Atch 2 - Drawings.pdf
PDF 6 MB Posted
- Attached to
- SXHT 21-1005 Replace Chiller AHU and Fan Coil Unit Federal contract opportunity
- Solicitation number
- FA252125B0002
About this file
These are design drawings for the replacement of HVAC equipment at Building B-3659 on Patrick Space Force Base, Florida. The comprehensive set of mechanical and electrical drawings details the full replacement of a 67.28-ton chiller, two air handling units (AHUs), twelve fan coil units, cooling tower, water pumps, and associated electrical infrastructure. The project involves removing existing R-22 refrigerant equipment and installing new R-410A systems from Trane, including upgrading controls to meet Space Force engineering management control system (EMCS) standards. The mechanical system will include new chilled water piping, electrical panels, and variable frequency drives (VFDs) for pumps and equipment, with work to be completed within 180 calendar days after notice to proceed.
The drawings specify detailed replacement requirements across multiple sheets, including demolition and installation plans for mechanical and electrical systems, equipment schedules, piping diagrams, and control sequences. Key new equipment includes a Trane water-cooled centrifugal chiller, Tower Tech cooling tower, Bell & Gossett pumps, and Trane fan coil units. The project also encompasses associated work such as potential wall repairs, touch-up painting, and replacement of damaged interior finishes. Electrical upgrades include new 800A service entrance equipment, panelboards, and motor controls, with careful consideration of existing infrastructure and connection requirements.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
FACILITY B-3659
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N O
D R
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
A A rh o d e s b ri to
A
C
H
I T
E
S
P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L
N T
S
/2
/2
:2
:4
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
G-000
C O
V E
R S
H E
E T
S X
H T
-1
G G
-0
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
J L
C R
D M
B H
100%
SXHT 21-1005
REPLACE CHILLER, AHU'S & FAN COIL UNITS, B3659
100% DESIGN DRAWINGS
NTS
LOCATION PLAN
PATRICK SPACE FORCE BASE
SOUTH HOUSING
SATELLITE BEACH, FLORIDA
TRUE
NORTH
PERMIT(S)/ENVIRONMENTAL AND SLD 45 ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
SLD 45 RISK ASSESSMENT
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
X
X
X
XX
SHEET INDEX
Sheet Number Sheet Name
G-000 COVER SHEET
HAZARDOUS MATERIALS
Sheet Number Sheet Name
H-001 HAZARDOUS MATERIALS GENERAL NOTES AND LEGEND
H-101 HAZARDOUS MATERIALS PLAN
INTERIORS
Sheet Number Sheet Name
ID-120 INTERIOR FINISH SCHEDULE & NOTES
ID-121 ENLARGED FINISH PLAN & DETAILS
ELECTRICAL
Sheet Number Sheet Name
E-001 ELECTRICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
E-101 ELECTRICAL COMPOSITE PLAN
E-401 EQUIPMENT ROOM ELECTRICAL DEMOLITION PLAN
E-402 CHAPEL ELECTRICAL DEMOLITION PLAN
E-403 EQUIPMENT ROOM ELECTRICAL INSTALLATION PLAN
E-404 CHAPEL ELECTRICAL INSTALLATION PLAN
E-601 SINGLE LINE DIAGRAMS
E-701 PANEL SCHEDULES
MECHANICAL
Sheet Number Sheet Name
M-001 MECHANICAL GENERAL NOTES
M-101 COMPOSITE PLAN
M-401 EQUIPMENT ROOM DEMOLITION PLAN
M-402 EQUIPMENT ROOM INSTALLATION PLAN
M-403 CHAPEL DEMOLITION PLAN
M-404 CHAPEL INSTALLATION PLAN
M-501 MECHANICAL DETAILS I
M-502 MECHANICAL DETAILS II
M-601 PIPING DIAGRAMS
M-602 MECHANICAL CONTROLS DIAGRAM
M-701 SCHEDULES I
M-702 SCHEDULES II
GENERAL NOTES - ENVIRONMENTAL:
1. HAZARDOUS MATERIALS MAY BE PRESENT WITHIN BUILDING B3659. LIMITED HAZARDOUS MATERIAL SAMPLING WAS
PERFORMED IN THE DIRECT PROJECT AREA, AND ALL RESULTS ARE INCLUDED ON THIS SHEET; HOWEVER, THE PERFORMED SAMPLING IS NOT ALL INCLUSIVE BUT REPRESENTS THE PROJECT AREA. ACM AND COATINGS CONTAINING HAZARDOUS CONSTITUENTS POTENTIALLY EXIST WITHIN THE IMMEDIATE VICINITY OF WORK. ABATEMENT AND
ENCAPSULATION OF HAZARDOUS MATERIALS MAY BE REQUIRED AS PART OF CONSTRUCTION.
A. ENVIRONMENTAL SAMPLING WAS PERFORMED BY SUNRISE SYSTEMS OF BREVARD, INC, ON JANRUARY 27, 2023, AND THE RESULTS ARE INCLUDED IN THE REPORT TITLED ASBESTOS SAMPLING REPORT FOR SXHT 21-1005 REPLACE CHILLER, AHUS AND FAN COIL UNITS BLDG 3659, DATED FEBRUARY 1, 2023. REQUEST A COPY FROM THE CONTRACTING OFFICER PRIOR TO BIDDING THE PROJECT. REFER TO H-101 FOR HAZARDOUS MATERIAL
LOCATION.
2. ALL COATED SURFACES IN THE FACILITY ARE ASSUMED TO CONTAIN HEAVY METALS AND/OR PCBS UNLESS OTHERWISE
DOCUMENTED IN THESE DRAWINGS OR SPECIFICATIONS.
3. DISPOSE OF ALL MATERIALS IN ACCORDANCE WITH THE CONTRACT CLAUSES AND SPECIFICATION SECTION 01 57 19.
4. IF HAZARDOUS MATERIALS ARE ENCOUNTERED, HANDLE, DISTURB, STORE, TRANSPORT AND DISPOSE IN ACCORDANCE
WITH SPECIFICATION SECTION 01 57 19.
5. THE HAZARDOUS MATERIAL SCHEDULE PROVIDED ON SHEET H-101 IS NOT ALL INCLUSIVE. SAMPLE AND ANALYZE ALL SUSPECT MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN THESE PROJECT DRAWINGS AND
SPECIFICATIONS OR ASSUMED WORST CASE.
6. SUBMIT ALL ENVIRONMENTAL PLANS TO THE CO FOR REVIEW, WHERE REQUIRED, AND RESUBMIT FOR APPROVAL. DO
NOT COMMENCE UNTIL EACH PLAN IS GIVEN FINAL APPROVAL.
7. PREPARE AND SUBMIT AN ENVIRONMENTAL PROTECTION PLAN (INCLUDING SPENT OIL AND REFRIGERANT REMOVAL, CONTROL, AND DISPOSAL).
8. IDENTIFY, CLASSIFY, MANAGE, TRANSPORT AND DISPOSE OF HAZARDOUS WASTE IN ACCORDANCE WITH ALL APPLICABLE LOCAL, MUNICIPAL AND FEDERAL ENVIRONMENTAL CODES, STANDARDS AND REGULATIONS INCLUDING BUT
NOT LIMITED TO USSF SLD 45, OSHA, EPA AND CFR.
9. IDENTIFY, CLASSIFY, MANAGE, TRANSPORT AND DISPOSE OF ALL HAZARDOUS MATERIALS IN ACCORDANCE WITH 40 CFR
260 THROUGH 273.
10. DISPOSE OF PCB CONTAINING MATERIALS IN ACCORDANCE WITH 40 CFR 761.
11. DISPOSE OF ACM IN ACCORDANCE WITH 40 CFR 76.
GENERAL NOTES - ASBESTOS:
1. ASBESTOS CONTAINING MATERIALS (ACM) ARE NOT PRESENT WITHIN THE IMMEDIATE AREAS OF WORK.
2. ASBESTOS FINDINGS FOR AREAS AFFECTED BY THIS WORK ARE PRESENTED IN THE HAZARDOUS MATERIALS TABLE ON SHEET H-101. A COPY OF THE ASBESTOS SURVEY REPORT IS INCLUDED AS A SUPPLEMENT TO THE DESIGN DATA
MANUAL.
3. SUSPECT ACM, NOT IDENTIFIED IN THE ASBESTOS REPORT, MUST BE BROUGHT TO THE CONTRACTING OFFICER'S
ATTENTION PRIOR TO DISTURBANCE OF THE MATERIAL.
4. WRITTEN NOTIFICATION TO THE CO AND SPACE FORCE IS REQUIRED FOR ANY REGULATED ASBESTOS REMOVAL.
SUBMIT A NOTIFICATION TO FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), “NOTICE OF ASBESTOS RENOVATION OR DEMOLITION” FDEP FORM 62-257.900(1) TEN (10) DAYS PRIOR TO ANY ACM REMOVAL. THE CONTRACTING OFFICER MUST PROVIDE APPROVAL OF ALL NOTIFICATIONS PRIOR TO SUBMITTING TO THE USSF OR ANY
REGULATORY AGENCY.
5. ACTIVITIES THAT MAY DISTURB ACM MUST BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL ASBESTOS RULES AND REGULATIONS BY PERSONNEL THAT ARE EPA TRAINED AND CERTIFIED IN HANDLING ACM.
GENERAL NOTES - HEAVY METAL AND PCB COATINGS:
1. HEAVY METYAL AND PCB COATINGS ARE NOT PRESENT WITHIN THE IMMEDIATE AREAS OF THE WORK.
2. 20 DAYS PRIOR TO COATING REMOVAL OPERATIONS, SUBMIT A COPY OF THE NOTIFICATION OF THE COMMENCEMENT OF
ABATEMENT TO THE CO.
3. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL OR SURFACES WITH PRESERVATIVE COATING IN ACCORDANCE WITH FEDERAL REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29 CFR 1926.354.
4. TREAT ANY COATING CONTAINING A DETECTABLE LIMIT OF ARSENIC, BARIUM, CADMIUM, CHROMIUM (TOTAL), CHROMIUM (HEXAVALENT), LEAD, MERCURY, SELENIUM, SILVER, OR PCBs AS COATING CONTAINING HAZARDOUS CONSTITUENTS.
5. PERFORM ANY DISTURBANCE OF COATING CONTAINING HAZARDOUS CONSTITUENTS IN ACCORDANCE WITH THE APPROVED HEAVY METAL AND PCB WASTE MANAGEMENT AND COMPLIANCE PLANS, AND SPECIFICATION SECTION 02 83 00.
6. COATINGS OR MATERIALS WITH PCB CONCENTRATION ABOVE 50 PPM ARE REGULATED BY THE TOXIC SUBSTANCES CONTROL ACT (TSCA) PURSUANT TO THE FEDERAL REGULATION 40 CFR 761. DEMOLITION DEBRIS WITH A COATING EXCEEDING 50 PPM PCBs MAY BE DISPOSED OF AS PCB BULK PRODUCT WASTE AT AN APPROVED LANDFILL, TO BE
DETERMINED BY THE CONTRACTOR IN THEIR WASTE MANAGEMENT PLAN.
7. ELECTRICAL CABLE SHEATHING AND COATINGS MAY CONTAIN PCBs AND SOME HEAVY METALS. IF THE CABLE IS TO BE DISPOSED OF OR RECYCLED, PROPERLY STAGE AND MANAGE SUCH CABLE IN ACCORDANCE WITH ALL REGULATORY REQUIREMENTS AND ENSURE THAT NO REGULATED SUBSTANCES ARE RELEASED TO THE ENVIRONMENT.
ABBREVIATIONS:
ACM ASBESTOS CONTAINING MATERIAL
CES/ESC CIVIL ENGINEERING SQUADRON / ENVIRONMENTAL SERVICE CONTRACT
Ag SILVER As ARENIC Ba BARIUM
CCSFS CAPE CANAVERAL SPACE FORCE STATION
Cd CADMIUM
CES CIVIL ENGINEERING SQUADRON
CFR CODE OF FEDERAL REGULATIONS
CHS COMPREHENSIVE HEALTH SERVICES
CO CONTRACTING OFFICER
Cr CHROMIUM
EA EACH
EPA ENVIRONMENTAL PROTECTION AGENCY
ESC ENVIRONMENTAL SERVICE CONTRACT
E/W EAST / WEST
FDEP FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FT FEET
Hg MERCURY Pb LEAD
PCB POLYCHLORINATED BIPHENYL
PPM PARTS PER MILLION
Se SELENUIM
SF SQUARE FOOT
SLD 45 SPACE LAUNCH DELTA 45
S/N SOUTH / NORTH
TSCA TOXIC SUBSTANCES CONTROL ACT
USSF UNITED STATES SPACE FORCE
VCT VINYL COMPOSITION TILE
W/ WITH
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
N T
S
/2
/2
:4
:3
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
H-001
H A
Z A
R D
O U
S M
A T
E R
IA
L
S G
E N
E R
A L N
O T
E S
A N
D L
E G
E N
D
S X
H T
-1
E N
V H
-0
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
M D
C
C R
J L
J L
100%
ENVIRONMENTAL SAMPLING RESULTS
HEX NOTES SAMPLE NUMBERS SAMPLE DESCRIPTION ACM
1 503786-006 GRAY, HARD CONCRETE NO
2 503786-007 BLACK BITUMINOUS JOINT MATERIAL NO
3 503786-005 GRAY, HARD CONCRETE NO
4 503786-002 WHITE/SILVER, SOFT/FIBROUS PIPE WRAP NO
5 503786-003 BLACK, FOAMY PIPE INSULATION NO
6 503786-001 WHITE, SOFT/FIBROUS ELBOW WRAP NO
7 503786-004 BLACK, FOAMY ELBOW MATERIAL NO
8 503786-008 GRAY, HARD CONCRETE NO
EXISTING AHU-2
EXISTING AHU-1
EXISTING CHILLED
WATER PUMP
EXISTING
CHILLER
EXISTING BOILER
EXISTING CHILLED
WATER EXPANSION TANK
EXISTING
CHIMNEY
EXISTING
COOLING TOWER
EXISTING TOWER
WATER PUMP2
EXISTING
CONCRETE PAD
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:4
:3
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
H-101
H A
Z A
R D
O U
S M
A T
E R
IA
L
S P
L A
N
S X
H T
-1
E N
V H
-1
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
M D
C
C R
J L
J L
100%0 2' 4' 8' 12'
SCALE: 1/4" = 1'-0"
PLAN NORTH
GENERAL NOTES:
1. THE ENVIRONMENTAL DRAWINGS DO NOT DEPICT ALL AREAS WHERE
CONSTRUCTION MAY OCCUR. AMPLE/ANALYZE SUSPECT
MATERIALS/COATINGS THAT ARE NOT IDENTIFIED SPECIFICALLY IN
THE DRAWINGS OR ASSUME WORSE CASE.
2. HAZARDOUS MATERIALS MAY EXIST IN AND AROUND THE
CONSTRUCTION AREA. COATINGS CONTAINING HAZARDOUS
CONSTITUENTS MAY EXIST WITHIN THE IMMEDIATE VICINITY OF
WORK. DEVELOP ENVIRONMENTAL PROTECTION PLANS AS
SAMPLING RESULTS DICTATE AND HANDLE HAZARDOUS MATERIALS
AS REQUIRED IN SPECIFICATIONS SECTIONS 01 57 19.
3. ENVIRONMENTAL DRAWINGS DO NOT DEPICT ALL AREAS WHERE
CONSTRUCTION MAY OCCUR. TREAT ALL COATING NOT ANALYZED AS
COATINGS CONTAINING HAZARDOUS CONSTITUENTS OR LEAVE
UNDISTURBED.
4. 20 DAYS PRIOR TO COATING REMOVAL OPERATIONS, SUBMIT A COPY
OF THE NOTIFICATION OF THE COMMENCEMENT OF ABATEMENT TO
THE CONTRACTING OFFICER IF REQUIRED.
5. PERFORM WELDING, CUTTING OR HOT WORK ON GALVANIZED STEEL
OR SURFACES WITH A PRESERVATIVE COATING IN ACCORDANCE
WITH FEDERAL REGULATIONS 29 CFR 1926.55, 29 CFR 1926.353 AND 29
CFR 926.354.
6. DISTURB COATINGS CONTAINING HAZARDOUS CONSTITUENTS IN
ACCORDANCE WITH SPECIFICATION SECTIONS 01 57 19.
7. ASBESTOS CONTAINING MATERIAL (ACM) MAY EXIST WITHIN THE
MMEDIATE AREA OF WORK. LEAVE SUSPECTED MATERIAL
UNDISTURBED AND REPORT IMMEDIATELY TO THE CONTRACTING
OFFICER. IF SUSPECT MATERIALS ARE IDENTIFIED, HANDLE THE
MATERIAL IN ACCORDANCE WITH SECTIONS 01 57 19. MANAGE ALL
WASTE STREAMS IN COMPLIANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS.
8. EQUIPMENT SHOWN IS FOR REFERENCE ONLY. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR FURTHER
INFORMATION.
1/4" = 1'-0"
EQUIPMENT ROOM HAZARDOUS MATERIALS PLAN
GENERAL NOTES
1. REFER TO PROJECT MANUAL FOR ALL GENERAL NOTES AND CONDITIONS.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON
DRAWINGS AND SHALL NOTIFY THE DESIGNER OF ANY ERROR, INCONSISTENCY
PRIOR TO BIDDING AND/OR PROCEEDING WITH THE WORK.
3. PROVIDE FLOORING SHOP DRAWING PRIOR TO INSTALLATION.
4. THESE DOCUMENTS ARE TO BE USED AS A BASIS OF DESIGN.
5. HATCHED AREAS INDICATE AREAS NOT IN SCOPE.
6. CONTRACTOR TO SECURE SIZE AND THICKNESS OF MATERIAL FROM
MANUFACTURER.
7. VERIFY CONDITIONS PRIOR TO INSTALLATION. PRIOR TO FLOORING
INSTALLATION, TEST CONCRETE SLAB FOR MOISTURE CONTENT BASED ON
MANUFACTURERS RECOMMENDATION.
8. ALL ADHESIVES MUST CONTAIN 'NO ADDED UREAFORMALDEHYDE' & MUST MEET
LEED LOW-VOC REQUIREMENTS.
9. ALL HOLLOW METAL DOORS AND WINDOW FRAMES ARE TO MATCH ADJACENT
WALL COLOR. U.N.O.
10. CONTRACTOR TO PROVIDE NECESSARY THRESOLD TRANITIONS AT ALL
LOCATIONS WITHIN THE SCOPE OF WORK.
11. ANY LOCATION WHERE TWO FLOORING FINISHES COME IN A DOORWAY, EXTEND
THE FLOORING TO MEET AT CENTERLINE OF DOOR.
12. FOR TRANSITIONS OF DIFFERENT THICKNESS, USE FLOOR LEVELING TRANSITION
MATERIAL AND FEATHER OUT OVER 2'-0" TO PROVIDE AN EVEN TRANSITION.
13. WALLS WITH LAVATORY FIXTURES SHALL HAVE EPOXY PAINT PTE-1 UP TO 6'-0"
AFF U.N.O.
14. WALLS AT E.W.C. TO HAVE EPOXY PAINT PTE-1 UP TO 6'-0" AFF U.N.O. INCLUDING
ADJACENT WALLS.
15. PAINT RECESS ELECTRICAL PANELS TO MATCH ADJACENT WALL.
16. ALL WALL BASE TO BE INSTALLED IN LENGTHS AS LONG AS FEASIBLE WITHOUT
GAPS AT SEAMS. TOP OF BASE TO ALIGN WITH ADJACENT PIECE.
17. PROVIDE CORNER GUARDS AT ALL EXPOSED EXTERIOR CORNERS IN CORRIDORS
(4" TO 52" AFF). CORNER GUARDS ARE TO MATCH PAINT COLOR.
OFFICE
101A
CORRIDOR
CHAPEL
WORK ROOM
104B
104A
STAGE EQUIP.
105A
LOBBY
CLASSROOM
107A108A
CLASSROOM
OFFICE
109A
109B
109C
109D
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
ID-121
A3
INTERIOR SCOPE OF WORK
FULL FINISH REPLACEMENT
1. REMOVE EXISTING A/C UNIT IN IT'S ENTIRETY. REFER TO MEP DRAWING FOR
ADDITIONAL NOTES.
2. REMOVE EXISTING CARPET IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW FINISH
MATERIAL.
3. REMOVE EXISTING VINYL BASE IN IT'S ENTIRETY IN ROOMS WHERE CARPET IS
REMOVED. PATCH AND REPAIR WALLS TO RECEIVE NEW FINISH.
4. EXISTING WOOD BASE IS TO REMAIN UNLESS DAMAGED BY REMOVAL OF
FLOORING. WOOD BASE IS TO BE REPLACED AND TO MATCH EXISTING.
5. REMOVE EXISTING VCT FLOOR IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW
FINISH MATERIAL.
6. PATCH AND REPAIR DRYWALL WALLS WHERE A/C UNITS WERE REMOVED.
REPAINT AREA TO MATCH ADJACENT WALL FINISH PRIOR TO INSTALLATION OF
NEW A/C UNITS.
7. EXISTING WOOD PANELS ARE TO BE PROTECTED DURING THE REMOVAL OF A/C
UNITS. REPAIR ANY DAMAGED PANELS WITH SAME MATERIAL. REPAIRED PANELS
ARE TO MATCH EXISTING PANELING.
8. REFER TO FINISH CODE SCHEDULE AND FINISH SCHEDULE BY ROOM FOR NEW
FINISH DESIGNATION.
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS ONLY
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:0
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
ID-120
IN
T
E R
IO
R
F
IN
IS
H
S C
H E
D U
L E
N
O T
E S
S X
H T
-1
I
ID
-1
F A
-1
-D
M A
R C
H
F A
F A
F A
-1 -D
K G
K G
K G
D W
100%
PLAN NORTH
04 8 16268
SCALE: 1/8"=1'-0"
1/8" = 1'-0"ID-120
A1 FLOOR PLAN
FINISH CODE SCHEDULE
FINISH
CODE TYPE MANUFACTURER MFG. LINE COLOR BACKING
FLAME
SPREAD
RATING REMARKS
CPT-1 CARPET - TILE MILLIKEN LINEN 2.0 LIN097 - NEITH TRACTION BACK CLASS I INSTALL MONOLITHIC
LVT LUXURY VINYL TILE MOHAWK HOT & HEAVY COLLECTION - SECOYA C0009 833 OAKBARK - 9" X 59" PLANK FLOATING/LOOSE CLASS I VERIFY LVT MATCHES EXISTING LVT ON SITE.
PTL PAINT SHERWIN WILLIAMS LOW VOC - LATEX OR EPOXY MATCH EXISTING CLASS I MATCH EXISTING PER ROOM
VB VINYL BASE BURKE BURKEBASE TYPE TV .080" BLACK ROLLS CLASS I NEW
WD WOOD BASE CONTRACTOR PAINTED WOOD FLAT STOCK PAINTED TO MATCH EXISTING MATCH EXISTING PROFILE / MITER ALL CORNERS
WP WOOD WALL PANELING CONTRACTOR WOOD VENEER PANELING STAINED TO MATCH EXISTING MATCH EXISTING WOOD SPECIES AND STAIN COLOR
DESIGN DRAWINGS
100%
IS
S
U E
D A
T E
M a rc h
OFFICE
STOR.
101A
CORRIDOR
CHAPEL
WORK ROOM
STOR.
104B
STOR.
104A
STAGE EQUIP.
STOR.
105A
LOBBY
CLASSROOM
STOR.
107A
STOR.
108A
CLASSROOM
OFFICE
STOR.
109A
STOR.
109B
STOR.
109C
STOR.
109D
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
WD
B2 / ID-121
D2 / ID-121
D2 / ID-121
D2 / ID-121
D2 / ID-121
D2 / ID-121
C2 / ID-121 C2 / ID-121
C2 / ID-121
P T
L E
P O
X Y
P T
L E
P O
X Y
LEGEND - NEW
A/C UNIT
CARPET - NEW
LVT - NEWCARPET TILE
CONCRETE SLAB
LUXURY VINYL TILE
VINYL TRANSITION STRIP
BLACK
DOOR
EXISTING FLOORING
FIELD VERIFY
MATERIAL HEIGHT
CONCRETE SLAB
LUXURY VINYL TILE
VINYL TRANSITION STRIP
BLACK
DOOR
CARPET TILE
CONCRETE SLAB
EXISTING FLOORING
FIELD VERIFY MATERIAL
HEIGHT
VINYL TRANSITION STRIP
BLACK
DOOR
INTERIOR SCOPE OF WORK
FULL FINISH REPLACEMENT
1. REMOVE EXISTING A/C UNIT IN IT'S ENTIRETY. REFER TO MEP DRAWING FOR
ADDITIONAL NOTES.
2. REMOVE EXISTING CARPET IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW FINISH
MATERIAL.
3. REMOVE EXISTING VINYL BASE IN IT'S ENTIRETY IN ROOMS WHERE CARPET IS
REMOVED. PATCH AND REPAIR WALLS TO RECEIVE NEW FINISH.
4. EXISTING WOOD BASE IS TO REMAIN UNLESS DAMAGED BY REMOVAL OF
FLOORING. WOOD BASE IS TO BE REPLACED AND TO MATCH EXISTING.
5. REMOVE EXISTING VCT FLOOR IN IT'S ENTIRETY. PREPARE FLOOR FOR NEW
FINISH MATERIAL.
6. PATCH AND REPAIR DRYWALL WALLS WHERE A/C UNITS WERE REMOVED.
REPAINT AREA TO MATCH ADJACENT WALL FINISH PRIOR TO INSTALLATION OF
NEW A/C UNITS.
7. EXISTING WOOD PANELS ARE TO BE PROTECTED DURING THE REMOVAL OF A/C
UNITS. REPAIR ANY DAMAGED PANELS WITH SAME MATERIAL. REPAIRED PANELS
ARE TO MATCH EXISTING PANELING.
8. REFER TO FINISH CODE SCHEDULE AND FINISH SCHEDULE BY ROOM FOR NEW
FINISH DESIGNATION.
GENERAL NOTES
1. REFER TO PROJECT MANUAL FOR ALL GENERAL NOTES AND CONDITIONS.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON
DRAWINGS AND SHALL NOTIFY THE DESIGNER OF ANY ERROR, INCONSISTENCY
PRIOR TO BIDDING AND/OR PROCEEDING WITH THE WORK.
3. PROVIDE FLOORING SHOP DRAWING PRIOR TO INSTALLATION.
4. THESE DOCUMENTS ARE TO BE USED AS A BASIS OF DESIGN.
5. HATCHED AREAS INDICATE AREAS NOT IN SCOPE.
6. CONTRACTOR TO SECURE SIZE AND THICKNESS OF MATERIAL FROM
MANUFACTURER.
7. VERIFY CONDITIONS PRIOR TO INSTALLATION. PRIOR TO FLOORING
INSTALLATION, TEST CONCRETE SLAB FOR MOISTURE CONTENT BASED ON
MANUFACTURERS RECOMMENDATION.
8. ALL ADHESIVES MUST CONTAIN 'NO ADDED UREAFORMALDEHYDE' & MUST MEET
LEED LOW-VOC REQUIREMENTS.
9. ALL HOLLOW METAL DOORS AND WINDOW FRAMES ARE TO MATCH ADJACENT
WALL COLOR. U.N.O.
10. CONTRACTOR TO PROVIDE NECESSARY THRESOLD TRANITIONS AT ALL
LOCATIONS WITHIN THE SCOPE OF WORK.
11. ANY LOCATION WHERE TWO FLOORING FINISHES COME IN A DOORWAY, EXTEND
THE FLOORING TO MEET AT CENTERLINE OF DOOR.
12. FOR TRANSITIONS OF DIFFERENT THICKNESS, USE FLOOR LEVELING TRANSITION
MATERIAL AND FEATHER OUT OVER 2'-0" TO PROVIDE AN EVEN TRANSITION.
13. WALLS WITH LAVATORY FIXTURES SHALL HAVE EPOXY PAINT PTE-1 UP TO 6'-0"
AFF U.N.O.
14. WALLS AT E.W.C. TO HAVE EPOXY PAINT PTE-1 UP TO 6'-0" AFF U.N.O. INCLUDING
ADJACENT WALLS.
15. PAINT RECESS ELECTRICAL PANELS TO MATCH ADJACENT WALL.
16. ALL WALL BASE TO BE INSTALLED IN LENGTHS AS LONG AS FEASIBLE WITHOUT
GAPS AT SEAMS. TOP OF BASE TO ALIGN WITH ADJACENT PIECE.
