Attachment_14_-_LRAFB_Section_09_06_89_Typical_Finish_Schedule.pdf
PDF 141 KB Posted
- Attached to
- LRAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA4460-16-R-0002
About this file
LRAFB Section 09 06 89 Typical Finish Schedule
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINISH SCHEDULE 09 00 01 - 1
SECTION 09 06 89 – TYPICAL FINISH SCHEDULE
PART 1 - GENERAL
1.01 FINISH SCHEDULE
A. Unless otherwise noted on the drawings or in the specifications the following typical finish schedule shall be followed for this project.
TYPICAL FINISH SCHEDULE
ROOM # WALLS FLOOR
WALL
BASE
CEILING REMARKS
101 CORRIDORS PAINT CPT-A CB ACT-A
CORNER GUARDS &
POSSIBLY WALL GUARDS
102 ENTRIES PAINT PCT PCTB ACT-A CORNER GUARDS
103 VESTIBULES PAINT PCT PCTB ACT-A
104 LOBBIES PAINT CPT-A CB ACT-A
105 PRIVATE
OFFICES
PAINT CPT-A CB ACT-B
COMMANDERS
OFFICES
VWC-A CPT-A CB ACT-B
TWO PIECE OAK OR BIRCH
CHAIR RAIL TO MATCH
INTERIOR DOOR WOOD
COLOR AND GRAIN
107 RESTROOMS CT PCT CTB ACT-C
Durock substrate with 9235
Laticrete membrane
108 OPEN OFFICE
AREAS
PAINT CPT-A CB ACT-A
109 STORAGE
CLOSETS
PAINT CPT-A CB
ACT-A or
PAINT
110 CONFERENCE
ROOMS
PAINT CPT-A CB ACT-B
VWC COVERED GYP BD
PERIMETER CEILING SOFFIT.
TWO PIECE OAK OR BIRCH
CHAIR RAIL TO MATCH
INTERIOR DOORS WOOD
COLOR AND GRAIN
111 MEETING
ROOMS
PAINT CPT-A CB ACT-B
GYP BD PERIMETER CEILING
SOFFIT
112 TRAINING/
CLASSROOMS
PAINT CPT-A CB ACT-B
113 TOOL ROOMS PAINT VCT VWB ACT-A
114 MECHANICAL
ROOMS
PAINT SC VWB
PAINT
OR ACT-
A
FINISH SCHEDULE 09 00 01 - 2
TYPICAL FINISH SCHEDULE
ROOM # WALLS FLOOR
WALL
BASE
CEILING REMARKS
COMMUNICATION
CLOSETS
PAINT SC VWB
PAINT
116 TELEPHONE
CLOSETS
PAINT SC VWB
PAINT
117 KITCHENS /
BREAK ROOMS
CT PCT CTB ACT-C
Durock substrate with 9235
Laticrete membrane
118 SLEEPING
QUARTERS
PAINT CPT-A CB
ACT-B
OR
PAINT
119 SHOWERS &
SAUNAS
CT PCT PCTB ACT-C
Durock substrate with 9235
Laticrete membrane
120 DAY ROOMS PAINT CPT-A CB ACT-B
121 LAUNDRY CT PCT PCTB ACT-C
Durock substrate with 9235
Laticrete membrane
122 OTHERS PAINT CPT-A CB ACT-A
B. LEGEND
1. PAINT – Prep wall or ceiling to Level 5, prime coat and two coat paint SEE SECTION 09
90 00 PAINTING & COATING
2. ACT-A – 2’ x 2’ sound controlling bright white fine fissure tegular edge 3/4” ceiling tile and grid system SEE SECTION 09 51 00 ACOUSTICAL CEILINGS
3. ACT-B – sound controlling and absorbing 2’ x 2’ bright white fine fissure tegular edge 3/4” ceiling tile and grid system SEE SECTION 09 51 00 ACOUSTICAL CEILINGS
4. ACT-C – washable and moisture resistant 2’ x 2’ bright white fine fissure tegular edge 3/4” ceiling tile and grid system SEE SECTION 09 51 00 ACOUSTICAL CEILINGS
5. CPT-A – Direct glue carpeting SEE SECTION 09 68 00 CARPET
6. CPT-B – Direct glue carpeting SEE SECTION 09 68 00 CARPET
7. CPT-C – Direct glue carpeting SEE SECTION 09 68 00 CARPET
8. PCT – Non-skid porcelain ceramic floor tile SEE SECTION 09 30 00 CERAMIC TILE
9. PCTB – Bullnose coved toe porcelain ceramic wall base SEE SECTION 09 30 00
CERAMIC TILE
10. CT – Glazed face wall tile SEE SECTION 09 30 00 CERAMIC TILE
11. CTB – Glazed face coved toe wall tile base SEE SECTION 09 30 00 CERAMIC TILE
12. VWC-A – TYPE II vinyl wall covering SEE SECTION 09 72 00 WALL COVERINGS
FINISH SCHEDULE 09 00 01 - 3
13. VWC-B – TYPE II vinyl wall covering stain resistant SEE SECTION 09 72 00 WALL
COVERINGS
14. VWC-C – TYPE II vinyl wall covering framed dry-erase and project screen SEE
SECTION 09 72 00 WALL COVERINGS
15. CB – Seamed edge roll stock carpet wall base to match CARPET SEE SECTION 09 68
00 CARPET
16. VCT – 1/8” thick vinyl composition tile SEE SECTION 09 65 00 RESILIENT FLOORING
17. VWB – 1/8” thick Vinyl Wall Base SEE SECTION 09 65 00 RESILIENT FLOORING
18. SC – Sealed concrete
19. CORNER GUARDS - SEE SECTION 10 23 13 WALL AND CORNER GUARDS
20. ETR – Existing To Remain
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION – NOT USED
END OF SECTION – TYPICAL FINISH SCHEDULE
File details come from the government source that posted it. Updated .