Industry_Day_Slides_1.pdf
PDF 3 MB Posted
- Solicitation number
- FA2521-13-R-0005-45CONS
About this file
Industry Day Slides
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force
Source Selection Sensitive Information – See FAR 2.101 and 3.104
Source Selection Sensitive Information – See FAR 2.101 and 3.104 1
Range Operations Support Industry Day Antigua
Ms. Lisa Uminn ROS Program Manager
5 March 2013
Source Selection Sensitive Information – See FAR 2.101 and 3.104
Presentation Agenda Range Operations Support (ROS) Acquisition Team
Itinerary
Rules of Engagement
Contract Scope
Maturity of Acquisition
Antigua vs. Ascension
Ascension Island Pictures
Questions
Acquisition POCs
PCO/ACO: Ms. Charlene Thomas
- Email: charlene.thomas@us.af.mil
- Organization: 45 CONS
Specialist: Ms. Kristine Lundblad Specialist: Ms. Queshanda Newton
- Email: kristine.lundblad@us.af.mil - Email: queshanda.newton@us.af.mil
- Organization: 45 CONS - Organization: 45 CONS
Itinerary 6 March
0900 – 1000 – In-brief with Det 1/CC and ROS Program Manager 1005 – 1130 – Walking tour of Antigua Air Station Main Base 1135 – 1300 – Lunch 1300 – 1315 – Board Bus to Consolidated Instrumentation Facility (CIF) 1330 – 1430 – Tour of CIF 1435 – 1440 – Board Bus to POVs 1445 – 1500 – Questions 1500 – End of Industry Day
7 & 8 March One-on-One Sessions by Appointment
Rules of Engagement
Must stay together as a group No independent view of facilities Everyone leaves upon conclusion of tour No re-entry permitted
Questions Must be submitted on note cards provided Will be answered at the end of presentations May not ask questions of CSR or subcontractor employees
One-on-One Will be escorted on base to conference room All questions will be recorded Will be escorted off installation No re-entry permitted
Contract Scope Provide Program Management
Financial Management Data Management Quality Management Personnel Management Security Management Occupational Safety and Health WR Manage Vandenberg Electronic Security System (VESS)
(ER Only) Downrange Base Operating Support (DBOS) Airlift and Cargo and Mail Support Emergency Medical Response & Fire Protection Security Ground Safety and Bioenvironmental Public Health Acute Routine and Emergency Medical Services Civil Engineering Support Lodging and Housekeeping
Contract Scope Logistics Management
Supply Fuel Airfield Operations Vehicle Maintenance Government Property
Mission Support Communications Air Force Network Operations Command (AFNETOPS) NIPRNet Base Public Address systems and Intercom systems Manage Assigned Land Mobile Radios (LMR) devices GIMS and 45 SW Enterprise GIS Sys Admin Computers System Installation Records (CSIR) Drawings Telephone Voice Systems Air Traffic Contract and Landing Systems (ATCALS)
Airborne Weather Surveillance (ER Only)
Soon to be added Morale Welfare and Recreation (MWR) both stations
Maturity of Acquisition
95% Complete
PWS
Contract Clauses
75% Complete Sections L&M
50% Complete Bidders Library
Workload Factors Historical Data
* Goal Contract Start Date Same as LISC OM&S
Antigua vs. Ascension Antigua Ascension
Military Assigned 2 3
Power Production 4 Diesel Generators: 1,000 kW ea 5 Diesel Generators (3-1900kW, 1-1364kW, 1-500kW) 6 Wind Turbines (2 not functioning) (4-225kW)(2-900kW) 32 Auxiliary backup generators
Water Production Reservoir (raw): Two ea 1M gal tanks 3 Storage Tanks (raw): 1.4M gal Consumption: ~11k gallons per day Capacity: Filtered, 25K gal tank; Potable, 5K gal tank
Reverse Osmosis Salt Water (raw): 30,000 gallons Potable storage: 1.8M gallons Consumption: ~50,000 gallons per day Capacity: 86,000 gallons/day
Warehousing 1 Climate Controlled 2 enclosed; 1 covered
36k square feet of storage
2 Climate Controlled:
15 enclosed; 1 covered Cargo Lay-down Yard
Living on Island With proper documentation Only if employed on the island
Medical Support St. John’s Hospital; TRICARE Georgetown Hospital
Motor Pool Inventory – 90 pieces Emergency Vehicles – 4
General Purpose Vehicles - 120 Special Purpose Vehicle - 80
Antigua vs. Ascension Antigua Ascension
Waste Water Systems 30k GPD capacity WWTP - 8,500 GPD flow Septic Tanks at Outlying Sites
75K GPD capacity WWTP - 40k GPD flow Septic Tanks at Outlying Sites
Hazardous Materials Control HAZMAT Storage Shelters – 6 modulars HAZWASTE Storage Facility
HAZMAT Storage Shelters HAZWASTE Storage Facility Pesticide Storage Facility
Fuel Storage Diesel - four 10k gallon double walled storage tanks MoGas - 5K gallon tank
MoGas - 5K gallons; 1 AST JP-8- P/H 66k gal; M/P 25K Secondary Containment for outlying site s/b generator fuel tanks
Cargo Logistics St John's Deep Water Harbour No Port, containers must be barged to pier head and lifted with crane
Government Antigua & Barbuda Ascension Island Government
35 Square Miles Patrick AFB - 5050 miles Ramstein AB - 4165 miles St. Helena - 698 miles Mean temperature ~ 77F Average rainfall ~ 6 inches Constant 15 knot trade wind Highest point - 2,800 Ft Population ~ 1,000
Ascension Island Pictures
3,856 Acres
Ascension Island Pictures
Main Base
Presenter Presentation Notes
Ascension Island Pictures
Residential
Presenter
Ascension CIF
Ascension Island Pictures
Wind Farm
Presenter
Windfarm
Power House
Presenter
Power House
Ascension Island Pictures
Runway Shared Operations with UK
Ascension Island Pictures
Cargo Support
Ascension Pictures
Dining Services
Ascension Island Pictures
Water Reverse Osmosis
Presenter
TLM
ROS Milestones Feb 2013 – Draft RFP Issued May 2013 – Final RFP Issued May 2013 – Pre-Proposal Conference July 2013 – Proposals Due Dec 2013 – Contract Award Jan 2014 – Debriefings Jan 2014 – Phase In (Up to 90 Days) Apr 2014 – Commence Full Contract Performance
Questions
Note card questions will be collected and answered
All answers provided will also be posted to FedBizOpps.gov
| Slide Number 1 |
| Presentation Agenda |
| Acquisition POCs |
| Itinerary |
| Rules of Engagement |
| Contract Scope |
| Contract Scope |
| Maturity of Acquisition |
| Antigua vs. Ascension |
| Antigua vs. Ascension |
| Ascension Island Pictures |
| Ascension Island Pictures |
| Ascension Island Pictures |
| Ascension Island Pictures |
| Ascension Island Pictures |
| Slide Number 16 |
| Ascension Island Pictures |
| Ascension Island Pictures |
| Ascension Pictures |
| Ascension Island Pictures |
| Ascension Island Pictures |
| ROS Milestones |
| Questions |
File details come from the government source that posted it. Updated .