Attachment 04 - Patch Panel and Multiple Input-Output (MIO)_Zone Boxes.pdf

PDF 212 KB Posted

Attached to
MPLS208151 - Renovate Controlled Area, Building 9225 Federal contract opportunity
Solicitation number
FA301621B0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This solicitation is for a design-build renovation project of a controlled area on Joint Base San Antonio Lackland Air Force Base. The project magnitude is between $500,000 and $1,000,000. This acquisition is set aside for women-owned small businesses and requires offerors to be certified through the WOSB Program Repository. Offerors must complete various SF 1442 proposal sections including providing unit pricing for contract line items and signing block 20b. Complete proposals and supporting documentation must address the requirements in the solicitation instructions. The Construction Wage Rate Requirements apply according to General Decision Number TX20210231 Building. The Department of the Air Force Air Education and Training Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to MPLS208151 - Renovate Controlled Area, Building 9225, newest first.
File Type Posted
Site Visit Questions - Renovate Controlled Area - 26Mar2021.pdf PDF
Attachment 01 - Revised Statement of Work 26 March 2021.pdf PDF
Attachment 04 - Revised Patch Panel and Multiple Input-Output (MIO)_Zone Boxes (Appendix D).pdf PDF
Attachment 7 - Revised Submittal Register 20210326.pdf PDF
Attachment 18 - Partial Mech.pdf PDF
Attachment 14 - Revised Wage Determination.pdf PDF
FA301621B00010003.pdf PDF
Attachment 02 - Revised Concept Drawings (Appendix A).pdf PDF
Attachment 16 - Section L - Instructions to Offerors Rev 26Mar2021.pdf PDF
Attachment 19 - MEP Record Drawings.pdf PDF
Site Visit Questions - Renovate Controlled Area - ANSWERED.docx DOCX document
FA301621B00010002.pdf PDF
FA301621B00010001.pdf PDF
FA301621B0001.pdf PDF
Attachment 09 - Asbestos Report.pdf PDF
Attachment 10 - Lead Based Paint Report.pdf PDF
Attachment 16 - Section L - Instructions to Offerors.pdf PDF
Attachment 2 - Concept Drawings.pdf PDF
Attachment 03 - Labeling.pdf PDF
Attachment 11 - General Requirement for Obtaining Waste Manifest.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 05 - CAD_Templates_and_Reqs.zip ZIP file
Attachment 07 - Submittal Register.pdf PDF
Attachment 08 - DD1354.pdf PDF
Attachment 14 - Wage Determination.pdf PDF
Attachment 06 - Installation Guidelines.pdf PDF
Attachment 12 - Bldg 9225 Record Dwg Binder 20140711.pdf PDF
Attachment 13 - Climatological Data 2019 - 2020.pdf PDF
Attachment 15 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 17 - Section M - Evaluation Factors for Award.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Patch Panel (PP) and Multiple Input-Output (MIO)/Zone Boxes

To maintain interchangeability, ensure compatibility and support migration to higher-data-rate currently being incorporated into the datacenter, Corning’s Universal polarity method (or technical equivalent) will be used throughout classified networks on JBSA for all new installs.

New installs will use Corning OM3/OM4 Universal Plug & Play™ Closet Connector Housings

(CCH) Modules for Secure Solutions or for high-density requirements, Pretium EDGE®

Modules for Secure Solutions (or technical equivalent). Utilizing RED LC connector for SIPRNet circuits, YELLOW LC connector for JWICS circuits (see Installation Guidelines for applicable situations).

All MIO/Zone boxes will be compatible with the applicable modules referenced above (see

Installation Guidelines for applicable situations).

File details come from the government source that posted it. Updated .