ATCH 2b-DC080001.doc
DOC document 103 KB Posted
- Attached to
- Award Notice for Andrews AFB & Bolling AFB Simplified Acquisition of Base Engineering Requirements (SABER)
- Solicitation number
- FA4416-08-R0010
About this file
Attachment 2b - General Decision Wage Rates - Highway and Heavy DC080001 - 2 May 2008
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2b
FA4416-08-R-0010
General Decision Number: DC080001 05/02/2008 DC1
Superseded General Decision Number: DC20070001
State: District of Columbia
Construction Types: Heavy (Heavy and Sewer and Water Line) and Highway
County: District of Columbia Statewide.
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines);
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 02/08/2008
1 04/18/2008
2 05/02/2008
ASBE0024-001 10/01/2007
Rates Fringes
Asbestos Worker/Heat and
Frost Insulator
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems..........$ 27.88 13.88
ASBE0024-002 10/01/2007
Rates Fringes
HAZARDOUS MATERIAL HANDLER
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 17.95 6.50
ASBE0024-005 10/01/2007
Rates Fringes
Fire Stop Technician.............$ 22.95 6.39
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
BOIL0193-001 10/01/2007
Rates Fringes
Boilermakers:....................$ 32.06 16.46
BRDC0001-001 04/30/2007
Rates Fringes
Bricklayer......................$ 25.90 6.19
CARP0132-001 05/01/2007
Rates Fringes
Carpenter/Lather.................$ 24.37 6.15
Piledriver.......................$ 22.87 6.85
CARP0132-003 05/01/2004
Rates Fringes
Diver Tender.....................$ 20.85 5.50
Diver............................$ 29.63 5.50
CARP1831-001 04/01/2003
Rates Fringes
Carpenters:
Millwrights.................$ 24.34 4.05
ELEC0026-001 11/05/2007
Rates Fringes
Electricians.....................$ 34.55 11.39+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Jr.'s
Birthday, Inauguration Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, the day after
Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0026-008 07/01/2003
Rates Fringes
Motor Repairmen
Removal and reinstallation of electrical motors........$ 23.69 7.73+3%+a
a. PAID HOLIDAYS:
New Year's Day, Martin Luther King Jr.'s Birthday, Inauguration Day, Memorial Day, Fourth of July,Labor Day, Veterans Day,Thanksgiving Day, the day after Thanksgiving and Christmas Day or days designated as legal holidays by the Federal Government.
ELEC0070-001 09/02/2007
Rates Fringes
Line Construction:
Cable Splicers..............$ 30.29 19.75%+4.81
Equipment Mechanic..........$ 21.82 19.75%+4.81
Equipment Operators.........$ 25.78 19.75%+4.81
Groundman/Truck Driver......$ 15.34 19.75%+4.81
Line Truck with Auger.......$ 20.09 19.75%+4.81
Linemen.....................$ 28.86 19.75%+4.81
ENGI0077-001 05/01/2007
Rates Fringes
Power equipment operators:
(HEAVY AND HIGHWAY
CONSTRUCTION)
GROUP 1.....................$ 27.64 6.82+a
GROUP 2.....................$ 27.18 6.82+a
GROUP 3.....................$ 26.47 6.82+a
GROUP 4.....................$ 24.44 6.82+a
GROUP 5.....................$ 19.90 6.82+a
GROUP 6.....................$ 29.01 6.82+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: 35 ton cranes & above, tower & climbing cranes, derricks, concrete boom pump, drill rigs (equivalent to L &
Double L), mole.
GROUP 2: Backhoes, cableways, cranes, cherry pickers, elevating graders, hoists, paving mixers, power shovels,tunnel shovels. batch plants, shields, tunnel mining machines, gradalls, front end loaders, 3 1/2 cu.
yds. and above, power driven wheel scoops and scrapers (50
cu. yds. struck capacity or above), rail tamper, draglines, boomcat, mucking machines, graders in tunnels, pile driving engines.
