These are design drawings for the replacement of HVAC equipment at Building B-3659 on Patrick Space Force Base, Florida. The comprehensive set of mechanical and electrical drawings details the full replacement of a 67.28-ton chiller, two air handling units (AHUs), twelve fan coil units, cooling tower, water pumps, and associated electrical infrastructure. The project involves removing existing R-22 refrigerant equipment and installing new R-410A systems from Trane, including upgrading controls to meet Space Force engineering management control system (EMCS) standards. The mechanical system will include new chilled water piping, electrical panels, and variable frequency drives (VFDs) for pumps and equipment, with work to be completed within 180 calendar days after notice to proceed.

The drawings specify detailed replacement requirements across multiple sheets, including demolition and installation plans for mechanical and electrical systems, equipment schedules, piping diagrams, and control sequences. Key new equipment includes a Trane water-cooled centrifugal chiller, Tower Tech cooling tower, Bell & Gossett pumps, and Trane fan coil units. The project also encompasses associated work such as potential wall repairs, touch-up painting, and replacement of damaged interior finishes. Electrical upgrades include new 800A service entrance equipment, panelboards, and motor controls, with careful consideration of existing infrastructure and connection requirements.

View the file

Other files for this federal contract opportunity

Other files attached to SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit, newest first.
File Type Posted
SXHT 21-1005 Abstract.pdf PDF
Solicitation Amendment FA252125B00020005 SF 30.pdf PDF
Atch 11 - Question 8 - Additional Question and Answer.pdf PDF
Atch 7 - Updated Patrick SFB Construction Wage Rates_21 Mar 2025.pdf PDF
Solicitation Amendment FA252125B00020004 SF 30.pdf PDF
Atch 9 - Answers to Q and A Sheet -SXHT 21-1005 Replace Chiller AHU and Fan Coil Units.pdf PDF
Atch 2 - Drawings - Revision A.pdf PDF
Solicitation Amendment FA252125B00020003 SF 30.pdf PDF
Atch 12 - AFCEC - Base Chiller Standard Approval Memo_25 Feb 2025.pdf PDF
Atch 11 - Site Visit Sign-In_24 Mar 2025.pdf PDF
Atch 8 - Site Visit Rules of Engagement Amended - CO.pdf PDF
Solicitation Amendment FA252125B00020002 SF 30.pdf PDF
Atch 10- ODS Amended.pdf PDF
Solicitation Amendment FA252125B00020001 SF 30.pdf PDF
Solicitation - FA252125B0002.pdf PDF
Atch 1 - Technical Specifications.pdf PDF
Atch 4 - SDVOSB-SelfPerformanceCertificationWrksht.pdf PDF
Atch 3 - Haz Waste Form.pdf PDF
Atch 5 - Badge Request 45 SFS Form V13.pdf PDF
Atch 6 - CECC Form 3052.xls XLS spreadsheet
Atch 10 - ODS.pdf PDF
Atch 7 - Patrick SFB Construction Wage Rates.pdf PDF
Atch 8 - Site Visit Rules of Engagement.pdf PDF
Atch 9 - Q and A Template.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

FACILITY B-3659

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N O

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

A A rh o d e s b ri to

A

C

H

I T

E

S

P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L

N T

S

/2

/2

:2

:4

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

G-000

C O

V E

R S

H E

E T

S X

H T

-1

G G

-0

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

J L

C R

D M

B H

100%

SXHT 21-1005

REPLACE CHILLER, AHU'S & FAN COIL UNITS, B3659

100% DESIGN DRAWINGS

NTS

LOCATION PLAN

PATRICK SPACE FORCE BASE

SOUTH HOUSING

SATELLITE BEACH, FLORIDA

TRUE

NORTH

PERMIT(S)/ENVIRONMENTAL AND SLD 45 ACTIONS

REQUIRED PRIOR TO CONSTRUCTION

ERP/STORMWATER

ERP/WETLANDS/DREDGE & FILL

FDEP/DRINKING WATER

FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL

SURVEY/WILDLIFE

SLD 45 RISK ASSESSMENT

NONE

FDEP/IND. WASTE WATER

IRP

FDEP/FUEL TANK

NOI/SWPPP

ASBESTOS

HEAVY METALS

YES NO

LEAD

PCB

NOT

VERIFIED

HAZARDOUS MATERIALS

NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT

IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN

ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL

UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.

X

X

X

XX

SHEET INDEX

Sheet Number Sheet Name

G-000 COVER SHEET

HAZARDOUS MATERIALS

Sheet Number Sheet Name

H-001 HAZARDOUS MATERIALS GENERAL NOTES AND LEGEND

H-101 HAZARDOUS MATERIALS PLAN

INTERIORS

Sheet Number Sheet Name

ID-120 INTERIOR FINISH SCHEDULE & NOTES

ID-121 ENLARGED FINISH PLAN & DETAILS

ELECTRICAL

Sheet Number Sheet Name

E-001 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS

E-101 ELECTRICAL COMPOSITE PLAN

E-401 EQUIPMENT ROOM ELECTRICAL DEMOLITION PLAN

E-402 CHAPEL ELECTRICAL DEMOLITION PLAN

E-403 EQUIPMENT ROOM ELECTRICAL INSTALLATION PLAN

E-404 CHAPEL ELECTRICAL INSTALLATION PLAN

E-601 SINGLE LINE DIAGRAMS

E-701 PANEL SCHEDULES

MECHANICAL

Sheet Number Sheet Name

M-001 MECHANICAL GENERAL NOTES

M-101 COMPOSITE PLAN

M-401 EQUIPMENT ROOM DEMOLITION PLAN

M-402 EQUIPMENT ROOM INSTALLATION PLAN

M-403 CHAPEL DEMOLITION PLAN

M-404 CHAPEL INSTALLATION PLAN

M-501 MECHANICAL DETAILS I

M-502 MECHANICAL DETAILS II

M-601 PIPING DIAGRAMS

M-602 MECHANICAL CONTROLS DIAGRAM

M-701 SCHEDULES I

M-702 SCHEDULES II

GENERAL NOTES - ENVIRONMENTAL:

1. HAZARDOUS MATERIALS MAY BE PRESENT WITHIN BUILDING B3659. LIMITED HAZARDOUS MATERIAL SAMPLING WAS

PERFORMED IN THE DIRECT PROJECT AREA, AND ALL RESULTS ARE INCLUDED ON THIS SHEET; HOWEVER, THE PERFORMED SAMPLING IS NOT ALL INCLUSIVE BUT REPRESENTS THE PROJECT AREA. ACM AND COATINGS CONTAINING HAZARDOUS CONSTITUENTS POTENTIALLY EXIST WITHIN THE IMMEDIATE VICINITY OF WORK. ABATEMENT AND

ENCAPSULATION OF HAZARDOUS MATERIALS MAY BE REQUIRED AS PART OF CONSTRUCTION.

A. ENVIRONMENTAL SAMPLING WAS PERFORMED BY SUNRISE SYSTEMS OF BREVARD, INC, ON JANRUARY 27, 2023, AND THE RESULTS ARE INCLUDED IN THE REPORT TITLED ASBESTOS SAMPLING REPORT FOR SXHT 21-1005 REPLACE CHILLER, AHUS AND FAN COIL UNITS BLDG 3659, DATED FEBRUARY 1, 2023. REQUEST A COPY FROM THE CONTRACTING OFFICER PRIOR TO BIDDING THE PROJECT. REFER TO H-101 FOR HAZARDOUS MATERIAL

LOCATION.

2. ALL COATED SURFACES IN THE FACILITY ARE ASSUMED TO CONTAIN HEAVY METALS AND/OR PCBS UNLESS OTHERWISE

DOCUMENTED IN THESE DRAWINGS OR SPECIFICATIONS.

3. DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH THE CONTRACT CLAUSES AND SPECIFICATION SECTION 01 57 19.

4. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, HANDLE, DISTURB, STORE, TRANSPORT AND DISPOSE IN ACCORDANCE

WITH SPECIFICATION SECTION 01 57 19.

5. THE HAZARDOUS MATERIAL SCHEDULE PROVIDED ON SHEET H-101 IS NOT ALL INCLUSIVE. SAMPLE AND ANALYZE ALL SUSPECT MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN THESE PROJECT DRAWINGS AND

SPECIFICATIONS OR ASSUMED WORST CASE.

6. SUBMIT ALL ENVIRONMENTAL PLANS TO THE CO FOR REVIEW, WHERE REQUIRED, AND RESUBMIT FOR APPROVAL. DO

NOT COMMENCE UNTIL EACH PLAN IS GIVEN FINAL APPROVAL.

7. PREPARE AND SUBMIT AN ENVIRONMENTAL PROTECTION PLAN (INCLUDING SPENT OIL AND REFRIGERANT REMOVAL, CONTROL, AND DISPOSAL).

8. IDENTIFY, CLASSIFY, MANAGE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, MUNICIPAL AND FEDERAL ENVIRONMENTAL CODES, STANDARDS AND REGULATIONS INCLUDING BUT

NOT LIMITED TO USSF SLD 45, OSHA, EPA AND CFR.

9. IDENTIFY, CLASSIFY, MANAGE, TRANSPORT AND DISPOSE OF ALL HAZARDOUS MATERIALS IN ACCORDANCE WITH 40 CFR

260 THROUGH 273.

10. DISPOSE OF PCB CONTAINING MATERIALS IN ACCORDANCE WITH 40 CFR 761.

11. DISPOSE OF ACM IN ACCORDANCE WITH 40 CFR 76.

GENERAL NOTES - ASBESTOS:

1. ASBESTOS CONTAINING MATERIALS (ACM) ARE NOT PRESENT WITHIN THE IMMEDIATE AREAS OF WORK.

2. ASBESTOS FINDINGS FOR AREAS AFFECTED BY THIS WORK ARE PRESENTED IN THE HAZARDOUS MATERIALS TABLE ON SHEET H-101. A COPY OF THE ASBESTOS SURVEY REPORT IS INCLUDED AS A SUPPLEMENT TO THE DESIGN DATA

MANUAL.

