QA - PACA USAFE Installation Audits 12Nov2026.pdf

PDF 128 KB Posted

Attached to
Public Accountant Contract Audits (PACA) Installation Audits (USAFE region)
Solicitation number
F41999-27-Q-0006
Issued by

About this file

Summary

This is a Questions and Answers (Q&A) document dated 12 November 2026 for RFQ F41999-27-Q-0006, addressing contractor inquiries regarding the AFSVC PACA USAFE Installation Audit solicitation. The document provides Government clarifications on pricing structures, deliverable requirements, submission procedures, personnel qualifications, security protocols, and operational scope for a firm-fixed-price audit services contract spanning a Base Year plus four Option Years.

The Q&A clarifies critical procurement terms including that ATCH 05 deliverable-level pricing may be adjusted by offerors; pricing may vary by fund size and installation; milestone payment percentages need not be reflected in CLIN pricing but all offerors must state agreement or disagreement in File 1; the $125,000 annual travel allowance is Government-established and addressed in updated ATCH 01; contractors may adjust ATCH 05 form as needed with final submission in PDF format; and no financial system access will be provided—all records transfer via DoD SAFE. The Government will not provide an Excel version of ATCH 05. For audit deliverables, each fund requires separate audit opinions; dual-year audits of a single fund are priced as one consolidated engagement with a single comparative report. Subcontracting is strictly prohibited with all personnel direct employees of the prime CPA firm; however, independent external engagement quality reviewers are permitted for pre-issuance review only. All 18 installations in ATCH 12 are in scope; all audit personnel must be U.S. citizens with valid passports; all audits at a single installation must be consolidated into one site visit; background Tier 1 investigations are required; and NIST SP 800-171 compliance for CUI/PII protection is mandatory without requiring formal CMMC certification. The RFQ closing date was extended to Monday, 23 November 2026, with estimated award within 45 days thereafter. The Government will utilize DoD SAFE for secure file transmission and does not mandate fixed level-of-effort for firm-fixed-price deliverables. ATCH 07 will be submitted with File I, and firms must demonstrate a "Pass" rating on most recent independent peer review with no consideration of "Pass with Deficiencies" ratings.

View the file

Other files

File Type Posted
ATCH 01 Instructions to Contractors 12 Nov 2026.pdf PDF
AMENDMENT 01 RFQ F41999-27-Q-0006 USAFE PACA AUDIT.pdf PDF
ATCH 11 NPA Agreement template 10 Nov 2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI)12 Nov 2026.pdf PDF
ATCH 08 Contract Administration Data 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 10 Nov 2026.pdf PDF
ATCH 07 Deliveries or Performances 12 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 07 Deliveries or Performances 23 Oct 26.pdf PDF
ATCH 08 Contract Admin Data 4 Nov 2026.pdf PDF
ATCH 11 NPA Agreement template 23 Oct 2026.pdf PDF
ATCH 03 Special Provisions 2 Nov 2026.pdf PDF
ATCH 09 Reps and Certs 30 Jul 2026.pdf PDF
ATCH 07 Deliveries or Performances 23 Oct 26.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 01 Instructions to Contractors PACA Region 2 USAFE 2Nov26.pdf PDF
ATCH 06 Evaluation Factors - LPTA 2 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 22 Oct 2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI) 2 Nov 2026.pdf PDF
RFQ - PACA Installation Audits (USAFE Region) F41999-27-Q-0006.pdf PDF
ATCH 02 NAF Standard Clauses 30 May 2025.pdf PDF
ATCH 12 PACA Installation Audits USAFE Region Breakout 21 Sept 2026.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFSVC PACA USAFE INSTALLATION AUDIT F41999-27-Q-0006

QUESTIONS & ANSWERS (Q&A)

12 November 2026

Question Answer

1. ATCH 01, Section 5.2 describes engagement-level firm-fixed pricing, while ATCH 05 provides deliverable-level pricing.

Please confirm or provide the following: Whether the sum of the deliverable CLIN prices in ATCH 05 represents the firm-fixed price for one fund audit (Section A) or one consolidated performance audit engagement (Section B)

Refer to the NEW ATCH 05 dated 12 Nov 2026. As stated in, ATCH 05 may be adjusted by Offerors.

2.

ATCH 01, Section 5.2 describes engagement-level firm-fixed pricing, while ATCH 05 provides deliverable-level pricing.

