Attachment 4c - General Decision Wage Rates - Highway MD080048 - 2 May 2008
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4c
FA4416-08-R-0010
General Decision Number: MD080048 05/02/2008 MD48
Superseded General Decision Number: MD20070048
State: Maryland
Construction Types: Heavy (Heavy and Sewer and Water Line)
Counties: Montgomery and Prince George's Counties in Maryland.
HEAVY CONSTRUCTION PROJECTS; SEWER AND WATER LINE CONSTRUCTION
PROJECTS (Montgomery County, Maryland ONLY)
Modification Number Publication Date
0 02/08/2008
1 04/18/2008
2 05/02/2008
ASBE0024-001 10/01/2007
Rates Fringes
Asbestos Worker/Heat and
Frost Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 27.88 13.88
ASBE0024-002 10/01/2007
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.95 6.50
ASBE0024-005 10/01/2007
Rates Fringes
Fire Stop Technician.............$ 22.95 6.39
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BOIL0193-001 10/01/2007
Rates Fringes
Boilermakers:....................$ 32.06 16.46
BRDC0001-001 04/30/2007
Rates Fringes
Bricklayer......................$ 25.90 6.19
CARP0132-001 05/01/2007
Rates Fringes
Carpenter/Lather.................$ 24.37 6.15
Piledriver.......................$ 22.87 6.85
CARP0132-003 05/01/2004
Rates Fringes
Diver Tender.....................$ 20.85 5.50
Diver............................$ 29.63 5.50
CARP1831-001 04/01/2003
Rates Fringes
Carpenters:
Millwrights.................$ 24.34 4.05
ELEC0026-001 11/05/2007
Rates Fringes
Electricians.....................$ 34.55 11.39+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s
Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after
Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0070-001 09/02/2007
Rates Fringes
Line Construction:
Cable Splicers..............$ 30.29 19.75%+4.81
Equipment Mechanic..........$ 21.82 19.75%+4.81
Equipment Operators.........$ 25.78 19.75%+4.81
Groundman/Truck Driver......$ 15.34 19.75%+4.81
Line Truck with Auger.......$ 20.09 19.75%+4.81
Linemen.....................$ 28.86 19.75%+4.81
ENGI0077-005 07/01/2007
Rates Fringes
Power equipment operators:
(SEWER, GAS AND WATER LINE
CONSTRUCTION:
(Montgomery County, Maryland
ONLY))
GROUP 1.....................$ 20.48 5.37+a
GROUP 2.....................$ 20.08 5.37+a
GROUP 3.....................$ 19.57 5.37+a
GROUP 4.....................$ 19.25 5.37+a
GROUP 5.....................$ 18.43 5.37+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Excavators, Cranes, Gradalls.
GROUP 2: Backhoes,Front-end Loaders, Fork Lift/Lull, Bulldozers, Motor Graders, Qualified Mechanics, Hydraulic
Tamper and Hoe Pack, Paving Mixers, Pile Driving Engines, Batch Plant, Concrete Pumps, Low- Boy Driver, Lube Truck.
GROUP 3: Trenching machine, Well Drilling Machines, Concrete
Mixers, Motor Graders, Truck Driver.
GROUP 4: Roller, Air-Compressors, Pumps, Welding Machines, Well Points, Firemen.
GROUP 5: Oiler.
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Washington's Birthday, Decoration Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day and Martin Luther King's Birthday.
ENGI0077-006 05/01/2007
Rates Fringes
Power equipment operators:
(HEAVY CONSTRUCTION)
GROUP 1.....................$ 27.64 6.82+a+b
GROUP 2.....................$ 27.18 6.82+a+b
GROUP 3.....................$ 26.47 6.82+a
GROUP 4.....................$ 24.44 6.82+a
GROUP 5.....................$ 19.90 6.82+a
GROUP 6.....................$ 29.01 6.82+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: 35 ton cranes & above, tower & climbing cranes, derricks, concrete boom pump, drill rigs (equivalent to L
& Double L), mole.
GROUP 2: Backhoes, cableways, cranes, cherry pickers, elevating graders, hoists, paving mixers, power shovels, tunnel shovels, batch plants, shields, tunnel mining machines, gradalls, front end loaders, 3 1/2 cu. yds. and above, power driven wheel scoops and scrapers (50 cu. yds.
struck capacity or above), rail tamper, draglines, boomcat, mucking machines, graders in tunnels, pile driving engines.
GROUP 3: Front end loaders below 3 1/2 cu. yds, boom trucks, hydraulic backhoes 1/2 yds. capacity or below rubber or rack mounted, tug boats, power driven wheel scoops and scrapers, blade graders, motor graders, bulldozers, trenching machines, concrete mixer, speed swing pettibone, ballast regulator, concrete pump, mechanic, welder, mechanic welder, shotcrete machines, Hoeram, locomotive (standard, narrow gauge), tuggers.
GROUP 4: High lifts above 10 feet, boilers (skelton), asphalt spreaders, bullfloat finishing machines, concrete finishing machines, concrete spreaders, fine graders, air compressors, welding machines, pumps, generators, well points, deep wells, hydraulic pumps, elevators, freeze units, tunnel motorman or dinky operator, roller, conveyors, well drilling machines, grout pump, fireman.
GROUP 5: Fork lifts, ditch witch, bobcat 1/3 cu. yd. and below, space heaters, sweepers, assistant engineers, oilers.
GROUP 6: Master mechanic.
a. PAID HOLIDAYS:New Years Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b. PREMIUM PAY: Tower crane and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
IRON0005-001 06/01/2007
Rates Fringes
Ironworkers:
Structural, Ornamental and
Chain Link Fence............$ 26.73 11.995
* IRON0201-001 05/01/2008
Rates Fringes
Ironworkers:
Reinforcing.................$ 26.15 12.08
LABO0657-004 06/01/2007
Rates Fringes
Laborers: (HAZARDOUS WASTE
REMOVAL, EXCEPT ON MECHANICAL
SYSTEMS:
Preparation for, removing and encapsulation of hazardous materials from non-mechanical systems)
Skilled Asbestos Abatement
Laborers....................$ 16.30 4.29
Skilled Toxic and
Hazardous Waste Removal
Laborers....................$ 19.02 4.29
LABO0657-005 06/01/2007
Rates Fringes
Laborers: (TUNNEL, RAISE &
SHAFT (FREE AIR)
FOR HEAVY AND SEWER & WATER
LINES CONSTRUCTION)
GROUP 1.....................$ 20.27 4.29
GROUP 2.....................$ 20.86 4.29
GROUP 3.....................$ 22.38 4.29
GROUP 4.....................$ 23.02 4.29
LABORERS CLASSIFICATIONS:
GROUP 1: Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man.
GROUP 2: Chuck Tender, Powdermen in Prime House, Form Setters and Movers, Nippers, Cableman, Houseman, Groutman, Bell or
Signalman, Top or Bottom Vibrator Operator.
GROUP 3: Miners, Re-Bar Underground, Concrete or Gunnite
Nozzlemen, Powdermen, Timbermen and Re-Timbermen, Wood Steel
Including Liner plate or Other Support, Material Motorman, Caulkers, Diamond Drill Operators, Riggers, Cement Finishers-
Underground, Welders and Burners, Shield Driver, Air Trac
Operator, Shotcrete Nozzlemen and Potman.
GROUP 4: Mucking Machine Operator (Air).
LABO0657-006 06/01/2007
Rates Fringes
Laborers: (TUNNEL, RAISE AND
SHAFT (COMPRESSED AIR) FOR
HEAVY CONSTRUCTION ONLY
Gauge Pressure Work Period
(Pounds) (Hours)
1-14 7...........$ 25.08 4.29
14-18 6............$ 29.55 4.29
FOOTNOTE: On any requirement for air pressure in excess of 18
PSI, work periods and rates should be negotiated at a pre-bid conference.
LABO0657-010 06/01/2007
Rates Fringes
Laborers: (HEAVY
CONSTRUCTION) (Montgomery &
Prince Georges Counties)
SEWER & WATER LINES
(Montgomery County ONLY))
GROUP 1.....................$ 19.61 4.29
GROUP 2.....................$ 19.90 4.29
GROUP 3.....................$ 20.05 4.29
GROUP 4.....................$ 20.20 4.29
GROUP 5.....................$ 20.61 4.29
GROUP 6.....................$ 21.12 4.29
GROUP 7.....................$ 21.61 4.29
GROUP 8.....................$ 22.28 4.29
MARB0002-003 05/01/2007
Rates Fringes
Marble & Stone Mason
Includes Pointing, Caulking and Cleaning of
All Types of Masonry, Brick, Stone and Cement
Structures..................$ 31.00 11.52
MARB0003-001 05/01/2007
Rates Fringes
Mosaic & Terrazzo Worker, Tile Layer
Marble Mason and Tile Layer.$ 24.67 8.78
Terrazzo Worker.............$ 25.42 8.78
MARB0003-004 05/01/2007
Rates Fringes
Marble, Tile & Terrazzo
Finisher.........................$ 19.84 7.90
PAIN0051-001 06/01/2007
Rates Fringes
Painters:
All Industrial Work.........$ 24.73 7.31
Bridges, Heavy Highway, Lead Abatement and
Flame/Thermal Spray.........$ 27.87 7.31
Commercial and Mold
Remediation, Painters, Wallcovers and Drywall
Finishers...................$ 23.31 7.31
Metal Polishing and
Refinishing.................$ 24.31 7.31
PLAS0891-003 05/01/2007
Rates Fringes
Cement Mason/Concrete Finisher...$ 26.15 6.01
PLUM0005-001 10/21/2007
Rates Fringes
Plumbers.........................$ 33.92 12.94+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving
Day and the day after Thanksgiving, Christmas Day, New
Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-005 11/01/2007
Rates Fringes
Steamfitter, Refrigeration &
Air Conditioning Mechanic........$ 33.27 13.57+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
SHEE0100-001 07/01/2007
Rates Fringes
Sheet Metal Worker...............$ 31.54 11.65
TEAM0639-003 06/01/2005
Rates Fringes
Truck drivers: (HEAVY
CONSTRUCTION)
Concrete Mixer Drivers......$ 17.40 5.82+a+b
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, Memorial Day,July 4th, Labor Day, Thanksgiving Day, Christmas
Day,or any day celebrated publicly in the District of
Columbia as one of the above holidays.
b. PAID VACATIONS: Employees with one (1) year of service shall be entitled to a vacation of one (1) week; five (5) years of service are entitled to two (2) weeks; fifteen
(15) years of service are entitled to three 3 weeks; twenty
(20) years of service are entitled to four (4) weeks.
TEAM0639-004 03/07/2004
Rates Fringes
Truck drivers: (HEAVY
CONSTRUCTION)
Tandem & Triaxle (3 or more axles, including steering axle)..............$ 16.00 5.82+a
Tractor-trailer, low boy....$ 20.00 5.82+a a.VACATION: Employees will receive one (1) week's paid vacation after one (1)year of service.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION