Atch 11 - Question 8 - Additional Question and Answer.pdf
PDF 82 KB Posted
- Attached to
- SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit Federal contract opportunity
- Solicitation number
- FA252125B0002
About this file
This document is a Question and Answer Form for Project Number SXHT 21-1005, which involves replacing a chiller, air handling units (AHUs), and fan coil units at Patrick Space Force Base. Specifically, Question #8 addresses whether the existing cooling tower and lightning protection will be replaced, to which the answer confirms both will be replaced as part of the project scope. The question is directly related to the broader solicitation (FA252125B0002) for a comprehensive HVAC system upgrade, which includes replacing a 60-ton R-22 chiller with an R-410A chiller, cooling tower, hot and chilled water pumps, electrical panels, and upgrading facility controls. The project requires 180 calendar days of work, with the Notice to Proceed to be issued within 30 days after award, and is contingent on fund availability.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER FORM- Question #8
Project Number: SXHT 21-1005
Project Description: Replace Chiller AHU and Fan Coil Units B3659
Question #8: Is the existing cooling tower going to be replaced? And if so, will the DOD like to replace the existing lightning protection as well?
Answer: The cooling tower is being replaced, and the lightning protection shall also be replaced.