Please confirm or provide the following:

Whether pricing may vary by fund size or installation, including the revenue ranges identified in ATCH 12

Refer to the NEW ATCH 05 dated 12 Nov 2026. As stated in, ATCH 05 may be adjusted by Offerors.

3.

ATCH 01, Section 5.2 describes engagement-level firm-fixed pricing, while ATCH 05 provides deliverable-level pricing.

Please confirm or provide the following: Whether the Section B price applies regardless of the number of activities (1 to 10 under ATCH 01, Section 5.2.2), and which activities or audit objectives are typically included

Refer to the NEW ATCH 05 dated 12 Nov 2026. As stated in, ATCH 05 may be adjusted by Offerors.

5.

ATCH 01, Section 5.2 describes engagement-level firm-fixed pricing, while ATCH 05 provides deliverable-level pricing.

Please confirm or provide the following:

The estimated quantities, by CLIN and period, that will be used to calculate the total evaluated price across the Base Year and four Option Years

Refer to the NEW ATCH 05 dated 12 Nov 2026. As stated in, ATCH 05 may be adjusted by Offerors.

6.

ATCH 01, Section 5.2 describes engagement-level firm-fixed pricing, while ATCH 05 provides deliverable-level pricing.

Please confirm or provide the following: Whether the milestone payment percentages in ATCH 08 must be reflected in the CLIN pricing allocation

Milestone payment percentages do NOT need to be included in ATCH 05 responses; however, all offerors must state in their File 1 whether they agree or not agree with the milestone payments. If not, submit an alternate milestone payment schedule.

7.

Per ATCH 01, Section 5.2.4, offerors are to enter the Government-established NTE travel allowance of $125,000.00 per year.

In ATCH 05, however, travel lines appear only once at the end of Section A and once at the end of Section B, rather than separately for each contract period.

Please confirm:

• Whether the $125,000.00 allowance should be entered once for the agreement, covering both Sections A and B, or separately in each section;

• How the annual allowance should be presented for the Base Year and each Option Year, including whether additional period-specific travel lines should be inserted;

• Whether the "Travel (Labor Category and Daily Cost)" line should be marked N/A; and

• Whether the allowance will be included in the total evaluated price.

Refer to updated ATCH 01, dated 12 November 2026.

8.

Table 2 of ATCH 01 requires both PDF and Excel versions of Volume II.

1. Please confirm whether the Government will provide an Excel version of ATCH 05 or confirm that a contractor created workbook reproducing Attachment 05 is acceptable?

2. Please confirm the maximum email attachment size permitted for quotation submission and whether files may be submitted across multiple emails or through DoD SAFE if necessary.

dated 10 November 2026.

See para 5 & 7.9. 1.

Contractor can adjust form as needed we request final form is changed to .pdf. 2.

9.

SOO Section 6.3.1 authorizes remote audit preparation and data analysis, while Section 6.6 establishes personnel security requirements for system access.

Please confirm whether authorized audit personnel will be provided read-only access to centralized NAF accounting records to support these activities, subject to the applicable security approvals.

Contractors will not be provided financial system access to records. All records will be provided by installation POCs to the contractors via authorized secure file transferring method (DODSAFE).

10.

ATCH 10 appears to be missing Page 4, including Item 12 referenced in ATCH 01, Section 7.2. Please provide the complete form or confirm the required treatment of Item 12.

Refer to updated ATCH 10, 11.

ATCH 02, Paragraph 8 references coverage "as stated in this contract." Please identify the applicable insurance types and minimum limits, including any professional liability requirements.

Industry standard is the insurance coverage that Contractors should have.

Government does NOT dictate the dollar amount of insurance coverage.

12.

NPA Pricing: ATCH 11, Block 12 references most-favored-customer pricing, a 3%–5% discount from GSA and commercial pricing, and firm prices for the agreement period. Please confirm whether these provisions apply to the resulting NPA and, if so, how they interact with the firm-fixed prices established under ATCH 05.

Refer to updated ATCH 11, dated 10 November 2026.

ATCH 11 is a sample ONLY.

The awarded NPA will be updated and sent to the contractor for signature.

13.

ATCH 07 includes a "Contractor Proposed Delivery Schedule" column and instructions for identifying concurrent deliverables. However, ATCH 01 does not expressly identify ATCH 07 among the required quotation submissions.

Please confirm whether offerors must complete and submit ATCH 07 with their quotations and, if so, the appropriate volume for inclusion.

14.

SOO Section 3.3 requires secure handling of CUI and PII in accordance with NIST SP 800-171.

Please clarify whether Government-provided secure platforms will be available for transmitting and reviewing audit information, and whether a current SPRS assessment or CMMC certification is required as a condition of award.

The Government will utilize DoD SAFE for primary secure file transmitting. A formal CMMC certification is not required. Offerors must comply with NIST SP800-171 to protect and safeguard CUI/PII.

Additionally, please clarify the applicable personnel investigation requirements under SOO Section 6.6 for personnel requiring read-only system access, including any citizenship restrictions.

Tier 1 Background investigation will be required.

15.

SOO Section 2.2.3 references an opinion on consolidated financial statements, while Section 4.1.1 defines financial statement audit deliverables by individual MWR or Lodging Fund. Please confirm whether separate audit opinions are expected for each fund.

SOO Section 2.2.4 references an opinion on compliance.

Please clarify whether the GAGAS report on internal control over financial reporting and on compliance and other matters satisfies this requirement, or whether a separate compliance audit opinion is expected.

Each fund requires its own separate audit opinion (e.g.

separate report for the MWR Fund and separate report for the Lodging Fund).

GAGAS report on internal control over financial reporting and on compliance and other matters satisfies the SOO.

16.

SOO Section 2.1.1 provides for dual-year financial statement audits under initial Base Year task orders.

Please confirm whether a dual-year audit of a single fund should be priced as two separate fund audits (two sets of Section A CLINs) or as one engagement. Please also clarify whether a single auditor's report covering comparative financial statements or separate reports for each fiscal year are expected.

A dual-year financial statement audit covering two fiscal years (e.g. FY24 and FY25) for a single fund will be ordered and priced as one single consolidated engagement with a single consolidated comparative report package presenting both fiscal years.

17.

As access to Attachments 04 and 07 was restored on November 9, 2026, and ATCH 01, Section 6.1 requires the CSOW to address SOO Sections 2.0 through 7.6, we respectfully request consideration of a one-week extension of the quotation due date to allow adequate time to incorporate these requirements.

The RFQ closing date has been changed to Monday, 23 November 2026.

18.

Attachment 04, §4.1, expressly requires separate deliverable performance and invoicing. Attachment 07 aligns with deliverable level rows, including financial audit contract line item numbers (CLINs) 0001–0008, whereas Attachment 01 describes a different engagement/type based CLIN structure. Please identify the controlling

Refer to updated ATCH 04, pricing and invoicing structure, reconcile Attachment 01 with Attachments 04, 05 and 07, and specify which rows require separate prices or are not separately priced (NSP), including how weekly/monthly deliverables roll up without duplicate charges.

19.

Attachment 06 states that price will be evaluated using the regional total, while Attachment 12 lists 18 installations and revenue ranges without audit quantities.

Please provide the quantities and evaluation formula for each fund audit, performance audit, base year, and option year, and confirm whether all four option years and travel allowances are included in the evaluated total. Will the same evaluation quantities be applied to every quote?

There are no guaranteed audit quantities per year.

Actual annual selections fluctuate year to year.

ATCH 12 is provided strictly as general information to assist offerors in understanding the scale and complexity of the NAFIs to formulate their firm fixed unit prices.

20.

Attachment 04 confirms initial base year dual-year audits and the Government’s right to request up to two historical fiscal years in Option Year 1, while §4.1.1 applies deliverables to a single fund audit. For one fund covering two fiscal years, is each deliverable price charged once for a combined engagement or twice as separate fund year audits? Please specify the required opinions/report packages, treatment of shared planning and fieldwork, and how Option Year 1 dual year orders are priced under the same schedule.

Refer to updated ATCH 04, 21.

The instructions require three references, but the evaluation factors treat unknown past performance as acceptable. Please confirm whether a firm with fewer than three qualifying references may submit and receive an acceptable assessment and identify the information it must provide in place of any missing reference. Does the three reference requirement remain an administrative prerequisite regardless of the unknown rating provision?

Refer to ATCH 06, para 5.6.

22.

Attachment 04 expressly prohibits subcontracting and requires all proposed personnel to be direct employees of the prime CPA firm. Attachment 06 nevertheless retains references to critical subcontractors, joint ventures and

ATCH 06, para. 5.1 states Subcontracting is strictly prohibited for this solicitation/requirement. In team members. We request allowance for a percentage of personnel to be subcontractors. If not allowable, please reconcile that evaluation language with the direct employee requirement. Does the restriction also prohibit an external independent engagement quality reviewer, and how should such a reviewer be treated if required by the firm’s applicable quality management procedures?

ATCH 06, “joint venture” refers to contractor’s past performance with another company, which can be utilized in Past Performance Information.

The use of an independent, external engagement quality reviewer is permitted strictly for pre-issuance quality review. The external reviewer may not participate in the planning, fieldwork, testing, or drafting of reports.

23.

Attachment 01 directs contractors to mark Attachment 10, Item 12, “N/A – Direct Prime Performance Only.” The supplied file contains three visible pages ending with Item 11, while its printed page labels indicate four pages.

Would the Government provide the complete four page form, including Item 12, or confirm how contractors should supply the required Item 12 statement?

24.

Attachment 10 refers to completed projects but requests a completion percentage when a project is unfinished.

May contractors submit an ongoing contract with comparable work performed within the confirmed three-year window, or must every reference be fully completed?

Yes

25.

Attachment 04 provides thirty (30) days for preliminary draft review and ten (10) business days for draft verification; contractor revisions and final issuance each have ten business day triggers. Please confirm whether the thirty-day period means calendar days and whether Government review time is excluded from contractor performance time. When records, access, management responses or approvals are delayed, what Contracting Officer authorized schedule relief process applies, given that the Contracting Officer’s Representative (COR) cannot change delivery terms? Are milestones and

The 30 day review window refers to calendar days. The Government review periods are excluded from the contractor’s performance time. If an operational conflict arises the COR will coordinate revised fieldwork or deliverable dates and submit any necessary administrative period of performance adjustments to the Contracting Officer acceptance tracked separately by installation, fund and fiscal year for bundled orders?

for formal modification.

Milestones and acceptance are tracked per individual installation/fund audit assignment.

26.

We understand that fieldwork and entrance/exit briefings must occur on site, while preparation, data analysis and report drafting may be remote, and that installation points of contact facilitate lodging, workspace and base access.

Please provide the anticipated base year audit mix, actual initial historical fiscal years, maximum expected concurrency, and order-to-fieldwork lead time. Are all 18 Attachment 12 installations, including Thule (Pituffik), within scope? Please identify overseas specific entry, work authorization, escort, language and records location requirements beyond the general access provisions.

Estimated workload would not establish a minimum order guarantee.

Anticipated base year workload may consists of 3 specific installations covering 1 performance audit engagement and 4 dual year financial statement audits.

All 18 installations listed in ATCH 12 are within scope for this solicitation and eligible for audit over the life of the agreement, not every installation is selected for an audit each year. All records are maintained in English.

All audit personnel assigned must be U.S. citizens and must possess a valid, active U.S passport. Because financial data CUI and other PII information will be viewed within the audit all personnel assigned to perform work under this contract must be U.S.

citizens.

All audits ordered for a single installation must be executed during a single, consolidated site visit.

27.

Attachment 01 requires a Contractor Statement of Work (CSOW), while Attachment 06 refers to an incorporated Contractor Technical Solution Statement (CTSS). Please confirm that these terms refer to the same File III

12 November 2026.

document and that no separate CTSS submission is required. Will the 50-page technical solution limit apply to the complete incorporated document, with the draft project plan and schedule covered by their separate 10 page limit?

28.

Please confirm whether contractors must complete and return the signed main RFQ form in File I in addition to the expressly listed administrative materials, and how its summary price should reconcile to File II. Please also confirm whether title pages, the RFQ form, and written Attachment 08 concurrence count within existing section limits or are excluded from page counting.

para 5.2.8, dated 12 November 2026. See ATCH 01, Table 2- ORGANIZATION for page counts.

29.

Attachment 01 uses the placeholder solicitation number F41999- 27-Q-XXXX. Please confirm that this attachment governs F41999-27-Q-0006 and provide any corrected version. Please also identify every applicable amendment and the specific acknowledgement page contractors must sign and return with File I.

30.

We acknowledge the licensed CPA firm requirement, passing most recent independent peer review, licensed CPA team lead with at least six years of relevant public accounting audit experience, and staff degree/accounting coursework and two-year audit experience requirements.

Will the government consider a peer review rating of Pass with Deficiencies, and the documented deficiencies have been resolved and approved?

Please specify the documentation required with File III to demonstrate firm and individual licensure, good standing, peer review result and date, and staff qualifications. Is licensure in the firm’s respective home state sufficient, or is any additional jurisdictional registration required? What peer review age or coverage criteria apply, and where should evidence be placed within the submission page limits?

No. As stated in the SOO the firm’s most recent independent peer review must have received a rating of “Pass”.

31.

Attachment 07 provides a Contractor Proposed Delivery Schedule column and requires concurrent deliverables to be annotated. Must contractors complete and return the full attachment with File III, in addition to the draft project

ATCH 07 will be submitted with File I. Refer to revised ATCH 01 for instructions.

plan, and does it count toward the technical or project plan page limit? Please reconcile twelve months after receipt of award with §1.3’s award date start.

32.

Does the ten business day audit plan deadline run from the agreement kickoff or a separate kickoff for each order?

For bundled MWR/lodging and dual year audits at one installation, does the four-week fieldwork cap apply per fund year audit, per combined engagement, or per installation visit?

The 10 business day audit plan deadline is from the initial kick off meeting held post award of task order (SOO 5.1.1). 4-week fieldwork applies per engagement. All audit engagements require a single, consolidated fieldwork. For multiple audit types or dual year audits occurring at the same installation, all on-site fieldwork to be executed concurrently during a single visit.

33.

Please identify the systems and data access methods required for audit personnel, applicable cybersecurity roles/certifications under DoDM 8140.03, and whether these apply to all auditors or only personnel performing cybersecurity functions. Please specify required investigation/adjudication levels, sponsorship and anticipated onboarding lead time, and whether existing favorable determinations may be used. Must these conditions be met at quotation, award or before system access? How will delayed Government onboarding affect kickoff and fieldwork milestones, and when may the referenced waiver permit work to begin?

Background Tier 1 investigation will be conducted for audit personnel. PBC documentation will be transmitted via DoDSAFE (DoDM 8140.03 does not apply). Personnel may begin remote PBC review and fieldwork upon task order award while awaiting CACs.

34.

Attachment 04 requires a secure, DoD compliant repository and transfer protocol protecting Controlled Unclassified Information (CUI) and Personally Identifiable Information (PII) in accordance with National Institute of Standards and Technology Special Publication (NIST SP) 800-171. Please identify the required revision, any assessment or authorization evidence required with

The Government will utilize DoDSAFE to transmit files.

Contractor’s environment must comply with NIST

SP800-171.

Audit work papers must be retained by the CPA firm in accordance with GAGAS standards and protected as the quote or before performance, and whether Government furnished repositories or access tools will be available. What approval, retention, destruction and hard copy transmission requirements apply to audit workpapers and report packages, including authorized remote analysis and drafting?

CUI with secure destruction in accordance with NIST SP 800-88 upon expiration of the retention period.

35.

Is there an estimated time of award?

We estimate award within 45 days following RFQ closing date.

36.

Would the government please provide an estimated level of effort for the engagement, annually?

The Government does not mandate a fixed level of effort (man-hours) for Firm- Fixed-Price deliverables.

Offerors are expected to propose an appropriate staffing mix based on GAGAS standards, the installation revenue sizes in ATCH 12, and the scope defined in the SOO.

Historically, installation performance audits involve approximately 1 week (5 business days) of on-site fieldwork per installation visit, bookended by remote planning and reporting

37.

Would the government consider making an award based on best value rather than lowest price technically acceptable?

No

38.

Section 3.4 on page 13 of 48 states, “Subcontracting is strictly prohibited. All proposed personnel must be direct employees of the Prime CPA firm.” As such, would the government allow for the use of a specialist consultant on the engagement with subject matter expertise of the U.S.

Air Force NAFI program and the Air Force Services Center (AFSVC) Public Accountant Contract Audit Program (PACA)? The specialized consultant would only serve as a subject matter expert, would be consulted periodically on

No. The CPA firm is expected to possess the necessary professional expertise to execute GAGAS financial and performance audits of NAFIs upon contract award.

During the planning and fieldwork phases, the audit team will have direct, the uniqueness of the organization, but would not be responsible for any of the audits or the associated deliverables as that would remain exclusively with the bidding firm.

authorized access to local NAF Accounting Office personnel, the Quality Assurance Evaluator (QAE), the NAFFA, and the AFSVC COR to conduct interviews, perform walkthroughs, and obtain clarification on Air Force NAF policies and systems.

File details come from the government source that posted it. Updated .