Site Visit Questions - Renovate Controlled Area - ANSWERED.docx

DOCX document 32 KB Posted

Attached to
MPLS208151 - Renovate Controlled Area, Building 9225 Federal contract opportunity
Solicitation number
FA301621B0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This federal solicitation is for a design-build renovation project of a controlled area on Joint Base San Antonio Lackland Air Force Base. The project scope involves renovating nine rooms totaling approximately 9,225 square feet, including installing new partitions, doors, flooring, ceilings and lighting, as well as upgrading mechanical, electrical and network infrastructure. The estimated value is between $500,000 and $1,000,000. The solicitation is set aside for women-owned small businesses and offers are due by the closing date. Offerors must complete various proposal sections and certifications as detailed in the solicitation instructions. The prevailing wage requirement applies to this project.

View the file

Other files for this federal contract opportunity

Other files attached to MPLS208151 - Renovate Controlled Area, Building 9225, newest first.
File Type Posted
Site Visit Questions - Renovate Controlled Area - 26Mar2021.pdf PDF
Attachment 14 - Revised Wage Determination.pdf PDF
Attachment 01 - Revised Statement of Work 26 March 2021.pdf PDF
Attachment 04 - Revised Patch Panel and Multiple Input-Output (MIO)_Zone Boxes (Appendix D).pdf PDF
Attachment 7 - Revised Submittal Register 20210326.pdf PDF
Attachment 18 - Partial Mech.pdf PDF
FA301621B00010003.pdf PDF
Attachment 02 - Revised Concept Drawings (Appendix A).pdf PDF
Attachment 16 - Section L - Instructions to Offerors Rev 26Mar2021.pdf PDF
Attachment 19 - MEP Record Drawings.pdf PDF
FA301621B00010002.pdf PDF
FA301621B00010001.pdf PDF
FA301621B0001.pdf PDF
Attachment 09 - Asbestos Report.pdf PDF
Attachment 10 - Lead Based Paint Report.pdf PDF
Attachment 16 - Section L - Instructions to Offerors.pdf PDF
Attachment 05 - CAD_Templates_and_Reqs.zip ZIP file
Attachment 07 - Submittal Register.pdf PDF
Attachment 08 - DD1354.pdf PDF
Attachment 14 - Wage Determination.pdf PDF
Attachment 2 - Concept Drawings.pdf PDF
Attachment 03 - Labeling.pdf PDF
Attachment 11 - General Requirement for Obtaining Waste Manifest.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 04 - Patch Panel and Multiple Input-Output (MIO)_Zone Boxes.pdf PDF
Attachment 06 - Installation Guidelines.pdf PDF
Attachment 12 - Bldg 9225 Record Dwg Binder 20140711.pdf PDF
Attachment 13 - Climatological Data 2019 - 2020.pdf PDF
Attachment 15 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 17 - Section M - Evaluation Factors for Award.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Can the Government confirm that these cameras and components must comply with the 2019 National Defense Authorization Act (NDAA), and cameras and components that do not comply (Dahua, HikVision, Huawei, ZTE, Hytera, etc.) will not be acceptable?

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Are there specific camera manufacturers the Government does not want?

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Are all 2019 National Defense Authorization Act (NDAA) approved cameras acceptable or are there specific manufacturers the Government prefers for compatibility or other reasons?

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Does the Government have any preference for Axis or Avigilon devices or does it matter?

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Can these be 720p interior or do they need to be 1080p or higher?

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 01 11 00.10, para 1.3.4.2 indicates that all new security cameras are to connect to a new monitoring station in Room 320. Para 1.3.4.3 states “the contractor shall connect all cameras” to a wall mounted flat screen .It appears some cameras will serve Rooms 317 and 318 (SCIF area #1) while other cameras serve the remaining rooms (SCIF area #2). Is the contractor required to connect all cameras to a single NVR + Monitor in room 320 or are they required to split them into 2 separate security monitor locations?

ANSWER: All camera will run to room 320

1. Section 01 11 00.10, para 1.3.4.2 requires contractor to provide and install security cameras. Is there a specific recording FIFO retention time we need to provide on the cameras (ie 7-days, 30-days, etc)? Please advise.

ANSWER: Per Section 01 11 00.10, paragraph 1.3.1 indicates that the Government will be providing the cameras for the contractor to install.

1. Section 10 11 00.10, para 1.3.4.2 says to “use schedule 40 PVC large enough to handle NIPR CAT 6 cabling.” Does the government want this PVC sized the handle CAT 6 or CAT 6 shielded cable (different diameters)?

ANSWER: CAT6 shielded cabling

1. Section 10 11 00.10, para 1.3.4.2: We would like to make sure we understand the outlet setup the government requires the contractor to provide since it is defined in several different locations in the SOW. The next-to-the-last paragraph says a Work Area Outlets equals: 4 NIPR in one FP and in one double gang FP will be 6 SIPR (pair) and 6 JWIC (pair). Page 9 the 5th paragraph says to use OM3 for SIPR and NIPR. Is this correct?

ANSWER: Yes, this is per work station cubicle. Four NIPR (unclassified) shielded CAT 6 drops (cable color green) in a single gang box to each cubicle. A double gang box with six SIPR OM3 (color red) LC drops, and six JWICS OM3 color yellow LC drops. They must meet TEMPEST separation distances of a minimum of 36 inches. Cubicle furniture can be equipped with external type boxes.

1. Section 10 11 00.10 1.3.4.2, page 10 says “the contractor is required to install one surface mount box, with two wall plates along the wall, at each cubicle in the rooms for NIPR with 4 ports” a) Does the government want one double gang box with 2 single gang faceplates? b) And 4 NIPR ports in each single gang faceplate? c) For each cubical that is located against a wall?

ANSWER: This item is specifically for the fiber networks and drops to be installed within the wall. The contractor is required to use existing wall conduit to single or double gang wall plates where applicable. The contractor shall install new in wall conduits with single/double gang boxes and faceplates in identified rooms for SIPR & JWICS configured with 6 pair each.

The contractor is required to install two surface mount boxes at each cubicle furniture desks in all the rooms where applicable. One surface mount box for SIPR with 6 ports and one surface mount box for JWICS with 6 ports, to be duplicated in each room and each cubicle.

1. Section 10 11 00.10, para 1.3.4.2, page 10-11 states “Additionally, the contractor shall install 3 wall jacks at each external cubicle.” a) Does external cubicle mean cubicles not against or touching a wall? b) Does the government want the NIPR Outlets for the external cubicles to be located on the wall and patch cords run through the furniture to the cubicle? c) Does the government want only 3 and not 4 NIPR drops per external cubical? d) What does the government mean by 3 wall jacks?

ANSWER:

a. Yes, furniture that is not connected in modular fashion that touches or is adjacent to a wall.

b. Patch cords ran through the furniture are not required.

c. Four NIPR drops are to be installed per identified location.

1. Section 10 11 00.10 chart on page 9 says room 318 has 8 work areas, but the 1st chart on Page 11 says place 28 NIPR which would be equivalent to only 7 work areas (positions). a) Can the government confirm how many NIPR pairs the government wants in room 318? b) Are there 7 work areas or 8 work areas in room 318?

ANSWER:

a) 28 Drops

b) 7 work stations

1. Section 10 11 00.10 chart on page 9 says room 317 has 12 work areas. 6 (pairs) x 12 (work areas) = 72 pairs (ea/for SIPR and JWICs). The 1st chart on Page 11 says there are only 62 pairs. Can the government confirm how many SIPR pairs the government wants in room 317? Can the government confirm how many JWICS pairs the government wants in room 317?

ANSWER: There are 10 work areas, but 12 drop locations for all networks.

(i.e two drop locations will be on the right side wall as you enter the room from the existing doorway)

NIPR50 drops (12 positions) – 2 locations each along wall
SIPR62 pair (12 positions) – 2 locations with 1 pair each along wall

JWIC 62 pair (12 positions) – 2 locations with 1 pair each along wall

1. Section 10 11 00.10 chart on page 9 says room 319 (the conference room) has 6 work areas. Para 1.3.4.3 on page 8 in the last paragraph (and continues to page 9) plus the chart on page 9 says to place 4 NIPR drops, 6 SIPR and 6 JWICS. a) Can the government tell the contractor which number is correct? b) Does the government want to contractor to provide enough drops for 6 work areas in the conference room?

ANSWER:

a) Page 8 specifically speaks to the network cable installation that is to be installed within the trench from the wall and is to be installed within the conference table.

NIPR4 drops (conference table) – 2 locations 2 each at front and back of table
SIPR6 pair (12 strand) – 2 locations 3 each at front and back of table

JWIC 6 pair (12 strand) – 2 locations 3 each at front and back of table

b) Room 319 is to be configured in this manner

SIPR48 pair (8 positions)
JWIC48 pair (8 positions)
NIPR56 drops (14 positions)

1. Section 10 11 00.10 chart on page 9 says room 320 has 6 work areas. 4 NIPR (drops) x 6 (work areas) = 24 drops. But the 1st chart on Page 11 says there are only 20 drops. Can the government confirm how many drops the government wants in room 320?

ANSWER: 24 drops. 6 work areas.

1. Section 01 11 00.10, para 1.3.1, page 3, note 2 states “verify that the two provided network racks for room 318 are sufficient in size.” There was only one full size Chatsworth data cabinet in room 318 when we walked the space. Does the government have another full-size data cabinet in some other location for the contractor to use?

ANSWER: Three network cabinets were present in room 318, one fully used and two empty ones.

1. Section 01 11 00.10, para 1.3.2 states “The communications racks must match or be equal to the existing 42U NIPRNET network rack.” Is the government referring to the data cabinets located in room 318?

ANSWER: Yes

1. Section 01 11 00.10, para 1.3.2 states “The communications racks must match or be equal to the existing 42U NIPRNET network rack.” The 42U NIPERNET network rack was actually a full-size Chatsworth Data Cabinet. Does the government want the contractor to provide data RACKs or data CABINETs for the new comm room?

ANSWER: Contractor must match or be equal to the 42U Chatsworth if the two existing ones are not usable.

1. Is the contractor required to perform an asbestos survey of the space or abate in accordance with the government report?

ANSWER: Contractor is required to perform an asbestos survey and abate in accordance to the report provided with the package.

1. SOW Section 1.3.1 states to provide a furniture layout plan. There is no indication of new furniture to be provided as part of this contract. What guidelines should be utilized for providing the furniture layout?

ANSWER: As indicated in SOW, contractor is require to store existing furniture and cubicles and install them at the end of each phase.

1. Please confirm no new furniture is being provided as part of this contract. If furniture is to be provided, please provide specific requirements by space.

ANSWER: No new furniture will be required. Contractor shall re-install existing cubicles and furniture at end of each phase.

1. SOW Section 1.3.1 states to re-install all office furniture and cubicles. During the site visit the office furniture in many cases seemed incomplete and partial taken apart. During the site visit it was not possible to obtain an inventory of the furniture to be removed and re-installed. Please provide a listing of items requiring, disassembly, storage, and re-installation within this space.

ANSWER: Reassemble usable furniture approximately 27 complete desk and 35 modular walls – TBD during design phase. Disposal of remaining.

1. SOW Section 1.3.3 requires a storage container for all furniture removed from the workspace. Does this storage container have to be conditioned?

ANSWER: No. Wrap and protect assets within the storage container

1. There does not appear to be existing fire sprinklers in the space. Please confirm this is not required.

ANSWER: No existing fire sprinkler is available in the space. Not required for this project.

1. SOW Section 1.3.4.1 states that the contractor shall install sealing floorboards at the end of carpet installation. Can the government please clarify what is meant by sealing floorboards? Is this rubber vinyl base?

ANSWER: Removal of floorboards is required. New Vinyl Cove Base floorboards shall be installed after the new carpet has been installed.

1. SOW Section 1.3.4.2 provides a table for quantity of electrical outlets per space. Is the quantity in this table in addition to maintaining the existing count within each room?

ANSWER: Yes.

1. As this is a highly technical design build project, responses to Q&A are critical to correctly interpret the design build requirements and devise accurate solutions for pricing. As a result, it is critical to have adequate time after receipt of Q&A responses to develop pricing documents and have adequate time for contractors to review and bid those documents. We are requesting an extension of the proposal due date to ensure a minimum of 10 business days is provided to submit proposals from the date that Q&A responses are provided.

ANSWER: Please refer to 502d CONS

1. Per the SOW section 1.3.4.3 page 6, in rooms 315 and 316 the government wants the contractor to replace / re-run the 44 drops (22 in Rm 315 and 22 in room 316). The existing drops are CAT6 drops in this area. Does the government want the contractor to replace in kind? (CAT6 Plenum) ANSWER: Yes. Replace with new CAT6e

1. Addressing the new drops that will be placed to room 315 and 316; will the government allow the contractor to use J Hooks for the replacement/rerouted drops?

ANSWER: Yes. Contractor can use J-hooks where needed to route the cables.

1. Room 315 had an MIO box on the wall. Is this NIPR fiber, or SIPR fiber or JWIC fiber.

ANSWER: SIPR and JWICS. The MIO box needs to be removed and returned to the government.

1. Does the government currently have SIPR or JWICs drops in room 315?

ANSWER: No SIPR or JWIC connectivity in the rooms.

1. Does the government currently have SIPR or JWICs drops in room 316?

ANSWER: No SIPR or JWIC connectivity in the rooms.

1. Does the government want SIPR or JWICs in room 315 when the project is completed?

ANSWER: No

1. Does the government want SIPR or JWICs in room 316 when the project is completed?

ANSWER: No

1. Where does the existing backbone fiber cable that feeds the MIO box in Room 315 originate? Does it originate in the TR Room 303?

ANSWER: No. All cabling between MIO boxes originated in the networking rack on the wall of room 317 and must be terminated. The MIO box should be uninstalled and returned to Government.

1. Where does the existing backbone fiber cable that feeds the MIO box in Room 316 originate? Does it originate in the TR Room 303?

ANSWER: No. All cabling between MIO boxes originated in the networking rack on the wall of room 317 and must be terminated. The MIO box should be uninstalled and returned to Government.

1. Can the government provide the Cisco IP phone model number they want the contractor to provide for this proposal?

ANSWER: Government will provide phone, contractor is not require to provide the phone.

1. Does Lackland allow for SIPR and JWICs to be in the same MIO box?

ANSWER: No.

1. Cipher locks are mentioned several times in the SOW. Does Lackland define a cipher lock as an X-10 lock?

ANSWER: Yes.

1. The 1.3.4.2 calls for the contractor to place two separate cable trays. Can the contractor use wire basket type cable trays for these cables (example: Flextray Wire Basket)?

ANSWER: Yes. One tray for unclassified cabling and one tray for classified cabling.

1. Does the government want 20% growth in the Backbone fiber cables for SIPR and JWICs?

ANSWER: Yes.

1. The SOW (1.3.4.3 page 11, between the 2 charts) in the 1st sentence (and other places in the document) refers to NIPR drops as CAT6. Then in the third sentence it says Shielded CAT6 drops. Does the government want the NIPR drops in room 317-323 to be CAT6, or Shielded CAT6?

ANSWER: All NIPR Data/Voice cabling is to be installed in a shielded CAT6 configuration from patch panel to data port/wall plate. Face plates can be keystone type with a shielded port connector.

1. The SOW (1.3.4.3 page 8, second paragraph) refers to NIPR drops in a separate faceplate. Does the government want these drops to be CAT6, or Shielded CAT6, or CAT6e or Fiber OM3?

ANSWER: All NIPR Data/Voice cabling is to be installed in a shielded CAT6 configuration from patch panel to data port/wall plate. Face plates can be keystone type with a shielded port connector.

1. The SOW (1.3.4.3 page 10 last paragraph) refers to NIPR drops along the wall in a separate faceplate. Does the government want these drops to be CAT6, or Shielded CAT6, or CAT6e or Fiber OM3?

ANSWER: All NIPR Data/Voice cabling is to be installed in a shielded CAT6 configuration from patch panel to data port/wall plate. Face plates can be keystone type with a shielded port connector.

1. Does the government want any of the NIPR drops to be fiber drops?

ANSWER: No.

1. Data Switches are not mentioned in the SOW. Will the Data Switches be GFGI?

ANSWER: Data Switches will be Government provided and Government Installed.

1. Uninterruptible Power Supplies are not mentioned in the SOW. Will the UPS’s be GFGI?

ANSWER: Uninterruptible Power Supply (UPS) is mentioned in the SOW and shall be provided by the government and installed by the contractor.

1. Does the government want the contractor to store the Chatsworth Data Cabinet in Room 318 and use it in the new comm room that is being built in Room318?

ANSWER: Yes. Contractor shall relocate the existing Chatsworth Data Cabinet/rack in the new comms room being built in room 318.

1. The SOW refers to data racks in several sections of the SOW. Does the government want the contractor to provide open Data Racks for the two addition requirements in the new comm room?

ANSWER: Contractor shall verify that the existing government provided Data Racks are sufficient in size to the Chatsworth Data Cabinet in Room 318. If cabinets are too small or too big, then contractor shall provide two new cabinets compatible with Chatsworth Data Cabinet/rack.

1. The SOW refers to data racks in several sections of the SOW. Does the government want the contractor to provide enclosed data cabinets for the two addition requirements in the new comm room?

ANSWER: Contractor shall verify that the existing government provided Data Racks are sufficient in size to the Chatsworth Data Cabinet in Room 318. If cabinets are too small or too big, then contractor shall provide two new cabinets compatible with Chatsworth Data Cabinet/Rack.

1. Does the government what the contractor to provide fans for these cabinets?

ANSWER: If government provided network racks are not sufficient in size, then the contractor will provide new racks along with associated fans, cable management and power switches.

1. Does the government what the contractor to provide large vertical power strips for these cabinets?

ANSWER: No. Government will provide UPS and power strips.

1. Or does the government what the contractor to provide smaller horizonal power strips for these cabinets?

ANSWER: No. Government will provide UPS and power strips.

1. Does the government what the contractor to provide ground bar/strip for these cabinets?

ANSWER: Yes; contractor shall provide a ground bar.

1. Is an ISP container required for the Taclane?

ANSWER: No

1. Are secure filing cabinets required for this project? If yes, how many?

ANSWER: No

1. Are any CATV drops required for any of these rooms? If yes in what rooms? How many in each room?

ANSWER: 2 drops, room 317 and 320

1. Is a fiber optic Isolator required for the CATV Headend?

ANSWER: Yes.

1. With respect to the schedule 40 PVC with lock box on both ends. Does the government want 16-gauge lockable security boxes with an SG lock for each box of the 2 boxes for the SIPR/JWICs PVC?

ANSWER: They must be 14-guage and must have a cover that can be locked.

1. With respect to the schedule 40 PVC with lock box on both ends. Does the government want 16-gauge lockable security boxes with an SG lock for each box of the 2 boxes for the NIPR PVC?

ANSWER: Yes, please install above false ceiling at same location of SIPR / JWICS.

1. Will a new electrical panel be required for the new office spaces? Some of the existing offices are fed from electrical panels that are in the hallway. Is this acceptable?

ANSWER: A new electrical panel is required. A 208/120V, 225A, 3Ph, 4W tied in to the main distribution panel.

1. Will a new electrical panel be required for the sole use in the new communication room?

ANSWER: A new electrical panel is required. A 208/120V, 100A 3Ph, 4W with a manual shutoff switch

1. Will any of these panels be fed from a generator for back up power?

ANSWER: No.

1. Will a UPS system be required in the communication room?

ANSWER: Yes. Government will provide UPS for contractor to install

1. Will the new lighting requested, match the existing within the building, or is LED now required?

1. Can we use a floor mounted floor track for the conference room requirement, such as Connectrac?

ANSWER: Trenching is preferred. Contractor will be allowed to use a combination of trenching and some sort of wireway as long as it is under-carpet not just laying on top of the carpet, as that is a tripping hazard.

1. Does the new cable tray need to be the secured type or is an open type acceptable?

ANSWER: Open type is acceptable

1. Is there any Seismic requirement?

ANSWER: Unknown requirements.

1. What is the Deck to Deck measurement?

ANSWER: Approximately 15’-1 1/2”. Contractor shall verify field dimensions.

1. What is the Finish Floor to Finish Ceiling measurements?

ANSWER: Approximately 9’-9 1/4”. Contractor shall verify field dimensions.

1. Will the winning contractor be required to foil the floor?

ANSWER: No.

1. Page 5 SOW paragraph 3 you have it stated you want the contractor to install STC 50 rating 3070 steel door with STC 45 rating. Do you want STC 50 or STC 50 Doors?

ANSWER: Please reference the Door Schedule in APPENDIX (Concept Drawings) A provided with the package. As different rooms have different STC rating requirements.

1. On the site survey it was notice that the hallway wall where CMU Block, will the winning contractor have to match existing finish after double doors are removed?

ANSWER: Yes.

1. Information needed for Acoustic carpet. How thick is the concrete slab between floors?

ANSWER: Concrete slab is approximately 6”.

1. Will the office need to be sound tested?

ANSWER: Contractor shall follow UFC 4-010-05 paragraph 3-4.4 Sound Attenuation for testing.

1. Card access System. Is the site looking for a stand-alone Hirsch/Identiv system or are you look for a stand-alone system that works with Military CAC system?

ANSWER: Per the SOW, contractor stand-alone system compatible with Military CAC system. Stand-alone system must meet Section 889 compliance.

1. Will a Nicet 3 Certified Technician be required for the fire alarm install on this project?

ANSWER: No.

1. Are we following the new Communications Guide version 10 for isolation of Red Comm/Power?

ANSWER: SOW was written to meet the requirements of DIA for building of SCIFs.

1. Question #1-The government has provided/stated the ICD dated 2020 applies. Please provide direction as to what provisions apply to this project?

ANSWER: All provisions in ICD dated 2020 version 1.5, except chapters 4, 5 and 6 chapter.

1. Question #2-A controlled space is a six sided box. The demo plan indicates the room perimeter walls and exterior walls are to remain. How does the government intend on upgrade these walls with only having access to one side (single sided upgrade)?

ANSWER: Patching of the walls, re-carpeting, and new dividing wall and door will be required and must meet UFC 4-010-05.

1. Question #3-Will the government be providing a Lead and abatement report? If not please give clear direction as what the contractor shall carry for this part of the project.

ANSWER: Government will provide Lead and Asbestos report to winning contractor. Contractor is responsible for abatement plan and coordination with 802 CES/CEIE and notifications to the State.

1. Question #4-All new ceilings, floors and penetrations shall meet Tempest Requirements. There are many options when it comes to this requirement. Can the government give direction as to what is required? Please clarify if the level of Tempest shielding that is required or desired.

ANSWER: Foil backed drywall to walls that are the perimeter of the secure space. No foil carpet required. Metal secure vault doors entering, metal emergency door. Z duct or sound baffle on HVAC. Penetrations that are over 96 sq inches, barred. Inspection ports in HVAC.

1. Question #5-In regards to 01 33 16.00 10 Design after award, It includes HPSB (High Performance and sustainable building) guiding principle 01 33 29 sustainability reporting with 3rd party verification. This project has very little opportunity to leverage sustainable design. Is this truly required? Please clarify the government’s intent on this.

ANSWER: Yes.

1. Question #6-What are the working hours for this project?

ANSWER: 0630-1630 – M-F

1. Question #7-What are the clearance requirements for the onsite personnel?

ANSWER: Per UFC 4-010-05, all personnel working in this project must be U.S citizens. Vetting will be done by Security Forces.

1. Question #8- The solicitation states that the SSHO can be the QC manager but not the Superintendent. Can the government please confirm that they want 2 managers on site at all times?

ANSWER: One manager must be on site at all times.

1. Question #9-What is the commissioning requirements for this project? Does it have to be 3rd party?

ANSWER: Commissioning does not need to be done by a 3rd party. Prime contractor or subcontractor commissioning is acceptable. The contractor shall be require to coordinate with appropriate GOV POC for commissioning of the systems.

1. Question #10-Where will the modular furniture be stored during renovations? Is this the governments or contractors responsibility?

ANSWER: Contractor shall provide storage for modular furniture as indicated in SOW Section 01 11 00.10, paragraph 1.3.1

1. Question #11-Are there any wall backing requirements for items that will be installed on the walls after the renovation is complete?

ANSWERS: Yes. Fire rated ¾” plywood.

1. Question #12-Will the sprinkler heads need to be turned up during construction?

ANSWER: No

1. Question #13-What are the STC requirements for all HVAC grilles and returns?

ANSWER: Contractor shall follow UFC 4-010-05 paragraph 3-5.8 to 3-5.9.1 for all HVAC grilles and returns. Also contractor shall reference the SOW paragraph 1.3.4.4 Mechanical and install bars and Z-ducts or sound baffles to aid in the STC requirements.

1.

1.

1. Specification 01 30 00 Paragraph 1.7 says that one qualified superintendent must be present. Is a QC required for this contract?

ANSWER: Yes.

1. 2. The demolition scope states to remove the entire ceiling grid and light fixtures. New work includes new ceiling grid, but the scope of new work only states to provide new light fixtures for the new offices, so are the existing light fixtures being reinstalled in the remaining spaces?

ANSWER: Yes

1. 3. Are the existing supply diffusers and return air grills to be reused as much as possible or will new devices be required when the ceiling grid is replaced?

ANSWER: Reuse as much as possible.

1. 4. Will the existing drywall be removed and replaced?

ANSWER: Yes, foiling is required to meet ICT standards.

1. 5. Please provide the Manufacturers and associated Vendors for all special systems in Building 9225, including Fire Alarm, Security/Intrusion Detection/BMS, video surveillance (CCTV) and any existing “White Noise” systems in order to verify compatibility of any system(s) modifications and additions with the existing systems. Also, clarify if White Noise cancellation is desired above the listed false ceilings, or if Sound Masking is the preferred solution. White Noise, when amplified, can be irritating or distracting in an office environment.

ANSWER: Noise cancellation is required. Winning contractor will coordinate 802d SFS/SS POC to determine what systems are acceptable.

1. 6. Please confirm the statement in the SOW that all demolition and construction work may be accomplished during normal business hours and on weekdays.

ANSWER: Contractor shall accomplish all word during normal business hours, weekend work might be authorized.

1. 7. Although the SOW states that the suspended ceiling grid and tiles are to be replaced in all rooms, and that the existing light fixtures are to be removed in all rooms, the only rooms specifically described as having new light fixtures are Rooms 317, 318, 320 and 322. Are the existing light fixtures in Rooms 319, 321 and 323 to be removed, stored and reinstalled, or do these rooms require new light fixtures as well?

ANSWER: Contractor shall remove, store and reinstall all existing light fixtures and provide new fixtures for new rooms.

1. Will Rooms 315 – 323 be fully available for access at start of the project?

ANSWER: Yes

1. Will the building manager provide a secure area on the 3rd floor for temp storage of components that require re-installation?

ANSWER: Per the SOW, the contractor is to provide (locked) storage containers to store components and furniture. Some room available in rooms 317 and 320, but contractor shall not relay on that space to solely.

1. Please confirm the government requires disposal of all hardware / locks on the existing doors.

ANSWER: Contractor shall remove, store, and reinstall all Cipher locks.

1. Will the GC have use of the freight elevator for all debris and new material movement?

ANSWER: Yes

1. Will the GC be allowed to use the east end of the building’s parking area as a lay-down area?

ANSWER: Contractor shall be allowed to use grassy area past parking as bed down area. Ensure coordination with CE to fence in the area.

1. Is the acoustic ceiling in the hallway coming down and/or being replaced?

ANSWER: No. Ceiling tile replaced in rooms only 1.

1. 2. It says in the SOW that we are to replace existing receptacles and switches with new. The receptacles are to be GFI but no color is mentioned. Assuming that will be determined at a later date?

ANSWER: Correct. Color selection during design phase.

1.

1. 3. Other than the new receptacles being added, are the existing receptacles staying where they are?

ANSWER: Yes. Unless they are located in a new pathway/walkway, those will have to be relocated.

1.

1. 4. On the new outlets, can we use existing circuits in the room? We assume that the twist locks will be coming out of IT panel.

ANSWER: Yes 1.

1. 5. Two different things are mentioned about the tails for existing furniture…just want to verify that the furniture is going back the way it is now? Keeping the tail location, the same?

ANSWER: Rearrangement will be required in some of the rooms as new offices are been constructed. Rearrangement plans shall be developed during the design phase.

1. The Attachment 12 - Bldg 9225 Record Dwg Binder 20140711 does not match the Attachment 2 - Concept Drawings. Was there another renovation that the Government can provide Record Drawings from?

ANSWER: Work associated with this project is only depicted in Attachment 2 – Concept drawing ONLY.

1. The Attachment 12 - Bldg 9225 Record Dwg Binder 20140711 does not show any actual HVAC ductwork or indicate the HVAC equipment capacities. Are there older Record Drawings that can be provided for the project?

ANSWER: Drawings can be provided to winning contractor.

1. Are there CAD files of the facility that can be provided?

ANSWER: Yes. The winning contractor will get CAD files.

1. Will this project be required to comply with UFC 1-200-02?

ANSWER: Yes.

1. Will Life Cycle Cost Analysis be required for any portion of this project?

ANSWER: No

1. Will any of the building envelopes be required to be upgraded to meet UFC 1-200-02 requirements?

ANSWER: No

1. Will air barrier testing be required?

ANSWER: No

1. RFP Attachment 1 para 1.3.4.4 “Mechanical” indicates that the “contractor shall retrofit the existing HVAC duct work to accommodate new offices built within the space in rooms 317, 318, 320, and 322.” Please clarify that the HVAC ductwork retrofit is to include all new spaces created by the new partitions shown in Attachment 2 Sheet A-102 within the existing boundaries of these room numbers as defined by Attachment 2 Sheet A-101. The intent of question is to confirm which new rooms shown on A-102 are to get the retrofitted HVAC ductwork.

ANSWER: All new offices and the new TR room as shown in the concept drawings.

1. Please confirm expected use and occupancy of each of the 11 new spaces created by the new partitions shown on RFP Attachment 2 Sheet A-102. The RFP alludes to these spaces being “offices”, however, one space appears to be a new TR Room.

ANSWER: New Offices and a new TR room

1. The RFP does not indicate the need for a separate HVAC system for what appears to be a new TR room created within Room 318. Will the Government require a separate HVAC system for this space?

ANSWER: No need for a separate HVAC system for the TR room. Contractor will retrofit existing HVAC ductwork to provide air supply and return to new rooms and also balance the system flow AC/Heat to property gauge different types and parts of the space.

1. RFP Attachment 1 para 1.3.4.4 “Mechanical” indicates that the “contractor shall retrofit the existing HVAC duct work to accommodate new offices built within the space in rooms 317, 318, 320, and 322.” The Attachment 12 record drawings (M1.1 and M3.1) showing existing supply and return air devices in these spaces; however, there is no duct size and routing indicated. Will the Government provide an as-built of the existing duct sizes and routing that enter this space so that required duct modification and TEMPEST envelope penetration requirements can be determined?

ANSWER: Work associated with this project is only depicted in Attachment 2 – Concept drawing. The winning contractor shall only reference Attachment 2 – concept drawings for this project. The winning contractor will receive drawings from previous projects.