ROS Communications Site Visit Questions and Answers (24 Apr 13)
1. Does the ROS contractor have any communication responsibility at any offsite locations at Vandenberg AFB?
Answer: No.
2. Will the BIGS covering all ROS contract areas be made available in the bidder’s library?
Answer: No.
3. What is the status of the GIMS/GIS communication data base, i.e., is it current and up to date?
Answer: At CCAFS and Downrange, the GIMS outside cable plant is current and the inside cable plant is a work in progress; WR GIS is current.
4. Will detailed facility maps be provided for each location outlining equipment type?
Answer: No maps will be provided; however a matrix will be provided in the bidder’s library.
5. Will the ROS contractor be responsible for outside plant? What is the interface?
Answer: Yes, downrange only. See PWS Ch.5 for interface specifics.
6. Will a workflow system i.e., Maximo be available? Operated by ROS or others?
Answer: Yes, it is the responsibility of the ROS contractor.
7. Any remote responsibility at Western Range?
Answer: No.
8. How much will ROS contractor be involved in relocation of XY?
Answer: There is no current requirement for relocation of XY. Please only refer to the PWS for requirements.
9. Define AFNETOPS for WR/ER/DBOS. What’s the degree of completion?
Answer: Air Force Network Operations (AFNETOPS) provides centralization and virtualization of management / administration of all Air Force networks. The ROS contractor will support AFNETOPS through cooperation or operation of the NCC.
Migration is complete.
10. Does AFNETOPS have a priority restoration system in place for telephone and other systems?
Answer: AFNETOPS priority restoration is Air Force wide. ROS will develop the restoration plan for their AFNETOPS area of responsibility in coordination with the Communication COR.
11. Will ROS contractor be responsible for the IA CSA of only systems directly under ROS control IAW PWS?
Answer: Yes, but the correct term is FSA (Functional System Administrator) instead of
CSA.
12. Who will be responsible for ID and removal of rogue software and HW on VAFB/CCAFS networks?
Answer: ROS based upon PWS requirements.
13. When will AFNETOPS migration occur for VAFB/CCAFS?
Answer: Migration is complete.
14. Could the inventory list be provided in excel?
Answer: Yes.