJZ

DRAWN BY:

E1DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

02 FEB 05 DESIGN CHANGE BASE ON SABER SK MJZ

WIRING & CIRCUIT # (CIRCUITS CONNECTED TO PP1)

4S SWITCH, 4 WAY, 15 AMP

SWITCH, 3 WAY, 15 AMP

SWITCH, SINGLE POLE, 20 AMP

EXIT LIGHT, DOUBLE FACE

EXIT LIGHT, SINGLE FACE

RECESS LIGHT FOR DROP CEILING, 2'x4'

S3

S

RECESS LIGHT FOR DROP CEILING, EMERGENCY, 2'x4'

LEGEND:

07 FEB 05 RELEASE FOR CONSTRUCTION MJZ

03 MAR 05 REDESIGNED MJZ

PLOT SCALE:

N O R T H

SCALE: 3/8" = 1'-0"

LIGHTING PLAN

31 OCT 05 AS BUILT PER FELTON ELEC MARK-UPS MJZ

AS BUILT DATE:

G

LOCATION IS NEAR

CEILING FOR TV

G

COUNTER WITH (2) ELECTRICAL

OUTLET STRIPS

G

18 18 16 16 17 17 10

J

SPARE

26 & 28

J

SPARE

HOT WATER HEATER

RHEEM-RUUD,

120 GALLON MODEL # ES120-36-G

ELECTRICAL CIRCUIT - MMC #1

9 TV MOUNT

E S T P A R A

E S T M I S C

E S T C O D E

DESCRIPTIONDATE

PROJECT MANAGER

WILLIAM KROSEL DATE

IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND

DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES

THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP

DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR

ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT

REQUIREMENTS.

BY AIR MOBILITY COMMAND

COMMANDER

APPROVEDSUBMITTED

CHIEF ENGINEER

TITLE:

OFFICE: (302) 735-5570 FAX: (302) 735-9737

Chugach Support Services Inc.

P.O. Box 2049

Building 447 Tuskeege Street

DOVER AIR FORCE BASE, DELAWARE

APPROVED

CHIEF ENGINEER

PROJECT NUMBER:

ELECTRICAL PLAN

PLOT SCALE:

SHEET 10 OF 10MJZ

DRAWN BY:

E2DAFB, DE 19902

RENOVATE LATRINES HANGAR 711

051052 / DO# 5039

7FEB05 RELEASE FOR CONSTRUCTION -

03 MAR 05 REDESIGNED MJZ

15 AMP RECEPTACLE -GFI (7)

G

COM/LAN DEVICE (49)

RECEPTACLE CIRCUIT # (ALL CIRCUITS FROM PP1)

20 AMP RECEPTACLE (95)

LEGEND:

N O R T H

SCALE: 3/8" = 1'-0"

ELECTRICAL PLAN

J JUNCTION BOX

31 OCT 05 AS BUILT PER FELTON ELEC. MARK UPS MJZ

AS BUILT DATE:

G1 COVER
A1 FLOOR PLAN
A2 EQUIPMENT LAYOUT
A3 ELEVATIONS & SECTIONS
A4 REFLECTIVE CEILING PLAN
F1 FIRE EQUIPMENT LAYOUT
P1 PLUMBING - drains & equipment locations
P2 DOMESTIC WATER PLAN
E1 CEILING LIGHTING
E2 ELECTRICAL PLAN

File details come from the government source that posted it. Updated .