TE-5_Performance_Thresholds.docx
DOCX document 21 KB Posted
- Attached to
- Rotary Wing Aircraft Maintenance Federal contract opportunity
- Solicitation number
- FA286018R0010
About this file
PERFORMANCE THRESHOLDS
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference Number: Solicitation FA2860-18-R-0010 Technical Exhibit 5
Performance Thresholds - “Required Services”
REQUIRED SERVICE
COMMON
| STANDARD |
| PERFORMANCE THERSHOLDS (PT) |
PT= Minor Discrepancies Allowed
| Correspondence, Records, and Files Paragraph |
| Provided as requested copies of all maintenance correspondence and documents. Ensure maintenance and disposition of records IAW AFRIMS RDS, AFMAN 33-363, AFI 33-364, and AFI 33-332. |
| PT 1 per inspection |
| Reports, Paragraphs |
| All Required Reports, Surveys, Studies, Tests, Historical Updates, Plans, Etc. Ensure documents are complete, accurate, and submitted on-time. |
| PT 1 per inspection |
| Maintain Publications |
| All TOs, Indexes, Regulations, Manuals, Directives, And Historical Files Are On-Hand And Current (Master Library And Any Work Center Libraries) |
| PT 3 per inspection for LEP |
PT 3 per inspection for Account management
| ADP Input |
| All Required ADPE Inputs Are Accurate, And Comply With AFI 21-101, AFI 21-104, TO 00-25-254, AFI 23-201, and AFMAN 23-110 |
| PT 1 per entry per inspection |
PT 2 Maintenance Information System 380 matches aircraft forms per inspection PT 10 Phase per inspection
| OSHA Stds, Industrial Hygiene, and Environmental Compliance |
| Comply with all OSHA, AF, Federal, State and Local environmental protection and health laws and regulations |
| PT 2 Work Area Safe…per inspection |
PT 0 HAZMAT properly stored and disposed of….per inspection
PT 1 Mishap reported and corrective action taken….per inspection
| Adherence to Directives, (AFI, TO, OI, etc.) |
| Procedures and all directives are current and complied with. |
| PT 2 per inspection |
Provide Quality Control Programs
Evaluate contractor's quality control programs for maintenance IAW directives.
Maintenance-(i.e.Weight & Balance, OIs, FCF, PQDR, FOD/DOPP etc.)
PT 1 per inspection
| Provide Quality Control inspections |
| Ensure timely inspections of all aspects of Aircraft Maintenance are assessed complying with all applicable directives. |
| PT 3 per inspection |
Perform Accountability of AF Assets
| Ensure all AF property is properly inspected, maintained, inventoried, and secured. |
| PT 2 per inspection |
Training Management.
| Ensure all applicable training and safety records are properly documented. |
| PT 2 per inspection |
REQUIRED SERVICE
AIRCRAFT
| STANDARD |
| PERFROMANCE |
THRESHOLD (PT)
PT= Minor Discrepancies Allowed
| Aircrew Debriefing |
| Contractor's established aircrew debriefing procedures are current, comply with AFI 21-101, and aircrews are not delayed. |
| PT 1 per inspection |
Scheduled and Unscheduled Inspections
| All aircraft and AGE are inspected (inclusive of on- and off-equipment inspections) on-time, inspections comply with applicable technical data, AF and AFDW directives, local directives, and inspections are properly documented. |
| PT 0 Preflt (current & signed off)…per inspection |
Pre-flt/Thru-flt 1 per 5carded items checked…per inspection BPO PT 5 per inspection Phase PT 10 per inspection
| Aircraft Maintenance Scheduling |
| Comply with paragraph 4.10 |
| PT 2 per inspection |
Aircraft Launch Process
| As stated in Para 4.25 & 4.26 and comply with departure reliability rates set forth in TE-3 |
| PT 0 per inspection |
| FOD and Dropped Object Program |
| Contractor's program is current and effective. |
| PT 2 per inspection |
Maintenance Analysis
| IAW Paragraph 4.12.3 Respond to requests for information within 24 hours of request. |
| PT 1 per inspection |
Composite Tool Kits
| Contractor's CTK Program complies with AFI 21-101 ensures serviceability and accountability of tools. |
| PT 2 per inspection |
| Aircraft Cleaning |
| Comply with the Andrews appearance standards set forth in TE-11 |
| PT 3 per inspection |
| Aircraft Maintenance Documentation |
| Insure all aircraft maintenance actions are documented. |
| PT 0 Plans & scheduling Aircraft hours, landings and cycles (PT 1 for all others) per inspection |
PT 2 Aircraft Forms per inspection PT 10 Phase per inspection
Aircraft Recovery
| Aircraft Status properly reported within one hour or within 15 minutes of ground found write-ups. |
| PT 2 Ground handling performed IAW applicable T.O. or directives…per inspection. |
Off-Station Aircraft Support
| Respond NLT 1 hour or as directed by the FC from notification with plan, all required test equipment, parts, and personnel necessary to return aircraft to MC status. |
| PT 0 per inspection |
Emergency Services and Dispersal’s
| Respond to all exercise and contingencies. |
| PT 0 per inspection |
| Airshow/Special Support |
| Comply with paragraph 4.14 |
| PT 2 per inspection |
File details come from the government source that posted it.