Tyndall AFB Final_SWPPP_Jan07.pdf

PDF 11 MB Posted

Attached to
Tyndall AFB Civil Engineering Operations Services
Solicitation number
FA3002-10-R-0059
Issued by

About this file

Additional documents for the Technical Library - Storm Pollution Prevention Plan for Tyndall AFB FL

View the file

Other files

File Type Posted
Atch 5 -Tyndall Cost Price Model 15 May 12.xlsx XLSX spreadsheet
Amendment 0011.pdf PDF
11 05 TYN Operations Workload Appendix 11B Appendix amendment0011.pdf PDF
11 05 TYN Operations Workload Appendix 11B Appendix amendment0010.docx DOCX document
SilverFlag_ArchE.pdf PDF
FA3002-10-R-0059-0010.docx DOCX document
CONFORMED COPY AFTER AMENDMENT 09.docx DOCX document
GroundsMx_AllAreas_93x36_halloween 20(2) 1 .pdf PDF
FA3002-10-R-0059-0009.docx DOCX document
FA3002-10-R-0059-0008.docx DOCX document
Summary of Changes Amendment0008.docx DOCX document
00 00b TYN Table of Contents amendment0008.pdf PDF
11 05 TYN Operations Workload Appendix 11B Appendix amendment0008.pdf PDF
Conformed Copy after Amendment 08.docx DOCX document
FA3002-10-R-0059-0007.docx DOCX document
Final Answers posted on 3 Nov 11.xlsx XLSX spreadsheet
11 03 TYndall General Information 11-3 amendment 0006.pdf PDF
02 17 TYN All Services Acronyms Appendix 2G amendment 0006.pdf PDF
11 14 TYN Operations GFP ADPE Appendix11FE Amendment 0006.pdf PDF
FA3002-10-R-0059-0006.docx DOCX document
11 10 TYN Operations GFP Facilities Appendix 11FA Amendment 0006.pdf PDF
Summary of Changes Amendment0006.docx DOCX document
11 11 TYN Operations GFP EAID Appendix 11FB Amendment 0006.pdf PDF
11 15 TYN Operations GFP Vehicles Appendix 11FFAmendment 0006.pdf PDF
02 04 TYN All Services Publications Appendix 2A amendment 0006.pdf PDF
11 07 TYN Operations Reqd Reports Appendix 11Damendment 0006.pdf PDF
02 01 TYN All Services Description of Services 2-1 26 Amendment 0006.pdf PDF
11 05 TYN Operations Workload Appendix 11B Appendix amendment0006.pdf PDF
FA3002-10-R-0059-0005.docx DOCX document
BASH_Plan_910_2010 final.pdf PDF
Support Agreements.zip ZIP file
TAFBI32-1004.pdf PDF
FY 12 sign page.pdf PDF
PMP FY 12.docx DOCX document
Answers posted on 28 Oct 11.xlsx XLSX spreadsheet
Water Notional PODS.doc DOC document
FA3002-10-R-0059-0004.docx DOCX document
Appendix B Base Irrigation Systems.pdf PDF
Critical Facility List.xlsx XLSX spreadsheet
FA3002-10-R-0059-0003.docx DOCX document
Atch 5 -Tyndall Cost Price Model 27 Oct 11.xlsx XLSX spreadsheet
Answers posted on 27 Oct 11.xlsx XLSX spreadsheet
FA3002-10-R-0059-0002.docx DOCX document
DD254.pdf PDF
Atch 5 -Tyndall Cost Price Model 19 Oct 11.xlsx XLSX spreadsheet
Annual RWP Report.txt TXT text file
Real Property Listing.xlsx XLSX spreadsheet
Answers Posted on 22 Oct 11.xlsx XLSX spreadsheet
Comments-Questions-19 Oct 2011.pdf PDF
List of Attendees for Posting.docx DOCX document
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stormwater Pollution Prevention Plan for Tyndall Air Force Base

January 2007

ES102006014GNV

FINAL

FRONT PAGES

REVISION 0

JANUARY 2007

PAGE I OF VIII

WPB310127161417.DOC/063530015 FINAL TYNDALL AFB

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

Principal Executive Officer

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations (Part VII.G.1.c.).

PAGE II OF VIII

This page intentionally left blank.

PAGE III OF VIII

Contents

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

Section Page

Acronyms and Abbreviations ........................................................................................... vii of viii

1. Introduction.................................................................................................................... 1 of 4

1.1 Overview and Purpose ......................................................................................1 of 4

1.2 Regulatory Overview.........................................................................................2 of 4

1.2.1 Sector A: Timber Product Facilities ....................................................3 of 4

1.2.2 Sector K: Hazardous Waste Treatment, Storage, or Disposal

Facility.....................................................................................................3 of 4

1.2.3 Sector N: Scrap Recycling and Waste Recycling Facilities ..............3 of 4

1.2.4 Sector Q: Ship and Boat Building or Repairing Yards .....................3 of 4

1.2.5 Sector S: Air Transportation Facilities ................................................3 of 4

1.3 SWPPP Organization .........................................................................................3 of 4

2. Stormwater Pollution Prevention Team ................................................................... 1 of 4

2.1 Introduction.........................................................................................................1 of 4

2.2 Team Members and Responsibilities...............................................................1 of 4

2.2.1 Team Leader, Program Manager for Stormwater Management ....1 of 4

2.2.2 Chief, Environmental Compliance......................................................2 of 4

2.2.3 Environmental Coordinator, 325th Maintenance Group.................2 of 4

2.2.4 QA from CE............................................................................................3 of 4

2.3 Unit Environmental Coordinators ...................................................................3 of 4

3. Drainage Characteristics and Outfall Descriptions.............................................. 1 of 14

3.1 Base Characteristics..........................................................................................1 of 14

3.2 Receiving Waters ..............................................................................................1 of 14

3.3 Drainage Areas and Outfall Description.......................................................1 of 14

3.3.1 Outfall A ...............................................................................................1 of 14

3.3.2 Outfall B................................................................................................4 of 14

3.3.3 Outfall C ...............................................................................................5 of 14

3.3.4 Outfall D ...............................................................................................7 of 14

3.3.5 Outfall E................................................................................................8 of 14

3.3.6 Outfall F ..............................................................................................10 of 14

3.3.7 Outfall G .............................................................................................11 of 14

3.3.8 Other Areas ........................................................................................12 of 14

3.3.9 Summary ............................................................................................12 of 14

4. Description of Industrial Activities ......................................................................... 1 of 14

4.1 Aircraft and Vehicle Storage, Maintenance, and Fueling ...........................1 of 14

4.1.1 Bulk Fuel Storage.................................................................................4 of 14

4.2 Installation Restoration Program ...................................................................6 of 14

4.3 Significant Material Inventory........................................................................7 of 14

PAGE IV OF VIII

Contents, Continued

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

Section Page

4.4 Non-Stormwater Discharge and Illicit Connections .................................10 of 14

4.5 Oil/Water Separators ....................................................................................11 of 14

4.6 Significant Spills and Leaks ..........................................................................14 of 14

5. Stormwater Management Plan ................................................................................... 1 of 6

5.1 Introduction.........................................................................................................1 of 6

5.2 Best Management Practices...............................................................................1 of 6

5.2.1 Spill Prevention and Response ............................................................1 of 6

5.2.2 Personnel Training Program................................................................2 of 6

5.2.3 Sedimentation and Erosion Control ...................................................2 of 6

5.2.4 Material Inventory and Tracking ........................................................2 of 6

5.2.5 Facility Security .....................................................................................2 of 6

5.2.6 Good Housekeeping .............................................................................3 of 6

5.2.7 Preventive Maintenance .......................................................................5 of 6

5.2.8 Visual Inspections .................................................................................5 of 6

5.2.9 Runoff Management .............................................................................5 of 6

5.3 Advanced BMPs .................................................................................................5 of 6

6. Stormwater Sampling................................................................................................... 1 of 2

7. Implementation and Recordkeeping......................................................................... 1 of 2

7.1 Introduction.........................................................................................................1 of 2

7.2 Recordkeeping and Reporting..........................................................................1 of 2

7.2.1 Procedure................................................................................................1 of 2

7.2.2 Stormwater Log Sheet and Inspection Checklist ..............................1 of 2

7.2.3 Annual Compliance Inspection...........................................................2 of 2

8. Annual SWPPP Review Guidance ............................................................................. 1 of 2

8.1 Annual Section Reviews....................................................................................1 of 2

8.1.1 Section 2 ..................................................................................................1 of 2

8.1.2 Section 3 ..................................................................................................1 of 2

8.1.3 Section 6 ..................................................................................................1 of 2

PAGE V OF VIII

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

Appendices

A Tyndall AFB SWPPP Maps B Tyndall AFB Notice of Intent and Multi-Sector “S” Permit for Stormwater Discharges

Associated with Industrial Activity C Sector N – Exemption Letter to FDEP D Photo Documentation E Storage Tank Inventory F Non-Storm Discharge Certification Sheets G Spills Inventory H Sampling Exemption Letter I Annual Comprehensive Site Compliance Evaluation

Tables

2-1 Tyndall Air Force Base Stormwater Pollution Prevention Team ............................ 3 of 4

3-1 Stormwater Outfall Informationa ..............................................................................13 of 14

4-1 Storage, Maintenance, Fueling and Defueling Buildings ....................................... 1 of 14 4-2 List of ASTs in POL 6000 and POL 400 Areas .......................................................... 4 of 14 4-3 List of Buildings used for Bulk Storage..................................................................... 6 of 14 4-4 List of IRP Sites ............................................................................................................. 7 of 14 4-5 Outdoor Storage Areasa..............................................................................................10 of 14

Exhibits

3-1 Outfall A Drainage Area, Adjacent to Florida Avenue........................................... 3 of 14 3-2 Outfall A Canal, Adjacent to Florida Avenue .......................................................... 3 of 14 3-3 Outfall B Drainage Area North of Perimeter Road ................................................. 5 of 14 3-4 Outfall C Drainage Area - #1 Located on a Perimeter Road East of

Taxiway "F".................................................................................................................... 6 of 14 3-5 Outfall C Drainage Area - #2 Located on a Perimeter Road East of

Taxiway "F".................................................................................................................... 7 of 14 3-6 Outfall D Discharging into St. Andrew Sound ........................................................ 8 of 14 3-7 Outfall D south end leading to St. Andrew Sound.................................................. 8 of 14 3-8 Outfall E Concrete Gutter Leading to Swale on Fuels Avenue ............................10 of 14 3-9 Outfall E Across From 400 Area, on Fuels Avenue ................................................10 of 14 3-10 Outfall F to Shoal Point Bayou From Inside POL 6000 ..........................................11 of 14 3-11 Outfall G Area, Located at the Northeast Corner of the Base ...............................12 of 14

PAGE VI OF VIII

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

Exhibits

4-1 Fueling Station Area 400.............................................................................................. 2 of 14 4-2 Pumping Station at Area 400 ...................................................................................... 3 of 14 4-3 Fueling Station at Area 9000 ....................................................................................... 3 of 14 4-4 Building 323 Jet Engine Test Cell ............................................................................... 4 of 14 4-5 2,000-Gallon Used Oil Behind Hangar 1 ................................................................... 5 of 14 4-6 Building 256 Drone Maintenance Covered Storage ................................................ 7 of 14 4-7 Bui 256 Drone Maintenance Drain to OWS .............................................................. 8 of 14 4-8 Area 9000 Storage Next to Bulding 9310................................................................... 8 of 14 4-9 Building 267 AGE Equipment Staging Yard ............................................................ 9 of 14 4-10 Building 323 Outside Storage ..................................................................................... 9 of 14 4-11 Area 6000 OWS for Fuel Stands.................................................................................12 of 14 4-12 Building 256 Drone Maintenance OWS....................................................................12 of 14 4-13 OWS Behind Building 561, Vehicle Maintenance ...................................................13 of 14 4-14 Building 316 Fuel Barn OWS .....................................................................................13 of 14

5-1 Area 6000 Spill Kit .......................................................................................................... 1 of 6 5-2 Building 559 Storage Area............................................................................................. 3 of 6

PAGE VII OF VIII

Acronyms and Abbreviations

AAFES Army & Air Force Exchange Service AF-EMIS Air Force - Environmental Management Information System AFB Air Force Base (Tyndall) AFFF Aqueous Film Forming Foam asl Above sea level AST Aboveground Storage Tank AUL Authorized User List AVGAS Aviation Gasoline BMP Best Management Practices BRA Baseline Risk Assessment CERCLA Comprehensive Environmental Response, Compensation, and

Liability Act CFR Code of Federal Regulations CSCE Comprehensive Site Compliance Evaluation CWA Clean Water Act DOCS Drive On Containment System DOD U.S. Department of Defense DOT U.S. Department of Transportation EPA United States Environmental Protection Agency ERA Environmental Restoration Account ETL Engineering Technical Letter F.A.C. Federal Administrative Code FDEP Florida Department of Environmental Protection FR Federal Register FRP Facility Response Plan F.S. Florida Statute ft2 Square feet gpd Gallons per day HAZMAT Hazardous materials HAZMO Hazardous Materials Management Office IAA Inter-Agency Agreement IRP Installation Restoration Program JP-8 Jet Petroleum LUCIP Land Use Constraints/Control Implementation Plan

PAGE VIII OF VIII

Acronyms and Abbreviations, Continued

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

LUCAP Land Use Constraints/Control Assurance Plan MAP Management Action Plan MOGAS Motor vehicle gasoline MS4 Municipal Separate Storm Sewer MSDS Material Safety Data Sheet MSGP Multi-Sector Generic Permit NDI Non-destructive inspection NFRAP No Further Action Planned NPDES National Pollutant Discharge Elimination System NPL National Priorities List OWS Oil/Water Separator POL Petroleum, oil, and lubricant RI/FS Remedial Investigation/Feasibility Study RQ Reportable Quantity SPCCP Spill Pollution Control and Countermeasure Plan SWPPP Stormwater Pollution Prevention Plan SWPPT Stormwater Pollution Prevention Team TDY Temporary duty TSDF Treatment, storage, or disposal facility UEC Unit Environmental Coordinator UST Underground Storage Tank(s) WWTP Wastewater Treatment Plant

SECTION 1

1. Introduction

1.1 Overview and Purpose

Tyndall Air Force Base (AFB) is located in Bay County, Florida, southeast of Panama City. It occupies approximately 28,000 acres on a narrow 16-mile long peninsula bordered by St.

Andrew Bay and East Bay to the north, and the Gulf of Mexico and St. Andrew Sound to the west. This location is shown graphically in Figure A-1 of Appendix A. The topography of Tyndall AFB is relatively flat with a rise to a maximum of approximately 30 feet above sea level (asl).

The purpose of this Stormwater Pollution Prevention Plan (SWPPP) is to assist Tyndall AFB in complying with their stormwater permit. The primary aim of this document is to serve as a guide for the base personnel who are responsible for ensuring that there is minimal stormwater pollution as a result of industrial activities on the base. This document also refers to stormwater management practices that the personnel at the base should follow for minimal exposure of contaminants to the stormwater.

The process of developing a SWPPP includes the following four steps:

1. Formation of a team of qualified personnel who will be responsible for preparing the plan and assisting the Stormwater Team Leader in its implementation.

2. Assessment of potential stormwater pollution sources.

3. Selection and implementation of appropriate practices and controls.

4. Periodic evaluation of the effectiveness of the plan to prevent stormwater contamination and comply with the terms and conditions of this permit.

Tyndall AFB is currently operating under the Multi-Sector Generic Permit (MSGP) (Facility ID: FLR05C304) issued by the Florida Department of Environmental Protection (FDEP) on June 19, 2006. The MSGP was issued under the provisions of Section 403.0885, Florida Statutes, and applicable rules of the Florida Administrative Code (F.A.C.). This plan has been developed in accordance with the MSGP permit.

Tyndall AFB is permitted under the Industrial Sector “S,” Air Transportation Facilities, of the National Pollutant Discharge Elimination System (NPDES) to operate facilities and discharge stormwater to surface waters. A copy of the MSGP permit is provided in Appendix B. The updated Tyndall AFB SWPPP is prepared in compliance with the Florida MSGP. It documents stormwater management practices at the base and will serve as a guide for the base personnel who are responsible for ensuring that the potential for stormwater contamination is minimized.

1.2 Regulatory Overview

In 1972, the Federal Water Pollution Control Act, also referred to as the Clean Water Act (CWA), was amended to provide that the discharge of pollutants to waters of the United States from any point source is effectively prohibited, unless the discharge is in compliance with the NPDES permit. In October 2000, the U.S. Environmental Protection Agency (EPA) authorized the FDEP to implement the NPDES stormwater permitting program in the State of Florida (in all areas except Indian Country lands). FDEP’s authority to administer the NPDES program is set forth in Section 403.0885, Florida Statutes (F.S.). The NPDES stormwater program regulates point source discharges of stormwater into surface waters of the State of Florida from certain municipal, industrial, and construction activities. As the NPDES stormwater permitting authority, FDEP is responsible for promulgating rules and issuing permits, managing and reviewing permit applications, and performing compliance and enforcement activities.

The NPDES stormwater permitting program is separate from the State of Florida’s stormwater/environmental resource permitting programs (found under Part IV, Chapter 373, F.S. and Chapter 62-25, F.A.C. and local stormwater/water quality programs, which have their own regulations and permitting requirements.

The sources of stormwater discharges regulated under the NPDES program fall into three categories. Follow the links below for more information on each:

• Industrial Activity http://www.dep.state.fl.us/water/stormwater/npdes/industrial1.htm

• Construction Activity http://www.dep.state.fl.us/water/stormwater/npdes/construction1.htm

• Municipal Separate Storm Sewer Systems http://www.dep.state.fl.us/water/stormwater/npdes/MS4_1.htm

This SWPPP is developed for compliance with the above Industrial Activity category for the NPDES program and does not address Construction Activity, Municipal Separate Storm Sewers (MS4s), or the State of Florida Stormwater Permitting found in Chapter 62-25, F.A.C.

Though EPA has modified the NPDES MSGP for Industrial Activities, the State of Florida is authorized to implement and has adopted the 1995 MSGP (Vol. 65 FR No. 83, p. 25123). The MSGP regulations require that a facility obtain permit coverage if there is stormwater discharge associated with industrial activity and the discharge is either directly to surface waters or indirectly through MS4s. The Federal Register (FR), Volume 60 No. 189, defines the industrial activities covered by the MSGP. The State of Florida MSGP for Stormwater Discharge Associated with Industrial Activity divides the regulated industrial activities into 30 sectors of related activity and specifies both general and sector-specific requirements for each. The permit, developed by EPA and then adopted and renamed by FDEP in October 2000, consists of the original 1995 issuance and the subsequent modifications and corrections.

The following is a list of base activities which were analyzed to determine if they should be permitted under any of the Sectors of the MSGP.

WPB310127161417.DOC/063530015 FINAL TYNDALL AFB

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY http://www.dep.state.fl.us/water/stormwater/docs/npdes/403_0885.pdf http://www.dep.state.fl.us/water/stormwater/docs/npdes/ch373.pdf http://www.dep.state.fl.us/water/stormwater/docs/npdes/ch373.pdf http://www.dep.state.fl.us/legal/legaldocuments/rules/surfacewater/62-25.pdf http://www.dep.state.fl.us/water/stormwater/npdes/industrial1.htm http://www.dep.state.fl.us/water/stormwater/npdes/construction1.htm http://www.dep.state.fl.us/water/stormwater/npdes/MS4_1.htm

• Timber Product Facilities (Sector A)

• Hazardous Waste Treatment, Storage, or Disposal Facilities (Sector K)

• Scrap Recycling and Waste Recycling Facilities (Sector N)

• Ship and Boat Building or Repairing Yards (Sector Q)

• Air Transportation Facilities (Sector S)

1.2.1 Sector A: Timber Product Facilities

Tyndall AFB conducts several non-point source silvicultural activities such as timber harvesting operations, site preparation, road construction, and controlled burns. In accordance with 40 Code of Federal Regulations (CFR) 122.27(b), point sources that must be covered by an NPDES permit are “any discernible, confined and discrete conveyance related to rock crushing, gravel washing, log sorting, or log storage facilities, which are operated in connection with silvicultural activities and from which pollutants are discharged directly into waters of the United States.” Discharges from non-point source silvicultural activities are not required to be covered. Therefore, these activities are not covered in this SWPPP.

1.2.2 Sector K: Hazardous Waste Treatment, Storage, or Disposal Facility Tyndall AFB generates hazardous waste during many of its operations. However, Tyndall does not meet the definition of a treatment, storage, or disposal facility (TSDF) in 40 CFR 264 because the waste is sent offsite to a TSDF within 90 days of collection. Because Tyndall does not meet the definition of a TSDF under this sector, this sector’s requirements are not addressed as part of this SWPPP. However, Tyndall accumulates its generated hazardous waste in a manner to prevent contact between stormwater and the waste. These BMPs are listed in Tyndall’s Hazardous Waste Management Plan, found in the CEV office.

1.2.3 Sector N: Scrap Recycling and Waste Recycling Facilities Tyndall is operating a Recycling Facility; however, the stormwater discharge for this site is to an open field and not to any State or U.S. waters, and not to an MS4. This was clarified to FDEP on December 16, 2002, and the documentation is presented in Appendix C. Due to this discharge situation, Sector N requirements are not included in the SWPPP.

1.2.4 Sector Q: Ship and Boat Building or Repairing Yards

Tyndall has two marinas, Bonita Bay and Beacon Beach. These marinas will be treated with a separate permit and SWPPP if needed and will not be addressed herein.

1.2.5 Sector S: Air Transportation Facilities

Tyndall meets the definition of this sector and obtained permit coverage under this sector in June 19, 2006. This SWPPP is developed as per the requirements of Sector S of the MSGP.

1.3 SWPPP Organization

This SWPPP is organized as follows:

Section 1 – Introduction briefly describes Tyndall AFB and the regulatory background.

Section 2 – Stormwater Pollution Prevention Team lists the members of the SWPP Team (SWPPT). These individuals are responsible for stormwater pollution prevention at Tyndall

AFB.

Section 3 – Drainage Characteristics and Outfall Descriptions provides a general description of Tyndall AFB including the drainage system and stormwater outfalls.

Section 4 – Description of Industrial Activities provides a description of the various industrial activities at the base that affect stormwater quality.

Section 5 - Stormwater Management Plan lists and describes the Best Management Practices (BMPs) and guidelines to reduce stormwater pollution at the base. These guidelines include good housekeeping, preventive maintenance, visual inspections, spill prevention and response, sediment and erosion control, and employee training.

Section 6 – Stormwater Sampling describes the stormwater outfall sampling plan.

Section 7 – Implementation and Recordkeeping lists the procedures to be used to implement the plan.

Appendix A provides a map of the entire site, as well as figures depicting Outfalls A through G and their current conditions.

Appendix B is a copy of the Tyndall AFB Notice of Intent and Multi-Sector “S” Permit for Stormwater Discharges Associated with Industrial Activity.

Appendix C includes the Sector N – Exemption Letter to FDEP.

Appendix D provides photo documentation of the site.

Appendix E provides a copy of the Storage Tank Inventory.

Appendix F is comprised of the Non-Storm Discharge Certification Sheets.

Appendix G provides a Spills Inventory.

Appendix H shows the Sampling Exemption Letter.

Appendix I is the Annual Comprehensive Site Compliance Evaluation.

SECTION 2

2. Stormwater Pollution Prevention Team

2.1 Introduction

The two major objectives of the MSGP are (1) to identify sources of pollution potentially affecting the quality of stormwater discharges associated with industrial activity from a facility and (2) to describe and ensure implementation of practices to minimize and control pollutants in stormwater discharges associated with industrial activity for the facility, and to ensure compliance with the terms and conditions of this permit. The SWPPP helps facilitate a process for the operator of the industrial facility to thoroughly evaluate potential pollution sources at the site and select and implement appropriate measures designed to prevent or control the discharge of pollutants in stormwater runoff (FR, vol. 60 no. 189, p.50814). In order to reach these objectives, the SWPPT has been formed by a team of qualified base personnel to perform the following:

• Implement and maintain the SWPPP in accordance with good engineering and management practices.

• Identify and incorporate into the plan any potential sources of pollution that could reasonably be expected to impact the quality of stormwater on base.

• Develop, document, and implement improved management practices to reduce the potential for contamination of stormwater discharges.

• Complete the annual Comprehensive Site Compliance Evaluation (CSCE) and submit the results of this evaluation for the time period specified by the permit conditions.

• Review the SWPPP annually and revise as necessary.

2.2 Team Members and Responsibilities

The following paragraphs provide the specific responsibilities of each team member.

2.2.1 Team Leader, Program Manager for Stormwater Management

The Team Leader bears overall responsibility for the implementation of the SWPPP and will delegate responsibilities to other team members as appropriate. The Team Leader’s main responsibilities include:

• Review and certification of the SWPPP, all modifications and updates, and signature authority for pertinent documents as required for the SWPPP;

• Request of funds to implement elements of the SWPPP;

• Communication with regulatory agencies and the SWPPT as needed;

• Ensuring that Tyndall AFB is in compliance with the terms of the MSGP for stormwater discharges associated with industrial activity;

• Identifying the appropriate team member to perform annual inspections of affected industrial areas and evaluation of new/modified activity areas to determine if they must be included in the SWPPP;

• Supervising facility and procedural changes identified to minimize pollutant exposure to stormwater;

• Identifying the appropriate team member(s) for inspecting oil/water separators (OWSs) to ensure compliance with all applicable laws and regulations;

• Scheduling and chairing regular and emergency meetings of the SWPPT;

• Updating the SWPPP as needed;

• Documenting spill and leak cleanup as required by the SWPPP;

• Providing oversight of affected industrial areas and inform the PPT of any new or modified activities in the flightline area that may affect the stormwater permitting program; and

• Supporting CEV with inspections by regulators, internal and external audits.

2.2.2 Chief, Environmental Compliance

The Chief of Environmental Compliance provides program support and serves as interim Program Manager on an as needed basis. This person will perform the following activities:

• Review annual reports

• Review compliance documents

• Review training program documents

• Review major spill response and reporting documents

2.2.3 Environmental Coordinator, 325th Maintenance Group

The Environmental Coordinator trains facility managers, provides awareness training to airmen and conducts inspections of flightline facilities. This member of the team is also responsible for the following:

• Lead the Flightline Working Group (a multi-functional team consisting of personnel from the Maintenance Group, Logistics Readiness Contractor, Civil Engineering Contractor and Civil Engineering Environmental Flight) that convenes, when needed, to address stormwater concerns for their industrial areas;

• Train the Maintenance Group Facility Managers (MXGs)

• Perform annual inspections of storm water outfalls

• Assist in reviewing and implementing the SWPPP; and

• Identify team member(s) to participate in annual inspections of industrial areas.

2.2.4 QA from CE

The QA from CE will conduct inspections of OWSs and report any unusual observations or discrepancies to the Program Manager.

2.3 Unit Environmental Coordinators

All of the major Tyndall AFB operations that may contribute to stormwater pollution have Unit Environmental Coordinators (UECs) that coordinate with the SWPPT to prevent stormwater pollution in their areas of responsibility. The primary SWPPT members and their support organizations are listed in Table 2-1.

TABLE 2-1

Tyndall Air Force Base Stormwater Pollution Prevention Team

Responsibility Contact Information Organization

Team Leader, Program Manager for Stormwater Management

850-283-2493 325 CES/CC

Environmental Compliance, 850-283-2493 325 CES/CEV

325th Maintenance Group Environmental Coordinator

850-283-8096 325 CES/CEV

QA from CE (TBD) 850-283-2679 325 CES/CEV

Other Supporting Organizations

Fuels/Petroleum, Oil, and Lubricants (POL) 325LSS/SUP

Maintenance Group 325 MXG

Transportation Squadron 325 LSS/TRN

Operations Group 325 OSS/OSMH

Bioenvironmental Engineering 325 AMDS/SGPB

Environmental/Hazmat Specialist 325 CES/DJHM

SECTION 3

3. Drainage Characteristics and Outfall Descriptions

WPB310127161417.DOC/063530015 FINAL TYNDALL AFB

THIS IS AN UNCONTROLLED DOCUMENT IF PRINTED AND AS SUCH SHOULD BE REGARDED AS A REFERENCE ONLY

3.1 Base Characteristics

Tyndall AFB has an extensive stormwater piping network. Stormwater from the industrial areas of the base and the property that surrounds the runway is channeled to one of the seven outfall locations via the storm drain network.

The stormwater collection system serves a variety of facilities on the base, a number of which are classified as industrial activities covered under the NPDES regulations for stormwater permitting. These include aircraft hangars, aircraft parking ramps, runways, fuels dispensing and storage, washracks, maintenance shops, warehouses, and wastewater treatment facilities. The work performed indoors does not pose a meaningful threat to the stormwater system. Maintenance activities performed on the aircraft parking ramps rarely pose a threat to the stormwater system; minor leaks are controlled by the use of sorbent pads and other preventive measures. A complete layout of the storm drain system of the industrial side of the base is shown in Figure A-1 of Appendix A.

3.2 Receiving Waters

Outfalls A, B, E, and F discharge into Shoal Point Bayou, which is located to the northwest of the base. It is the major receiving water to the north of Tyndall AFB. Outfall C discharges into Little Cedar Bayou, which is located northeast of the base. Outfall D discharges into St.

Andrew Sound located to the south of the base. Outfall G discharges into East Bay located to the northeast of the base.

3.3 Drainage Areas and Outfall Description

As mentioned above, the industrial areas at the base drain through one of the seven stormwater outfalls. These outfalls are designated as Outfalls A through G. Appendix D includes the photos for all seven outfalls. Detailed descriptions of the outfalls and the respective drainage areas are provided in the following sub-sections. Figures depicting Outfalls A through G are provided in Appendix A.

3.3.1 Outfall A

Outfall A encompasses the northwest area of the runway on the flightline side of Tyndall AFB. The area of the outfall is approximately 200 acres. The impervious fraction of this area is approximately 73 acres (47 percent).

A system of pipes, catch basins, drain inlets, manholes, and related construction is in place to drain stormwater from this outfall area. Two separate collection systems combine to form a tributary to Shoal Point Bayou. The discharge location for Outfall A consists of four rectangular conduits (approximately 48 inches tall and 36 inches wide) that are used to bridge the drainage channel. The drainage channel is approximately 12 feet wide where the two streams come together.

There are no Installation Restoration Program (IRP) sites in this outfall; however, several IRP sites are located downstream in the channel near Shoal Point Bayou. More than 30 buildings are located within this outfall area and several contain industrial activity. The buildings include two hangars, Base Operations, Avionic Maintenance Shops, and Armament Release Systems Maintenance Shops.

Significant materials handled in this outfall area include:

• (Jet fuel) JP-8, MOGAS

• Oil, diesel fuel

• Hydraulic fluids, antifreeze

• Solvents, paints

• Degreasers, detergents

• Hazardous waste

• Aqueous Film Forming Foam (AFFF) agents

The most significant material handled involves fuel transfer activities. Over 4 million gallons of jet fuel are consumed at Tyndall AFB on a monthly basis. At present, fuel is received by barge at Shoal Point Bayou and transferred to the Fuels Management Division storage tanks where it is loaded onto R-11 fuel trucks, which then refuel aircraft on the flightline. The apron area in front of Hangar 1 (Building 180) and Hangar 2 (Building 182) is where the majority of fueling activity takes place in Outfall A.

Hangars 1 and 2 are engaged in the repair and maintenance of aircraft. The repair activities in the hangars generate small quantities of lubricating oils, hydraulic fluids and fuels which pose a small risk to the stormwater system. Waste fluids are segregated and collected for recycling or proper disposal. Minor aircraft maintenance occurs on the aircraft parking ramps. When minor spills (i.e., spills that don’t require implementation of the spill plan) do occur, they are cleaned up using sorbent materials and disposed of as hazardous waste. A hazardous materials storage shed and a hazardous waste accumulation point is adjacent to Hangar 2. These sheds store materials used by personnel or spent materials previously used and ready for discarding. Both sheds are fully enclosed and provide adequate storm-resistant shelter. The Base Fuels Management Group parks R-11 fuel trucks in front of Building 117.

Several other buildings in the Outfall A area are engaged in industrial-type activities in direct support of flightline operations. These buildings include the Avionics Shop (Building

186) and the Armament Release Systems Shop (Building 188) which operate small-scale painting and hydraulic operations, and the Base Civil Engineers Shops (Buildings 421, 425 and 427). All generate waste materials that are stored indoors and would not pose a threat to the stormwater system.

The drainage area for Outfall A is shown in Figure A-2 in Appendix A. The exhibits that follow show the current outfall condition.

EXHIBIT 3-1

Outfall A Drainage Area, Adjacent to Florida Avenue

EXHIBIT 3-2

Outfall A Canal, Adjacent to Florida Avenue

3.3.2 Outfall B

Outfall B drains an area of approximately 360 acres along the west central portion of the runway. Approximately 34 percent (92 acres) of the Outfall B are is impervious. There are three separate networks of piping, drains, catch basins, and drop inlets in place that discharge stormwater from Outfall B to Shoal Point Bayou. All three networks combine to form an unnamed tributary of Shoal Point Bayou. Two of the drainage systems are relatively small and serve only small portions of the runway. The third drainage system serves all of the developed portions of Outfall B and the apron portion of the runway in the Outfall B area. The discharge location for Outfall Area B is a channel located on the north-central side of the runway. The channel is approximately 25 feet wide.

Industrial activity in the Outfall B area includes the apron area where aircraft are refueled on the south side of the runway. Other industrial sites include Buildings 83 and 168, which are aircraft washracks using biodegradable cleaning solutions. Buildings 166 and 169 house washrack equipment and supplies. All effluents from the washracks are directed to OWSs and eventually to the Bay County Wastewater Treatment Plan (WWTP).

Hangar 3 (Building 156) is engaged in activities that are related to the maintenance of aircraft shells and surface coating operations. The hangar houses a fabrication shop which operates a small walk-in paint booth with a particulate air filter to control air emissions.

Another area of significant industrial activity is the Vehicle Maintenance Area that includes Buildings 558, 559, 560, 561, 571, and 575. These buildings comprise the majority of non-aircraft vehicle maintenance activities carried out at Tyndall AFB. Building 558 is a washrack behind the tire shop (Building 571) facing Alabama Avenue. All repair activities are completed indoors and are not exposed to precipitation. Small quantities of hazardous waste are generated in these buildings including cleaning solvents, antifreeze, lubricating oils, lead-acid batteries, and waste paint/thinners. All wastes are segregated and disposed of as hazardous waste.

Building 522 is the location of the defense support services contractor, which houses a welding shop, machine shop, corrosion control shop, accessories branch for servicing batteries, and a hydraulic repair shop. Only the accessories shop and hydraulic repair shop generate hazardous waste, the majority of which is either recycled or disposed of as hazardous waste. The drainage area for Outfall B is shown in Figure A-3 of Appendix A.

The exhibit below depicts the current outfall condition.

EXHIBIT 3-3

Outfall B Drainage Area, North of Perimeter Road

3.3.3 Outfall C

Outfall C contains the largest outfall area at Tyndall AFB, encompassing approximately 760 acres. The area of the outfall is non-contiguous, but has been grouped in a manner consistent with the final destination of stormwater drainage. From a surficial view, Outfall D basically splits Outfall C in half. Approximately 264 acres (40 percent) of the Outfall C area is impervious to precipitation. Outfall C contains three stormwater drainage systems that discharge to Little Cedar Bayou. Two of the drainage systems are small and drain small portions of the runway. The third drainage system serves the apron portion of the runway and the buildings in the outfall area. This drainage system generates the majority of stormwater flow to the outfall. The discharge location for Outfall C is a channel located on the northeastern side of the runway.

There is one IRP site located in the Outfall C area. FT023 is adjacent to the active fire training area that is used to simulate aircraft and fuel spill fires. The area is currently being remediated to correct soil and groundwater contaminated with petroleum hydrocarbons.

Building 21 also is part of this site.

As with Outfalls A and B, the primary industrial activity in Outfall C is the aircraft fueling operation that occurs on the apron of the runway, and maintenance hangar operations. Hangar 4 (Building 280) is operated by the 95th Aircraft Maintenance Unit and performs structural and mechanical maintenance on aircraft. Hangar 5 straddles the borderline between Outfalls C and D; half of Hangar 5 is used by Lockheed, an onsite contractor for aircraft maintenance. The activities and wastes generated in Hangars 4 and 5 are similar to those generated in Hangars 1, 2, and 3 and consist primarily of fuels, lubricants, and painting wastes.

Other significant industrial activities that occur in Outfall C consist largely of storage activities that occur in the following buildings:

• Building 266 - General storage including adhesives, paints

• Building 267 - Hazardous materials storage

• Building 269 - Hazardous materials storage

• Building 272 - Acid storage

• Building 317 - Paint storage

• Building 319 - Paint storage

• Building 322 - Hazardous materials storage

All of these buildings are relatively small (4,000 square feet [ft2] or less), with the exception of Building 266 (30,000 ft2). There are no materials stored outdoors in the vicinity of the buildings.

Building 315 is a corrosion control facility that operates a solvent distillation unit for reclaiming polyurethane-based paints and used solvents for reuse as a cleaning solvent on equipment items and parts. The building also serves as a hazardous waste accumulation point for paint stripping, unusable solvents, paint booth filters containing metals, lubricants and still bottoms from the solvent distillation unit.

Building 316 is the fuel systems building and drains jet fuels from tank cells. The majority of the fuel is collected and reused. Small amounts of fuel can be found in the water used during cleanup operations. The water passes through and oil/water separator prior to being released to the sanitary wastewater system. Foam baffles from the tanks are removed and disposed of as hazardous waste.

In addition, there is one cooling tower (Building 546) in the Outfall C area. The blow-down from this cooling tower discharges to the sanitary sewer system and is not considered a potential stormwater pollutant source.

The drainage area for Outfall C is shown in Figure A-4 of Appendix A. The following photos show the current conditions of the outfall.

EXHIBIT 3-4

Outfall C Drainage Area - #1, Located on a Perimeter Road East of Taxiway “F”

EXHIBIT 3-5

Outfall C Drainage Area - #2, Located on a Perimeter Road East of Taxiway “F”

3.3.4 Outfall D

Outfall D has a total area of approximately 35 acres and a total impervious area of about 23 acres (65 percent). This outfall area is bracketed to the east and west by Outfall C with the active flightline to the north and U.S. Highway 98 to the south. Outfall D discharges from a headwall located just south of Highway 98, near the radar test squadron and flows into an unnamed tributary of St. Andrew Sound.

Only two industrial activities are present in this area, Hangar 5 (Building 227) and Building

224. Hangar 5 straddles the border between Outfall Areas D and the eastern half of Outfall Area C. The southern portion of Hangar 5 discharges to stormwater inlets that channel runoff to Outfall D. A portion of Building 224 is used to service temporary duty (TDY) aircraft, not typically assigned to Tyndall AFB.

The activity in Building 310 (Non-Destructive Inspection [NDI] lab) is not considered industrial activity under the current stormwater regulations since this portion of the facility is not involved in vehicle maintenance or other categories defined under NPDES regulations. Several small amounts of hazardous materials are consumed in Building 310 including acid, solvents, fluorescent dyes, and photographic wastes. Since 90 percent of the photographic activities are digital file processing in nature, these old-technology photographic wastes are not considered threatening to the stormwater system. There is no outdoor storage of material at Building 310.

The drainage area for Outfall D is shown in Figure A-5 of Appendix A. The photos below show current outfall conditions at the mouth of St. Andrew Sound.

EXHIBIT 3-6

Outfall D Discharging into St. Andrew Sound

EXHIBIT 3-7

Outfall D South End, Leading to St. Andrew Sound

3.3.5 Outfall E

Outfall Area E drains the Fuels Management Area, or more commonly known as the POL 400 Area. It serves as the main storage and distribution facility for fuels. The POL 400 Area receives diesel fuel and MOGAS from commercial fuel trucks and JP-8 via pipeline from the POL 6000 Area or commercial fuel truck. This area consists of 10 aboveground storage tanks (ASTs) and an administration and operations building. There is also vehicle parking for R-11 fuel trucks. This area is included as an individual outfall area due to its high volume of material handled, the potential risk of spills, and the presence of a stormwater collection system.

The tank farm consists of the following ASTs:

• One 50,000-gallon tank for MOGAS

• Two 50,000-gallon tanks for diesel

• Two 480,0000-gallon tanks for JP-8

• Three 560-gallon JP-8 additive tanks

• One 2,000-gallon JP-8 additive tank

• One 1,000-gallon JP-8 additive tank.

The tanks in the Fuels Management Area are considered Industrial Activity under the stormwater discharge regulations. The primary potentially polluting materials handled in this area are JP-8, diesel, and MOGAS.

At the fill stand area, loading and unloading of fuels takes place. Four fill stands are used for JP-8 loading and off-loading and three are used for MOGAS and diesel. MOGAS and diesel are also transferred to vehicles through dispensers at the automated service station.

Spills occurring at the fill stand and fuel truck parking areas would be contained by secondary containment berms and/or catch basins and routed to oil/water separators that capture the first flush. After the initial flush, subsequent stormwater is inspected and then passed through the stormwater system.

Stormwater from all secondary containment dikes are either discharged to the storm drainage system or routed to an oil/water separator and then to the sanitary sewer.

Stormwater is inspected for any evidence of sheen prior to discharge to the storm drainage system. During storm events, personnel at the POL 400 Area shut the valve to the oil/water separator in order for that line to fill with stormwater. Once the line has filled with stormwater, all remaining water is properly routed to the storm drainage system. After such a storm event, the OWS valve is reopened and is allowed to enter the sanitary sewer system.

This method of controlling was intended to be a temporary solution since it does allow some clean to enter the sanitary sewer system. However, funds have never been allocated to allow for the installation of a proper diverter valve system, which would alleviate this problem.

The outfall area encompasses 14 acres and is 87 percent impervious. The runoff from the Fuels Management Area is collected in drains in the dikes around the tanks and flows through a concrete pipe to the ground adjacent to the north and west sides of the area.

The drainage area for Outfall E is shown in Figure A-6 in Appendix A. The photos below show the current outfall conditions.

EXHIBIT 3-8

Outfall E Concrete Gutter Leading to Swale on Fuels Avenue

EXHIBIT 3-9

Outfall E Across from 400 Area, on Fuels Avenue

3.3.6 Outfall F

Outfall F is the barge off-loading dock located at Shoal Point Bayou. The area is more commonly known as the POL 6000 Area and contains the greatest volume of fuel on Tyndall AFB. The facility primarily serves as a storage and distribution point for JP-8. The area contains eight ASTs and one UST. The ASTs within individual dike containment have capacities of 420,000; 820,000; and 838,000 gallons. Other ASTs include: two 12,000-gallon used oil tanks and two 560-gallon JP-8 additive tanks. There is one UST with a 6,000 gallon capacity at pump house 6042 that holds water.

Loading/unloading procedures in the POL 6000 Area are performed in accordance with Department of Transportation (DOT) regulations. Bowsers are brought to the POL 6000 Area from other areas of the base to be pumped out to the bulk ASTs. Spill response kits are located next to fillstands and on tank trucks, allowing for timely response to spills. Transfer hookups and lines are labeled and protective booms are deployed during barge offloading events. These bowsers are parked within a concrete curbed area that is restrained by a valve.

Spills in the vicinity of the loading dock during receipt JP-8 from fuel barges could enter Shoal Point Bayou. However, spills due to offloading almost never occur because of active BMPs in place. The outfall area covers approximately 13 acres, 61 percent of which is impervious. Stormwater runoff from the area is collected in the dikes around the tanks. It is inspected then released into swales before being discharged to the Bayou. Stormwater outside of the dikes is directed to a headwall before being released directly to Shoal Point Bayou.

The drainage area for Outfall F is shown in Figure A-7 in Appendix A. The photo below depicts the connection of Outfall F to the bayou.

EXHIBIT 3-10

Outfall F to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .