FA4460-16-R-0002-0004.pdf

PDF 38 KB Posted

Attached to
LRAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4460-16-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This amendment extends the due date for proposals to 3 00 PM CST 30 June 2016 extends the due date for past performance questionnaires to 20 June 2016 establishes 3 00 PM CST 1 June 2016 as the due date for questions (all questions submitted after this date and time will not be accepted or considered) and incorporates Attachment 21 Questions Answers 2 and Attachment 22 Site Visit Attendance Rosters into the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to LRAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attachment_25_-_NKAK_15-1088_Rpr_Sus_Aircraft_MX_Shop_Restroom_Bldg_364_Revised_24_June_2016.pdf PDF
Attachment_27_-_ADA_Clarification.pdf PDF
FA4460-16-R-0002-0006.pdf PDF
Attachment_26_-_08_71_00_Door_Hardware.pdf PDF
Attachment_23_-_LRAFB_MACC_Site_Visit_Questions_ _Answers.pdf PDF
Attachment_24_-_B-364_Floorplans.pdf PDF
FA4460-16-R-0002-0005.pdf PDF
Attachment_21_-_Solicitation_Questions_ _Answers_2.pdf PDF
Attachment_22_-_Site_Visit_Attendance_Rosters.pdf PDF
FA4460-16-R-0002-0003.pdf PDF
Attachment_20_-_Solicitation_Questions_ _Answers.pdf PDF
FA4460-16-R-0002-0002.pdf PDF
Attachment_19_-_Site_Visit_Attendee_Information.xlsx XLSX spreadsheet
NKAK_15-1088_Rpr_Acft_Mx_Shop_Restroom_B-364.pdf PDF
FA4460-16-R-0002-U0001.pdf PDF
Attachment_7_-_LRAFB_Architectural_Design_Guide_Supplement.pdf PDF
Attachment_18_-_LRAFB_Architectural_Compatibility_Guide.pdf PDF
Attachment_6_-_Seed_Project_Package.zip ZIP file
Attachment_4_-_Past_Performance_Package.docx DOCX document
Attachment_12_-_LRAFB_Fire_Detection_and_Alarm_Systems.pdf PDF
FA4460-16-R-0002.pdf PDF
Attachment_15_-_LRAFB_Section_26_05_04_Raceways.pdf PDF
Attachment_14_-_LRAFB_Section_09_06_89_Typical_Finish_Schedule.pdf PDF
Attachment_13_-_LRAFB_Mechanical_Design_Criteria.pdf PDF
Attachment_3_-_C D_Report.doc DOC document
Attachment_5_-_Financial_Institution_Reference_Sheet.docx DOCX document
Attachment_17_-_Scheduled_Government_Furnished_Property.pdf PDF
MACC_Statement_of_Work.pdf PDF
Attachment_2_-_Environmental_MOA.doc DOC document
Attachment_10_-_LRAFB_Computer_Telephone_Systems.pdf PDF
Attachment_11_-_LRAFB_Building_Mass_Notification_System.pdf PDF
Attachment_7_-_LRAFB_Architectural_Design_Guide_Supplement.pdf PDF
Attachment_9_-_LRAFB_Electrical_Design_Standards.pdf PDF
Attachment_1_-_EMIS_Instruction_Guide.doc DOC document
Attachment_8_-_LRAFB_Civil_Design_Criteria.pdf PDF
Attachment_16_-_LRAFB_Information.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NKAK 0000

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1) The purpose of this amendment is to extend the due date for proposals to 3:00 PM CST 30 June 2016. The due date for for past performance questionnaires is also extended to 20 June 2016. The due date for questions is hereby established as 3:00 PM CST 1 June

2016. All questions submitted after this date w ill not be accepted or considered. This amendment also incorporates Attachment 21

Questions & Answ ers 2 and Attachment 22 Site Visit Attendance Rosters into the solicitation. See summary of changes for a full narrative.

2) All other solicitation terms and conditions remain unchanged and in full effect.

3) POC for this amendment is TSgt Johnathan Anderson w ho may be contacted by phone at 501-987-6470 or by email at johnathan.anderson.2@us.af.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4460-16-R-0002

X 9B. DATED (SEE ITEM 11)

13-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-May-2016

CODE

19TH CONTRACTING SQUADRON - FA4460

642 THOMAS AVE

LITTLE ROCK AFB AR 72099

FA4460 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4460-16-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Jun-2016 03:00 PM to 30-Jun-2016 03:00 PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

DOCUMENT TYPE DESCRIPTION PAGES DATE

Statement of Work MACC Statement of Work 62 15-Mar-16

Attachment 1 EMIS Contractor Instruction Guide 3 N/A

Attachment 2 Memorandum of Agreement between Little Rock Air Force Base (Little

Rock AFB) and Arkansas Department of

Pollution Control and Ecology (ADPC&E) or its successors relating to the Compliance of contractors performing work at Little Rock AFB with Environmental Laws and Regulations and

Addendum to the MOA dated (05/04/99)

3 31-Dec-98

Attachment 3 Contractor Construction and Demolition

(C&D) Report 1 N/A

Attachment 4 Past Performance Package 11 N/A

Attachment 5 Financial Institution Reference Sheet 1 N/A

Attachment 6 Seed Project Task Order RFP Request Package 8 N/A

Attachment 7 LRAFB Architectural Design Guide

Supplement

10 28-Apr-16

Attachment 8 LRAFB Civil Design Criteria 34 15-May-13

Attachment 9 LRAFB Electrical Design Standards 10 15-Mar-16

Attachment 10 LRAFB Computer Telephone Systems 7 N/A

FA4460-16-R-0002

Attachment 11 LRAFB Building Mass Notification System 12 N/A

Attachment 12 LRAFB Fire Detection and Alarm Systems 16 N/A

Attachment 13 LRAFB Mechanical Design Criteria 13 1-Nov-15

Attachment 14 LRAFB Section 09 06 89 Typical Finish

Schedule

3 N/A

Attachment 15 LRAFB 26 05 04 Raceways 4 N/A

Attachment 16 LRAFB Information 1 21-Oct-15

Attachment 17 Scheduled Government Furnished Property 1 N/A

Attachment 18 LRAFB Architectural Compatibility Guide 76 1-Jun-06

Attachment 19 Site Visit Attendee Information 1 N/A

Attachment 20 Solicitation Questions & Answers 6 23-May-16

Attachment 21 Solicitation Questions & Answers 2 2 26-May-16

Attachment 22 Site Visit Attendance Rosters 5 26-May-16

(End of Summary of Changes)