W4962_051052_Renovate Latrines Hnager Fac 711
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A R K I N G
P A R K I N G
PARKING
P A R K I N G
PA
RK
IN
G
P A R K I N G
PARKING
PARKING
MA
RS
HA
LI
NG
A
RE
A
PA
RK
IN
G
PA
RK
IN
G
PARKING
P A R K I N G
P A R K I N G
P K N G
MAIN RAMP
MA
IN
GA
TE
T A N K S
TA
NK
T
TA
NK
TA
NK
TA
NK
TA
NK
PO
OL
OPEN STORAGE
AI
R
FENCE ON BOUNDARY
ST
AT
IO
N
SU
B
T A X I W A Y
C
TAXIWAY "A"
FU
EL
TA
NK
S
67501 67483
67484
64503
611 6
69615
65003
64504
67413
65002
67409
8 6
65001
67519
65000
66223
65011
65061
64512
ST.
T H
S T
T H
S T
T H
S T
TH
S T.
PARIS ST
T H
S T
M A I N
G A T E
W A Y
T H
S T
E A G L E
W A Y
T H
S T
T H
S T
RAMP ROAD
C L E A R
Z O N E
AS
PH
DR
A B O V E
G R O U N D
F U E L
T A N K
R Q P O N M L J I H G F EK D2
D1
C H E V R O N
A V E
B A S K E T B A L L
C O U R T S
67585
RA
IL
RO
AD
S
PI
KE
N 0, 9.
E 0, 7.
EL
.7
H
AR
TM
AN
N
AS
SO
C.
EL
.4
E 0, 9.
N 9, 1.
PK
N
AI
L
PK
N
AI
L
EL
.7
E 0, 1.
N 0, 9.
68525
68525
68525
68525
68525
051052 / DO# 5039
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskegee Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
COVER SHEET
SHEET 1 OF 10MJZ
DRAWN BY:
G1DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
04 NOV 05 AS BUILT MJZ
N O R T H
BUILDING 711
DOVER AIR FORCE BASE
DOVER, DELAWARE
G1 COVER SHEET
A1 FLOOR PLAN
A2 EQUIPMENT LAYOUT
A3 ELEVATIONS & SECTIONS
A4 REFLECTIVE CEILING PLAN
F1 FIRE PROTECTION PLAN
P1 PLUMBING - DRAINS & EQUIPMENT
P2 PLUMBING - DOMESTIC WATER PLAN
E1 ELECTRICAL LIGHTING PLAN
E2 ELECTRICAL PLAN
DRAWING INDEX
RENOVATE LATRINES HANGAR 711
PLOT SCALE:AS BUILT DATE:
04 NOV 2005 1=1 FOR 24x36
"AS BUILT"
ABBREVIATIONS
A/C AIR CONDITION
ACT ACOUSTIC
AFF ABOVE FINISHED FLOOR
ALUM ALUMINUM
APPROX APPROXIMATELY
CB CIRCUIT BREAKER
CFM CUBIC FEET A MINUTE
CO CLEAN OUT
COM/LAN COMMUNICATION / LOCAL AREA NETWORK
CONC CONCRETE
CONT CONTINUOS
DW/PTD DRYWALL, PAINTED
ELEC ELECTRICAL
EW EYE WASH
EX EXHAUST
FD FLOOR DRAIN
FIN GR FINISH GRADE
GFI GROUND FAULT INTERRUPT
GYP GYPSUM
HM HOLLOW METAL
MAX MAXIMUM
MIN MINIMUM
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
PLS PLACES
PNL PANEL
RECP RECEPTACLE
REF REFERENCE
RM ROOM
SQ SQUARE
TYP TYPICAL
VCT VINYL COMPOSITION TILE
1 2
1 2
4'
EXISTING DOOR
9'
1 2
9'-6"
05 8
COUNTER TOPS &
CABINETS
3' R E F
2'-734"
REF
8'
COUNTER & CABINETS WITH
ELECTRICAL OUTLETS AND CASH
DRAWER
36'-101532"
3' D O O R
1 2
3' D O O R
EXISTING OPENING WITH
NEW DOOR
5'-118"
03 8
R E F
27'-412"
3'-658"
4"
3'-258"
3'-1"
3'
18" SINK
2'-612"
TYP WALL CONSTRUCTION
WITH PLUMBING:
1/2" GYPSUM BOARD
2x6 METAL STUD
1/2" GYPSYM BOARD
3'-11516"
5/8" FINISH
GYPSUM BOARD
EXISTING METAL STUD
1'-51732"
8"
5/8" FINISH
GYPSUM BOARD
5/8" FINISH
GYPSUM BOARD
A1 A3
A1 A3
A1 A3
A1 A3
R11 INSULATION LENGTH
OF THIS WALL AS SHOWN
3'-912" 4'-338"
14'-11"
1'-714"
8'-11516"
21'-21316"
9'-678"
1'-714"
5'-6"
7 1
14'-1158"
1 2
1 2
5'-018"
3'-658"
E S T P A R A
E S T M I S C
E S T C O D E
THIS DOORWAY AND TWO
WINDOW OPENINGS SEALED
WITH METAL SIDING MATCHING
THE EXISTING BUILDING.
SEE FOR ENLARGE DETAIL
A1 A3
051052 / DO# 5039
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskegee Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
FLOOR PLAN
SHEET 2 OF 10H. Shaw
DRAWN BY:
A1DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
18JUN04 GENERAL UPDATE MJZ
MJZDESIGN CHANGE BASE ON SABER SK20 DEC 04
MJZRELEASE FOR CONSTRUCTION07 FEB 05
MJZREDESIGNED03 MAR 05
N O R T H
PLOT SCALE:
SCALE: 3/8" = 1'-0"
D
D
D
D
FLOOR PLAN
30 SEP 05 ADJUSTED DIM. FOR AS BUILT MJZ
AS BUILT DATE:
04 NOV 2005 1=1 FOR 24x36
"AS BUILT"
ICE MACHINE
REF.
W/LOCK
ON SIDE
REF.
W/LOCK
ON SIDE
REF.
W/LOCK
ON SIDE
REF.
W/LOCK
ON SIDE
REF.
W/LOCK
ON SIDE
REF.
W/LOCK
ON SIDETRASH CAN
CEILING
MOUNTED
TV
HIGH LOW
WATER
FOUNTAIN
PLASTIC CAN
ALUM. CAN
TV MOUNT
E S T P A R A
E S T M I S C
E S T C O D E
THESE ITEMS SUPPLIED BY OTHERS
DESCRIPTIONDATE
PROJECT MANAGER
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
EQUIPMENT LAYOUT
SHEET 3 OF 10MJZ
DRAWN BY:
A2DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
MJZGENERAL UPDATE18jUN04
20 DEC 04 DESIGN CHANGE BASE ON SABER SK MJZ
051052 / DO# 5039
WILLIAM KROSEL DATE
07 FEB 05 RELEASE FOR CONSTRUCTION MJZ
03 MAR 05 REDESIGNED MJZ
PLOT SCALE:
N O R T H
SCALE: 3/8" = 1'-0"
EQUIPMENT LAYOUT
AS BUILT13 OCT 05 MJZ
AS BUILT DATE:
4'-6"
2'-2"
1'
1"
3' 3'-8"
3'-10"
4'-3"
6'
11'-5"
8'
112"
2"
2'-7"
EXISTING
BEAM
EXISTING CMU
WALL
METAL STUD
1-5/84" x 6" x 20 GAGE
R-11 INSULATION
1/2" GYPSUM
BOARD
SUSPENDED
CEILING
3'
5' 3'
1'-8"
1"
3'6"
2"
6'
1"
4" 4"
1"
3'
7"10" 2'-2"10" 2'-2"2'-2"3"
6 "
METAL STUD
1-3/4"x 3-5/8" x 20 GAGE
1/2" GYPSUM
BOARD
1/2" GYPSUM
BOARD
1/2" GYPSUM
BOARD
5/8" GYPSUM
BOARD
METAL STUD
1-3/4"x 3-5/8" x 20 GAGE
1/2" GYPSUM
BOARD
METAL STUD
1-3/4"x 10" x
20 GAGE
1/2" GYPSUM
BOARD
EXISTING CMU WALL
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
ELEVATIONS & SECTIONS
SHEET 4 OF 10MJZ
DRAWN BY:
A3DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
A1 A3 SCALE: 3/4"=1'-0"
PLAN OF LATRINE STALLS
ELEVATION @ BEAM
SCALE: 1"=1'-0"
A1 A3
A1 A3 SCALE: 1-1/2"=1'-0"
TYP. WALL SECTION WALL SECTION
SCALE: 1-1/2"=1'-0"
A1 A3
A1 A3 SCALE: 1-1/2"=1'-0"
EXISTING CMU WALL SECTION
03 MAR 05 REDESIGNED MJZ
PLOT SCALE:
N O R T H
15 OCT 05 ADJUSTED FOR AS BUILT MJZ
AS BUILT DATE:
TV MOUNT
E S T P A R A
E S T M I S C
E S T C O D E
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
REFLECTIVE CEILING PLAN
SHEET 5 OF 10MJZ
DRAWN BY:
A4DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
02 FEB 05 DESIGN CHANGE BASE ON SABER SK MJZ
EXIT LIGHT, SINGLE FACE
RECESS LIGHT FOR DROP CEILING, 2'x4'
RECESS LIGHT FOR DROP CEILING, EMERGENCY, 2'x4'
LEGEND:
07 FEB 05 RELEASE FOR CONSTRUCTION MJZ
03 MAR 05 REDESIGNED MJZ
PLOT SCALE:
SCALE: 3/8" = 1'-0"
INCANDESCENT LIGHTING
HVAC SUPPLY
HVAC RETURN
EXHAUST FAN
21 AUG 05 ADJUSTED LIGHTS AND DIFFUSERS PER SABER MJZ
REFLECTIVE CEILING PLAN
SPRINKLER HEAD
ADJUSTED CEILING PLAN FOR AS-BUILT31 0CT 05 MJZ
N O R T H
AS BUILT DATE:
FROM FIRE PANEL
TO FIRE PANEL
E S T P A R A
E S T M I S C
E S T C O D E
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
FIRE PROTECTION PLAN
SHEET 6 OF 10MJZ
DRAWN BY:
F1DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
07 FEB 05 RELEASE FOR CONSTRUCTION MJZ
LEGEND:
STROBE & HORN
PULL STATION
STROBE ONLY
NOTE:
1. WIRING PER NEC/NFPA 72 CODE FOR REDUNDANCY.
2. RUN ALL WIRE IN 3/4"EMT.
03 MAR 05 REDESIGNED MJZ
PLOT SCALE:
N O R T H
FIRE PROTECTION PLAN
SCALE: 3/8" = 1'-0"
SPRINKLER HEADS
15 OCT 05 AS BUILT MJZ
AS BUILT DATE:
5'-7"
8'-9"
11'-10"
14'-11"
5'
8'-3"
11'-5"
14'-6"
16'-11"
18'-9516"
20'-4"
" 2 " 4 " 6 " 8 " 1
1'-3"
3'-9"
6'-4"
8'-9"
11'-4"
35 8
6'-4"
FD
EXISTING
FD
EXISTING
9'-1"
4" WALL C.O.
3" WALL C.O.
3" MAIN C.O.
VERT. 'Y' TO DRAIN PIPE
VENT
VENT & 3" C.O.
HIGH LOW
DRINKING
FOUNTAIN
E S T P A R A
E S T M I S C
E S T C O D E
FD
2" DRAIN
3" DRAIN
2" DRAIN
4" DRAIN
1-1/2" DRAIN
FROM SINKS TYP.
2" DRAIN
2" DRAIN
4" DRAIN
4" DRAIN
FROM TOILETS TYP.
3" DRAIN 3" DRAIN
FROM
URINALS
3" DRAIN
3" DRAIN
4" EXISTING DRAIN
2" DRAIN
2" DRAIN
2" VENT
3" VENT
4" VENT THRU ROOF
2" VENT THRU ROOF
1-1/2" VENT
1-1/2" VENT
2" VENT
4" VENT
THIS DOORWAY AND TWO
WINDOW OPENINGS SEALED
WITH METAL SIDING MATCHING
THE EXISTING BUILDING.
VENT LINE
2" VENT
CONNECT TO
EXISTING
1-1/2" DRAIN
FROM SINKS TYP.
2" VENT
3" VENT
2" VENT
C.O.
DESCRIPTIONDATE
QC MANAGER
David Neal DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
PLUMBING - DRAINS & EQUIPMENT PLAN
SHEET 7 OF 10MJZ
DRAWN BY:
P1DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
03 OCT 05 CREATED FOR AS BUILT MJZ
PLOT SCALE:
N O R T H
PLUMBING PLAN
SCALE: 3/8" = 1'-0"
AS BUILT DATE:
04 NOV 2005 1=1 FOR 24x36
"AS BUILT"
11 NOV 05 ADDED DRAIN SIZES FOR AS BUILT MJZ
MJZADDED VENTS & FIXED DRAINS PER SABER16 NOV 05
FD
1"
HOT
1"
COLD
1/2" COLD
1/2" HIOT1-1/2"
HOT
1-1/2"
COLD
1-1/2"
COLD
1-1/2"
HOT
EXISTING 2"
MAIN WATER
SUPPLY
HOT WATER HEATER
RHEEM-RUUD,
120 GALLON MODEL # ES120-36-G
ELECTRICAL CIRCUIT - MMC #1
1-1/2"
COLD
1-1/2"
HOT
E S T P A R A
E S T M I S C
E S T C O D E
1/2" HIOT
1/2" COLD
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
PLUMBING - DOMESTIC WATER PLAN
SHEET 8 OF 10MJZ
DRAWN BY:
P2DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
01 NOV 05 CREATED FOR AS BUILT MJZ
1=1 FOR 24x36
PLOT SCALE:
N O R T H
PLUMBING DOMESTIC WATER PLAN
SCALE: 3/8" = 1'-0"
AS BUILT DATE:
04 NOV 2005
S3
S
S3
S
S
S3
S3
S3
S3S
S
E S T P A R A
E S T M I S C
E S T C O D E
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
LIGHTING PLAN
SHEET 9 OF 10MJZ
DRAWN BY:
E1DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
02 FEB 05 DESIGN CHANGE BASE ON SABER SK MJZ
WIRING & CIRCUIT # (CIRCUITS CONNECTED TO PP1)
4S SWITCH, 4 WAY, 15 AMP
SWITCH, 3 WAY, 15 AMP
SWITCH, SINGLE POLE, 20 AMP
EXIT LIGHT, DOUBLE FACE
EXIT LIGHT, SINGLE FACE
RECESS LIGHT FOR DROP CEILING, 2'x4'
S3
S
RECESS LIGHT FOR DROP CEILING, EMERGENCY, 2'x4'
LEGEND:
07 FEB 05 RELEASE FOR CONSTRUCTION MJZ
03 MAR 05 REDESIGNED MJZ
PLOT SCALE:
N O R T H
SCALE: 3/8" = 1'-0"
LIGHTING PLAN
31 OCT 05 AS BUILT PER FELTON ELEC MARK-UPS MJZ
AS BUILT DATE:
G
LOCATION IS NEAR
CEILING FOR TV
G
COUNTER WITH (2) ELECTRICAL
OUTLET STRIPS
G
18 18 16 16 17 17 10
J
SPARE
26 & 28
J
SPARE
HOT WATER HEATER
RHEEM-RUUD,
120 GALLON MODEL # ES120-36-G
ELECTRICAL CIRCUIT - MMC #1
9 TV MOUNT
E S T P A R A
E S T M I S C
E S T C O D E
DESCRIPTIONDATE
PROJECT MANAGER
WILLIAM KROSEL DATE
IN ACCORDANCE WITH FAR 52.236-21 ENTITLED SPECIFICATIONS AND
DRAWINGS FOR CONSTRUCTION, THE SIGNATURE HEREON EVIDENCES
THE APPROVAL OF CHUGACH SUPPORT SERVICES, INC. THE SHOP
DRAWINGS PROVIDED HAVE BEEN COORDINATED ON AND REVIEWED FOR
ACCURACY, COMPLETENESS, AND COMPLIANCE WITH CONTRACT
REQUIREMENTS.
BY AIR MOBILITY COMMAND
COMMANDER
APPROVEDSUBMITTED
CHIEF ENGINEER
TITLE:
OFFICE: (302) 735-5570 FAX: (302) 735-9737
Chugach Support Services Inc.
P.O. Box 2049
Building 447 Tuskeege Street
DOVER AIR FORCE BASE, DELAWARE
APPROVED
CHIEF ENGINEER
PROJECT NUMBER:
ELECTRICAL PLAN
PLOT SCALE:
SHEET 10 OF 10MJZ
DRAWN BY:
E2DAFB, DE 19902
RENOVATE LATRINES HANGAR 711
051052 / DO# 5039
7FEB05 RELEASE FOR CONSTRUCTION -
03 MAR 05 REDESIGNED MJZ
15 AMP RECEPTACLE -GFI (7)
G
COM/LAN DEVICE (49)
RECEPTACLE CIRCUIT # (ALL CIRCUITS FROM PP1)
20 AMP RECEPTACLE (95)
LEGEND:
N O R T H
SCALE: 3/8" = 1'-0"
ELECTRICAL PLAN
J JUNCTION BOX
31 OCT 05 AS BUILT PER FELTON ELEC. MARK UPS MJZ
AS BUILT DATE:
| G1 COVER |
| A1 FLOOR PLAN |
| A2 EQUIPMENT LAYOUT |
| A3 ELEVATIONS & SECTIONS |
| A4 REFLECTIVE CEILING PLAN |
| F1 FIRE EQUIPMENT LAYOUT |
| P1 PLUMBING - drains & equipment locations |
| P2 DOMESTIC WATER PLAN |
| E1 CEILING LIGHTING |
| E2 ELECTRICAL PLAN |
File details come from the government source that posted it. Updated .