17. PROVIDE CORNER GUARDS AT ALL EXPOSED EXTERIOR CORNERS IN CORRIDORS
(4" TO 52" AFF). CORNER GUARDS ARE TO MATCH PAINT COLOR.
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS ONLY
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:0
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
ID-121
E N
L A
R G
E D
F
IN
IS
H
P L A
N
D E
T A
IL
S
S X
H T
-1
I
ID
-1
F A
-1
-D
M A
R C
H
F A
F A
F A
-1 -D
K G
K G
K G
D W
100%
3/16" = 1'-0"ID-121
A3 ENLARGED FINISH PLAN
106 04 2
SCALE: 3/16"=1'-0"
PLAN NORTH
12" = 1'-0"ID-121
D2 TRAN. DETAIL - CPT - LVT
12" = 1'-0"ID-121
C2 TRAN. DETAIL - EXISTING - NEW LVT
12" = 1'-0"ID-121
B2 TRAN. DETAIL - EXISTING - NEW CPT
DESIGN DRAWINGS
100%
IS
S
U E
D A
T E
M a rc h
1. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR EQUIPMENT ARE
DAMAGED IN APPEARANCE, OR BECOMES UNSERVICEABLE DUE TO CONTRACTOR
OPERATIONS, THE CONTRACTOR SHALL REPLACE WITH NEW PRODUCTS OF EQUAL
CAPACITY AND QUALITY.
2. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT DOWNS,
OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY SERVICES BEFORE
PERFORMING ANY WORK.
3. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY PARTITIONS
AND MEANS OF EGRESS RESULTING FROM DEMOLITION OPERATIONS.
4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER ALL
DEMOLITION THAT AFFECTS OCCUPIED PORTIONS OF THE FACILITY.
5. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF PROTECTION FOR
ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE REMOVAL FROM THE FACILITY.
6. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH DEMOLITION.
7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT AS
INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF
GOVERNING REGULATIONS AND AS FOLLOWS:
A. HOLES IN WALLS AND FLOORS SHALL BE CUT NEATLY WITH STRAIGHT AND
PLUMB EDGES. PROCEED WITH DEMOLITION SYSTEMATICALLY; NEATLY CUT
OPENINGS AND HOLES PLUMB; AND SQUARE TRUE TO DIMENSIONS
REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE NEW
CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR
SAWING OR GRINDING. THE CONTRACTOR SHALL MINIMIZE HAMMERING AND
CHOPPING TO REDUCE DISTURBANCE TO ADJACENT SURFACES.
TEMPORARILY COVER OPENINGS.
B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED
SURFACES TO AVOID MARRING EXISTING FINISHED SURFACES.
C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL WORK
AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES,
SUCH AS DUCT INTERIORS AND PIPE INTERIORS, VERIFY CONDITIONS AND
CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME-CUTTING OR
GRINDING OPERATIONS. MAINTAIN A FIRE WATCH AND PORTABLE FIRE-
SUPPRESSION DEVICES DURING FLAME-CUTTING OR GRINDING
OPERATIONS. OBTAIN ALL REQUIRED BURN PERMITS BEFORE ANY OF THIS
WORK IS PERFORMED.
D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES AND
GRINDING.
E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE DANGEROUS OR
UNSUITABLE MATERIAL AND PROMPTLY DISPOSE OF OFF-SITE.
F. LOWER DEMOLISHED MATERIAL ABOVE FINISHED FLOOR TO GROUND BY
METHODS SUITABLE TO AVOID FREE FALL AND PREVENT GROUND IMPACT
AND DUST GENERATION.
G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE DEMOLISHED
EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE
LOADS ON SUPPORTING WALLS, FLOORS, ROOFS OR FRAMING.
GENERAL NOTES:
8. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.
9. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND LEGALLY
DISPOSE OF DEBRIS.
10. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST, DIRT, AND
DEBRIS CAUSED BY DEMOLITION OPERATIONS.
11. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING. PRIOR
APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER REQUIRE ADDITIONAL
REMOVALS AND REPLACEMENTS OF UNSATISFACTORY WORK.
12. CONTRACTOR TO PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED
POTENTIAL ENERGY SYSTEMS INCLUDING ELECTRICAL HYDRAULIC AND PNEUMATIC
INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO CONSTRUCTION.
13. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE REMAINING
OPENINGS SHALL BE PATCHED AND SEALED.
14. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.
GENERAL NOTES:
15. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL, COMMUNICATION OR CLEAN
WORK AREAS.
16. ALL WORK SHALL BE IN ACCORDANCE WITH UFC 3-410-01 AND UFC 3-401-01.
17. THE CODES AND STANDARDS LISTED ON THIS SHEET.
18. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF ACTUAL
CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTING
WORK.
19. WHEREVER EXISTING SYSTEMS ARE ALTERED, EXTENDED, OR PARTS THERE OF
ABANDONED, MAINTAIN, IN GOOD OPERATING CONDITION, THE INTEGRITY OF THE
REMAINING SYSTEM, OR PARTS THEREOF.
20. COORDINATE ALL MECHANICAL WORK AND EQUIPMENT WITH STRUCTURAL MEMBERS,
ELECTRICAL WORK AND FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS.
21. INSULATION REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH ASBESTOS
HANDLING SPECIFICATIONS.
22. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR GAPS, FROM
COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN, OR OTHER TERMINATION AS
SHOWN ON DRAWINGS.
23. PROVIDE ALL HVAC EQUIPMENT AS PER MANUFACTURER REQUIREMENTS AND DIVISION
23 SPECIFICATIONS.
24. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN THE FIELD.
25. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL
CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE APPROXIMATE AND
MUST BE FIELD VERIFIED.
26. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH FIRE/SMOKE RATED
WALLS.
27. FOR NEW CONNECTIONS PROVIDE FLANGED PIPING CONNECTIONS AT COILS TO ALLOW
FOR TUBE/COIL REMOVAL/REINSTALLATION.
28. SLOPE ALL CONDENSATE AND FLOOR DRAIN PIPING TO HAVE A MINIMUM SLOPE OF 1/8"
PER 12" RUN.
29. ENSURE ALL STEEL SHAPES (FABRICATIONS) CONFORM TO ASTM-A-3C AND ROUND ALL
SHARP EDGES. REMOVE ALL BURRS.
30. REFER TO DIVISION 26 SPECIFICATIONS FOR ALL BONDING AND GROUNDING
REQUIREMENTS.
31. REFER TO DIVISION 23 SPECIFICATIONS FOR ALL WELDING AND COATING
REQUIREMENTS.
32. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES NECESSARY TO
PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN ACCORDANCE WITH THE INTENT
OF THE CONTRACT DRAWINGS. FULLY TEST, BALANCE, CLEAN, AND LEAVE SYSTEMS IN
A COMPLETE AND OPERATIONAL STATUS.
33. INSTALL ALL MATERIALS IN A NEAT AND WORKMANLIKE MANNER WITH THE
COORDINATION OF ALL INVOLVED TRADES.
34. INSTALL IN ACCORDANCE WITH MANUFACTURER’S RECOMMENDATIONS WITH
ADEQUATE MAINTENANCE CLEARANCES. PROVIDE SUBMITTALS AS INDICATED ON THE
SUBMITTAL SCHEDULE.
35. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT DRAWINGS ARE
TO ESTABLISH THE SPECIFIED STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED
TYPE(S), SIZE(S), AND CONFIGURATION.
36. EXCEPT WHERE INDICATED IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING,
MECHANICAL EQUIPMENT, PIPING, AND FITTINGS ARE APPROXIMATE. EXACT LOCATIONS
SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE COORDINATED WITH ALL
APPLICABLE TRADES.
37. HANGERS FOR ALL COPPER PIPING SHALL BE PLASTIC-COATED TYPE.
38. CONFIRM LOCATION AND ELEVATION OF ALL CROSSING LINES PRIOR TO INSTALLING
ANY PIPE. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER.
39. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO EXISTING
CONNECTIONS SHALL BE MADE USING THE SAME PIPE SIZE AS EXISTING (UNLESS
NOTED OTHERWISE).
40. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS SHALL BE
SEALED AND THE PIPES PROTECTED ACCORDING TO THE SPECIFICATIONS.
41. THE EXISTING HVAC CONTROLS WILL BE UPGRADED TO SCHNEIDER ELECTRIC
ECOSTRUXURE PER THE ENERGY MANAGEMENT CONTROLS SYSTEMS STANDARDS
(PAFB INSTALLATION FACILITY STANDARDS SUPPLEMENT D09) REQUIREMENTS OF
CCSFS.
CODES & STANDARDS
UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITION SYSTEMS
UFC 3-401-01 MECHANICAL ENGINEERING
ASHRAE 62.1 STANDARDS FOR VENTILATION AND ACCEPTABLE INDOOR AIR QUALITY
UFC 3-560-01 OPERATION AND MAINTENANCE: ELECTRICAL SAFETY
G10 PSFB IFS 45 CES HEATING, VENTILATION & AIR CONDITION (HVAC) STANDARDS
G13 PSFB IFS 45 CES ENERGY MANAGEMENT & CONTROLS SYSTEMS (EMCS)
ABBREVIATIONS:
VOLTS, VOLTAGE
ODP OPEN DRIP PROOF
ELEC ELECTRIC, ELECTRICAL
OUTSIDE AIR LOUVEROAL
HVAC HEATING, VENTILATION AND AIR CONDITIONING
AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME
AND AIR CONDITIONING ENGINEERS
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
CONTRACTORS' NATIONAL ASSOCIATION
SHEET METAL AND AIR CONDITIONINGSMACNA
RH RELATIVE HUMIDITY
PRV PRESSURE REDUCING VALVE
BUILDING AUTOMATION SYSTEMBAS
BYPASSBYP
BPV BYPASS VALVE
BTUH BRITISH THERMAL UNIT PER HOUR
SUPPLY AIR TEMPERATURESAT
SS
RETURN AIR TEMPERATURERAT
OAT OUTSIDE AIR TEMPERATURE
POTABLE WATERPW
TYPICALTYP
VARIABLE FREQUENCY DRIVEVFD
EQUIPMENTEQUIP
MIN
FLOORFLR
ACCESS DOORAD
BOTTOM OF PIPEBOP
BRITISH THERMAL UNITBTU
AIR HANDLERAH
ABOVE FINISHED GRADEAFG
AIR CONDITIONERAC
AIR CONDITIONINGA/C
1000 BRITISH THERMAL UNITS PER HOUR
NATIONAL ELECTRIC CODE
NATIONAL FIRE PROTECTION ASSOCIATION
MINIMUM CIRCUIT AMPACITY
POINT OF CONNECTION
PRESSURE DROP
STATIC PRESSURE
REVOLUTION PER MINUTE
RATED LOAD AMPS
POUNDS PER SQUARE INCH
STAINLESS STEEL
TOTAL STATIC PRESSURE
TOTAL SENSIBLE HEAT
OUTSIDE AIROA
FLEXIBLE
FLANGE
FEET
ENTERING WATER TEMPERATURE
EXTERNAL STATIC PRESSURE
DEGREES FAHRENHEIT
GALVANIZED
HORSEPOWER
HERTZ
INCHES
GALLONS PER MINUTE
HZ
IN
HP
GALV
GPM
°F
FLEX
FLG
FT
ESP
EWT
ROOMRM
TSP
TSH
TEMP
STL
SP
RPM
SA
TEMPERATURE
STEEL
SUPPLY AIR
RLA
PSI
RA
POC
PH
PD
OC
RETURN AIR
ON CENTER
PHASE
CAPACITY
CHILLED WATER
CONNECTION
CONTINUE
DRY BULB
DIAMETER
AIR HANDLING UNIT
AUTOMATIC FLOW CONTROL VALVE
BOTTOM OF DUCT
CUBIC FEET PER MINUTE
DIRECT DIGITAL CONTROL
DRAWING
DOWN
DB
DDC
DIA
DWG
DN
CHW
CONT
CONN
BOD
CAP
CFM
AFCV
AHU
MECHANICALMECH
NFPA
NTE
NOM
NEC
NOT TO EXCEED
NOMINAL
MINIMUM
MCA
MBH
MAT MIXED AIR TEMPERATURE
SF SUPPLY FAN
W
WATT(S)
W/ WITH
LEAVING AIR TEMPERATURELAT
EXISTING TO REMAINETR
CHILLED WATER SUPPLY / RETURNCHWS/R
REG REGULATION
TS TEMPERATURE SENSOR
OD OUTSIDE DIAMETER
INSIDE DIMENSIONID
CONCRETECONC
DIVISIONDIV
KILOWATTSKW
POUNDS PER SQUARE INCH GAUGEPSIG
TEMPERATURE DRYBULBTDB
SEN SENSIBLE
FEET PER MINUTEFPM
REQ REQUIRED
NTS NOT TO SCALE
ABOVE FINISHED FLOORAFF
TEST ADJUST AND BALANCETAB
CONDENSATE DRAINCD
DAMPERDAMP
EXISTING(E)
ENERGY MANAGEMENT CONTROL SYSTEMEMCS
MAX MAXIMUM
PRESS PRESSURE
V
VOLTS ALTERNATING CURRENTVAC
W
LOW PRESSURE LP
EXIST EXISTING
ACOUSTICAL CEILING TILEACT
NPT NATIONAL PIPE THREAD
DENOTE NEW(N)
REMOTE SENSORRS
PS PRESSURE SENSOR
DISCHARGE AIT TEMPERATUREDAT
INDICATES PIPING OR EQUIPMENT
TO BE REMOVED
LINEWORK INDICATES
NEW PIPING OR EQUIPMENT
SYMBOL ABBR DESCRIPTION
DESCRIPTIONSYMBOL ABBR
PIPE END CAP
PIPE TURNING DOWN OR AWAY
PIPE TURNING UP OR TOWARD
PIPE TURNING DOWN OR AWAY (TEE)
DIRECTION OF FLOW
LIGHT LINEWORK INDICATES
EXISTING PIPING OR EQUIPMENT
REDUCER
CD
PIPING LEGEND
AIR DISTRIBUTION LEGEND
(UNLESS NOTED OTHERWISE)
END OF DUCT WITH CAP
SQUARE TO ROUND TRANSITION
ECCENTRIC DUCT TRANSITION
EXISTING DUCT
CONCENTRIC DUCT TRANSITION
BACKDRAFT DAMPER
GENERAL LEGEND
SYMBOL ABBR DESCRIPTION
DETAIL SYMBOL:
IDENTIFYING NUMBERA =
SHEET WHERE DETAIL IS SHOWNB =
SECTION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
B
A
A
H HUMIDISTAT/HUMIDITY SENSOR
(WALL MOUNTED)
H'STAT/HS
TITLE SYMBOL ON SHEET WHERE SHOWN:
A = IDENTIFYING NUMBER/LETTER
SD-1
REVISION CLOUD AND
REVISION NUMBER
EQUIPMENT IDENTIFICATION:
(REFER TO SCHEDULES)
CFM
B
A
SHEET WHERE SECTION IS FROMB =
A
B
POINT OF CONNECTION
H
T
HUMIDISTAT (DUCT MOUNTED)
THERMOSTAT (DUCT MOUNTED)
POC
P PRESSURE SENSOR PORT
B
A
ELEVATION SYMBOL:
SHEET WHERE SECTION IS SHOWN
IDENTIFYING LETTER
B
A
SMOKE DETECTORSD
POINT OF DISCONNECTION
TO BE DEMOLISHED AND REMOVED
POD
BALANCING DAMPER
FUSIBLE LINK FIRE DAMPER F
SUPPLY DUCT (VERTICAL CHANGE)
RETURN DUCT (VERTICAL CHANGE)
CONDENSATE DRAIN
CHWS/R
CWS/R
CHILLED WATER SUPPLY/RETURN
CONDENSOR WATER SUPPLY/RETURN
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-001
M E
C H
A N
IC
A
L G
E N
E R
A L
N O
T E
S
S X
H T
-1
M e c h a n ic a l M
-0
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
M-401
M-402
M-404
M-401
M-403
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
/8
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-101
C O
M P
O S
IT
E
P L
A N
S X
H T
-1
M e c h a n ic a l M
-1
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%1/8" = 1'-0"
MECHANICAL COMPOSITE PLAN
04 8 16268
SCALE: 1/8"=1'-0"
PLAN NORTH
EXISTING AHU-2
EXISTING AHU-1
EXISTING CHILLER
EXISTING CHILLED WATER PUMP
1"ø CHWR 1"ø CHWS
2"ø CHWR
2"ø CHWS
1 1/2"ø CHWS
1 1/2"ø CHWR
EXISTING COOLING TOWER 1
EXISTING TOWER WATER PUMP 2
3 1/2"ø CHWR 3 1/2"ø CHWS
2"ø HWS
2"ø HWR
2 1/2"ø CHWR
2 1/2"ø CHWS
3"ø CHWR
1 1/2"ø CHWS
1 1/2"ø CHWR
EXISTING 1 1/2" CHWS/R
PIPING TO FAN COIL UNITS
FC-8, FC-9, FC-10, FC-11
EXISTING 1 1/2" CHWS/R
PIPING TO FAN COIL UNITS
FC-1, FC-2, FC-3, FC-4, FC-5, FC-6, FC-7
EXISTING 1" CHWS/R
PIPING TO FAN COIL UNIT
FC-14
TYP
EXISTING COLUMN CHIMNEY,
TO REMAIN
EXISTING BOILER,
TO REMAIN
EXISTING CHILLED WATER
EXPANSON TANK
EXISTING CHILLED WATER
EXPANSON TANK
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
/4
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-401
E Q
U
IP
M E
N T
R O
O M
D E
M O
L
IT
IO
N
P L
A N
S X
H T
-1
M e c h a n ic a l M
-4
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%1/4" = 1'-0"M-401
1 EQUIPMENT ROOM DEMOLITION PLAN
KEY NOTES:
PLAN NORTH
1. DEMOLISH EXISTING COOLING TOWER, ASSOCIATED PIPING, AND
SUPPORTS. DEMOLISH EXISTING CONCRETE BLOCK SUPPORTS
FLUSH WITH TOP OF EXISTING CONCRETE. PATCH WITH NON-SHRINK
GROUT AS REQUIRED.
2. DEMOLISH EXISTING COOLING TOWER PUMP AND ASSOCIATED
PIPING.
3. DEMOLISH EXISTING CHILLER AND ASSOCIATED PIPING.
4. DEMOLISH EXISTING CHILLED WATER PUMP ASSOCIATED PIPING.
5. DEMOLISH EXISTING AIR HANDLING UNITS. PRESERVE DUCTWORK TO
THE GREATEST EXTEND POSSIBLE FOR REUSE.
6. DEMOLISH EXISTING AIR HANDLING UNIT SUPPORTS TO EXISTING
SLAB ON GRADE.
7. DEMOLISH EXISTING TANKS.
0 2' 4' 8' 12'
SCALE: 1/4" = 1'-0"
AHU-2 AHU-1
CHILLER C-2
NEW CHILLED
WATER PUMP P-1
TOWER WATER
PUMP P-2
EXISTING COLUMN
CHIMNEY
1"ø CHWS
1"ø CHWR
3"ø CHWS 2"ø CHWR
TYP
2"ø CHWS2"ø CHWR
4"ø CHWS
4"ø CHWR
41"x20" SA
24"x24" SA
COOLING TOWER
EXISTING BOILER
40"x12" RA
4"ø CHWS
37"x19" SA
EXISTING 1 1/2" CHWS/R
PIPING TO FAN COIL UNITS
FC-8, FC-9, FC-10, FC-11
EXISTING 1 1/2" CHWS/R
PIPING TO FAN COIL UNITS
FC-1, FC-2, FC-3, FC-4, FC-5, FC-6, FC-7
EXISTING 1" CHWS/R
PIPING TO FAN COIL UNIT
FC-14
6"ø CWS 6"ø CWS
2"ø HWR 2"ø HWS
2"ø HWS
2"ø HWR
60"x24" RA
(BELOW)
40"x12" RA
"x
R A
NEW AIR
SEPARATOR AS-1
NEW EXPANSION
TANK ET-1
NEW BUFFER
TANK BT-1
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
/4
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-402
E Q
U
IP
M E
N T
R O
O M
IN
S
T A
L L
A T
IO
N
P L
A N
S X
H T
-1
M e c h a n ic a l M
-4
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%1/4" = 1'-0"M-402
2 EQUIPMENT ROOM INSTALLATION PLAN
KEY NOTES:
PLAN NORTH
1. PROVIDE AND INSTALL NEW COOLING TOWER CT-1 PER
MANUFACTURER'S INSTRUCTIONS. PROVIDE ALL PIPING AND
APPURTENANCES REQUIRED FOR INSTALLATION. REFER TO THE
COOLING TOWER SCHEDULE ON M-601 AND THE SPECIFICATIONS.
INSTALL NEW EQUIPMENT PAD IN ACCORDANCE WITH DETAIL C4 ON
SHEET M-502.
2. PROVIDE AND INSTALL NEW TOWER WATER PUMP P-2 PER
MANUFACTURER'S INSTRUCTIONS ON NEW HOUSEKEEPING PAD.
PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR
INSTALLATION. REFER TO THE PUMP SCHEDULE ON M-601 AND THE
SPECIFICATIONS. INSTALL NEW EQUIPMENT PAD IN ACCORDANCE
WITH DETAIL C4 ON SHEET M-502.
3. PROVIDE AND INSTALL NEW CHILLER C-1 PER MANUFACTURER'S
INSTRUCTIONS ON EXISTING HOUSEKEEPING PAD. PROVIDE ALL
PIPING AND APPURTENANCES REQUIRED FOR INSTALLATION. REFER
TO THE CHILLER SCHEDULE ON M-601 AND THE SPECIFICATIONS.
4. PROVIDE AND INSTALL NEW CHILLED WATER PUMP P-1 PER
MANUFACTURER'S INSTRUCTIONS ON EXISTING HOUSEKEEPING PAD.
PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR
INSTALLATION. REFER TO THE CHILLER SCHEDULE ON M-601 AND THE
SPECIFICATIONS.
5. PROVIDE AND INSTALL NEW CHILLED WATER SUPPLY, CHILLED
WATER RETURN, HEATING WATER SUPPLY, AND HEATING WATER
RETURN PIPING IN THE MECHANICAL ROOM. CONNECT CHILLED
WATER SUPPLY AND CHILLED WATER RETURN PIPE TO THE EXISTING
BRANCH PIPING BELOW FLOOR.
6. PROVIDE AND INSTALL NEW AIR HANDLING UNITS AHU-1 AND AHU-2
PER MANUFACTURER'S INSTRUCTIONS ON NEW HOUSEKEEPING PAD.
PROVIDE ALL PIPING AND APPURTENANCES REQUIRED FOR
INSTALLATION. REFER TO THE CHILLER SCHEDULE ON M-601 AND THE
SPECIFICATIONS.
7. PROVIDE AND INSTALL NEW SIX INCH HOUSE-KEEPING PAD
EXTENDING SIX INCHES FROM ALL EDGES OF EQUIPMENT. REFER TO
NEW HOUSE-KEEPING PAD DETAIL ON SHEET M-502.
8. PROVIDE AND INSTALL AIR SEPARATOR, EXPANSION TANK, AND
BUFFER TANK. REFER TO PIPING DIAGRAM ON SHEET M-601.
FC-14
FC-6
FC-5
FC-4
FC-3
FC-7
FC-9 FC-10 FC-8 FC-11
FC-2 FC-1
(TYP OF 12)
EXISTING
CHWS/R PIPE
(TYP OF 12)
CHAPEL
WORK ROOM
STAGE EQUIP.
OFFICE
CLASSROOM
CLASSROOM
LOBBY
OFFICE
CORRIDOR
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
/4
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-403
C H
A P
E L
D E
M O
L
IT
IO
N
P L
A N
S X
H T
-1
M e c h a n ic a l M
-4
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%1/4" = 1'-0"M-403
3 CHAPEL DEMOLITION PLAN
KEY NOTES:
PLAN NORTH
1. DEMOLISH EXISTING CHILLED WATER FAN COIL UNITS. PRESERVE
CHILLED WATER PIPING AND ELECTRICAL CONDUITS AND
CONDUCTORS FOR REUSE.
(TYP OF 12)
FC-14
FC-6
FC-5
FC-4
FC-3
FC-7
FC-9 FC-10 FC-8 FC-11
FC-2 FC-1
EXISTING
CHWS/R PIPE
(TYP OF 12)
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
/4
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-404
C H
A P
E L
I N
S T
A L
L A
T
IO
N P
L A
N
S X
H T
-1
M e c h a n ic a l M
-4
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%1/4" = 1'-0"M-404
4 CHAPEL INSTALLATION PLAN
KEY NOTES:
PLAN NORTH
1. PROVIDE AND INSTALL TWELVE (12) NEW TWO-PIPE CHILLED WATER
FAN COIL UNITS PER MANUFACTURER'S INSTRUCTIONS. PROVIDE
CHILLED WATER PIPE NECESSARY TO INSTALL NEW FAN COIL UNITS
AND CONNECT TO EXISTING CHILLED WATER PIPE BELOW FLOOR.
REFER TO FAN COIL UNIT SCHEDULE ON M-601 AND THE
SPECIFICATIONS.
PIPE INSULATION
INSULATION SHIELD REQUIRED
FOR INSULATED PIPE
(TOP & BOTTOM) MIN 6" LONG
PIPE SADDLE W/ U-BOLT
(TOLCO FIG 318A OR
APPROVED EQUAL)
3"
CONCRETE FLOOR
THREADED PIPE STAND W/
WELDED BASE PLATE
(TOLCO FIG316T) SECURED TO
SLAB W/ 1/2" HILTI KWIK BOLT
NEW PIPING WITH
INSULATION. PROVIDE
POLYISOCYANURATE
INSULATION (DOW TRYMER
1800) TO EXTEND 2" LONGER
THAN PIPE SHIELD
V
R
IE
S
3/8" HILTI KWIK BOLT TZ
WITH 3" MIN EMBEDMENT
3/8" THREADED HANGER ROD
NUT & BACKNUT
PIPE HANGER
CONDENSATE PIPING
PIPE INSULATION SHIELD
SEE MECHANICAL SPECIFICATION
SECTION "A-A"
PIPE W/ INSULATION
SECURE ISOLATOR TO STRUCTURE W/ 1/2"∅
BOLT THRU PHILLIPS RED HEAD EXPANSION
ANCHOR LOAD RATED. 3" MIN. EMBEDMENT.
UNISTRUT ANGULAR
BRACKET (TYP)
UNISTRUT CHANNEL SWAY
BRACING (TYP)
UNISTRUT BRACKET
INSULATION SHIELD (TYP)
1/2" NUT & BACKNUT (TYP)
1/2"∅ HANGER ROD. LOAD
RATED. LENGTH AS REQ'D
LONGITUDINAL BRACING
SIMILAR TO SWAY BRACING
FOR CONNECTION TO
CONCRETE STRUCTURE
SEE DETAIL 9 ON SHEET M-503
PC
CHWR
CHWS
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-501
M E
C H
A N
IC
A
L D
E T
A
IL
S I
S X
H T
-1
M e c h a n ic a l M
-5
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%
NTSM-501
A1 TYPICAL PIPE SUPPORT DETAIL
NTSM-501
A3 CONDENSATE PIPE SUPPORT DETAIL
NTSM-501
C1 PIPE SUPPORT DETAIL
ATTACH TO STRUCTURE
WITH BEAM CLAMP (TYP)
1/4"∅ THREADED STEEL ROD
V A
R
IE
S
VARIES
P1000 UNISTRUT
1/4" THREADED STEEL ROD
WASHER (TYP)
P1000 UNISTRUT
NUT (TYP)
NUT (TYP)
P1000 UNISTRUT
WASHER (TYP)
1/4" THREADED STEEL ROD
P1000 UNISTRUT
SPANNING OVERHEAD
STRUCTURAL MEMBERS
SUPPORT HANGER,
TYPE VARIES
WINDOW CLAMP,
EACH SIDE OF BEAM
#4 REBAR AT 18" OC MID
DEPTH ALONG PAD
PERIMETER
WWF 6x6-W4xW4
AT MID DEPTH
4000 PSI CIP CONCRETE
HOUSEKEEPING PAD
3/4" CHAMFER EXPOSED
CORNERS (TYP)
EXISTING SLAB ON GRADE
ROUGHEN SLAB SURFACE
AND APPLY BONDING AGENT
PRIOR TO PAD PLACEMENT
EPOXY #4 DOWEL INTO
FLOOR SLAB HILTI HIT-RE 500
V3, OR APPROVED EQUAL
NOTES:
1. INSTALL PADS A MINIMUM OF 2-INCHES OFF OF ADJACENT WALLS.
2. SIZE PADS TO ACCOMMODATE 6-INCHES OF CLEAR SPACE BETWEEN
EDGE OF PAD AND FACE OF EQUIPMENT ON ALL SIDES.
3. ANCHOR EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS.
EQUIPMENT
6" TYP.
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri s i n d ic a te d
/2
/2
:4
:5
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-502
M E
C H
A N
IC
A
L D
E T
A
IL
S I
I
S X
H T
-1
M e c h a n ic a l M
-5
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%
NTSM-502
A1 HVAC HANGER SUPPORT
NTSM-502
A4 TYPICAL SPANNING STRUT
NTSM-502
C1 NEW HOUSE-KEEPING PAD DETAIL
AHU-1
P-1
CFA-1
BULK
TANK
BT-1
CH-1
P-2
CT-1
AIR
SEPARATOR
AS-1
EXPANSION TANK ET-1
3/4" PIPE TO DOMESTIC
WATER MAKE-UP
3/4" TO PLUMBING DRAIN
2" CHWS
4" CHWR
2" CHWR
4" CHWR
4" CHWS
6" CWS
6" CWR
2.5"
3"
2"
4"
TDV-4
SD-4
E X
T E
R
IO
R
IN
T
E R
IO
R
6" CWS
M
BLEED VALVE TO DRAIN
ACV-1
SD-1
TDV-1
TPV-1
SYSTEM RACK
CHW
TREATMENT
2.5"
4"
4" CHWS
AHU-1
COIL
CONDENSER WATER
TREATMENT SYSTEM RACK
BFV-2
BFV-2
BV-1
BV-1
BFV-1
BFV-1
BFV-1
BFV-1
BFV-3
BFV-3
BFV-3
BFV-3
BV-1
BV-1
BV-2
AHU-2
COIL
AHU-2
3" CHWR
3" CHWS
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
T
S
/2
/2
:4
:0
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-601
P
IP
IN
G
D
IA
G R
A M
S
S X
H T
-1
M e c h a n ic a l M
-6
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%
NTSM-601
A1 PIPING DIAGRAM
TO
AHU-1,
AHU-2,
FCUS
CH-1
CT-1
P-2 P-1
FROM
AHU-1,
AHU-2,
FCUS
C H
IL
L E
D W
A T
E R
S U
P P
L Y
T E
M P
E R
A T
U R
E
C H
IL
L E
D W
A T
E R
R E
T U
R N
T E
M P
E R
A T
U R
E
C H
IL
L E
D W
A T
-1
F L
O W
T O
W E
R W
A T
-1
F L
O W
T O
W E
R W
A T
E R
S U
P P
L Y
T E
M P
E R
A T
U R
E
D R
A
IN
P A
N H
IG
H
L E
V E
L A
L A
R M
O A
D A
M P
E R
O A
T E
M P
E R
A T
U R
E
F
IL
T E
R S
A C
R O
S S
F
IL
T E
R D
IF
F
E R
E N
T
IA
L P
R E
S S
U R
E
H E
A T
IN
G
C O
IL
H E
A T
IN
G
C O
IL
L
E A
V
IN
G A
IR
T
E M
P E
R A
T U
R E
S U
P P
L Y
A
IR
F A
N S
S U
P P
L Y
A
IR
T E
M P
E R
A T
U R
E
NO
O A
D A
M P
E R
P O
S
IT
IO
N
-C L O
S E
O P
E N
C O
O L
IN
G
C O
IL
E
N T
E R
IN
G
A
IR
T E
M P
E R
A T
U R
E
MAGNEHELIC
PRESSURE GAGES
DRAIN PAN
HIGH LEVEL
FLOAT SWITCH
H
IG
H D
R
IP
P A
N L
E V
E L
A L
A R
M
H E
A T
IN
G
W A
T E
R P
IP
IN
G S
U P
P L
Y
H E
A T
IN
G
W A
T E
R P
IP
IN
G R
E T
U R
N
D A
M P
E R
NC
E M
E R
G E
N C
Y D
A M
P E
R C
L O
S E
S W
IT
C
H
M O
D U
L A
T
IN
G H
E A
T
IN
G W
A T
E R
C O
N T
R O
L V
A L V
E A
N D
R E
T U
R N
W A
T E
R T
E M
P E
R A
T U
R E
RA DAMPER
RA TEMPERATURE
NO
RA DAMPER POSITION-CLOSE OPEN
C O
O L
IN
G
C O
IL
C H
IL
L E
D W
A T
E R
P
IP
IN
G
S U
P P
L Y
C H
IL
L E
D W
A T
E R
P
IP
IN
G
R E
T U
R N
M O
D U
L A
T
IN
G C
H
IL
L E
D W
A T
E R
C O
N T
R O
L V
A L V
E A
N D
R E
T U
R N
W A
T E
R T
E M
P E
R A
T U
R E
C H
IL
L E
D W
A T
E R
S U
P P
L Y
T E
M P
E R
A T
U R
E
H E
A T
IN
G
W A
T E
R S
U P
P L
Y T
E M
P E
R A
T U
R E
S U
P P
L Y
F A
N S
T A
T U
S
H
IG
H D
R
IP
P A
N L
E V
E L A
L A
R M
S H
U T
D O
W N
S M
O K
E A
L A
R M
S H
U T
D O
W N
S U
P P
L Y
F A
N S
T A
R T
/S T
O P
S M
O K
E A
L A
R M
S E
N S
O R
C O
L
E V
E L
S E
N S
O R
* BY OTHERS IN ANOTHER
PROJECT SCOPE
OA
RA
MS
CO2
F
IL
T E
R S
C O
O L
IN
G
C O
IL
C H
IL
L E
D W
A T
E R
P
IP
IN
G
S U
P P
L Y
C H
IL
L E
D W
A T
E R
P
IP
IN
G
R E
T U
R N
M O
D U
L A
T
IN
G C
H
IL
L E
D W
A T
E R
C O
N T
R O
L V
A L V
E A
N D
R E
T U
R N
W A
T E
R T
E M
P E
R A
T U
R E
C H
IL
L E
D W
A T
E R
S U
P P
L Y
T E
M P
E R
A T
U R
E
SHEET
IDENTIFICATION
1 2 3 4 5
D
C
B
A
C O
N T
R A
C T
N
A W
N B
Y
D E
S
IG
N B
Y
S B
M T
B Y
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
D E
L
IV
E R
Y O
R D
E R
N O
C
K D
B Y x
F
IL
E N
U M
B E
R
P L
O T
S C
A L E
P L
O T
D A
T E
DESIGN DRAWINGS
T R
A C
E S
T E
C H
N
IC
A L R
A N
G E
A R
C H
IT
E
C T
U R
A L E
N G
IN
E
E R
IN
G
S E
R V
IC
E
S
S P
A C
E L
A U
N C
H D
E L T
A
P
S F
B F
L rh o d e s b ri
T
S
/2
/2
:4
:0
P
M
R E
P L
A C
E C
H
IL
L E
R
A H
U 'S
F
A N
C O
IL
U N
IT
S
B
D E
S
IG
N D
R A
W
IN
G S
M-602
M E
C H
A N
IC
A
L C
O N
T R
O L
S D
IA
G
R A
M
S X
H T
-1
M e c h a n ic a l M
-6
F A
-1
-D
M a rc h
F A
F A
F A
-1 -D
P B
C R
J M
R F
100%
NTS
CHILLED WATER CONTROLS DIAGRAM
NTS
AHU CONTROLS DIAGRAM
SEQUENCE OF OPERATIONS:
THE OCCUPANCY MODE (OCCUPIED OR UNOCCUPIED) SHALL BE DETERMINED THROUGH A USER-
ADJUSTABLE SCHEDULE AND OVERRIDDEN TO OCCUPIED WHEN THRESHOLD CO2 LEVEL IS SENSED .
WHENEVER THE SUPPLY FAN IS DE-ENERGIZED, AS SENSED BY THE STATUS SWITCH, THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL BE CLOSED AND THE RETURN AIR DAMPER SHALL BE OPEN, THE HEATING
AND COOLING VALVES SHALL BE CLOSED OR POSITIONED AS DESCRIBED BELOW.
A. OCCUPIED MODE
1. THE SUPPLY FAN SHALL BE ENERGIZED.
2. THERE SHALL BE SEPARATE HEATING AND COOLING SPACE TEMPERATURE SET-POINTS
WITH A 5°F DEAD-BAND BETWEEN THE HEATING AND COOLING SET-POINTS
3. THE HEATING COIL VALVE AND COOLING COIL VALVE SHALL MODULATE IN SEQUENCE TO
MAINTAIN SUPPLY AIR TEMPERATURE SET-POINT.
4. MINIMUM OUTSIDE AIR: THE MINIMUM OA FLOW RATE IS ESTABLISHED BY THE REQUIRED
OUTDOOR AIR FLOW WITH NO OCCUPANTS (VAT) AND THE REQUIRED OUTDOOR AIR FLOW
AT DESIGN OCCUPANCY (VOT). THE DAMPER POSITIONS CORRESPONDING TO THESE TWO
AIRFLOW RATES SHALL BE SET IN CONJUNCTION WITH THE BALANCE CONTRACTOR. THE OA
DAMPER SHALL MODULATE BETWEEN THE NO OCCUPANTS POSITION AND THE DESIGN
OCCUPANCY POSITION AS THE SPACE CO2 CONCENTRATION VARIES FROM 400 PPM
(AMBIENT) TO 1,500 PPM (ADJUSTABLE).
5. SUPPLY AIR TEMPERATURE SET-POINT FOR COOLING AND DEHUMIDIFYING SHALL BE RESET
BASED ON SPACE RELATIVE HUMIDITY TO ACHIEVE 50% ACCORDING TO THE FOLLOWING
RESET SCHEDULE:
A. SUPPLY AIR TEMPERATURE SET-POINT FOR COOLING AND DEHUMIDIFYING 55°F,
ADJUSTING +2°F INCREMENTS UNTIL 50%, +/- 10%, RH IS ACHIEVED.
B. SUPPLY AIR TEMPERATURE SET-POINT FOR HEATING 85F.
C. ALL PARAMETERS SHALL BE INDEPENDENTLY ADJUSTABLE.
B. UNOCCUPIED MODE
1. UNOCCUPIED OFF: THE SUPPLY FAN SHALL BE DE-ENERGIZED EXCEPT WHEN OPERATION IS
CALLED FOR AS DESCRIBED BELOW. OUTSIDE AIR DAMPERS AND EXHAUST DAMPERS SHALL
BE CLOSED AND RETURN AIR DAMPER OPEN. HEATING AND COOLING VALVES SHALL BE
CLOSED.
2. UNOCCUPIED OFF, COIL PROTECTION: WHEN THE SUPPLY FAN IS DE-ENERGIZED AND THE
OUTSIDE AIR TEMPERATURE IS BELOW THE OUTSIDE AIR LOW TEMPERATURE PROTECTION
SET-POINT OF 35°F (ADJUSTABLE) AND THE MIXED AIR TEMPERATURE IS LESS THAN THE
MIXED AIR LOW TEMPERATURE PROTECTION SET-POINT OF 45°F (ADJUSTABLE), OR THE LOW
TEMPERATURE LIMIT TRIPS, THEN THE HEATING COIL VALVE SHALL CYCLE TO MAINTAIN
MIXED AIR TEMPERATURE PROTECTION SET-POINT OF 45°F. WHEN THE OUTSIDE AIR
TEMPERATURE IS ABOVE THE OUTSIDE AIR LOW TEMPERATURE PROTECTION SET-POINT OF
35°F + DEAD-BAND, OR THE MIXED AIR TEMPERATURE IS GREATER THAN THE MIXED AIR LOW
TEMPERATURE PROTECTION SET-POINT OF 45°F + DEAD-BAND; THE HEATING AND COOLING
COIL VALVE SHALL BE CLOSED.
3. UNOCCUPIED SETBACK: THE SUPPLY FAN SHALL CYCLE ON WITH THE OUTSIDE AND
EXHAUST DAMPERS CLOSED WHEN THE SPACE TEMPERATURE DROPS BELOW THE
UNOCCUPIED SPACE TEMPERATURE SET-POINT OF 65°F (ADJUSTABLE). WHEN THE FAN IS
ENERGIZED, THE HEATING SHALL MODULATE TO MAINTAIN SUPPLY AIR TEMPERATURE SET-
POINT OF 85°F (ADJUSTABLE).
C. OCCUPIED OR UNOCCUPIED MODE
1. THE SUPPLY FAN SHALL SHUT DOWN WHEN THE DRIP PANEL HIGH LEVEL SWITCH INDICATES
HIGH LEVEL.
2. THE SUPPLY FAN SHALL SHUT DOWN WHEN THE SMOKE ALARM SENSOR INDICATES SMOKE.
3. ALL DAMPERS WILL CLOSE UPON ACTIVATION OF EMERGENCY DAMPER CLOSE SWITCH.
NTS
FAN COIL UNIT CONTROLS DIAGRAM
SEQUENCE OF OPERATIONS:
THE CHILLER WILL OPERATE AS ESTABLISHED AT THE CHILLER
CONTROL PANEL. THE CONDENSER WATER PUMPS WILL START/STOP
UPON RECEIVING INPUT FROM THE CHILLER OR THE BAS SYSTEM OR
FROM THE START/STOP SWITCH.
SEQUENCE OF OPERATIONS:
START/STOP WILL BE INITIATED VIA THE SWITCH ON THE UNIT OR AS
SCHEDULED BY THE BAS. THE CONTROLLER SHALL CONTINUE TO
MONITOR ROOM TEMPERATURE AS SENSED AT THE UNIT MOUNTED
THERMOSTAT TO MAINTAIN THE COOLING SETPOINT. THE UNIT
CONTROLLER SHALL MODULATE THE COOLING COIL CONTROL
VALVE TO MAINTAIN THE COOLING SETPOINT.
AIR HANDLING UNIT SCHEDULE
GENERAL DATA SUPPLY AIR FAN COOLING COIL HEATING COIL FILTER
MARK AREA SERVED
BASIS OF DESIGN
MANUFACTURER
MODEL
FAN MOTOR
TOTAL
CAPACITY
(MBH)
SENSIBLE
CAPACITY
(MBH)
ROWS
COIL FIN & TUBE
MATERIAL
AIR SIDE WATER SIDE
TOTAL
CAPACITY
(MBH)
ROWS
COIL FIN &
TUBE
MATERIAL
AIR SIDE WATER SIDE
TYPESUPPLY
AIR (CFM)
TOTAL SP
(IN. H2O)
QTY RPM HP TYPE V/PH/HZ
FACE
VELOCITY
(FT/MIN)
ENTERING LEAVING
FLOW
(GPM)
ENT.
(F)
LEAV.
(F)
FACE
VELOCITY
(FT/MIN)
ENT.
(F)
LEAV.
(F)
FLOW
(GPM)
ENT.
(F)
LEAV.
(F)DB
(F)
WB
(F)
DB
(F)
WB
(F)
AHU-1 CHAPEL TRANE CSAA021 9,600 3.015 2 1800 5
PREMIUM
ODP
208/60/3 368.96 246.77 6
ALUMINUM FIN,
COPPER TUBE
461.30 78.0 67.0 54.7 54.6 73.5 45.00 55.00 206.14 1
ALUMINUM FIN,
COPPER TUBE
484.11 55.00 74.80 20.7 140.00 120.00 2" MERV 8
AHU-2 ASSEMBLY ROOM TRANE CSAA014 6,000 2.754 2 1800 2
PREMIUM
ODP
208/60/3 233.64 154.23 6
ALUMINUM FIN,
COPPER TUBE
439.56 78.0 67.0 54.7 54.4 46.6 45.00 55.00 128.84 1
ALUMINUM FIN,
COPPER TUBE
480.00 55.00 74.80 12.9 140.00 120.00 2" MERV 8
NOTES:
1. INSTALL CONDENSATE DRAIN AND TRAP IN ACCORDANCE WITH MFG. REQUIREMENTS.
2. PROVIDE UNIT IN SECTIONS NECESSARY FOR TRANSPORT AND INSTALATION AT UNIT SITE.
3. PROVIDE NEW SERVICE DISCONNECTS. COORDINATE WITH ELECTRICAL CONTRACTOR FOR INSTALLATION.
4. PROVIDE COILS WITH EPOXY COATING OR APPROVED EQUIVALENT FOR MEETING 10,000 HOUR SALT SPRAY TEST.
CHILLER SCHEDULE
GENERAL DATA EVAPORATOR CONDENSER ELECTRICAL DATA
MARK TYPE
BASIS OF DESIGN
MANUFACTURER
MODEL
CAPACITY
(TONS)
REFRIGERANT
FLUID
TEMPERATURE FLOW
RATE
(GPM)
PRESSURE
DROP (FT.
H2O)
FLUID
TEMPERATURE
FLOW
RATE (GPM)
PRESSURE
DROP (FT. H2O)
VOLTS PHASE HERTZ MCA MOP
EWT (°F) LWT (°F) EWT (°F) LWT (°F)
CH-1 WATER COOLED CENTRIFUGAL TRANE TPWCCMV0600D3-MM 67.28 R410A 54.0 44.0 160.9 15.7 85 94.3 211.0 22.1 208 3 60 196 300
NOTES:
1. PROVIDE FLANGED CONNECTIONS FOR EVAPORATOR AND CONDENSER CONNECTIONS.
2. PROVIDE WITH FLOW SWITCHES.
3. PROVIDE WITH A CONTROL PANEL WITH CONTROL AND MONITORING FUNCTIONS SPECIFIED ON SHEET M-602, AND LOCKABLE CONTROL PANEL CABINET.
COOLING TOWER SCHEDULE
MARK TYPE
BASIS OF DESIGN
MANUFACTURER
MODEL FLOW (GPM) EWT (°F) LWT (°F) WBT (°F)
PUMP HEAD
(FT)
FAN MOTOR (HP)
ELECTRICAL DATA
(VOLTS/PH)
CT-1
FORCED DRAFT, FRP CONSTRUCTION, 304
STAINLESS STEEL HARDWARE
TOWER TECH TTXR-011930 215.0 95.0 85.0 80.0 13.0 3.0 208/3
NOTES:
1. PROVIDE CONSTRUCTION TO MEET THE ULTIMATE WIND SPEED AS REQUIRED BY 45TH CES AT PATRICK SFB.
2. PROVIDE PREMIUM EFFICIENCY MOTORS, INDOOR VFD, NEMA 4 STAINLESS STEEL DISCONNECT, AND VIBRATION SWITCH.
CHILLED WATER FAN COIL UNIT SCHEDULE
GENERAL DATA SUPPLY AIR FAN COOLING COIL FILTER HEAT
MARK AREA SERVED
BASIS OF DESIGN
MANUFACTURER
MODEL ORIENTATION
FAN MOTOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .