Atch 12 - AFCEC - Base Chiller Standard Approval Memo_25 Feb 2025.pdf
PDF 209 KB Posted
- Attached to
- SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit Federal contract opportunity
- Solicitation number
- FA252125B0002
About this file
This memorandum is an official document from the Air Force Civil Engineer Center (AFCEC) approving HVAC chiller system manufacturer standardization for multiple Air Force installations. The document details approved chiller manufacturers for seven specific bases: Anacostia Boling AFB, F.E. Warren AFB, Macdill AFB, Minot AFB, Patrick SFB, Vandenberg SFB, and Wright Patterson AFB. Manufacturers selected include Trane (for five installations), Carrier (for Macdill AFB), and York (for Minot AFB). The directive requires an annual comprehensive inventory analysis to document progress in standardizing HVAC chiller systems and to validate the continued appropriateness of the chosen manufacturers. If Base Civil Engineers determine a manufacturer change is necessary, they must submit a new Memorandum of Request (MOR) with supporting analysis. Primary points of contact for this standardization guidance are Mona Morsi and Mr. Day Stephen, with the AFCEC Reachback Center available for additional inquiries.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE CIVIL ENGINEER CENTER
TYNDALL AIR FORCE BASE FLORIDA
25 February 2025
MEMORANDUM FOR RECORD
FROM: AFCEC/CO
139 Barnes Drive, STE 1 Tyndall AFB, FL 32403-5319
SUBJECT: HVAC Chiller System Manufacturer Standardization Request
1. This memorandum serves as AFCEC/CO’s official communication approving the selection for standard Chiller System(s) respective to the following installations:
Installations: Unit: Manufacturer:
ANACOSTIA BOLING AFB
F.E. WARREN AFB
MACDILL AFB
MINOT AFB
PATRICK SFB
VANDENBERG SFB
WRIGHT PATTERSON AFB
11 CES
90 CES
9 CES
5 CES
45 CES
30 CES
88 CES
Trane Trane
Carrier York Trane Trane Trane
2. Approval for Manufacturer Standardization: The Air Force Civil Engineer Center Operations Directorate (AFCEC/CO) has reviewed and approved the request submitted by the listed installations. The analyses conducted by each base effectively justify the use of the chosen manufacturer.
3. The comprehensive inventory analysis is to be repeated annually. The purpose of this secondary analysis is to document the installation’s progress in standardizing HVAC chiller systems, consider any changes in the decision facts, and confirm no external factors exist that may drive a reconsideration of the approved manufacturer. Should the BCE determine that a change in manufacturer is required, a new Memorandum of Request (MOR) and analysis will be accomplished.
4. Please direct any questions and/or concerns regarding implementation of this guidance to Primary POC: Mona MORSI, DSN 523-6264, Mona.Morsi.1@us.af.mil, Alternate POC: Mr. Day Stephen, DSN 523-6363, stephen.day.1@us.af.mil, or to the AFCEC Reachback Center at AFCEC.RBC@us.af.mil.
CLIFFORD M. THEONY, Colonel, USAF Director, Operations mailto:Mona.Morsi.1@us.af.mil mailto:stephen.day.1@us.af.mil mailto:AFCEC.RBC@us.af.mil
| 2025-02-25T12:44:49-0600 | |
| THEONY.CLIFFORD.M.1030901459 |