Attachment 10 - Lead Based Paint Report.pdf

PDF 20 KB Posted

Attached to
MPLS208151 - Renovate Controlled Area, Building 9225 Federal contract opportunity
Solicitation number
FA301621B0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This solicitation is for a design-build renovation project of a controlled area located at Joint Base San Antonio Lackland Air Force Base. The project magnitude is between $500,000 to $1,000,000 and is set aside for women-owned small businesses. The solicitation closing date is for offers to be submitted to the Department of the Air Force's Air Education and Training Command. The construction work will be governed by the Construction Wage Rate Requirement and General Decision Number TX20210231 for building construction projects effective January 1, 2021. Offerors must complete the necessary proposal documentation, certifications, and representations in sections A, B, I, and K of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to MPLS208151 - Renovate Controlled Area, Building 9225, newest first.
File Type Posted
Site Visit Questions - Renovate Controlled Area - 26Mar2021.pdf PDF
Attachment 14 - Revised Wage Determination.pdf PDF
Attachment 01 - Revised Statement of Work 26 March 2021.pdf PDF
Attachment 04 - Revised Patch Panel and Multiple Input-Output (MIO)_Zone Boxes (Appendix D).pdf PDF
Attachment 7 - Revised Submittal Register 20210326.pdf PDF
Attachment 18 - Partial Mech.pdf PDF
FA301621B00010003.pdf PDF
Attachment 02 - Revised Concept Drawings (Appendix A).pdf PDF
Attachment 16 - Section L - Instructions to Offerors Rev 26Mar2021.pdf PDF
Attachment 19 - MEP Record Drawings.pdf PDF
Site Visit Questions - Renovate Controlled Area - ANSWERED.docx DOCX document
FA301621B00010002.pdf PDF
FA301621B00010001.pdf PDF
FA301621B0001.pdf PDF
Attachment 09 - Asbestos Report.pdf PDF
Attachment 16 - Section L - Instructions to Offerors.pdf PDF
Attachment 05 - CAD_Templates_and_Reqs.zip ZIP file
Attachment 07 - Submittal Register.pdf PDF
Attachment 08 - DD1354.pdf PDF
Attachment 14 - Wage Determination.pdf PDF
Attachment 2 - Concept Drawings.pdf PDF
Attachment 03 - Labeling.pdf PDF
Attachment 11 - General Requirement for Obtaining Waste Manifest.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 04 - Patch Panel and Multiple Input-Output (MIO)_Zone Boxes.pdf PDF
Attachment 06 - Installation Guidelines.pdf PDF
Attachment 12 - Bldg 9225 Record Dwg Binder 20140711.pdf PDF
Attachment 13 - Climatological Data 2019 - 2020.pdf PDF
Attachment 15 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 17 - Section M - Evaluation Factors for Award.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lead Based Paint Detected:

Administrative

AFB LBP Inventory

Square Footage: 11571

Number of Floors: 3

100.jpg

Drawing File Name:

View Drawing

Facility Status: Manned

PhotoUnavailable.jpg

Photo File Name

Date Constructed: 1961

Facility Number: Facility Name:9225 37 TRSS

Facility Owner: 502 CE

Facility Type

Facility Address: 1220 Truemper St.

Facility Summary Report:

None

Facility Site: JBSA Lackland

Facility Comments:

LBP Report File Name(s):

2018-07-14_LAK9225_InstallMo

Date User Comment

5/28/2020 elv W7540904 Assess 3rd floor for relocation of AFPC personnel. All areas are Negative for Lead Based Paint. Areas that are hidden behind walls are to be assumed positive unless proven otherwise by EPA approved methods.

7/10/2018 elv Work Order 47442 Assess - Mount Brackets for Installation of monitors. All surfaces throughout all rooms are negative for Lead Based Paint. The following rooms were assessed.

211,213,215,216,snd roomd 218

Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

9225Lead Based Paint Samples for Facility

1 5/18/2020 0 0320 A Upper Wall Asphalt orange Intact Negative

2 5/18/2020 0 0320 B Upper Wall Drywall white Intact Negative

3 5/18/2020 0 0320 D Upper Wall Drywall white Intact Negative

4 5/18/2020 0 0320 C Upper Wall Drywall white Intact Negative

5 5/18/2020 0 0321 A Upper Wall Drywall green Intact Negative

6 5/18/2020 0 0321 B Upper Wall Drywall green Intact Negative

7 5/18/2020 0 0321 C Upper Wall Drywall white Intact Negative

8 5/18/2020 0 0322 D Upper Wall Drywall ora ge Intact Negative

9 5/18/2020 0 0322 D Upper Wall Drywall ora ge Intact Negative

10 5/18/2020 0 0322 B Upper Wall Drywall white Intact Negative

10/19/2020 03:44 PM Page 1 of 3

Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

9225Lead Based Paint Samples for Facility

11 5/18/2020 0 0322 C Upper Wall Drywall white Intact Negative

12 5/18/2020 0 0322 C Upper Wall Drywall white Intact Negative

13 5/18/2020 0 0323 A Upper Wall Drywall green Intact Negative

14 5/18/2020 0 0323 B Upper Wall Drywall white Intact Negative

15 5/18/2020 0 0323 C Upper Wall Drywall white Intact Negative

16 5/18/2020 0 0323 C Upper Wall Drywall white Intact Negative

17 5/18/2020 0 0323 D Upper Wall Drywall white Intact Negative

18 5/18/2020 0 0323 B Upper Wall Drywall white Intact Negative

19 5/18/2020 0 0319 C Upper Wall Drywall white Intact Negative

20 5/18/2020 0 0319 D Upper Wall Drywall white Intact Negative

21 5/18/2020 0 0318 A Upper Wall Drywall orange Intact Negative

22 5/18/2020 0 0318 A Upper Wall Drywall orange Intact Negative

23 5/18/2020 0 0318 B Upper Wall Drywall white Intact Negative

24 5/18/2020 0 0318 C Upper Wall Drywall white Intact Negative

25 5/18/2020 0 0317 A Lower Wall Drywall white Intact Negative

26 5/18/2020 0 0317 B Lower Wall Drywall white Intact Negative

27 5/18/2020 0 0317 C Lower Wall Drywall green Intact Negative

28 5/18/2020 0 0317 D Lower Wall Drywall white Intact Negative

29 5/18/2020 0 0317 C Lower Wall Support Concrete green Intact Negative

30 5/18/2020 0 0317 C Lower Wall Support Concrete green Intact Negative

6 7/11/2018 0 0215 C Upper Wall Concrete Blue Solid Negative

7 7/11/2018 0 0215 A Upper Wall Concrete Blue Solid Negative

8 7/11/2018 0 0213 A Upper Wall Concrete Blue Solid Negative

9 7/11/2018 0 0213 C Upper Wall Concrete Blue Solid Negative

10 7/11/2018 0 0216 A Upper Wall Concrete Blue Solid Negative

11 7/11/2018 0 0216 A Upper Wall Concrete Blue Solid Negative

12 7/11/2018 0 0212 A Upper Wall Concrete Blue Solid Negative

13 7/11/2018 0 0212 C Upper Wall Concrete Blue Solid Negative

14 7/11/2018 0 0218 C Upper Wall Concrete Blue Solid Negative

15 7/11/2018 0 0218 A Upper Wall Concrete Blue Solid Negative

16 7/11/2018 0 0211 A Upper Wall Concrete Blue Solid Negative

17 7/11/2018 0 0211 C Upper Wall Concrete Blue Solid Negative

10/19/2020 03:44 PM Page 2 of 3

10/19/2020 03:44 PM Page 3 of 3

File details come from the government source that posted it. Updated .