FA4460-16-R-0002.pdf
PDF 285 KB Posted
- Attached to
- LRAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4460-16-R-0002
About this file
Please see the attached solicitation for the Multiple Award Construction Contract (MACC) at Little Rock Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
THE TOTAL AGGREGATE AMOUNT EXPENDABLE UNDER ALL MACC CONTRACTS AWARDED SHALL NOT EXCEED $165 MILLION FOR BASE PERIOD AND ALL OPTION PERIODS. SEED PROJECT MAGNITUDE IS BETWEEN $100,000 and $250,000.
PRE-PROPOSAL CONFERENCES/SITE VISITS ARE SCHEDULED AND WILL INCLUDE A VISIT TO THE SEED PROJECT LOCATION. SEE SECTION
L, INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS FOR DATES/TIMES.
NOTICE TO OFFERORS: FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT. NO AWARD WILL BE MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER BEFORE OR AFTER THE CLOSING DATE. IN THE EVENT THE GOVERNMENT CANCELS THIS SOLICITATION, THE GOVERNMENT HAS NO OBLIGATION
TO REIMBURSE AN OFFEROR FOR ANY COSTS.
THE GUARANTEED MINIMUM AMOUNT OVER THE LIFE OF THIS CONTRACT IS $500.00 PAYABLE FOLLOWING ATTENDANCE AT A
MANDATORY ORIENTATION CONFERENCE.
CONTRACT PERFORMANCE PERIOD IS A BASE PERIOD PLUS FOUR (4) ONE-YEAR OPTION PERIODS. BASE PERIOD IS ONE YEAR FROM
DATE OF CONTRACT AWARD.
THIS ACQUISITION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE. GOVERNMENT ANTICIPATES AWARD OF UP TO TEN (10)
CONTRACTS. REFER TO SECTION I, 52.219-14 FOR LIMITATIONS ON SUBCONTRACTING.
JOHNATHAN S. ANDERSON 501-987-6470
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-May-2016
(RFP)
(IFB)
X
CALL:
MACC
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________13 Jun 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
19TH CONTRACTING SQUADRON - FA4460
642 THOMAS AVE
LITTLE ROCK AFB AR 72099
FA4460
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
NKAK 0000
8. ADDRESS OFFER TO (If Other Than Item 7)
501-987-8119FAX:TEL: 501-987-3303 TEL: FAX:
FA4460-16-R-0002 101
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4460-16-R-0002
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
NSN: Z2JZ-00-000-0000
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0003 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0004 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0005 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0006 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0007 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0008 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0009 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0010 33,000,000 Lot IDIQ MACC Base Year
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1001 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1002 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1003 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1004 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1005 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1006 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1007 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1008 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1009 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1010 33,000,000 Lot OPTION IDIQ MACC Option Year One
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2001 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2002 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2003 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2004 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2005 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2006 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2007 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2008 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2009 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2010 33,000,000 Lot OPTION IDIQ MACC Option Year Two
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3001 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3002 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3003 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3004 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3005 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3006 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3007 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3008 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3009 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3010 33,000,000 Lot OPTION IDIQ MACC Option Year Three
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4001 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4002 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4003 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4004 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4005 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4006 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4007 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4008 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4009 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4010 33,000,000 Lot OPTION IDIQ MACC Option Year Four
FFP
The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration and/or new construction work on various real property facilities. Type work contractors can expect (not all inclusive): new construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JET-A fuel systems and miscellaneous services including hazardous waste removal.
FOB: Destination
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$500.00 $165,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
Section E - Inspection and Acceptance
INSPECTION/ACCEPTANCE
19 CES/CENMP is designated as the office responsible for inspecting the work while the Contracting Officer is responsible for final acceptance of the work.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 3005 Destination Government Destination Government
3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government 3009 Destination Government Destination Government 3010 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government 4005 Destination Government Destination Government 4006 Destination Government Destination Government 4007 Destination Government Destination Government 4008 Destination Government Destination Government 4009 Destination Government Destination Government 4010 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996 252.246-7000 Material Inspection And Receiving Report MAR 2008
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-JUL-2016 TO
30-JUN-2017
N/A 19 CES/CEIAR - F2S3CZ
DIANNE PRIDDY
528 THOMAS AVENUE RM 600
LITTLE ROCK AFB AR 72099
501-987-7679 FOB: Destination
F2S3CZ
0002 POP 01-JUL-2016 TO
30-JUN-2017
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 01-JUL-2016 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-JUL-2017 TO
30-JUN-2018
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 01-JUL-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-JUL-2018 TO
30-JUN-2019
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 01-JUL-2018 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-JUL-2019 TO
30-JUN-2020
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3005 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3006 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3007 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3008 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3009 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
3010 POP 01-JUL-2019 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-JUL-2020 TO
30-JUN-2021
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4005 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4006 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4007 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4008 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4009 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
4010 POP 01-JUL-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
52.211-13 Time Extensions SEP 2000 52.247-34 F.O.B. Destination NOV 1991
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within * (See Note Below) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than * (See Note Below). The time stated for completion shall include final cleanup of the premises.
*Note: Performance period to be negotiated on individual task orders.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of *See Note Below for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
*Note: Liquidated Damages rate will be set on each individual Task Order.
Section G - Contract Administration Data
ADMINISTRATIVE MATTERS
1. ADMINISTRATIVE MATTERS
ADDRESS:
19th Contracting Squadron
19 CONS/LGCA
642 Thomas Avenue Little Rock AFB, AR 72099-4971
CONTRACTOR’S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title:
Responsible Office:
Address:
Telephone Number:
Email:
Cage Code:
Duns Number:
Tax Identification Number:
INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary: Name of Alternate:
Address: Address:
Telephone #: Telephone #:
Alternate #: Alternate #:
Fax No: Fax No:
Email: Email:
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
2-in-1
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .