Attachment 23 LRAFB MACC Site Visit Questions Answers

View the file

Other files

File Type Posted
Attachment_25_-_NKAK_15-1088_Rpr_Sus_Aircraft_MX_Shop_Restroom_Bldg_364_Revised_24_June_2016.pdf PDF
Attachment_26_-_08_71_00_Door_Hardware.pdf PDF
Attachment_27_-_ADA_Clarification.pdf PDF
FA4460-16-R-0002-0006.pdf PDF
FA4460-16-R-0002-0005.pdf PDF
Attachment_24_-_B-364_Floorplans.pdf PDF
Attachment_21_-_Solicitation_Questions_ _Answers_2.pdf PDF
FA4460-16-R-0002-0004.pdf PDF
Attachment_22_-_Site_Visit_Attendance_Rosters.pdf PDF
FA4460-16-R-0002-0003.pdf PDF
Attachment_20_-_Solicitation_Questions_ _Answers.pdf PDF
Attachment_19_-_Site_Visit_Attendee_Information.xlsx XLSX spreadsheet
NKAK_15-1088_Rpr_Acft_Mx_Shop_Restroom_B-364.pdf PDF
FA4460-16-R-0002-0002.pdf PDF
FA4460-16-R-0002-U0001.pdf PDF
Attachment_7_-_LRAFB_Architectural_Design_Guide_Supplement.pdf PDF
Attachment_18_-_LRAFB_Architectural_Compatibility_Guide.pdf PDF
FA4460-16-R-0002.pdf PDF
Attachment_9_-_LRAFB_Electrical_Design_Standards.pdf PDF
Attachment_8_-_LRAFB_Civil_Design_Criteria.pdf PDF
Attachment_1_-_EMIS_Instruction_Guide.doc DOC document
Attachment_17_-_Scheduled_Government_Furnished_Property.pdf PDF
MACC_Statement_of_Work.pdf PDF
Attachment_2_-_Environmental_MOA.doc DOC document
Attachment_16_-_LRAFB_Information.pdf PDF
Attachment_6_-_Seed_Project_Package.zip ZIP file
Attachment_10_-_LRAFB_Computer_Telephone_Systems.pdf PDF
Attachment_4_-_Past_Performance_Package.docx DOCX document
Attachment_12_-_LRAFB_Fire_Detection_and_Alarm_Systems.pdf PDF
Attachment_7_-_LRAFB_Architectural_Design_Guide_Supplement.pdf PDF
Attachment_11_-_LRAFB_Building_Mass_Notification_System.pdf PDF
Attachment_15_-_LRAFB_Section_26_05_04_Raceways.pdf PDF
Attachment_14_-_LRAFB_Section_09_06_89_Typical_Finish_Schedule.pdf PDF
Attachment_13_-_LRAFB_Mechanical_Design_Criteria.pdf PDF
Attachment_5_-_Financial_Institution_Reference_Sheet.docx DOCX document
Attachment_3_-_C D_Report.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: FA4460-16-R-0002

Attachment No.: 23

LRAFB MACC Site Visit Questions & Answers

10 June 2016

1. What type of faucet would they like; sensor activated or manual? If sensor, battery or permanent power?

A: Sensor activated / permanent power.

2. Do they have a particular brand of water closet they want?

A: No. Refer to LRAFB Mechanical Design Guide for requirements.

3. If the Prime Contractor has subsidiary and/or sibling companies with related, relevant, experience, may the past performance of the subsidiary and/or sibling companies be used as past performance of the Prime Contractor, assuming the Prime Contractor can show meaningful involvement of its sibling/subsidiary companies on the proposed MACC? In section L it mentions predecessor companies, does that apply to subsidiaries as well?

A: ANC sibling companies are "key personnel who have relevant experience" within the language of our Section M, and therefore ANCs can use sibling and subsidiary company past performance information. Also, such past performance information regarding the sibling companies (i.e., key personnel) will be considered as highly as past performance information for the principal offeror

4. Please confirm that in accordance with “Part 2 – Technical Description of Project”, that the only work in the building is limited to the actual restroom room. Please confirm that the only work outside of that room are required electrical or mechanical connections to support the work confined to that room.

A: Concur. Only work necessary outside the room is that which is required to complete the scope within the restroom making the entire project complete and usable.

5. Are “As Built” or other design documents available for building? Are CAD documents available? If, so can you issue same by way of Amendment?

A: No as-builts are available. Autocad floorplans are available and shall be provided.

Accuracy of the floorplan is suspect and the contractor shall be responsible for verification.

6. Will a hand wash sink be required with the portable toilet for the building users?

A: No. Provide hand wipes and hand sanitizer.

Solicitation No.: FA4460-16-R-0002

Attachment No.: 23

7. Will there be any ADA accessories needed for the toilet?

A: Yes, restroom must be ADA compliant.