GROUP 3: Front end loaders below 3 1/2 cu. yds, boom trucks, hydraulic backhoes 1/2 yds. capacity or below rubber or track mounted, tug boats, power driven wheel scoops & scrapers, blade graders, motor graders, bulldozers, trenching machines, concrete mixer, speed swing pettibone, ballast regulator, concrete pump, mechanic, welder, mechanic welder, shotcrete machines, Hoeram, locomotive
(standard, narrow gauge), tuggers.
GROUP 4: High lifts above 10 feet, boilers (skelton), asphalt spreaders, bullfloat finishing machines, concrete finishing machines, concrete spreaders, fine graders, air compressors, welding machines, pumps, generators, well points, deep wells, hydraulic pumps, elevators, freeze uniits, tunnel motorman or dinky operator, roller, conveyors, well drilling machines, grout pump, fireman.
GROUP 5: Fork lifts, ditch witch, bobcat 1/3 cu. yd. and below, space heaters, sweepers, assistant engineers, oilers.
GROUP 6: Master mechanic.
a. PAID HOLIDAYS: New Years Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
b. PREMIUM PAY: Tower cranes and cranes 100-ton and over to receive $1.00 per hour premium over Group One.
ENGI0077-002 06/01/2007
Rates Fringes
Power equipment operators:
(PAVING AND INCIDENTAL
GRADING)
GROUP 1.....................$ 23.00 5.50
GROUP 2.....................$ 20.05 5.50
GROUP 3.....................$ 17.19 5.50
GROUP 4.....................$ 15.85 5.50
GROUP 5.....................$ 23.50 5.30
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Gradall operator, Crane.
GROUP 2: Boom Truck, Milling Machine, Excavator, Rubber Tire
Backhoe, Asphalt Paver, Asphalt Plant Engineer, Motor
Grader, Track Loader, Rubber Tire Loader, Track Dozer, Concrete Paver.
GROUP 3: Broom Truck, Asphalt Roller.
GROUP 4: Air Compressor, Grade Rollers.
GROUP 5: Mechanic.
ENGI0077-003 07/01/2007
Rates Fringes
Power equipment operators:
(SEWER, GAS AND WATER LINE
CONSTRUCTION)
GROUP 1....................$ 20.48 5.37+a
GROUP 2....................$ 20.08 5.37+a
GROUP 3....................$ 19.57 5.37+a
GROUP 4....................$ 19.25 5.37+a
GROUP 5....................$ 18.43 5.37+a
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Excavators, Cranes, Gradalls.
GROUP 2: Backhoes, Front-end Loaders, Fork alift/Lull, Bulldozers, Motor Graders. Qualified Mechanics, Hydraulic
Tamper and Hoe Pack, Paving Mixers, Pile Driving Engines, Batch Plant, Concrete Pumps, Low-Boy Driver, Lube Truck.
GROUP 3: Trenching Machine, Well Drilling Machines, Concrete
Mixers, Motor Graders, Truck Driver.
GROUP 4. Roller, Air Compressors, Pumps, Welding Machines, Well Points, Firemen.
GROUP 5: Oiler a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Washington's
Birthday, Decoration Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Christmas Day and Martin
Luther King's Birthday.
IRON0005-001 06/01/2007
Rates Fringes
Ironworkers:
Structural, Ornamental and
Chain Link Fence............$ 26.73 11.995
* IRON0201-001 05/01/2008
Rates Fringes
Ironworkers:
Reinforcing.................$ 26.15 12.08
LABO0657-003 06/01/2007
Rates Fringes
Laborers: (HEAVY AND HIGHWAY
AND SEWER & WATER LINES
CONSTRUCTION)
GROUP 1.....................$ 19.61 4.29
GROUP 2.....................$ 19.90 4.29
GROUP 3.....................$ 20.05 4.29
GROUP 4.....................$ 20.20 4.29
GROUP 5.....................$ 20.61 4.29
GROUP 6.....................$ 21.12 4.29
GROUP 7.....................$ 21.61 4.29
GROUP 8.....................$ 22.28 4.29
LABORERS CLASSIFICATIONS:
GROUP 1: Carloaders, choker setter, concrete crewman, crushed feeder, demolition laborers, including salvaging all material, loading, cleaning up, wrecking, dumpmen, flagmen, fence erector and installer (other than chain link), including installation and erection of fence, guard rails, medial rails, reference posts, guide posts and right-of-way markers, form strippers, general laborers, railroad track laborers, riprap man, scale man, stake jumper, structure mover, includes foundation, separation, preparation, cribbing, shoring, jacking and unloading of structures, water nozzleman, timber bucker and faller, truck loader, water boys, tool room men.
GROUP 2: Combined air and water nozzleman, cement handler, dope pot fireman (nonmechanical), form cleaning machine, mechanical railroad equipment (includes spiker, puller, tile cleaner, tamper, pipe wrapper, power driven wheelbarrows, operators of hand derricks, towmasters, scootcretes, buggymobiles and similar equipment), tamper or rammer operator, trestle scaffold builders over one tier high, power tool operator (gas, electric or pneumatic), sandblast or gunnite tailhose man, scaffold erector, (steel or wood), vibrator operator (up to 4 feet), asphalt cutter, mortar men, shorer and lagger, creosote material handler, corrosive enamel or equl, paver breaker and jackhammer operators.
GROUP 3: Multi-section pipe layer, non-metallic clay and concrete pipe layer (including caulker, collarman, jointer, rigger and jacker, thermal welder and corrugated metal culvert pipe layer.
GROUP 4: Asphalt block pneumatic cutter, asphalt roller, walker, chainsaw operator with attachment, concrete saw
(walking), high scalers, jackhammer operator (using over 6 feet of steel), vibrator operator (4 feet and over), well point installer, air trac operator.
GROUP 5: Asphalt screeder, big drills, cut of the hole drills
(1 1/2 " piston or larger), down the hole drills (3 1/2" piston or larger) gunnite or sandblaster nozzleman, asphalt raker, asphalt tamper, form setter, demolition torch operator, shotcrete nozzlemen and potman.
GROUP 6: Powderman, master form setters.
GROUP 7: Brick paver (asphalt block paver, asphalt block sawman, asphalt block grinder, hastings block or similar type)
GROUP 8: Licensed powdermen.
LABO0657-004 06/01/2007
Rates Fringes
Laborers: (HAZARDOUS WASTE
REMOVAL, EXCEPT ON MECHANICAL
SYSTEMS:
Preparation for, removing and encapsulation of hazardous materials from non-mechanical systems)
Skilled Asbestos Abatement
Laborers....................$ 16.30 4.29
Skilled Toxic and
Hazardous Waste Removal
Laborers....................$ 19.02 4.29
LABO0657-005 06/01/2007
Rates Fringes
Laborers: (TUNNEL, RAISE &
SHAFT (FREE AIR)
FOR HEAVY AND SEWER & WATER
LINES CONSTRUCTION)
GROUP 1.....................$ 20.27 4.29
GROUP 2.....................$ 20.86 4.29
GROUP 3.....................$ 22.38 4.29
GROUP 4.....................$ 23.02 4.29
LABORERS CLASSIFICATIONS:
GROUP 1: Brakeman, Bull Gang, Dumper, Trackmen, Concrete Man.
GROUP 2: Chuck Tender, Powdermen in Prime House, Form Setters and Movers, Nippers, Cableman, Houseman, Groutman, Bell or
Signalman, Top or Bottom Vibrator Operator.
GROUP 3: Miners, Re-Bar Underground, Concrete or Gunnite
Nozzlemen, Powdermen, Timbermen and Re-Timbermen, Wood Steel
Including Liner plate or Other Support, Material Motorman, Caulkers, Diamond Drill Operators, Riggers, Cement Finishers-
Underground, Welders and Burners, Shield Driver, Air Trac
Operator, Shotcrete Nozzlemen and Potman.
GROUP 4: Mucking Machine Operator (Air).
LABO0657-006 06/01/2007
Rates Fringes
Laborers: (TUNNEL, RAISE AND
SHAFT (COMPRESSED AIR) FOR
HEAVY CONSTRUCTION ONLY
Gauge Pressure Work Period
(Pounds) (Hours)
1-14 7...........$ 25.08 4.29
14-18 6............$ 29.55 4.29
FOOTNOTE: On any requirement for air pressure in excess of 18
PSI, work periods and rates should be negotiated at a pre-bid conference.
LABO0657-007 06/01/2007
Rates Fringes
Laborers: (PAVING AND
INCIDENTAL GRADING)
Asphalt Raker & Concrete
Saw Operator................$ 17.14 4.30
Asphalt Shoveler............$ 16.59 4.30
Asphalt Tammer & Concrete
Shoveler....................$ 16.84 4.30
Jack Hammer.................$ 17.03 4.30
Laborer.....................$ 16.48 4.30
Sand Setter & Form Setter...$ 17.76 4.30
LABO0657-008 06/01/2007
Rates Fringes
Laborers (BRICK MASONRY WORK)
Mason Tenders...............$ 14.14 4.29
Scaffold Builders, Mortarmen and Small
Equipment Operators.........$ 14.90 4.29
MARB0002-003 05/01/2007
Rates Fringes
Marble & Stone Mason
Includes Pointing, Caulking and Cleaning of
All Types of Masonry, Brick, Stone and Cement
Structures..................$ 31.00 11.52
MARB0003-001 05/01/2007
Rates Fringes
Mosaic & Terrazzo Worker, Tile Layer
Marble Mason and Tile Layer.$ 24.67 8.78
Terrazzo Worker.............$ 25.42 8.78
MARB0003-004 05/01/2007
Rates Fringes
Marble, Tile & Terrazzo
Finisher.........................$ 19.84 7.90
PAIN0051-001 06/01/2007
Rates Fringes
Painters:
All Industrial Work.........$ 24.73 7.31
Bridges, Heavy Highway, Lead Abatement and
Flame/Thermal Spray.........$ 27.87 7.31
Commercial and Mold
Remediation, Painters, Wallcovers and Drywall
Finishers...................$ 23.31 7.31
Metal Polishing and
Refinishing.................$ 24.31 7.31
PLAS0891-001 05/01/2007
Rates Fringes
Cement Masons:
HEAVY CONSTRUCTION ONLY.....$ 26.15 6.01
PLAS0891-002 06/01/2007
Rates Fringes
Cement Masons: (PAVING &
INCIDENTAL GRADING)
Cement Masons...............$ 17.35 4.35
Concrete Saw Operators......$ 17.35 4.35
Form Setters................$ 17.35 4.35
PLUM0005-001 10/21/2007
Rates Fringes
Plumbers.........................$ 33.92 12.94+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving
Day and the day after Thanksgiving, Christmas Day, New
Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-005 11/01/2007
Rates Fringes
Steamfitter, Refrigeration &
Air Conditioning Mechanic........$ 33.27 13.57+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
SHEE0100-001 07/01/2007
Rates Fringes
Sheet Metal Worker...............$ 31.54 11.65
TEAM0639-001 03/07/2004
Rates Fringes
Truck drivers: (HEAVY &
HIGHWAY CONSTRUCTION)
Tandem & Triaxle (3 or more axles, including steering axle)..............$ 16.00 5.82+a
Tractor-trailer, Low Boy....$ 20.00 5.82+a
a. VACATION: Employees will receive one (1) week's paid vacation after one (1) year of service.
TEAM0639-002 06/01/2005
Rates Fringes
Truck drivers: (HEAVY &
HIGHWAY CONSTRUCTION)
Concrete Mixer Drivers......$ 17.40 5.82+a+b
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.
Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, or any day celebrated publicly in the
District of Columbia as one of the above holidays.
b. PAID VACATIONS: Employees with one (1) year of service shall be entitled to a vacation of one (1) week; five (3) years of service are entitled to two (2) weeks; fifteen(10) years of service are entitled to three 3 weeks; twenty (20) years of service are entitled to four (4) weeks.
TEAM0639-005 09/01/2006
Rates Fringes
Truck drivers: (PAVING &
INCIDENTAL GRADING)
All paving projects where the grading is incidental to the paving...............$ 14.05 3.69
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION