SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The purpose of this amendment is to incorporate the changes listed below into the solicitation.

2. Offerors must acknowledge receipt of this amendment by either acknowledging on the reverse side of the 1442 block 19 or by signing on each copy of the amendment.

3. The cut off date for receipt of any additional contractor questions is 30 June 2008 04:00 PM DST.

4. Add: To Section L, PREPARATION OF PROPOSALS, paragraph D.5. Page Limit:

“Each offeror is limited to provide no more than ten (10) recent and relevant past performance references for each party to the Joint Venture or Teaming partner and no more than ten (10) recent and relevant past performance references for any significant subcontractors that will perform major critical aspects of the requirement.”

5. Delete: From Technical Exhibit 1 of Attachment: 1 Specifications:

3.4.1.1
Design Analysis, Civil
Provide all design analysis as minimum to include: water demand, and sewage and ground water flow, irrigation systems design analyses and pressure calculations, and soil bearing capacity
3.4.1.2
Design Analysis, Architectural/Structural
Provide all design analysis as minimum to include: live and dead structural loads, roof loads, wind loads, seismic loads, and snow loads
3.4.1.3
Design Analysis, Mechanical
Provide all HVAC design analysis as minimum to include: catalog cuts of projected equipment; cooling and heating load analysis and calculations; a completed AF Form 108; control valve sizing; duct sizing and air flow; fan sizing and fan curves; psychometric chart analysis; and heat exchanger selection
3.4.1.4
Design Analysis, Plumbing
Provide all design analysis as minimum to include: pipe sizing, pump sizing and pump curves, and static pressure loss
3.4.1.5
Design Analysis, Electrical
Provide all design analysis as minimum to include: photometric data, and power requirement and distribution loads

Design should not be included in the contractor’s coefficient. Design costs shall be incurred on a project-by-project basis.

6. Acknowledge receipt of all questions and answers posted on Federal Business Opportunities to date of this amendment as stated in Block 11 method (b) of this amendment. Questions and Answers received are as follows:

QUESTIONS AND ANSWERS

SOLICITATION FA4416-08-R-0010

27 JUNE 2008

Question 1: Technical Exhibit 1 starting on page 57 of the Specifications lists several design analysis items (e.g., Civil, Architectural/Structural, Mechanical, Electrical etc.) that are to be included in the coefficient. The cost and unpredictability of the necessity for design analysis will require the contactor to increase its coefficient to account for the possibility of this requirement, thus increasing the cost to the Air Force for every task order, whether or not design analysis is required. To reduce both the risk to the contractor and the cost to the Government, would the Government consider removing design analysis from the coefficient and instead including it, as needed, in individual delivery orders? If this is not possible, can the Government provide an estimate of how much of the work will require design analysis for the various disciplines?

Answer 1: The government is in agreement. Design should NOT be included in the coefficient. Design costs will be covered on a project by project basis.

Question 2: Based on the response to Question 27 during Industry Day, projects assigned under the SABER will “require minimum design; typically not exceeding 35%”. In order to provide the most cost-effective coefficient, will the Government provide an estimate of the number of task orders that will require this level of design or should the contractor anticipate in their cost and schedules, the delivery of 35% design documents on all projects under the SABER program?

Answer 2: Greater than 35% design is only required in approximately 10% of SABER projects.

Question 3: Under section “FURNISHINGS”, 12.1 notes that the information counter must “support two computers and monitors”. Question 13 answer notes for support of “three computers”

Should the information counter support 2 or 3 computers? Does the number of computers imply the number of workers at the information counter? The number of workers will affect the design (furniture, comm., elec.) and cost of the information counter.

Answer 3: The information counter should support 2 computers and monitors and two workers.

Question 4: My firm would like to know the incumbents coefficient(s) for the base and option years for each facility. We are requesting this info from you because doing so under the FOI Act procedures would prevent us from receiving the info in a timely manner.

Answer 4: In accordance with the Freedom of Information Act (FOIA) it is encouraged that the Government make available to the public information and all records. However, as established by Canadian Commercial Corp. v. U. S. Air Force, Court of Appeals for the District of Columbia, 29 Jan 08, the FOIA release exemption of (b)(4) “Trade secrets and commercial or financial information obtained from private source which would cause substantial competitive harm to the source if disclosed”, applies to all unit item prices (or coefficients) and therefore, can not be released.

Question 5: Does the Joint-Venture, Teaming, or Partnership arrangement have to be approved before bid date...regulation says no...before award but we would like clarification.

Answer 5: In accordance with the Small Business Act 13 CFR 124.513(e) “Prior approval by SBA. SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture”. The joint venture has to be approved prior to the award of the contract not the proposal due date. Please refer all 8(a), joint venture, teaming, partnering questions to the SBA.

Question 6: Is the offeror required to name key personnel & submit key personnel resumes with the original copy of the Tech Proposal (& four redacted copies) or is it preferred that the offeror identify the key positions only by job description and position qualifications in the proposal and submit resumes after time of award for approval prior to NTP?

Answer 6: Resumes are NOT required prior to award because specific personnel are subject to change. In accordance with Volume II, Subfactor 1 of the solicitation offerors shall address their management organization, including a description of functions, authorities and credentials of key management personnel fulfilling at a minimum the personnel requirements specified within the contract specification paragraph 2.1.

Question 7: Is past performance only supposed to cover contracts and the contract value within the past three years?

Answer 7: The intent is to evaluate JOC or SABER contracts with some or all of the performance occurring during the last three years, considering the total value of the contract which would include all option years’ prices.

Question 8: Will the date response to the RFP are due change from July 3rd, 2008?

Answer 8: No, the due date for proposals remains 3 July 2008. In accordance with amendment 1 of the solicitation posted 3 June 2008, “the required response/proposal due date for past performance questionnaires is hereby changed from 16 June 2008 04:00 PM DST to 3 July 2008 04:00 PM DST,” and “the required response/proposal due date for volumes I, II, III, and IV is hereby changed from 23 June 2008 04:00 PM DST to 3 July 2008 04:00 PM DST.”

Question 9: The RFP requires 4 volumes – can volumes 1-4 be included in one three ring binder with tabs to separate the volumes for the original of a team’s response to the RFP?

Answer 9: No, the volumes are to be submitted independently of the others. Please follow the guidance stated on page 39 of 55 of the solicitation “Section L, PREPARATION OF PROPOSALS, paragraph D. Preparation instructions:”.

Question 10: It appears that three additional copies of Volume 1, one additional copy of Volume 4, and 4 additional redacted copies of volumes II and III are required. Would the government consider requiring non-redacted copies of volumes II and III and also requiring the same number of copies of all 4 volumes so that they could be provided in one 3 ring binder for each copy?

Answer 10: No, please provide “copies” as dictated in Section L, PREPARATION OF PROPOSALS, paragraph D.6. Copies:”.

Question 11: Bid Bond- In numerous locations the RFP indicates that no bid bond is required followed by a statement that a bid bond is required – is this correct?

Answer 11: In accordance with the solicitation, page 16 of 55, Bid Bonds are not required with the proposal. However, a bid guarantee in the form of a firm comitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States will be required in the amount of 20 percent of the contract minimum or $40,000; whichever is less.

Question 12: Technical Exhibit 1: Para 3.3.2.4.1.4 – We are asked to carry subcontractor cost as part of our coefficient. Please clarify. Should this be carried as NPI?

Answer 12: No, subcontractor cost should not be kept as a non-priced item.

Question 13: Technical Exhibit 1: Para 3.3.2.5.3 – We are asked to carry subcontractor cost as part of our coefficient. Please clarify. Should this be carried as NPI?

Answer 13: No, subcontractor cost should not be kept as a non-priced item.

Question 14: For how long should we maintain the project records/files after it is completed?

Answer 14: In accordance with FAR 52.222-8 “Payrolls and Basic Records”, Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work.

Question 15: Technical Exhibit 2- What is the purpose of this form?

Answer 15: Tech Exhibit 2 is a record form that the contractor will use to submit to the government for the purpose of keeping track of all equipment that are purchased/ installed for each project; this form will be submitted to the CO within 10 days of final inspection, per spec 5.2.6.6. This form doesn’t replace any warranty/ guarantee paperwork that they are to submit as well.

Question 16: Will the Government reconsider the requirement to apply a proposal coefficient to the demonstration project estimate?

Answer 16: The demonstration project estimate shall not be used to determine the contractor’s price. It is used to determine the contractor’s ability to correctly apply the city cost index and coefficient to typical SABER type projects/delivery orders. The contractor’s coefficient is the single determinate in the price evaluation. The Government will not reconsider the requirement to apply a proposal coefficient to the demonstration project estimate.

Question 17: On page 40 of the original solicitation it states "each offeror is limited to provide no more than ten (10) past performance references". In the case of a Joint Venture and/or Prime Subcontractor, is the requirement still a total of 10 (for all participants) OR is it limited to 15 pages?

Answer 17: Each offeror is limited to provide no more than ten (10) recent and relevant past performance references for each party to the Joint Venture or Teaming partner and no more than ten (10) recent and relevant past performance references for any significant subcontractors that will perform major critical aspects of the requirement.

QUESTIONS AND ANSWERS

SOLICITATION FA4416-08-R-0010

13 JUNE 2008

Question 1: Page 18 of 55, Para H-12: Does this apply to subcontractors labor force such as laborer, carpenter, painter, painter, electrician, etc…

Answer 1: H-12 applies to all personnel working on Bolling AFB and/or Andrews AFB in support of this contract.

Question 2: Page 22 of 55, Clause 52.216-19, Para b (2) & b (3): Is it supposed to be $18M in lieu of $5M

Answer 2: No, $5M is the correct maximum amount for a single delivery order. $18M is the maximum annual amount for the base year and each option year.

Question 3: Page 33 of 55, Clause 252.236-7001, Para (a): Is this a design build contract or does the government intend to issue drawings and specifications for each project?

Answer 3: Drawings will be provided by the government when available to assist the contractor with creating an accurate proposal.

Question 4: Page 46 of 55, (f) Contract Award, Sub-par (1) & (6) read that multiple awards might be made; whereas on page 51 Para A states that only one award will be made. Please clarify?

Answer 4: The government intends to award only one contract.

Question 5: Page 13 of 76, Para 2.3.2.1: Cell phone, what is the minimum minutes per month required? How much monthly usage should be allowed for Government use?

Answer 5: The Nextel digital cellular phones or an acceptable equivalent that meets military standard 810F specifications, employing Direct Connect walkie-talkie service, or an acceptable equivalent service must provide a minimum of 100 monthly, anytime minutes.

Question 6: On page 8 of 76 Para 2.1.1. Program Manager it states that contractor will provide 2 Program Managers. On page 9 of 76 2.1.2.1. Project Staff it states the contractor shall designate in writing to the CO the assigned Project Manager and Project Superintendent. Is it the intention of the government to have Program Mangers, Project Managers and Project Superintendents on site at both facilities or is it that the Program Manager and the Project Manager are one and the same?

Answer 6: The offeror will be required to have separate Program Managers and Project Managers/Superintendents at both Bolling AFB and Andrews AFB. Project Managers and Project Superintendents are one in the same.

QUESTIONS AND ANSWERS

SOLICITATION FA4416-08-R-0010

6 JUNE 2008

Question 1: Please provide “ETL Engineering Technical Letter 12/02. This document is not provided in the Request for Proposal.

Answer 1: Please see the attached document labled “ETL Engineering Technical Letter 12-02”.

Question 2: Please provide “As Built” drawings of existing utilities. This will be required for determining the path of the new underground utilities.

Answer 2: Please see the attached document labled “Existing Utilities As Builts”.

Question 3: Government furnished drawings refer to “New location of televisions” and “New personnel computer stations”. Can you please provide clarification on who is to provide electronic systems and who will be responsible for providing connectivity?

Answer 3: Contractor will be responsible for providing connectivity of existing televisions and computers.

Question 4: If we are to provide new electronic systems can you please provide information on the type of electronic systems required and sequence of performance for each respective requirement.

Answer 4: No new electonic systems are needed. Moving existing systems.

Question 5: Section 2.9 of Existing Conditions: Regarding communication wiring can you please provide clarification on what are the requirements for servicing of the communication system.

Answer 5: The communications system should follow the ETL 12/02 standards and requirements.

Question 6: Section 12.1 of Furnishings: Please clarify if the design of the new service counter will require meeting the American with Disability Act Requirements (ADA).

Answer 6: The new service counter will need to meet ADA Requirements.

Question 7: Section 12.3 of Furnishings: Please clarify if a temporary guard station and associated equipment will be required for relocating of the existing guard station equipment.

Answer 7: Yes, a Temporary Guard Station will be required while relocating existing guard station.

Question 8: Section 26.1 of Electrical: Please clarify if the existing electric panel has sufficient power to support new electric requirements.

Answer 8: Yes the existing electrical panel can meet the requirements.

Question 9: Section 26.2 of Electrical: Please provide requirements for providing raceway for electric and communication.

Answer 9: The raceway needs to meet the NEC requirements.

Question 10: Section 26.3 of Electrical: Please provide electric wiring requirements for existing security station.

Answer 10: The wiring needs to meet the NEC requirements.

Question 11: Section 27.1 Communication: Please clarify if we are to provide final connection to communication equipment.

Answer 11: Yes the contractor is to provide the final connection to communication equipment. The Communications Squadron will perform the cross connects.

Question 12: May we have the copy of the color blue print and also the addendum(s) Solicitation Number: FA7012-08-R-0001Solicitation Number: FA7012-08-R-0001(s) for Solicitation Number: FA7012-08-R-0001.

Answer 12: The drawings posted on www.fbo.gov are in color. Please utilize those. Solicitation number FA7012-08-R-0001 does not pertain to this acquisition. Please contact the 11th Contracting Squadron at Bolling AFB, DC.

Question 13: Please clarify the requirements for the new service counter / information center referenced in the Attachment 7, page 4 of 5, section 12.1. (Match existing finishes?, Storage requirements?, Elevated platform?, Tele/Data requirements?, etc.)

Answer 13: Service counter requires about 8’ of desk area must be ADA accessible, and must counter cover above desk area for the privacy of employees, similar to the PAX reception counters. Three computers 3 phones and one fax machine, two Kiosks 4 bin areas and 8 draws to support files.

Questions 14: Please provide the product information for the existing wall covering. Attachment 7, page 3 of 5, section 2.7 indicates new wall covering to match existing.

Answer 14: There is none

Question 15: Please provide details as to the construction of the Service Counter, Security Station and SAMPAX Counter casework to aide in developing a plan to relocate these furnishings. How are they attached floor? Are they modular units that can be disassembled and relocated for reassembly?

Answer 15: The counters are custom case work and cannot be dissembled; they are not bolted to the floor. See Question 13.

Question 16: Please provide details on how the existing seating to be removed is fastened to the floor.

Answer 16: Seating is not bolted to the floor its to be removed and turned over to the Government.

Question 17: Is the seating scheduled for removal turned over to the Air Force or should the contractor dispose of the seating?

Answer 17: Seating is not bolted to the floor its to be removed and turned over to the Government.

Question 18: Please provide details for how the storefront wall assemblies are attached to the flooring. Should the contractor anticipate that the storefront is attached atop the floor finish or is the floor tile run to the storefront framing?

Answer 18: The store front system is attached to the floor and ceiling using a track system. The contractor should make sure the storefront system is properly secure.

Question 19: Does the Air Force expect to provide any attic stock finishes (carpet, floor tile, wall covering) to aide in patching finishes where materials are relocated?

Answer 19: No.

Question 20: Is there a base requirements contractor responsible for all communications infrastructure? If so, does the SABER contractor have to use or coordinate with the requirements contractor for installation of new communications wiring and terminations? Please provide the contact information for the requirements contractor, if present.

Answer 20: Please refer to the ETL Letter provided

Question 21: Are the existing personnel computer stations to be disposed of or turned over to the Air Force?

Answer 21: If your talking about the counters, the unused sections are to be disposed of.

Question 22: Does the existing service counter section to be removed for relocation of the SAMPAX counter get turned over to the Air Force or should the contractor dispose of the unused section?

Answer 22: Dispose of unused section

Question 23: Will the Air Force be relocating telephones, radios and computers/monitors/printers or should the contractor include this work in the scope for the project?

Answer 23: The Air Force will move their own equipment

Question 24: At the site visit, it was noted there is a communication/power raceway integral to the service counter. Please indicate from which direction the communication and power wiring are fed from in the raceway.

Answer 24: North and South of the counters because they are in sections

Question 25: Please provide information on the power and telephone/data requirements for the personnel computer stations, the information kiosks, and the SAMPAX Counter.

Answer 25: There are no special power requirements other than what’s there they have three computers a couple of phones, two fax machines and that about it.

Questions 26: Please indicate which electric panel to use to feed new power requirements and provide details on the panel (size, spare capacity, etc.).

Answer 26: It should be the same panel in use

Question 27: Please provide information on how the project should be phased to accommodate construction. At the site visit, it was noted that the area will remain operational throughout construction. At what time should the contractor anticipate materials may be relocated and how long can the various systems be offline during the relocation process?

Answer 28: 48 hours, temporary phone lines and computer stations and power must remain in place while the contractor is relocation the Stations. It’s probably best to pre-wire all new areas before totally disconnecting everything.

Question 29: At the site visit, it was noted that the existing guard station is the monitoring / operation station for an exterior security gate. Please provide information relative to the power and raceway requirements to monitor and operate the gate. Where is the existing wiring fed from at the guard station?

Answer 29: Still working on as builds with our drafting section.

Question 30: Please provide manufacturer information and model numbers for the existing metal detector and x-ray machines to be relocated.

Answer 30: Information not available

Question 31: Is the metal detector and x-ray machine under warranty?

Answer 31: No

Question 32: Do any service contracts exist for this equipment?

Answer 32: No

Quesiton 33: Are there any requirements for non-normal working hours for the demonstration project?

Answer 33: No

Question 34: Please indicate where the contractor staging area (dumpster, vehicle access, and material staging area) will be.

Answer 34: Outside the building in the parking area/ eating area

Question 35: For the above solicitation, will any furniture be ordered for the spaces at a later date?

Answer 35: Furniture is not included in the requirements for this solicitation.

Question 36: In the solicitation it mentions a site visit and I was wondering when you are planning to schedule that meeting. I would like to attend and better prepare myself for this opportunity.

Answer 36: The site visit was conducted on May 27th. No additional site visits are planned at this time.

Question 37: We are preparing to send Attachment 5 PPQs to our references as part of our bid package for the SABER IDIQ (FA4416-08-R-0010 ) at Andrews AFB and Bolling AFB. I noticed in Section A of the PPQ that Line J refers to SECTION B of the Questionnaire. There appears to be no SECTION B. There is a page titled "Additional Information," but no SECTION B.

Answer 37: An amendment which includes the correct version of the PPQ has been posted to www.fbo.gov.

Question 38: I noticed on page 41 of the solicitation that if a teaming arrangement is contemplated, our teaming party would also need to provide a list of past and present relevant contracts (no more than 10). We are working closely with a design consultant for this proposal and would like to include some of the firm's relevant contracts. My question regards the page count for Volume 1. Do we each have a 15-page maximum for Volume I or do we have a 15-page maximum combined?

Answer 38: The 15 page limitation is per offer and should contain all applicable information the offeror wishes to submit.

Question 39: Is there a list of bidders for this solicitation?

Answer 39: No, a list of offeror’s is not available.

Question 40: Please clarify the requirement for the Teaming/Partnering arrangement documentation requirement stated in Section L, Part A, on page 39 of 55. Is it the Air Force’s intent that this is a copy of the official Joint Venture or Teaming agreement, or just an explanation describing the offeror? If it is a copy of the agreement, would the Air Force please consider excluding this from the page limitations, as the agreement may exceed 15 pages, and inclusion will prevent the offeror from submitting any additional information, and will put any JV or teaming arrangement at a significant disadvantage.

Answer 40: A copy of the official Joint Venture or Teaming agreement is required. This documentation will not count against the 15-page limitation for Volume I of the proposals.

Question 41: Section L, Item III, in the instructions for the Demonstration Project, the Solicitation indicates that the Offeror should apply the “applicable co-efficient” to their estimate. This will result in the Offeror’s price being revealed prior to the evaluation of the Pricing volume. Would the Air Force consider instead requiring an estimate for the Demonstration Project utilizing a coefficient of 1.0 for evaluation purposes?

Answer 41: No, part of the evaluation is verifying that each offeror accurately applies their unique coefficient to the demonstration project estimate. This evaluation will have no bearing on the evaluation of price.

Question 42: Please supply a list of general contractors for this project. We would like to explore sub-contracting opportunities.

Answer 42: No, a list of offeror’s is not available.

Question 43: On page 3 of Attachment 5, the questions in "Section II Timely Performance" are exactly the same as the questions in "Section IV Compliance with Labor Standards" on page 4. Is this correct?

Answer 43: Yes, please use the Past Performance Questionnaire posted in Amendment 1.

(End of Summary of Changes)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Please see the continuation page for details.

POC: Nathaniel Franz

Email: nathaniel.franz@us.af.mil

Fax: 301-981-1907

1. CONTRACT ID CODE

PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

06-Jun-2008

16B. UNITED STATES OF AMERICA

15C. DATE SIGNED

15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)

(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code)

X

FA4416-08-R-0010

9B. DATED (SEE ITEM 11)

13-May-2008

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jun-2008

CODE

316TH CONTRACTING SQUADRON

1535 COMMAND DRIVE, STE E210

ANDREWS AFB MD 20762-6500

FA4416

7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

See Item 6

FACILITY CODE

EMAIL:

TEL:

Other files

File Type Posted
Amendment 04 FA4416-08-R-0010 —
Contractor Questions and Government Answers —
1245.2.pdf PDF
Existing Utilities As Builts.pdf PDF
ETL Engineering Technical Letter 12-02.pdf PDF
1245.3.pdf PDF
1245.6.pdf PDF
1245.1.pdf PDF
1245.5.pdf PDF
1245.4.pdf PDF
Contractor Questions and Government Answers.doc DOC document
Amendment 02 FA4416-08-R-0010.doc DOC document
Amendment 01 FA4416-08-R-0010.doc DOC document
ATCH 5-Past Performance Questionnaire.doc DOC document
ATCH 9-AF66 Schedule of Material Submittals.xls XLS spreadsheet
ATCH 8-Drawings BLDG 1245 Passenger Terminal.doc DOC document
ATCH 4b-MD080016.doc DOC document
ATCH 4c-MD080048.doc DOC document
ATCH 3b-MD080022.doc DOC document
ATCH 1-BAFB-AAFB SABER Specs —
ATCH 2b-DC080001.doc DOC document
ATCH 3a-MD080021.doc DOC document
ATCH 7-SOW Bldg 1245.doc DOC document
ATCH 2a-DC080003.doc DOC document
ATCH 3c-MD080035.doc DOC document
ATCH 6-Past Performance Reference List.doc DOC document
ATCH 4a-MD080057.doc DOC document
BAFB-AAFB SABER Solicitation —
Industry Day QA's.doc DOC document
Industry Day Attendees by Company Name.xls XLS spreadsheet
Industry Day Slides —
BAFB-AAFB SABER Specs —
DRAFT BAFB-AAFB SABER Solicitation —
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .