FA4497-12-R-0002.pdf
PDF 330 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4497-12-R-0002
About this file
Multiple Award Construction Contract (MACC) for Dover AFB
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. Project Title: (MACC) Multiple Aw ard Construction Contract - Indefinite Delivery/Indefinite Quantity (IDIQ) B. This acquisition is a Total Small Business Set-Aside. NAICS Code: 236220. Government anticipates aw ard of up to 6 contracts.
C. Project performance period is scheduled for a Base Year plus four (4) one-year Option Periods.
D. The Guaranteed Minimum amount over the life of this contract is $1,000 payable follow ing attendance at a mandatory orientation conference.
E. The total aggregate maximum amount expendable under all MACC contracts aw arded shall not exceed $60 Million for base and all option years.
F. The "seed project" magnitude is betw een $100,000 - $250,000.
G. A Bid Bond in the amount of 20% w ill be required for the seed project. See Section H, Special Contract Requirements.
H. Reference Section L, "Instructions, Conditions, and Notices to Offerors" for proper proposal preparation and Section M - "Evaluation Factors for Aw ard".
I. Pre-proposal conferences/site visits are scheduled for 22/28 Feb @ 9:00 A.M (EST) on Dover AFB. The specif ic location is to be announced. The conference w ill include a visit to the seed project location.
TINA MONTEIRO DE RAMIREZ 302-677-5027
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
15-Feb-2012
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 Mar 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
436 CONTRACTING SQUADRON
BLDG 639 ATLANTIC ST
DOVER AFB DE 19902-5639
FA4497
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
FA4497-12-R-0002 61
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4497-12-R-0002
Section B - Supplies or Services and Prices
PERIOD OF PERFORMANCE
Dates will be adjusted once award is made: Date of Award- 365 Days (on or about 1 May 2012)
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Years Base Year- 1 May 2012- 30 Apr 2013
FFP
MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general specifications further defined with a statement of work for each individual task order. The work will consist of multiple disciplines in general construction categories for facilities on and under the jurisdiction of Dover AFB. Minimum guarantee of $1000 will be paid in the base year after attending the mandatory orientation conference. The minimum guarantee for recipient of the "seed project" award will be satisfied by the award amount.
FOB: Destination
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Years OPTION Option 1- 1 May 2013- 30 Apr 2014
FFP
MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general specifications further defined with a statement of work for each individual task order. The work will consist of multiple disciplines in general construction categories for facilities on and under the jurisdiction of Dover AFB.
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Years OPTION Option 2- 1 May 2014- 30 Apr 2015
FFP
MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general specifications further defined with a statement of work for each individual task order. The work will consist of multiple disciplines in general construction categories for facilities on and under the jurisdiction of Dover AFB.
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Years OPTION Option 3- 1 May 2015- 30 Apr 2016
FFP
MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general specifications further defined with a statement of work for each individual task order. The work will consist of multiple disciplines in general construction categories for facilities on and under the jurisdiction of Dover AFB.
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Years OPTION Option 4- 1 May 2016- 30 Apr 2017
FFP
MACC is a multiple award, competitive design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on general specifications further defined with a statement of work for each individual task order. The work will consist of multiple disciplines in general construction categories for facilities on and under the jurisdiction of Dover AFB.
WORK STATEMENT
See Exhibit 1, STATEMENT OF WORK FOR MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), SEED PROJECT, Dated 20 JAN 2012
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996 252.246-7000 Material Inspection And Receiving Report MAR 2008
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-MAY-2012 TO
30-APR-2013
N/A N/A
1001 POP 01-MAY-2013 TO
30-APR-2014
2001 POP 01-MAY-2014 TO
30-APR-2015
3001 POP 01-MAY-2015 TO
30-APR-2016
4001 POP 01-MAY-2016 TO
30-APR-2017
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within * calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than * The time stated for completion shall include final cleanup of the premises.
*Dates and number of days will be established with each task order.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of * for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
* Liquidated damages will be established based on each project and will be established with each task order.
Section G - Contract Administration Data
G-001 ACCOUNTING AND APPROPRIATION DATA AND AMOUNT:
Each task order will be funded separately.
G-002 CONTRACT ADMINISTRATION:
Administration of this contract will be performed by 436 CONS/LGCA, 639 Atlantic Street, Dover Air Force Base, Delaware 19902-5639. No changes, deviations, or waivers, shall be effected without a modification of the contract, executed by the Contracting Officer authorizing such changes, deviations, or waivers.
G-003 IDENTIFICATION OF CORRESPONDENCE:
All correspondence and data submitted by the contractor under this contract shall reference the contract number, task order number, project title, and project number.
G-004 INVOICING:
Prepare invoices in accordance with contract clauses FAR 52.232-5 AND FAR 52.232-27. Unless otherwise directed, requests for payments must be submitted electronically via the internet through the Wide Area Workflow – Receipt and Acceptance (WAWF-RA) system at https://wawf.eb.mil in accordance with DFARS 252.232-7003 entitled “Electronic Submission of Payment Requests”. Unless otherwise advised, the contractor shall use the following with any WAWF submission:
Issue By DODAAC: FA4497 Admin DODAAC: FA4497 Inspect By DODAAC: F1Q3FQ Contracting Officer DODAAC: F1Q3CN Pay Office DODAAC: F67100
Contract Administrator: tina.monteiro@us.af.mil Contracting Officer: james.russial@dover.af.mil Inspector: dustin.brown@dover.af.mil Additional notification: michael.adkins@dover.af.mil
The contractor shall invoice against the correct line item number using the correct ACRN from the contract issued.
Failure to use the correct DODACC or other required information shall result in an invoice being rejected and/or delayed payment.
G-005 POSTAWARD CONFERENCE
The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office.
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
H-001: REQUIRED INSURANCE (IAW FAR 28.306(b)(1))
Reference FAR clause FAR 52.228-5, “Insurance- Work on a Government Installations,” the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
1. Workers' compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
2. General liability. The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
3. Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H-002: FEDERAL HOLIDAYS
The following Federal Legal holidays are observed by this base:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
H-003: PERFORMANCE AND BID REQUIREMENTS (IAW FAR 28.101-2 and FAR 28.102-3)
(a) Bid Guarantee:
(1) A proposal/bid bond IS required, with this proposal, in the form of a firm commitment e.g. bid bond (Standard Form 24) supported by good and sufficient surety or sureties acceptable to the government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or under Treasury Department regulations, certain bonds or notes of the United States. The contracting officer will return any bid guarantee, other than bid bond, to the successful offeror upon execution of contractual documents and bond (including any necessary coinsurance agreements) as required by the bid as accepted.
(2) The amount of the bid guarantee shall be 20% of the bid price for the seed project or $3 million whichever is less. Additionally, offers shall provided a letter from their bonding company stating that the offeror has the capacity to obtain bonding up to $10 million. Actual bonding will be required with each task order.
(3) If the successful bidder (offeror) upon acceptance of its bid by the government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder (offeror) the contracting officer may terminate the contract for default.
(4) In the event the contract is terminated for default, the offeror is liable for any cost of acquiring the work that exceeds the amount of its offer and the bid guarantee is available to offset the difference.
(b) Performance and Payment Bonds. In accordance with the Miller Act (40 U.S.C. 2701-270f), the bidder to whom award is made shall, within fifteen (15) calendar days after the date of award, furnish a performance bond (Standard Form 25) and a Payment Bond (Standard Form 25a), each with good and sufficient surety of sureties acceptable to the Government.
(1) Performance Bond: The penal sum of the performance bonds at the time of contract award shall be one hundred percent (100%) of the contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be one hundred percent (100%) of the original contract price.
(c) The contractor will not be issued a Notice to Proceed or be allowed to start work prior to furnishing the requested bond, including any necessary insurance agreements.
H-004 PREPARATION OF PROGRESS SCHEDULE AND REPORTS
The reports contemplated by FAR 52.236-15 entitled “Schedules for Construction Contracts” shall be accomplished on and in accordance with instructions pertaining to AF Form 3064 - Contract Progress Schedule, and AF Form 3065- Contract Progress Report. The Contract Progress Reports shall be submitted bi-weekly after the Progress Schedule has been approved.
H-005: PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by FAR 52.336-5 entitled “Material and Workmanship” shall be accomplished on and in accordance with instructions pertaining to AF Form 3000, Material Approval Submittal. The contractor shall, within 30-days of receiving the notice to proceed, submit the AF Forms 3000, for material submittals required by Attachment 2, Material Approval Submittals, to allow sufficient time for government review and approval (approximately 30-calendar days), ordering and delivery of material prior to scheduled installation. The contractor shall be responsible for any delays resulting from late submissions of the AF Form 3000 or submittals disapproved due to non-compliance with the project requirements.
H-006: PAYMENT FOR MATERIALS STORED ON SITE
(a) This clause implements FAR 52.232-5, Payments Under Fixed Price Construction Contracts, with regard to material payments.
(b) Consideration for payment under this contract for materials stored on site is subject to the following conditions:
(1) The contractor shall furnish the Contracting Officer a list of major high-cost items to be incorporated into the contract and for which payment, prior to installation, will be requested. Those items approved by the contracting officer will be entered on the AF Form 3064, Contract Progress Schedule, as a percentage factor, or factors if items are listed individually.
(2) Payment is limited to major high-cost items. A major high-cost item is defined as a single item of material with a unit price of $500.00. Such costs as sales tax, freight, handling, pallets, etc., are excluded.
(3) Payment requests shall be consistent with approved material submittals and shall be supported by the following documents
(i) Certified paid vendor invoices.
(ii) Accepted delivery tickets, if applicable.
(4) All material for which payment is requested shall be delivered to an approved location on site, and certified that none will be removed without written permission of the contracting officer. Materials may also be stored in a bonded warehouse.
(5) Payments will be made monthly, or at more frequent intervals as determined by the Contracting Officer.
H-007: SECURITY REQUIREMENTS
(a) General:
(1) All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.
(2) At the close for each work period, government facilities, equipment and materials shall be secured, lights, and all doors and window secured.
(3) The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI).
(4) Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities.
(5) The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
(6) All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.
(b) Contractor Badge Policies:
(1) All requests for contractor badges will be submitted through the Base Contracting Squadron Office and/or the requesting agencies base point of contact. The Contracting Squadron Office or base point of contact will then fill out an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the Pass and Registrations section for approval IAW DAFBI 31-101. As a minimum the ORM will be submitted 72-hours prior to the requested date of employment.
(2) All contactor employees who’ll be granted unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the criminal background check.
(3) Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction. Also before a new badge will be issued an ORM must be resubmitted to the Pass and Registration section for approval again. In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge renewal per paragraph 1.8.4.1. before a new badge can be reissued.
(4) Base Contracting Office or base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Agency Chief or Site Supervisors are responsible for notifying and returning the contractor’s badge to Pass and Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Squadron.
(c) Installation Access:
(1) The contractor shall obtain personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from Pass and Registration, for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their contractor badge.
(2) Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the installation. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or non consent by an employee will result in termination of their base access and immediate confiscation of this access badge.
(3) During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.
(4) During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.
(5) During Higher FPCONs (Charlie and Delta) the base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended as the direction of the Installation Commander.
(d) Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities.
(e) The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
H-008 TASK ORDER PERFORMANCE PERIOD
Performance periods will be negotiated for each individual task order.
H-009 PREAWARD SITE INSPECTIONS
Contractors shall inspect project job sites with Government representatives. Any deficiencies, conflicts, or other areas of concern existing in the scope of work and/or applicable drawings should be brought to the attention of the Contracting Officer, in writing. The contractor shall also notify the Contracting Officer, in writing, upon observing any features in the design that appear to be ambiguous, confusing, conflicting or erroneous.
H-010 NOTICE OF CONSTRUCTIVE CHANGES
No order, statement or direction of the Contracting Officer, authorized representative of the Contracting Officer, whether or not acting within the limits of his or her authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless a change is issued in writing and signed by the Contracting Officer.
H-011 PRE-DESIGN AND/OR PRE-CONSTRUCTION CONFERENCE
Prior to starting work under a task order, contractors shall meet with the Contracting Officer and designated technical representative to discuss and develop mutual understandings concerning schedule and performance.
H-012 TASK ORDER ISSUANCE PROCEDURES
(a) Work under this contract will be ordered by written task orders issued on DD Form 1155 (Order for Supplies or Services) to the contractor by the Contracting Officer.
(b) Task order numbers will consist of the basic contract number followed by a 4-digit supplemental task order number. The task order number must be reflected on all correspondence related to the task order.
(c) The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task orders.
(d) Task Orders will be firm fixed price and clearly define the specific services to be performed or the performance desired. Each Task Order may contain additional, site or project specific, provisions. Any such additional provisions shall be a part of the Request for Proposal.
(e) Task order projects may be non-complex performance-oriented tasks requiring minimal design, may be complex construction requiring design development for design-build construction, or any combination thereof. Any estimated quantities provided in project documents are considered informational only. Contractors must validate quantities and all features of work necessary to deliver a complete and functional project. The Task Order may or may not have traditional plans and specifications but may include sketches, and requests for catalog cuts, and other submittals. The following describes the procedures for each type of requirement the Task Order could present:
(1) Contractor-Provided Design/Design-Build: MACC Contractors shall provide an initial ‘Concept’ design consisting of drawings, sketches, outline specifications, design analysis, and/or other documentation as required by the task order Statement of Work. MACC Contractors shall also provide a price proposal and may be required to include a proposed performance period. The Government will evaluate submitted proposals in accordance with task order requirements. Only the successful offeror will be required to proceed with subsequent design effort (i.e. 35%, 65%, 95% and/or 100% as stated in each Task Order) and execute construction.
(2) Government-Provided Design/Design-Build: MACC Contractors shall be provided a ‘Concept’ design, consisting of drawings, sketches, outline specifications, design analysis and/or other documentation as required by the task order Statement of Work. Based on the ‘Concept’ design, MACC Contractors shall provide a price proposal and may be required to include a proposed performance period. The Government will evaluate the submitted proposals in accordance with task order requirements. Only the successful offeror will be required to proceed with subsequent design effort, i.e. 35%, 65%, 95% and/or 100% as stated in each Task Order) and execute construction.
(3) Construction Only: MACC Contractors shall be provided a previously accomplished design which may be representative of a 35%, 65%, 95% or 100% design consisting of drawings, specifications, design analysis and/or other documentation as required by the task order Statement of Work. Based on this completed design, MACC Contractors shall provide a price proposal and may be required to include a proposed performance period (as stated in each Task Order). The Government will evaluate submitted price proposals in accordance with task order requirements. Only the successful offeror will proceed with construction. The design levels stated above are defined in the basic MACC Statement of Work.
(f) Task order solicitations will provide contractors with as much information as possible regarding the existing conditions of the site and any pre-existing structures.
(g) Contractors will provide a price proposal and a proposed performance period. The Government will evaluate submitted proposals according to criteria specified in the Task order RFP. Only the successful offeror will be required to proceed with subsequent design effort, if required, and execute construction.
(h) Task orders may be modified by the Contracting Officer. Modifications to task orders will be issued on Standard Form (SF) 30 and cite the task order number.
(i) Submission of proposals for Task Orders is not required. However, contractors are required to contact the Contracting Officer within two days after receipt of Task Order Request for Proposal (TORFP) if a contractor will not participate in the walk through or submit a proposal on a Task Order. Failure by offerors to participate responsibly in site visits and submit proposals may result in the Government not exercising the option to extend the contract or exclusion of the contractor from further competition.
H-013 COMPETITION
(a) Only contractors awarded contract as a result of this RFP will compete for subsequent task orders. Contractors are encouraged to participate in all site visits and submit proposals. To execute fiscal year end projects, the government may solicit offers for projects for which funds are not certified or readily available. Submission of proposals for these acquisitions is discretionary and will have no negative impact on the contractor.
Occasionally, (generally during the last quarter of the fiscal year), the government will solicit offers for projects for which funds are not certified nor readily available. Air Mobility Command refers to these acquisitions as “Special Advance Authority” (SAA) or “Normal Straddle Bid” (NSB) projects. Under SAA funds are not available and may not become available. The Government makes no promise to award a contract. If funds do not become available for SAA projects, the Request for Quote is cancelled and no award is made. Under NSB funds may be available in the current fiscal year or the next fiscal year. If a contract is not awarded in the currentfiscal year, it will be awarded in the following fiscal year.(See AFFARS MP5332.7, Contract Funding). Submission of proposals for these acquisitions is at the sole discretion of the respective MACC contractors and their declination to participate in any or all such solicitations will not reflect negatively upon them. This includes projects that are in whole or in part “SAA” projects.
(b) Unless the Contracting Officer applies the exceptions noted below, each task order will be awarded, as a result of competition to the contractor who offers the best value to the Government considering task order evaluation criteria.
The contracting Officer’s decision as to the selection for award of a task order is not protestable unless the protest is on the grounds that the order increases the scope, period, or maximum value of the contract program.
(c) The contracting Officer reserves the right to award a task order without competition based upon a determination that:
(1) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays;
(2) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services being ordered are unique or highly specialized;
(3) The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order.
H-014 DESCRIPTION OF SUBSEQUENT TASK ORDERS
(a) Task orders may range from $500,000 to $10,000,000, with most falling in the range of $500,000 to $2,000,000.
Task order projects may require either a single discipline or multi-disciplined design services. Projects may also require comprehensive interior design, lead and asbestos abatement and incorporation of sustainable features. Some projects may require only minimal design.
(b) Technical narratives, if required, may address one or more of the following factors:
- Design
- The contractor’s technical understanding of the work.
- The most efficient and effective plan to accomplish the work.
- Rationale for proposed materials, type and quantities.
- Sustainable design features
H-015 SUBSEQUENT TASK ORDER EVALUATION CRITERIA
Subsequent Task orders may be awarded on best value, either tradeoff process or low price, technically acceptable. If the Government decides to issue the Task order as a best value using the trade off process, award factors will vary depending on the unique requirements of each Task order. One or more of the following criteria in addition to Price or Cost may be considered:
(a) Past Performance - Task order past performance or prior past performance on other contracts
(b) Quality of Deliverables
(c) Ability to Meet Schedule Requirements
(d) Relevant Experience
(e) Cost Control
(f) Potential impact on other orders placed with the contractor
(g) Current workload
(h) Design
(j) The contractor’s technical understanding of the work.
(k) The most efficient and effective plan to accomplish the work.
(l) Rationale for proposed materials, type and quantities.
(m) Sustainable design features
H-016 WAGE RATES
Because each task order will be competed among all the MACC holders, the current applicable Davis-Bacon wage rate at the time of request for proposal issuance shall be used.
Section I - Contract Clauses
52.202-1 Definitions JAN 2012 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 Central Contractor Registration FEB 2012 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
FEB 2012
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-2 Alt I Audit and Records--Negotiation (Oct 2010) Alternate I MAR 2009 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-21 Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data-- Modifications
OCT 2010
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns JAN 2011 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records JUN 2010 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007
52.222-27 Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)
DEC 2001
52.222-35 Equal Opportunity for Veterans SEP 2010 52.222-36 Affirmative Action For Workers With Disabilities OCT 2010 52.222-37 Employment Reports on Veterans SEP 2010 52.222-50 Combating Trafficking in Persons FEB 2009 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
DEC 2007
52.223-6 Drug-Free Workplace MAY 2001 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995 52.228-14 Irrevocable Letter of Credit DEC 1999 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes APR 2003 52.230-2 Cost Accounting Standards OCT 2010 52.230-6 Administration of Cost Accounting Standards JUN 2010 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-16 Progress Payments AUG 2010 52.232-17 Interest OCT 2010 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims JAN 1986 52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984 52.232-27 Prompt Payment for Construction Contracts OCT 2008 52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002 52.233-1 Alt I Disputes (Jul 2002) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991
52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-23 Responsibility of the Architect-Engineer Contractor APR 1984 52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984 52.236-25 Requirements for Registration of Designers JUN 2003 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-4 Subcontractors and Outside Associates and Consultants
(Architect-Engineer Services)
AUG 1998
52.244-6 Subcontracts for Commercial Items DEC 2010 52.246-21 Warranty of Construction MAR 1994 52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984 52.248-3 Value Engineering-Construction OCT 2010 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
MAY 2004
52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (May 2004) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.209-7999 (Dev) Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law.
JAN 2012
252.215-7000 Pricing Adjustments DEC 1991 252.223-7002 Safety Precautions For Ammunition And Explosives MAY 1994 252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
252.225-7002 Qualifying Country Sources As Subcontractors APR 2003 252.225-7012 Preference For Certain Domestic Commodities JUN 2010 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7023 Drawings and Other Data to become Property of Government MAR 1979 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
SEP 2011
252.247-7023 Transportation of Supplies by Sea MAY 2002
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 May 2012 through 365 days following the last option exercised.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $10,000,000;
(2) Any order for a combination of items in excess of $10,000,000; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within five (5) days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 29 Apr 2018.
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 calendar days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2009)
(a) Definitions. As used in this clause--
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size…