3. SUSPECT ACM, NOT IDENTIFIED IN THE ASBESTOS REPORT, MUST BE BROUGHT TO THE CONTRACTING OFFICER'S

ATTENTION PRIOR TO DISTURBANCE OF THE MATERIAL.

4. WRITTEN NOTIFICATION TO THE CO AND SPACE FORCE IS REQUIRED FOR ANY REGULATED ASBESTOS REMOVAL.

SUBMIT A NOTIFICATION TO FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), “NOTICE OF ASBESTOS RENOVATION OR DEMOLITION” FDEP FORM 62-257.900(1) TEN (10) DAYS PRIOR TO ANY ACM REMOVAL. THE CONTRACTING OFFICER MUST PROVIDE APPROVAL OF ALL NOTIFICATIONS PRIOR TO SUBMITTING TO THE USSF OR ANY

REGULATORY AGENCY.

5. ACTIVITIES THAT MAY DISTURB ACM MUST BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL ASBESTOS RULES AND REGULATIONS BY PERSONNEL THAT ARE EPA TRAINED AND CERTIFIED IN HANDLING ACM.

GENERAL NOTES - HEAVY METAL AND PCB COATINGS:

1. HEAVY METYAL AND PCB COATINGS ARE NOT PRESENT WITHIN THE IMMEDIATE AREAS OF THE WORK.

2. 20 DAYS PRIOR TO COATING REMOVAL OPERATIONS, SUBMIT A COPY OF THE NOTIFICATION OF THE COMMENCEMENT OF

ABATEMENT TO THE CO.

3. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL OR SURFACES WITH PRESERVATIVE COATING IN ACCORDANCE WITH FEDERAL REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29 CFR 1926.354.

4. TREAT ANY COATING CONTAINING A DETECTABLE LIMIT OF ARSENIC, BARIUM, CADMIUM, CHROMIUM (TOTAL), CHROMIUM (HEXAVALENT), LEAD, MERCURY, SELENIUM, SILVER, OR PCBs AS COATING CONTAINING HAZARDOUS CONSTITUENTS.

5. PERFORM ANY DISTURBANCE OF COATING CONTAINING HAZARDOUS CONSTITUENTS IN ACCORDANCE WITH THE APPROVED HEAVY METAL AND PCB WASTE MANAGEMENT AND COMPLIANCE PLANS, AND SPECIFICATION SECTION 02 83 00.

6. COATINGS OR MATERIALS WITH PCB CONCENTRATION ABOVE 50 PPM ARE REGULATED BY THE TOXIC SUBSTANCES CONTROL ACT (TSCA) PURSUANT TO THE FEDERAL REGULATION 40 CFR 761. DEMOLITION DEBRIS WITH A COATING EXCEEDING 50 PPM PCBs MAY BE DISPOSED OF AS PCB BULK PRODUCT WASTE AT AN APPROVED LANDFILL, TO BE

DETERMINED BY THE CONTRACTOR IN THEIR WASTE MANAGEMENT PLAN.

7. ELECTRICAL CABLE SHEATHING AND COATINGS MAY CONTAIN PCBs AND SOME HEAVY METALS. IF THE CABLE IS TO BE DISPOSED OF OR RECYCLED, PROPERLY STAGE AND MANAGE SUCH CABLE IN ACCORDANCE WITH ALL REGULATORY REQUIREMENTS AND ENSURE THAT NO REGULATED SUBSTANCES ARE RELEASED TO THE ENVIRONMENT.

ABBREVIATIONS:

ACM ASBESTOS CONTAINING MATERIAL

CES/ESC CIVIL ENGINEERING SQUADRON / ENVIRONMENTAL SERVICE CONTRACT

Ag SILVER As ARENIC Ba BARIUM

CCSFS CAPE CANAVERAL SPACE FORCE STATION

Cd CADMIUM

CES CIVIL ENGINEERING SQUADRON

CFR CODE OF FEDERAL REGULATIONS

CHS COMPREHENSIVE HEALTH SERVICES

CO CONTRACTING OFFICER

Cr CHROMIUM

EA EACH

EPA ENVIRONMENTAL PROTECTION AGENCY

ESC ENVIRONMENTAL SERVICE CONTRACT

E/W EAST / WEST

FDEP FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

FT FEET

Hg MERCURY Pb LEAD

PCB POLYCHLORINATED BIPHENYL

PPM PARTS PER MILLION

Se SELENUIM

SF SQUARE FOOT

SLD 45 SPACE LAUNCH DELTA 45

S/N SOUTH / NORTH

TSCA TOXIC SUBSTANCES CONTROL ACT

USSF UNITED STATES SPACE FORCE

VCT VINYL COMPOSITION TILE

W/ WITH

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

N T

S

/2

/2

:4

:3

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

H-001

H A

Z A

R D

O U

S M

A T

E R

IA

L

S G

E N

E R

A L N

O T

E S

A N

D L

E G

E N

D

S X

H T

-1

E N

V H

-0

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

M D

C

C R

J L

J L

100%

ENVIRONMENTAL SAMPLING RESULTS

HEX NOTES SAMPLE NUMBERS SAMPLE DESCRIPTION ACM

1 503786-006 GRAY, HARD CONCRETE NO

2 503786-007 BLACK BITUMINOUS JOINT MATERIAL NO

3 503786-005 GRAY, HARD CONCRETE NO

4 503786-002 WHITE/SILVER, SOFT/FIBROUS PIPE WRAP NO

5 503786-003 BLACK, FOAMY PIPE INSULATION NO

6 503786-001 WHITE, SOFT/FIBROUS ELBOW WRAP NO

7 503786-004 BLACK, FOAMY ELBOW MATERIAL NO

8 503786-008 GRAY, HARD CONCRETE NO

EXISTING AHU-2

EXISTING AHU-1

EXISTING CHILLED

WATER PUMP

EXISTING

CHILLER

EXISTING BOILER

EXISTING CHILLED

WATER EXPANSION TANK

EXISTING

CHIMNEY

EXISTING

COOLING TOWER

EXISTING TOWER

WATER PUMP2

EXISTING

CONCRETE PAD

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:4

:3

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

H-101

H A

Z A

R D

O U

S M

A T

E R

IA

L

S P

L A

N

S X

H T

-1

E N

V H

-1

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

M D

C

C R

J L

J L

100%0 2' 4' 8' 12'

SCALE: 1/4" = 1'-0"

PLAN NORTH

GENERAL NOTES:

1. THE ENVIRONMENTAL DRAWINGS DO NOT DEPICT ALL AREAS WHERE

CONSTRUCTION MAY OCCUR. AMPLE/ANALYZE SUSPECT

MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN

THE DRAWINGS OR ASSUME WORSE CASE.

2. HAZARDOUS MATERIALS MAY EXIST IN AND AROUND THE

CONSTRUCTION AREA. COATINGS CONTAINING HAZARDOUS

CONSTITUENTS MAY EXIST WITHIN THE IMMEDIATE VICINITY OF

WORK. DEVELOP ENVIRONMENTAL PROTECTION PLANS AS

SAMPLING RESULTS DICTATE AND HANDLE HAZARDOUS MATERIALS

AS REQUIRED IN SPECIFICATIONS SECTIONS 01 57 19.

3. ENVIRONMENTAL DRAWINGS DO NOT DEPICT ALL AREAS WHERE

CONSTRUCTION MAY OCCUR. TREAT ALL COATING NOT ANALYZED AS

COATINGS CONTAINING HAZARDOUS CONSTITUENTS OR LEAVE

UNDISTURBED.

4. 20 DAYS PRIOR TO COATING REMOVAL OPERATIONS, SUBMIT A COPY

OF THE NOTIFICATION OF THE COMMENCEMENT OF ABATEMENT TO

THE CONTRACTING OFFICER IF REQUIRED.

5. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL

OR SURFACES WITH A PRESERVATIVE COATING IN ACCORDANCE

WITH FEDERAL REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29

CFR 926.354.

6. DISTURB COATINGS CONTAINING HAZARDOUS CONSTITUENTS IN

ACCORDANCE WITH SPECIFICATION SECTIONS 01 57 19.

7. ASBESTOS CONTAINING MATERIAL (ACM) MAY EXIST WITHIN THE

MMEDIATE AREA OF WORK. LEAVE SUSPECTED MATERIAL

UNDISTURBED AND REPORT IMMEDIATELY TO THE CONTRACTING

OFFICER. IF SUSPECT MATERIALS ARE IDENTIFIED, HANDLE THE

MATERIAL IN ACCORDANCE WITH SECTIONS 01 57 19. MANAGE ALL

WASTE STREAMS IN COMPLIANCE WITH FEDERAL, STATE AND LOCAL

REGULATIONS.

8. EQUIPMENT SHOWN IS FOR REFERENCE ONLY. REFER TO

MECHANICAL AND ELECTRICAL DRAWINGS FOR FURTHER

INFORMATION.

1/4" = 1'-0"

EQUIPMENT ROOM HAZARDOUS MATERIALS PLAN

GENERAL NOTES

1. REFER TO PROJECT MANUAL FOR ALL GENERAL NOTES AND CONDITIONS.

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON

DRAWINGS AND SHALL NOTIFY THE DESIGNER OF ANY ERROR, INCONSISTENCY

PRIOR TO BIDDING AND/OR PROCEEDING WITH THE WORK.

3. PROVIDE FLOORING SHOP DRAWING PRIOR TO INSTALLATION.

4. THESE DOCUMENTS ARE TO BE USED AS A BASIS OF DESIGN.

5. HATCHED AREAS INDICATE AREAS NOT IN SCOPE.

6. CONTRACTOR TO SECURE SIZE AND THICKNESS OF MATERIAL FROM

MANUFACTURER.

7. VERIFY CONDITIONS PRIOR TO INSTALLATION. PRIOR TO FLOORING

INSTALLATION, TEST CONCRETE SLAB FOR MOISTURE CONTENT BASED ON

MANUFACTURERS RECOMMENDATION.

8. ALL ADHESIVES MUST CONTAIN 'NO ADDED UREAFORMALDEHYDE' & MUST MEET

LEED LOW-VOC REQUIREMENTS.

9. ALL HOLLOW METAL DOORS AND WINDOW FRAMES ARE TO MATCH ADJACENT

WALL COLOR. U.N.O.

10. CONTRACTOR TO PROVIDE NECESSARY THRESOLD TRANITIONS AT ALL

LOCATIONS WITHIN THE SCOPE OF WORK.

11. ANY LOCATION WHERE TWO FLOORING FINISHES COME IN A DOORWAY, EXTEND

THE FLOORING TO MEET AT CENTERLINE OF DOOR.

12. FOR TRANSITIONS OF DIFFERENT THICKNESS, USE FLOOR LEVELING TRANSITION

MATERIAL AND FEATHER OUT OVER 2'-0" TO PROVIDE AN EVEN TRANSITION.

13. WALLS WITH LAVATORY FIXTURES SHALL HAVE EPOXY PAINT PTE-1 UP TO 6'-0"

AFF U.N.O.

14. WALLS AT E.W.C. TO HAVE EPOXY PAINT PTE-1 UP TO 6'-0" AFF U.N.O. INCLUDING

ADJACENT WALLS.

15. PAINT RECESS ELECTRICAL PANELS TO MATCH ADJACENT WALL.

16. ALL WALL BASE TO BE INSTALLED IN LENGTHS AS LONG AS FEASIBLE WITHOUT

GAPS AT SEAMS. TOP OF BASE TO ALIGN WITH ADJACENT PIECE.

17. PROVIDE CORNER GUARDS AT ALL EXPOSED EXTERIOR CORNERS IN CORRIDORS

(4" TO 52" AFF). CORNER GUARDS ARE TO MATCH PAINT COLOR.

OFFICE

101A

CORRIDOR

CHAPEL

WORK ROOM

104B

104A

STAGE EQUIP.

105A

LOBBY

CLASSROOM

107A108A

CLASSROOM

OFFICE

109A

109B

109C

109D

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

ID-121

A3

INTERIOR SCOPE OF WORK

FULL FINISH REPLACEMENT

1. REMOVE EXISTING A/C UNIT IN IT'S ENTIRETY. REFER TO MEP DRAWING FOR

ADDITIONAL NOTES.

2. REMOVE EXISTING CARPET IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW FINISH

MATERIAL.

3. REMOVE EXISTING VINYL BASE IN IT'S ENTIRETY IN ROOMS WHERE CARPET IS

REMOVED. PATCH AND REPAIR WALLS TO RECEIVE NEW FINISH.

4. EXISTING WOOD BASE IS TO REMAIN UNLESS DAMAGED BY REMOVAL OF

FLOORING. WOOD BASE IS TO BE REPLACED AND TO MATCH EXISTING.

5. REMOVE EXISTING VCT FLOOR IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW

FINISH MATERIAL.

6. PATCH AND REPAIR DRYWALL WALLS WHERE A/C UNITS WERE REMOVED.

REPAINT AREA TO MATCH ADJACENT WALL FINISH PRIOR TO INSTALLATION OF

NEW A/C UNITS.

7. EXISTING WOOD PANELS ARE TO BE PROTECTED DURING THE REMOVAL OF A/C

UNITS. REPAIR ANY DAMAGED PANELS WITH SAME MATERIAL. REPAIRED PANELS

ARE TO MATCH EXISTING PANELING.

8. REFER TO FINISH CODE SCHEDULE AND FINISH SCHEDULE BY ROOM FOR NEW

FINISH DESIGNATION.

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS ONLY

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:0

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

ID-120

IN

T

E R

IO

R

F

IN

IS

H

S C

H E

D U

L E

N

O T

E S

S X

H T

-1

I

ID

-1

F A

-1

-D

M A

R C

H

F A

F A

F A

-1 -D

K G

K G

K G

D W

100%

PLAN NORTH

04 8 16268

SCALE: 1/8"=1'-0"

1/8" = 1'-0"ID-120

A1 FLOOR PLAN

FINISH CODE SCHEDULE

FINISH

CODE TYPE MANUFACTURER MFG. LINE COLOR BACKING

FLAME

SPREAD

RATING REMARKS

CPT-1 CARPET - TILE MILLIKEN LINEN 2.0 LIN097 - NEITH TRACTION BACK CLASS I INSTALL MONOLITHIC

LVT LUXURY VINYL TILE MOHAWK HOT & HEAVY COLLECTION - SECOYA C0009 833 OAKBARK - 9" X 59" PLANK FLOATING/LOOSE CLASS I VERIFY LVT MATCHES EXISTING LVT ON SITE.

PTL PAINT SHERWIN WILLIAMS LOW VOC - LATEX OR EPOXY MATCH EXISTING CLASS I MATCH EXISTING PER ROOM

VB VINYL BASE BURKE BURKEBASE TYPE TV .080" BLACK ROLLS CLASS I NEW

WD WOOD BASE CONTRACTOR PAINTED WOOD FLAT STOCK PAINTED TO MATCH EXISTING MATCH EXISTING PROFILE / MITER ALL CORNERS

WP WOOD WALL PANELING CONTRACTOR WOOD VENEER PANELING STAINED TO MATCH EXISTING MATCH EXISTING WOOD SPECIES AND STAIN COLOR

DESIGN DRAWINGS

100%

IS

S

U E

D A

T E

M a rc h

OFFICE

STOR.

101A

CORRIDOR

CHAPEL

WORK ROOM

STOR.

104B

STOR.

104A

STAGE EQUIP.

STOR.

105A

LOBBY

CLASSROOM

STOR.

107A

STOR.

108A

CLASSROOM

OFFICE

STOR.

109A

STOR.

109B

STOR.

109C

STOR.

109D

NOT IN SCOPE

NOT IN SCOPE

NOT IN SCOPE

WD

B2 / ID-121

D2 / ID-121

D2 / ID-121

D2 / ID-121

D2 / ID-121

D2 / ID-121

C2 / ID-121 C2 / ID-121

C2 / ID-121

P T

L E

P O

X Y

P T

L E

P O

X Y

LEGEND - NEW

A/C UNIT

CARPET - NEW

LVT - NEWCARPET TILE

CONCRETE SLAB

LUXURY VINYL TILE

VINYL TRANSITION STRIP

BLACK

DOOR

EXISTING FLOORING

FIELD VERIFY

MATERIAL HEIGHT

CONCRETE SLAB

LUXURY VINYL TILE

VINYL TRANSITION STRIP

BLACK

DOOR

CARPET TILE

CONCRETE SLAB

EXISTING FLOORING

FIELD VERIFY MATERIAL

HEIGHT

VINYL TRANSITION STRIP

BLACK

DOOR

INTERIOR SCOPE OF WORK

FULL FINISH REPLACEMENT

1. REMOVE EXISTING A/C UNIT IN IT'S ENTIRETY. REFER TO MEP DRAWING FOR

ADDITIONAL NOTES.

2. REMOVE EXISTING CARPET IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW FINISH

MATERIAL.

3. REMOVE EXISTING VINYL BASE IN IT'S ENTIRETY IN ROOMS WHERE CARPET IS

REMOVED. PATCH AND REPAIR WALLS TO RECEIVE NEW FINISH.

4. EXISTING WOOD BASE IS TO REMAIN UNLESS DAMAGED BY REMOVAL OF

FLOORING. WOOD BASE IS TO BE REPLACED AND TO MATCH EXISTING.

5. REMOVE EXISTING VCT FLOOR IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW

FINISH MATERIAL.

6. PATCH AND REPAIR DRYWALL WALLS WHERE A/C UNITS WERE REMOVED.

REPAINT AREA TO MATCH ADJACENT WALL FINISH PRIOR TO INSTALLATION OF

NEW A/C UNITS.

7. EXISTING WOOD PANELS ARE TO BE PROTECTED DURING THE REMOVAL OF A/C

UNITS. REPAIR ANY DAMAGED PANELS WITH SAME MATERIAL. REPAIRED PANELS

ARE TO MATCH EXISTING PANELING.

8. REFER TO FINISH CODE SCHEDULE AND FINISH SCHEDULE BY ROOM FOR NEW

FINISH DESIGNATION.

GENERAL NOTES

1. REFER TO PROJECT MANUAL FOR ALL GENERAL NOTES AND CONDITIONS.

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON

DRAWINGS AND SHALL NOTIFY THE DESIGNER OF ANY ERROR, INCONSISTENCY

PRIOR TO BIDDING AND/OR PROCEEDING WITH THE WORK.

3. PROVIDE FLOORING SHOP DRAWING PRIOR TO INSTALLATION.

4. THESE DOCUMENTS ARE TO BE USED AS A BASIS OF DESIGN.

5. HATCHED AREAS INDICATE AREAS NOT IN SCOPE.

6. CONTRACTOR TO SECURE SIZE AND THICKNESS OF MATERIAL FROM

MANUFACTURER.

7. VERIFY CONDITIONS PRIOR TO INSTALLATION. PRIOR TO FLOORING

INSTALLATION, TEST CONCRETE SLAB FOR MOISTURE CONTENT BASED ON

MANUFACTURERS RECOMMENDATION.

8. ALL ADHESIVES MUST CONTAIN 'NO ADDED UREAFORMALDEHYDE' & MUST MEET

LEED LOW-VOC REQUIREMENTS.

9. ALL HOLLOW METAL DOORS AND WINDOW FRAMES ARE TO MATCH ADJACENT

WALL COLOR. U.N.O.

10. CONTRACTOR TO PROVIDE NECESSARY THRESOLD TRANITIONS AT ALL

LOCATIONS WITHIN THE SCOPE OF WORK.

11. ANY LOCATION WHERE TWO FLOORING FINISHES COME IN A DOORWAY, EXTEND

THE FLOORING TO MEET AT CENTERLINE OF DOOR.

12. FOR TRANSITIONS OF DIFFERENT THICKNESS, USE FLOOR LEVELING TRANSITION

MATERIAL AND FEATHER OUT OVER 2'-0" TO PROVIDE AN EVEN TRANSITION.

13. WALLS WITH LAVATORY FIXTURES SHALL HAVE EPOXY PAINT PTE-1 UP TO 6'-0"

AFF U.N.O.

14. WALLS AT E.W.C. TO HAVE EPOXY PAINT PTE-1 UP TO 6'-0" AFF U.N.O. INCLUDING

ADJACENT WALLS.

15. PAINT RECESS ELECTRICAL PANELS TO MATCH ADJACENT WALL.

16. ALL WALL BASE TO BE INSTALLED IN LENGTHS AS LONG AS FEASIBLE WITHOUT

GAPS AT SEAMS. TOP OF BASE TO ALIGN WITH ADJACENT PIECE.

17. PROVIDE CORNER GUARDS AT ALL EXPOSED EXTERIOR CORNERS IN CORRIDORS

(4" TO 52" AFF). CORNER GUARDS ARE TO MATCH PAINT COLOR.

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS ONLY

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:0

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

ID-121

E N

L A

R G

E D

F

IN

IS

H

P L A

N

D E

T A

IL

S

S X

H T

-1

I

ID

-1

F A

-1

-D

M A

R C

H

F A

F A

F A

-1 -D

K G

K G

K G

D W

100%

3/16" = 1'-0"ID-121

A3 ENLARGED FINISH PLAN

106 04 2

SCALE: 3/16"=1'-0"

PLAN NORTH

12" = 1'-0"ID-121

D2 TRAN. DETAIL - CPT - LVT

12" = 1'-0"ID-121

C2 TRAN. DETAIL - EXISTING - NEW LVT

12" = 1'-0"ID-121

B2 TRAN. DETAIL - EXISTING - NEW CPT

DESIGN DRAWINGS

100%

IS

S

U E

D A

T E

M a rc h

1. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR EQUIPMENT ARE

DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE DUE TO CONTRACTOR

OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH NEW PRODUCTS OF EQUAL

CAPACITY AND QUALITY.

2. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT DOWNS,

OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES BEFORE

PERFORMING ANY WORK.

3. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY PARTITIONS

AND MEANS OF EGRESS RESULTING FROM DEMOLITION OPERATIONS.

4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER ALL

DEMOLITION THAT AFFECTS OCCUPIED PORTIONS OF THE FACILITY.

5. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION FOR

ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE FACILITY.

6. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING

CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.

7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS

INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF

GOVERNING REGULATIONS AND AS FOLLOWS:

A. HOLES IN WALLS AND FLOORS SHALL BE CUT NEATLY WITH STRAIGHT AND

PLUMB EDGES. PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT

OPENINGS AND HOLES PLUMB; AND SQUARE TRUE TO DIMENSIONS

REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE NEW

CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR

SAWING OR GRINDING. THE CONTRACTOR SHALL MINIMIZE HAMMERING AND

CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES.

TEMPORARILY COVER OPENINGS.

B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED

SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES.

C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK

AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES,

SUCH AS DUCT INTERIORS AND PIPE INTERIORS, VERIFY CONDITIONS AND

CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OR

GRINDING OPERATIONS. MAINTAIN A FIRE WATCH AND PORTABLE FIRE-

SUPPRESSION DEVICES DURING FLAME-CUTTING OR GRINDING

OPERATIONS. OBTAIN ALL REQUIRED BURN PERMITS BEFORE ANY OF THIS

WORK IS PERFORMED.

D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND

GRINDING.

E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR

UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.

F. LOWER DEMOLISHED MATERIAL ABOVE FINISHED FLOOR TO GROUND BY

METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT

AND DUST GENERATION.

G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED

EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE

LOADS ON SUPPORTING WALLS, FLOORS, ROOFS OR FRAMING.

GENERAL NOTES:

8. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.

9. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY

DISPOSE OF DEBRIS.

10. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND

DEBRIS CAUSED BY DEMOLITION OPERATIONS.

11. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR

APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL

REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.

12. CONTRACTOR TO PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED

POTENTIAL ENERGY SYSTEMS INCLUDING ELECTRICAL HYDRAULIC AND PNEUMATIC

INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.

13. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING

OPENINGS SHALL BE PATCHED AND SEALED.

14. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.

GENERAL NOTES:

15. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL, COMMUNICATION OR CLEAN

WORK AREAS.

16. ALL WORK SHALL BE IN ACCORDANCE WITH UFC 3-410-01 AND UFC 3-401-01.

17. THE CODES AND STANDARDS LISTED ON THIS SHEET.

18. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL

CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING

WORK.

19. WHEREVER EXISTING SYSTEMS ARE ALTERED, EXTENDED, OR PARTS THERE OF

ABANDONED, MAINTAIN, IN GOOD OPERATING CONDITION, THE INTEGRITY OF THE

REMAINING SYSTEM, OR PARTS THEREOF.

20. COORDINATE ALL MECHANICAL WORK AND EQUIPMENT WITH STRUCTURAL MEMBERS,

ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS.

21. INSULATION REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH ASBESTOS

HANDLING SPECIFICATIONS.

22. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS, FROM

COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER TERMINATION AS

SHOWN ON DRAWINGS.

23. PROVIDE ALL HVAC EQUIPMENT AS PER MANUFACTURER REQUIREMENTS AND DIVISION

23 SPECIFICATIONS.

24. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.

25. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL

CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE APPROXIMATE AND

MUST BE FIELD VERIFIED.

26. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED

WALLS.

27. FOR NEW CONNECTIONS PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW

FOR TUBE/COIL REMOVAL/REINSTALLATION.

28. SLOPE ALL CONDENSATE AND FLOOR DRAIN PIPING TO HAVE A MINIMUM SLOPE OF 1/8"

PER 12" RUN.

29. ENSURE ALL STEEL SHAPES (FABRICATIONS) CONFORM TO ASTM-A-3C AND ROUND ALL

SHARP EDGES. REMOVE ALL BURRS.

30. REFER TO DIVISION 26 SPECIFICATIONS FOR ALL BONDING AND GROUNDING

REQUIREMENTS.

31. REFER TO DIVISION 23 SPECIFICATIONS FOR ALL WELDING AND COATING

REQUIREMENTS.

32. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY TO

PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH THE INTENT

OF THE CONTRACT DRAWINGS. FULLY TEST, BALANCE, CLEAN, AND LEAVE SYSTEMS IN

A COMPLETE AND OPERATIONAL STATUS.

33. INSTALL ALL MATERIALS IN A NEAT AND WORKMANLIKE MANNER WITH THE

COORDINATION OF ALL INVOLVED TRADES.

34. INSTALL IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS WITH

ADEQUATE MAINTENANCE CLEARANCES. PROVIDE SUBMITTALS AS INDICATED ON THE

SUBMITTAL SCHEDULE.

35. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT DRAWINGS ARE

TO ESTABLISH THE SPECIFIED STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED

TYPE(S), SIZE(S), AND CONFIGURATION.

36. EXCEPT WHERE INDICATED IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING,

MECHANICAL EQUIPMENT, PIPING, AND FITTINGS ARE APPROXIMATE. EXACT LOCATIONS

SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE COORDINATED WITH ALL

APPLICABLE TRADES.

37. HANGERS FOR ALL COPPER PIPING SHALL BE PLASTIC-COATED TYPE.

38. CONFIRM LOCATION AND ELEVATION OF ALL CROSSING LINES PRIOR TO INSTALLING

ANY PIPE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER.

39. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING

CONNECTIONS SHALL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS

NOTED OTHERWISE).

40. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS SHALL BE

SEALED AND THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS.

41. THE EXISTING HVAC CONTROLS WILL BE UPGRADED TO SCHNEIDER ELECTRIC

ECOSTRUXURE PER THE ENERGY MANAGEMENT CONTROLS SYSTEMS STANDARDS

(PAFB INSTALLATION FACILITY STANDARDS SUPPLEMENT D09) REQUIREMENTS OF

CCSFS.

CODES & STANDARDS

UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITION SYSTEMS

UFC 3-401-01 MECHANICAL ENGINEERING

ASHRAE 62.1 STANDARDS FOR VENTILATION AND ACCEPTABLE INDOOR AIR QUALITY

UFC 3-560-01 OPERATION AND MAINTENANCE: ELECTRICAL SAFETY

G10 PSFB IFS 45 CES HEATING, VENTILATION & AIR CONDITION (HVAC) STANDARDS

G13 PSFB IFS 45 CES ENERGY MANAGEMENT & CONTROLS SYSTEMS (EMCS)

ABBREVIATIONS:

VOLTS, VOLTAGE

ODP OPEN DRIP PROOF

ELEC ELECTRIC, ELECTRICAL

OUTSIDE AIR LOUVEROAL

HVAC HEATING, VENTILATION AND AIR CONDITIONING

AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME

AND AIR CONDITIONING ENGINEERS

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,

CONTRACTORS' NATIONAL ASSOCIATION

SHEET METAL AND AIR CONDITIONINGSMACNA

RH RELATIVE HUMIDITY

PRV PRESSURE REDUCING VALVE

BUILDING AUTOMATION SYSTEMBAS

BYPASSBYP

BPV BYPASS VALVE

BTUH BRITISH THERMAL UNIT PER HOUR

SUPPLY AIR TEMPERATURESAT

SS

RETURN AIR TEMPERATURERAT

OAT OUTSIDE AIR TEMPERATURE

POTABLE WATERPW

TYPICALTYP

VARIABLE FREQUENCY DRIVEVFD

EQUIPMENTEQUIP

MIN

FLOORFLR

ACCESS DOORAD

BOTTOM OF PIPEBOP

BRITISH THERMAL UNITBTU

AIR HANDLERAH

ABOVE FINISHED GRADEAFG

AIR CONDITIONERAC

AIR CONDITIONINGA/C

1000 BRITISH THERMAL UNITS PER HOUR

NATIONAL ELECTRIC CODE

NATIONAL FIRE PROTECTION ASSOCIATION

MINIMUM CIRCUIT AMPACITY

POINT OF CONNECTION

PRESSURE DROP

STATIC PRESSURE

REVOLUTION PER MINUTE

RATED LOAD AMPS

POUNDS PER SQUARE INCH

STAINLESS STEEL

TOTAL STATIC PRESSURE

TOTAL SENSIBLE HEAT

OUTSIDE AIROA

FLEXIBLE

FLANGE

FEET

ENTERING WATER TEMPERATURE

EXTERNAL STATIC PRESSURE

DEGREES FAHRENHEIT

GALVANIZED

HORSEPOWER

HERTZ

INCHES

GALLONS PER MINUTE

HZ

IN

HP

GALV

GPM

°F

FLEX

FLG

FT

ESP

EWT

ROOMRM

TSP

TSH

TEMP

STL

SP

RPM

SA

TEMPERATURE

STEEL

SUPPLY AIR

RLA

PSI

RA

POC

PH

PD

OC

RETURN AIR

ON CENTER

PHASE

CAPACITY

CHILLED WATER

CONNECTION

CONTINUE

DRY BULB

DIAMETER

AIR HANDLING UNIT

AUTOMATIC FLOW CONTROL VALVE

BOTTOM OF DUCT

CUBIC FEET PER MINUTE

DIRECT DIGITAL CONTROL

DRAWING

DOWN

DB

DDC

DIA

DWG

DN

CHW

CONT

CONN

BOD

CAP

CFM

AFCV

AHU

MECHANICALMECH

NFPA

NTE

NOM

NEC

NOT TO EXCEED

NOMINAL

MINIMUM

MCA

MBH

MAT MIXED AIR TEMPERATURE

SF SUPPLY FAN

W

WATT(S)

W/ WITH

LEAVING AIR TEMPERATURELAT

EXISTING TO REMAINETR

CHILLED WATER SUPPLY / RETURNCHWS/R

REG REGULATION

TS TEMPERATURE SENSOR

OD OUTSIDE DIAMETER

INSIDE DIMENSIONID

CONCRETECONC

DIVISIONDIV

KILOWATTSKW

POUNDS PER SQUARE INCH GAUGEPSIG

TEMPERATURE DRYBULBTDB

SEN SENSIBLE

FEET PER MINUTEFPM

REQ REQUIRED

NTS NOT TO SCALE

ABOVE FINISHED FLOORAFF

TEST ADJUST AND BALANCETAB

CONDENSATE DRAINCD

DAMPERDAMP

EXISTING(E)

ENERGY MANAGEMENT CONTROL SYSTEMEMCS

MAX MAXIMUM

PRESS PRESSURE

V

VOLTS ALTERNATING CURRENTVAC

W

LOW PRESSURE LP

EXIST EXISTING

ACOUSTICAL CEILING TILEACT

NPT NATIONAL PIPE THREAD

DENOTE NEW(N)

REMOTE SENSORRS

PS PRESSURE SENSOR

DISCHARGE AIT TEMPERATUREDAT

INDICATES PIPING OR EQUIPMENT

TO BE REMOVED

LINEWORK INDICATES

NEW PIPING OR EQUIPMENT

SYMBOL ABBR DESCRIPTION

DESCRIPTIONSYMBOL ABBR

PIPE END CAP

PIPE TURNING DOWN OR AWAY

PIPE TURNING UP OR TOWARD

PIPE TURNING DOWN OR AWAY (TEE)

DIRECTION OF FLOW

LIGHT LINEWORK INDICATES

EXISTING PIPING OR EQUIPMENT

REDUCER

CD

PIPING LEGEND

AIR DISTRIBUTION LEGEND

(UNLESS NOTED OTHERWISE)

END OF DUCT WITH CAP

SQUARE TO ROUND TRANSITION

ECCENTRIC DUCT TRANSITION

EXISTING DUCT

CONCENTRIC DUCT TRANSITION

BACKDRAFT DAMPER

GENERAL LEGEND

SYMBOL ABBR DESCRIPTION

DETAIL SYMBOL:

IDENTIFYING NUMBERA =

SHEET WHERE DETAIL IS SHOWNB =

SECTION SYMBOL:

SHEET WHERE SECTION IS SHOWN

IDENTIFYING LETTER

B

A

B

A

A

H HUMIDISTAT/HUMIDITY SENSOR

(WALL MOUNTED)

H'STAT/HS

TITLE SYMBOL ON SHEET WHERE SHOWN:

A = IDENTIFYING NUMBER/LETTER

SD-1

REVISION CLOUD AND

REVISION NUMBER

EQUIPMENT IDENTIFICATION:

(REFER TO SCHEDULES)

CFM

B

A

SHEET WHERE SECTION IS FROMB =

A

B

POINT OF CONNECTION

H

T

HUMIDISTAT (DUCT MOUNTED)

THERMOSTAT (DUCT MOUNTED)

POC

P PRESSURE SENSOR PORT

B

A

ELEVATION SYMBOL:

SHEET WHERE SECTION IS SHOWN

IDENTIFYING LETTER

B

A

SMOKE DETECTORSD

POINT OF DISCONNECTION

TO BE DEMOLISHED AND REMOVED

POD

BALANCING DAMPER

FUSIBLE LINK FIRE DAMPER F

SUPPLY DUCT (VERTICAL CHANGE)

RETURN DUCT (VERTICAL CHANGE)

CONDENSATE DRAIN

CHWS/R

CWS/R

CHILLED WATER SUPPLY/RETURN

CONDENSOR WATER SUPPLY/RETURN

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-001

M E

C H

A N

IC

A

L G

E N

E R

A L

N O

T E

S

S X

H T

-1

M e c h a n ic a l M

-0

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

M-401

M-402

M-404

M-401

M-403

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

/8

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-101

C O

M P

O S

IT

E

P L

A N

S X

H T

-1

M e c h a n ic a l M

-1

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%1/8" = 1'-0"

MECHANICAL COMPOSITE PLAN

04 8 16268

SCALE: 1/8"=1'-0"

PLAN NORTH

EXISTING AHU-2

EXISTING AHU-1

EXISTING CHILLER

EXISTING CHILLED WATER PUMP

1"ø CHWR 1"ø CHWS

2"ø CHWR

2"ø CHWS

1 1/2"ø CHWS

1 1/2"ø CHWR

EXISTING COOLING TOWER 1

EXISTING TOWER WATER PUMP 2

3 1/2"ø CHWR 3 1/2"ø CHWS

2"ø HWS

2"ø HWR

2 1/2"ø CHWR

2 1/2"ø CHWS

3"ø CHWR

1 1/2"ø CHWS

1 1/2"ø CHWR

EXISTING 1 1/2" CHWS/R

PIPING TO FAN COIL UNITS

FC-8, FC-9, FC-10, FC-11

EXISTING 1 1/2" CHWS/R

PIPING TO FAN COIL UNITS

FC-1, FC-2, FC-3, FC-4, FC-5, FC-6, FC-7

EXISTING 1" CHWS/R

PIPING TO FAN COIL UNIT

FC-14

TYP

EXISTING COLUMN CHIMNEY,

TO REMAIN

EXISTING BOILER,

TO REMAIN

EXISTING CHILLED WATER

EXPANSON TANK

EXISTING CHILLED WATER

EXPANSON TANK

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

/4

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-401

E Q

U

IP

M E

N T

R O

O M

D E

M O

L

IT

IO

N

P L

A N

S X

H T

-1

M e c h a n ic a l M

-4

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%1/4" = 1'-0"M-401

1 EQUIPMENT ROOM DEMOLITION PLAN

KEY NOTES:

PLAN NORTH

1. DEMOLISH EXISTING COOLING TOWER, ASSOCIATED PIPING, AND

SUPPORTS. DEMOLISH EXISTING CONCRETE BLOCK SUPPORTS

FLUSH WITH TOP OF EXISTING CONCRETE. PATCH WITH NON-SHRINK

GROUT AS REQUIRED.

2. DEMOLISH EXISTING COOLING TOWER PUMP AND ASSOCIATED

PIPING.

3. DEMOLISH EXISTING CHILLER AND ASSOCIATED PIPING.

4. DEMOLISH EXISTING CHILLED WATER PUMP ASSOCIATED PIPING.

5. DEMOLISH EXISTING AIR HANDLING UNITS. PRESERVE DUCTWORK TO

THE GREATEST EXTEND POSSIBLE FOR REUSE.

6. DEMOLISH EXISTING AIR HANDLING UNIT SUPPORTS TO EXISTING

SLAB ON GRADE.

7. DEMOLISH EXISTING TANKS.

0 2' 4' 8' 12'

SCALE: 1/4" = 1'-0"

AHU-2 AHU-1

CHILLER C-2

NEW CHILLED

WATER PUMP P-1

TOWER WATER

PUMP P-2

EXISTING COLUMN

CHIMNEY

1"ø CHWS

1"ø CHWR

3"ø CHWS 2"ø CHWR

TYP

2"ø CHWS2"ø CHWR

4"ø CHWS

4"ø CHWR

41"x20" SA

24"x24" SA

COOLING TOWER

EXISTING BOILER

40"x12" RA

4"ø CHWS

37"x19" SA

EXISTING 1 1/2" CHWS/R

PIPING TO FAN COIL UNITS

FC-8, FC-9, FC-10, FC-11

EXISTING 1 1/2" CHWS/R

PIPING TO FAN COIL UNITS

FC-1, FC-2, FC-3, FC-4, FC-5, FC-6, FC-7

EXISTING 1" CHWS/R

PIPING TO FAN COIL UNIT

FC-14

6"ø CWS 6"ø CWS

2"ø HWR 2"ø HWS

2"ø HWS

2"ø HWR

60"x24" RA

(BELOW)

40"x12" RA

"x

R A

NEW AIR

SEPARATOR AS-1

NEW EXPANSION

TANK ET-1

NEW BUFFER

TANK BT-1

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

/4

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-402

E Q

U

IP

M E

N T

R O

O M

IN

S

T A

L L

A T

IO

N

P L

A N

S X

H T

-1

M e c h a n ic a l M

-4

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%1/4" = 1'-0"M-402

2 EQUIPMENT ROOM INSTALLATION PLAN

KEY NOTES:

PLAN NORTH

1. PROVIDE AND INSTALL NEW COOLING TOWER CT-1 PER

MANUFACTURER'S INSTRUCTIONS. PROVIDE ALL PIPING AND

APPURTENANCES REQUIRED FOR INSTALLATION. REFER TO THE

COOLING TOWER SCHEDULE ON M-601 AND THE SPECIFICATIONS.

INSTALL NEW EQUIPMENT PAD IN ACCORDANCE WITH DETAIL C4 ON

SHEET M-502.

2. PROVIDE AND INSTALL NEW TOWER WATER PUMP P-2 PER

MANUFACTURER'S INSTRUCTIONS ON NEW HOUSEKEEPING PAD.

PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR

INSTALLATION. REFER TO THE PUMP SCHEDULE ON M-601 AND THE

SPECIFICATIONS. INSTALL NEW EQUIPMENT PAD IN ACCORDANCE

WITH DETAIL C4 ON SHEET M-502.

3. PROVIDE AND INSTALL NEW CHILLER C-1 PER MANUFACTURER'S

INSTRUCTIONS ON EXISTING HOUSEKEEPING PAD. PROVIDE ALL

PIPING AND APPURTENANCES REQUIRED FOR INSTALLATION. REFER

TO THE CHILLER SCHEDULE ON M-601 AND THE SPECIFICATIONS.

4. PROVIDE AND INSTALL NEW CHILLED WATER PUMP P-1 PER

MANUFACTURER'S INSTRUCTIONS ON EXISTING HOUSEKEEPING PAD.

PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR

INSTALLATION. REFER TO THE CHILLER SCHEDULE ON M-601 AND THE

SPECIFICATIONS.

5. PROVIDE AND INSTALL NEW CHILLED WATER SUPPLY, CHILLED

WATER RETURN, HEATING WATER SUPPLY, AND HEATING WATER

RETURN PIPING IN THE MECHANICAL ROOM. CONNECT CHILLED

WATER SUPPLY AND CHILLED WATER RETURN PIPE TO THE EXISTING

BRANCH PIPING BELOW FLOOR.

6. PROVIDE AND INSTALL NEW AIR HANDLING UNITS AHU-1 AND AHU-2

PER MANUFACTURER'S INSTRUCTIONS ON NEW HOUSEKEEPING PAD.

PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR

INSTALLATION. REFER TO THE CHILLER SCHEDULE ON M-601 AND THE

SPECIFICATIONS.

7. PROVIDE AND INSTALL NEW SIX INCH HOUSE-KEEPING PAD

EXTENDING SIX INCHES FROM ALL EDGES OF EQUIPMENT. REFER TO

NEW HOUSE-KEEPING PAD DETAIL ON SHEET M-502.

8. PROVIDE AND INSTALL AIR SEPARATOR, EXPANSION TANK, AND

BUFFER TANK. REFER TO PIPING DIAGRAM ON SHEET M-601.

FC-14

FC-6

FC-5

FC-4

FC-3

FC-7

FC-9 FC-10 FC-8 FC-11

FC-2 FC-1

(TYP OF 12)

EXISTING

CHWS/R PIPE

(TYP OF 12)

CHAPEL

WORK ROOM

STAGE EQUIP.

OFFICE

CLASSROOM

CLASSROOM

LOBBY

OFFICE

CORRIDOR

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

/4

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-403

C H

A P

E L

D E

M O

L

IT

IO

N

P L

A N

S X

H T

-1

M e c h a n ic a l M

-4

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%1/4" = 1'-0"M-403

3 CHAPEL DEMOLITION PLAN

KEY NOTES:

PLAN NORTH

1. DEMOLISH EXISTING CHILLED WATER FAN COIL UNITS. PRESERVE

CHILLED WATER PIPING AND ELECTRICAL CONDUITS AND

CONDUCTORS FOR REUSE.

(TYP OF 12)

FC-14

FC-6

FC-5

FC-4

FC-3

FC-7

FC-9 FC-10 FC-8 FC-11

FC-2 FC-1

EXISTING

CHWS/R PIPE

(TYP OF 12)

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

/4

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-404

C H

A P

E L

I N

S T

A L

L A

T

IO

N P

L A

N

S X

H T

-1

M e c h a n ic a l M

-4

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%1/4" = 1'-0"M-404

4 CHAPEL INSTALLATION PLAN

KEY NOTES:

PLAN NORTH

1. PROVIDE AND INSTALL TWELVE (12) NEW TWO-PIPE CHILLED WATER

FAN COIL UNITS PER MANUFACTURER'S INSTRUCTIONS. PROVIDE

CHILLED WATER PIPE NECESSARY TO INSTALL NEW FAN COIL UNITS

AND CONNECT TO EXISTING CHILLED WATER PIPE BELOW FLOOR.

REFER TO FAN COIL UNIT SCHEDULE ON M-601 AND THE

SPECIFICATIONS.

PIPE INSULATION

INSULATION SHIELD REQUIRED

FOR INSULATED PIPE

(TOP & BOTTOM) MIN 6" LONG

PIPE SADDLE W/ U-BOLT

(TOLCO FIG 318A OR

APPROVED EQUAL)

3"

CONCRETE FLOOR

THREADED PIPE STAND W/

WELDED BASE PLATE

(TOLCO FIG316T) SECURED TO

SLAB W/ 1/2" HILTI KWIK BOLT

NEW PIPING WITH

INSULATION. PROVIDE

POLYISOCYANURATE

INSULATION (DOW TRYMER

1800) TO EXTEND 2" LONGER

THAN PIPE SHIELD

V

R

IE

S

3/8" HILTI KWIK BOLT TZ

WITH 3" MIN EMBEDMENT

3/8" THREADED HANGER ROD

NUT & BACKNUT

PIPE HANGER

CONDENSATE PIPING

PIPE INSULATION SHIELD

SEE MECHANICAL SPECIFICATION

SECTION "A-A"

PIPE W/ INSULATION

SECURE ISOLATOR TO STRUCTURE W/ 1/2"∅

BOLT THRU PHILLIPS RED HEAD EXPANSION

ANCHOR LOAD RATED. 3" MIN. EMBEDMENT.

UNISTRUT ANGULAR

BRACKET (TYP)

UNISTRUT CHANNEL SWAY

BRACING (TYP)

UNISTRUT BRACKET

INSULATION SHIELD (TYP)

1/2" NUT & BACKNUT (TYP)

1/2"∅ HANGER ROD. LOAD

RATED. LENGTH AS REQ'D

LONGITUDINAL BRACING

SIMILAR TO SWAY BRACING

FOR CONNECTION TO

CONCRETE STRUCTURE

SEE DETAIL 9 ON SHEET M-503

PC

CHWR

CHWS

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-501

M E

C H

A N

IC

A

L D

E T

A

IL

S I

S X

H T

-1

M e c h a n ic a l M

-5

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%

NTSM-501

A1 TYPICAL PIPE SUPPORT DETAIL

NTSM-501

A3 CONDENSATE PIPE SUPPORT DETAIL

NTSM-501

C1 PIPE SUPPORT DETAIL

ATTACH TO STRUCTURE

WITH BEAM CLAMP (TYP)

1/4"∅ THREADED STEEL ROD

V A

R

IE

S

VARIES

P1000 UNISTRUT

1/4" THREADED STEEL ROD

WASHER (TYP)

P1000 UNISTRUT

NUT (TYP)

NUT (TYP)

P1000 UNISTRUT

WASHER (TYP)

1/4" THREADED STEEL ROD

P1000 UNISTRUT

SPANNING OVERHEAD

STRUCTURAL MEMBERS

SUPPORT HANGER,

TYPE VARIES

WINDOW CLAMP,

EACH SIDE OF BEAM

#4 REBAR AT 18" OC MID

DEPTH ALONG PAD

PERIMETER

WWF 6x6-W4xW4

AT MID DEPTH

4000 PSI CIP CONCRETE

HOUSEKEEPING PAD

3/4" CHAMFER EXPOSED

CORNERS (TYP)

EXISTING SLAB ON GRADE

ROUGHEN SLAB SURFACE

AND APPLY BONDING AGENT

PRIOR TO PAD PLACEMENT

EPOXY #4 DOWEL INTO

FLOOR SLAB HILTI HIT-RE 500

V3, OR APPROVED EQUAL

NOTES:

1. INSTALL PADS A MINIMUM OF 2-INCHES OFF OF ADJACENT WALLS.

2. SIZE PADS TO ACCOMMODATE 6-INCHES OF CLEAR SPACE BETWEEN

EDGE OF PAD AND FACE OF EQUIPMENT ON ALL SIDES.

3. ANCHOR EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS.

EQUIPMENT

6" TYP.

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri s i n d ic a te d

/2

/2

:4

:5

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-502

M E

C H

A N

IC

A

L D

E T

A

IL

S I

I

S X

H T

-1

M e c h a n ic a l M

-5

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%

NTSM-502

A1 HVAC HANGER SUPPORT

NTSM-502

A4 TYPICAL SPANNING STRUT

NTSM-502

C1 NEW HOUSE-KEEPING PAD DETAIL

AHU-1

P-1

CFA-1

BULK

TANK

BT-1

CH-1

P-2

CT-1

AIR

SEPARATOR

AS-1

EXPANSION TANK ET-1

3/4" PIPE TO DOMESTIC

WATER MAKE-UP

3/4" TO PLUMBING DRAIN

2" CHWS

4" CHWR

2" CHWR

4" CHWR

4" CHWS

6" CWS

6" CWR

2.5"

3"

2"

4"

TDV-4

SD-4

E X

T E

R

IO

R

IN

T

E R

IO

R

6" CWS

M

BLEED VALVE TO DRAIN

ACV-1

SD-1

TDV-1

TPV-1

SYSTEM RACK

CHW

TREATMENT

2.5"

4"

4" CHWS

AHU-1

COIL

CONDENSER WATER

TREATMENT SYSTEM RACK

BFV-2

BFV-2

BV-1

BV-1

BFV-1

BFV-1

BFV-1

BFV-1

BFV-3

BFV-3

BFV-3

BFV-3

BV-1

BV-1

BV-2

AHU-2

COIL

AHU-2

3" CHWR

3" CHWS

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

T

S

/2

/2

:4

:0

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-601

P

IP

IN

G

D

IA

G R

A M

S

S X

H T

-1

M e c h a n ic a l M

-6

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%

NTSM-601

A1 PIPING DIAGRAM

TO

AHU-1,

AHU-2,

FCUS

CH-1

CT-1

P-2 P-1

FROM

AHU-1,

AHU-2,

FCUS

C H

IL

L E

D W

A T

E R

S U

P P

L Y

T E

M P

E R

A T

U R

E

C H

IL

L E

D W

A T

E R

R E

T U

R N

T E

M P

E R

A T

U R

E

C H

IL

L E

D W

A T

-1

F L

O W

T O

W E

R W

A T

-1

F L

O W

T O

W E

R W

A T

E R

S U

P P

L Y

T E

M P

E R

A T

U R

E

D R

A

IN

P A

N H

IG

H

L E

V E

L A

L A

R M

O A

D A

M P

E R

O A

T E

M P

E R

A T

U R

E

F

IL

T E

R S

A C

R O

S S

F

IL

T E

R D

IF

F

E R

E N

T

IA

L P

R E

S S

U R

E

H E

A T

IN

G

C O

IL

H E

A T

IN

G

C O

IL

L

E A

V

IN

G A

IR

T

E M

P E

R A

T U

R E

S U

P P

L Y

A

IR

F A

N S

S U

P P

L Y

A

IR

T E

M P

E R

A T

U R

E

NO

O A

D A

M P

E R

P O

S

IT

IO

N

-C L O

S E

O P

E N

C O

O L

IN

G

C O

IL

E

N T

E R

IN

G

A

IR

T E

M P

E R

A T

U R

E

MAGNEHELIC

PRESSURE GAGES

DRAIN PAN

HIGH LEVEL

FLOAT SWITCH

H

IG

H D

R

IP

P A

N L

E V

E L

A L

A R

M

H E

A T

IN

G

W A

T E

R P

IP

IN

G S

U P

P L

Y

H E

A T

IN

G

W A

T E

R P

IP

IN

G R

E T

U R

N

D A

M P

E R

NC

E M

E R

G E

N C

Y D

A M

P E

R C

L O

S E

S W

IT

C

H

M O

D U

L A

T

IN

G H

E A

T

IN

G W

A T

E R

C O

N T

R O

L V

A L V

E A

N D

R E

T U

R N

W A

T E

R T

E M

P E

R A

T U

R E

RA DAMPER

RA TEMPERATURE

NO

RA DAMPER POSITION-CLOSE OPEN

C O

O L

IN

G

C O

IL

C H

IL

L E

D W

A T

E R

P

IP

IN

G

S U

P P

L Y

C H

IL

L E

D W

A T

E R

P

IP

IN

G

R E

T U

R N

M O

D U

L A

T

IN

G C

H

IL

L E

D W

A T

E R

C O

N T

R O

L V

A L V

E A

N D

R E

T U

R N

W A

T E

R T

E M

P E

R A

T U

R E

C H

IL

L E

D W

A T

E R

S U

P P

L Y

T E

M P

E R

A T

U R

E

H E

A T

IN

G

W A

T E

R S

U P

P L

Y T

E M

P E

R A

T U

R E

S U

P P

L Y

F A

N S

T A

T U

S

H

IG

H D

R

IP

P A

N L

E V

E L A

L A

R M

S H

U T

D O

W N

S M

O K

E A

L A

R M

S H

U T

D O

W N

S U

P P

L Y

F A

N S

T A

R T

/S T

O P

S M

O K

E A

L A

R M

S E

N S

O R

C O

L

E V

E L

S E

N S

O R

* BY OTHERS IN ANOTHER

PROJECT SCOPE

OA

RA

MS

CO2

F

IL

T E

R S

C O

O L

IN

G

C O

IL

C H

IL

L E

D W

A T

E R

P

IP

IN

G

S U

P P

L Y

C H

IL

L E

D W

A T

E R

P

IP

IN

G

R E

T U

R N

M O

D U

L A

T

IN

G C

H

IL

L E

D W

A T

E R

C O

N T

R O

L V

A L V

E A

N D

R E

T U

R N

W A

T E

R T

E M

P E

R A

T U

R E

C H

IL

L E

D W

A T

E R

S U

P P

L Y

T E

M P

E R

A T

U R

E

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L rh o d e s b ri

T

S

/2

/2

:4

:0

P

M

R E

P L

A C

E C

H

IL

L E

R

A H

U 'S

F

A N

C O

IL

U N

IT

S

B

D E

S

IG

N D

R A

W

IN

G S

M-602

M E

C H

A N

IC

A

L C

O N

T R

O L

S D

IA

G

R A

M

S X

H T

-1

M e c h a n ic a l M

-6

F A

-1

-D

M a rc h

F A

F A

F A

-1 -D

P B

C R

J M

R F

100%

NTS

CHILLED WATER CONTROLS DIAGRAM

NTS

AHU CONTROLS DIAGRAM

SEQUENCE OF OPERATIONS:

THE OCCUPANCY MODE (OCCUPIED OR UNOCCUPIED) SHALL BE DETERMINED THROUGH A USER-

ADJUSTABLE SCHEDULE AND OVERRIDDEN TO OCCUPIED WHEN THRESHOLD CO2 LEVEL IS SENSED .

WHENEVER THE SUPPLY FAN IS DE-ENERGIZED, AS SENSED BY THE STATUS SWITCH, THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN, THE HEATING

AND COOLING VALVES SHALL BE CLOSED OR POSITIONED AS DESCRIBED BELOW.

A. OCCUPIED MODE

1. THE SUPPLY FAN SHALL BE ENERGIZED.

2. THERE SHALL BE SEPARATE HEATING AND COOLING SPACE TEMPERATURE SET-POINTS

WITH A 5°F DEAD-BAND BETWEEN THE HEATING AND COOLING SET-POINTS

3. THE HEATING COIL VALVE AND COOLING COIL VALVE SHALL MODULATE IN SEQUENCE TO

MAINTAIN SUPPLY AIR TEMPERATURE SET-POINT.

4. MINIMUM OUTSIDE AIR: THE MINIMUM OA FLOW RATE IS ESTABLISHED BY THE REQUIRED

OUTDOOR AIR FLOW WITH NO OCCUPANTS (VAT) AND THE REQUIRED OUTDOOR AIR FLOW

AT DESIGN OCCUPANCY (VOT). THE DAMPER POSITIONS CORRESPONDING TO THESE TWO

AIRFLOW RATES SHALL BE SET IN CONJUNCTION WITH THE BALANCE CONTRACTOR. THE OA

DAMPER SHALL MODULATE BETWEEN THE NO OCCUPANTS POSITION AND THE DESIGN

OCCUPANCY POSITION AS THE SPACE CO2 CONCENTRATION VARIES FROM 400 PPM

(AMBIENT) TO 1,500 PPM (ADJUSTABLE).

5. SUPPLY AIR TEMPERATURE SET-POINT FOR COOLING AND DEHUMIDIFYING SHALL BE RESET

BASED ON SPACE RELATIVE HUMIDITY TO ACHIEVE 50% ACCORDING TO THE FOLLOWING

RESET SCHEDULE:

A. SUPPLY AIR TEMPERATURE SET-POINT FOR COOLING AND DEHUMIDIFYING 55°F,

ADJUSTING +2°F INCREMENTS UNTIL 50%, +/- 10%, RH IS ACHIEVED.

B. SUPPLY AIR TEMPERATURE SET-POINT FOR HEATING 85F.

C. ALL PARAMETERS SHALL BE INDEPENDENTLY ADJUSTABLE.

B. UNOCCUPIED MODE

1. UNOCCUPIED OFF: THE SUPPLY FAN SHALL BE DE-ENERGIZED EXCEPT WHEN OPERATION IS

CALLED FOR AS DESCRIBED BELOW. OUTSIDE AIR DAMPERS AND EXHAUST DAMPERS SHALL

BE CLOSED AND RETURN AIR DAMPER OPEN. HEATING AND COOLING VALVES SHALL BE

CLOSED.

2. UNOCCUPIED OFF, COIL PROTECTION: WHEN THE SUPPLY FAN IS DE-ENERGIZED AND THE

OUTSIDE AIR TEMPERATURE IS BELOW THE OUTSIDE AIR LOW TEMPERATURE PROTECTION

SET-POINT OF 35°F (ADJUSTABLE) AND THE MIXED AIR TEMPERATURE IS LESS THAN THE

MIXED AIR LOW TEMPERATURE PROTECTION SET-POINT OF 45°F (ADJUSTABLE), OR THE LOW

TEMPERATURE LIMIT TRIPS, THEN THE HEATING COIL VALVE SHALL CYCLE TO MAINTAIN

MIXED AIR TEMPERATURE PROTECTION SET-POINT OF 45°F. WHEN THE OUTSIDE AIR

TEMPERATURE IS ABOVE THE OUTSIDE AIR LOW TEMPERATURE PROTECTION SET-POINT OF

35°F + DEAD-BAND, OR THE MIXED AIR TEMPERATURE IS GREATER THAN THE MIXED AIR LOW

TEMPERATURE PROTECTION SET-POINT OF 45°F + DEAD-BAND; THE HEATING AND COOLING

COIL VALVE SHALL BE CLOSED.

3. UNOCCUPIED SETBACK: THE SUPPLY FAN SHALL CYCLE ON WITH THE OUTSIDE AND

EXHAUST DAMPERS CLOSED WHEN THE SPACE TEMPERATURE DROPS BELOW THE

UNOCCUPIED SPACE TEMPERATURE SET-POINT OF 65°F (ADJUSTABLE). WHEN THE FAN IS

ENERGIZED, THE HEATING SHALL MODULATE TO MAINTAIN SUPPLY AIR TEMPERATURE SET-

POINT OF 85°F (ADJUSTABLE).

C. OCCUPIED OR UNOCCUPIED MODE

1. THE SUPPLY FAN SHALL SHUT DOWN WHEN THE DRIP PANEL HIGH LEVEL SWITCH INDICATES

HIGH LEVEL.

2. THE SUPPLY FAN SHALL SHUT DOWN WHEN THE SMOKE ALARM SENSOR INDICATES SMOKE.

3. ALL DAMPERS WILL CLOSE UPON ACTIVATION OF EMERGENCY DAMPER CLOSE SWITCH.

NTS

FAN COIL UNIT CONTROLS DIAGRAM

SEQUENCE OF OPERATIONS:

THE CHILLER WILL OPERATE AS ESTABLISHED AT THE CHILLER

CONTROL PANEL. THE CONDENSER WATER PUMPS WILL START/STOP

UPON RECEIVING INPUT FROM THE CHILLER OR THE BAS SYSTEM OR

FROM THE START/STOP SWITCH.

SEQUENCE OF OPERATIONS:

START/STOP WILL BE INITIATED VIA THE SWITCH ON THE UNIT OR AS

SCHEDULED BY THE BAS. THE CONTROLLER SHALL CONTINUE TO

MONITOR ROOM TEMPERATURE AS SENSED AT THE UNIT MOUNTED

THERMOSTAT TO MAINTAIN THE COOLING SETPOINT. THE UNIT

CONTROLLER SHALL MODULATE THE COOLING COIL CONTROL

VALVE TO MAINTAIN THE COOLING SETPOINT.

AIR HANDLING UNIT SCHEDULE

GENERAL DATA SUPPLY AIR FAN COOLING COIL HEATING COIL FILTER

MARK AREA SERVED

BASIS OF DESIGN

MANUFACTURER

MODEL

FAN MOTOR

TOTAL

CAPACITY

(MBH)

SENSIBLE

CAPACITY

(MBH)

ROWS

COIL FIN & TUBE

MATERIAL

AIR SIDE WATER SIDE

TOTAL

CAPACITY

(MBH)

ROWS

COIL FIN &

TUBE

MATERIAL

AIR SIDE WATER SIDE

TYPESUPPLY

AIR (CFM)

TOTAL SP

(IN. H2O)

QTY RPM HP TYPE V/PH/HZ

FACE

VELOCITY

(FT/MIN)

ENTERING LEAVING

FLOW

(GPM)

ENT.

(F)

LEAV.

(F)

FACE

VELOCITY

(FT/MIN)

ENT.

(F)

LEAV.

(F)

FLOW

(GPM)

ENT.

(F)

LEAV.

(F)DB

(F)

WB

(F)

DB

(F)

WB

(F)

AHU-1 CHAPEL TRANE CSAA021 9,600 3.015 2 1800 5

PREMIUM

ODP

208/60/3 368.96 246.77 6

ALUMINUM FIN,

COPPER TUBE

461.30 78.0 67.0 54.7 54.6 73.5 45.00 55.00 206.14 1

ALUMINUM FIN,

COPPER TUBE

484.11 55.00 74.80 20.7 140.00 120.00 2" MERV 8

AHU-2 ASSEMBLY ROOM TRANE CSAA014 6,000 2.754 2 1800 2

PREMIUM

ODP

208/60/3 233.64 154.23 6

ALUMINUM FIN,

COPPER TUBE

439.56 78.0 67.0 54.7 54.4 46.6 45.00 55.00 128.84 1

ALUMINUM FIN,

COPPER TUBE

480.00 55.00 74.80 12.9 140.00 120.00 2" MERV 8

NOTES:

1. INSTALL CONDENSATE DRAIN AND TRAP IN ACCORDANCE WITH MFG. REQUIREMENTS.

2. PROVIDE UNIT IN SECTIONS NECESSARY FOR TRANSPORT AND INSTALATION AT UNIT SITE.

3. PROVIDE NEW SERVICE DISCONNECTS. COORDINATE WITH ELECTRICAL CONTRACTOR FOR INSTALLATION.

4. PROVIDE COILS WITH EPOXY COATING OR APPROVED EQUIVALENT FOR MEETING 10,000 HOUR SALT SPRAY TEST.

CHILLER SCHEDULE

GENERAL DATA EVAPORATOR CONDENSER ELECTRICAL DATA

MARK TYPE

BASIS OF DESIGN

MANUFACTURER

MODEL

CAPACITY

(TONS)

REFRIGERANT

FLUID

TEMPERATURE FLOW

RATE

(GPM)

PRESSURE

DROP (FT.

H2O)

FLUID

TEMPERATURE

FLOW

RATE (GPM)

PRESSURE

DROP (FT. H2O)

VOLTS PHASE HERTZ MCA MOP

EWT (°F) LWT (°F) EWT (°F) LWT (°F)

CH-1 WATER COOLED CENTRIFUGAL TRANE TPWCCMV0600D3-MM 67.28 R410A 54.0 44.0 160.9 15.7 85 94.3 211.0 22.1 208 3 60 196 300

NOTES:

1. PROVIDE FLANGED CONNECTIONS FOR EVAPORATOR AND CONDENSER CONNECTIONS.

2. PROVIDE WITH FLOW SWITCHES.

3. PROVIDE WITH A CONTROL PANEL WITH CONTROL AND MONITORING FUNCTIONS SPECIFIED ON SHEET M-602, AND LOCKABLE CONTROL PANEL CABINET.

COOLING TOWER SCHEDULE

MARK TYPE

BASIS OF DESIGN

MANUFACTURER

MODEL FLOW (GPM) EWT (°F) LWT (°F) WBT (°F)

PUMP HEAD

(FT)

FAN MOTOR (HP)

ELECTRICAL DATA

(VOLTS/PH)

CT-1

FORCED DRAFT, FRP CONSTRUCTION, 304

STAINLESS STEEL HARDWARE

TOWER TECH TTXR-011930 215.0 95.0 85.0 80.0 13.0 3.0 208/3

NOTES:

1. PROVIDE CONSTRUCTION TO MEET THE ULTIMATE WIND SPEED AS REQUIRED BY 45TH CES AT PATRICK SFB.

2. PROVIDE PREMIUM EFFICIENCY MOTORS, INDOOR VFD, NEMA 4 STAINLESS STEEL DISCONNECT, AND VIBRATION SWITCH.

CHILLED WATER FAN COIL UNIT SCHEDULE

GENERAL DATA SUPPLY AIR FAN COOLING COIL FILTER HEAT

MARK AREA SERVED

BASIS OF DESIGN

MANUFACTURER

MODEL ORIENTATION

FAN MOTOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .