ATCH 05 Supplies Services and Prices 12 Nov 2026.pdf
PDF 212 KB Posted
- Solicitation number
- F41999-27-Q-0006
About this file
This is a pricing template for a Public Accountant Contract Audit Program (PACA) Installation Audits contract with the U.S. Air Force Services Center (AFSVC) under USAFE. The document establishes firm-fixed unit pricing structures for audit services delivered during a Base Year and four Option Years, with pricing CLINs organized into two primary sections aligned with deliverables outlined in the Statement of Objectives.
Section A covers Financial Statement Audits priced per individual fund audit (MWR Fund or Lodging Fund), encompassing seven deliverables: Audit Plan & Project Schedule, Provided by Client (PBC) List and Audit In-Brief, Audit Out-Brief, Preliminary Draft Audit Report, Formal Draft Audit Report, Final Audit Report Package, and Progress and Summary Reports (Not Separately Priced). Section B covers Performance Audits priced per consolidated audit engagement of one to ten designated activities on a single installation during a single site visit, with seven corresponding deliverables using identical deliverable categories. Travel labor is quoted as a daily rate with actual travel expenses (lodging, per diem, transportation) reimbursed separately at actual allowable cost per Federal Travel Regulations (FTR) / Joint Travel Regulations (JTR) rates. Offerors must submit firm-fixed prices for all technical deliverables, with progress and summary reporting costs distributed across technical deliverables rather than separately priced. All meetings, administration, kick-off activities, entrance/exit briefs, and status meetings are incorporated into technical deliverable pricing. The form permits contractor adjustment to reflect specific proposal pricing structures and rolls up period totals for the Base Year and each Option Year (Years 1–4) to calculate total evaluated price across all ordering periods.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH 05 - SUPPLIES, SERVICES AND PRICES
Public Accountant Contract Audit Program Installation Audits
12 Nov 2026
ATTACHMENT 05 – SUPPLIES, SERVICES, AND PRICES
Public Accountant Contract Audit Program (PACA) – Installation Audits - USAFE
Air Force Services Center (AFSVC) The contractor can adjust this form as needed.
1.0 CLIN STRUCTURE & MASTER PRICING TEMPLATE
To simplify presentation and provide standardized pricing across all ordering periods, the pricing schedule is structured into two primary sections matching the deliverables in paragraph 4.0 Deliverables, Milestone Schedule, and Acceptance Criteria of the Statement of Objectives (SOO) (Attachment 04):
• Financial Statement Audit – Section A: Covers financial statement audits across the Base Year and Option Years 1 through 4. Deliverables are priced per individual fund audit (MWR Fund or Lodging Fund).
• Performance Audits – Section B: Covers performance audits ordered on an as-needed basis across the Base Year and Option Years 1 through 4. Deliverables are priced per consolidated audit engagement encompassing one (1) to ten (10) designated activities on a single installation during a single site visit.
Offerors must propose firm-fixed unit prices for each deliverable line item. Progress and summary reporting deliverables are designated as Not Separately Priced (NSP) as their costs are distributed across technical audit deliverables. Reimbursable travel expenses are excluded from firm-fixed labor rates and will be reimbursed separately at actual allowable cost in accordance with the Federal Travel Regulations (FTR) / Joint Travel Regulations (JTR) up to authorized task order amounts.
FINANCIAL STATEMENT AUDIT – SECTION A
(Applicable to Base Year and Option Years 1–4 Engagements; Priced per Individual Fund – MWR or Lodging)
Base Year
CLIN
Description Base Year Amount
Option Yr 1
CLIN
Option Yr 1 Amount
Option Yr 2
CLIN
Option Yr 2 Amount
Option Yr 3
CLIN
Option Yr 3 Amount
Option Yr 4
CLIN
Option Yr 4 Amount
0001 Audit Plan & Project Schedule
$ 1001 $ 2001 $ 3001 $ 4001 $
0002 Provided by Client (PBC) List and Audit In-Brief
$ 1002 $ 2002 $ 3002 $ 4002 $
0003 Audit Out- Brief
$ 1003 $ 2003 $ 3003 $ 4003 $
0004 Preliminary Draft Audit Report
$ 1004 $ 2004 $ 3004 $ 4004 $
Base Year
CLIN
Description Base Year Amount
Option Yr 1
CLIN
Option Yr 1 Amount
Option Yr 2
CLIN
Option Yr 2 Amount
Option Yr 3
CLIN
Option Yr 3 Amount
Option Yr 4
CLIN
Option Yr 4 Amount
0005 Formal Draft Audit Report
$ 1005 $ 2005 $ 3005 $ 4005 $
0006 Final Audit Report Package
$ 1006 $ 2006 $ 3006 $ 4006 $
0007 Progress and Summary Reports
NSP 1007 NSP 2007 NSP 3007 NSP 4007 NSP
TOTAL Section A Subtotal (per Fund Audit)
Travel Labor - Daily Cost
PERFORMANCE AUDITS – SECTION B
(Ordered As-Needed across Base Year and Option Years 1–4; Priced per Consolidated Audit Engagement)
CLIN
Description Base Year Amount
Option Yr 1
CLIN
Option Yr 1 Amount
Option Yr 2
CLIN
Option Yr 2 Amount
Option Yr 3
CLIN
Option Yr 3 Amount
Option Yr 4
CLIN
Option Yr 4 Amount
0008 Audit Plan & Performance Project Schedule
$ 1008 $ 2008 $ 3008 $ 4008 $
0009 PBC List and Performance Audit In-Brief
$ 1009 $ 2009 $ 3009 $ 4009 $
0010 Performance Audit Out-Brief
$ 1010 $ 2010 $ 3010 $ 4010 $
0011 Preliminary Draft Performance Audit Report
$ 1011 $ 2011 $ 3011 $ 4011 $
CLIN
Description Base Year Amount
Option Yr 1
CLIN
Option Yr 1 Amount
Option Yr 2
CLIN
Option Yr 2 Amount
Option Yr 3
CLIN
Option Yr 3 Amount
Option Yr 4
CLIN
Option Yr 4 Amount
0012 Formal Draft Performance Audit Report
$ 1012 $ 2012 $ 3012 $ 4012 $
0013 Final Performance Audit Report
$ 1013 $ 2013 $ 3013 $ 4013 $
0014 Progress and Summary Reports
NSP 1014 NSP 2014 NSP 3014 NSP 4014 NSP
TOTAL Section B Subtotal (per Engagement)
Travel Labor - Daily Cost
TOTAL EVALUATED PRICE SUMMARY ROLLUP
Ordering Period Financial Statement Audit (Section A Subtotal)
Performance Audits (Section B Subtotal)
Travel Labor - Daily Cost *
Period Total Evaluated Price
Base Year (12 Months) $ $ $ $
Option Year 1 (12 Months) $ $ $ $
Option Year 2 (12 Months) $ $ $ $
Option Year 3 (12 Months) $ $ $ $
Option Year 4 (12 Months) $ $ $ $
TOTAL EVALUATED PRICE
(All Ordering Periods)
*Note: Travel Labor Category and Daily Rate. Actual travel expenses (lodging, per diem, transportation) will be invoiced separately at actual allowable cost in accordance with the Federal Travel Regulation (FTR) / Joint Travel Regulations (JTR) under Clause 29 of the NAF Standard Clauses.
2.0 PRICING INSTRUCTIONS & NOTES
1. Deliverable Scope Applicability:
• Section A (Financial Statement Audits): Unit prices represent a complete engagement for a single, individual fund audit (MWR Fund or Lodging Fund) as outlined in SOO paragraph 4.1.1. Dual-year audits (e.g., historical FY24 & FY25) ordered pursuant to SOO paragraph 2.1.1 shall be performed under the designated financial statement CLINs.
• Section B (Performance Audits): Unit prices represent a single consolidated performance audit engagement encompassing one (1) to ten (10) designated activities on an installation during a single site visit as outlined in SOO paragraph 4.1.2.
2. Not Separately Priced (NSP) Deliverables:
• Line items 0007 / 1007 / 2007 / 3007 / 4007 and 0014 / 1014 / 2014 / 3014 / 4014 (Progress and Summary Reports, status updates, and interim reporting) are Not Separately Priced. Offerors shall distribute associated management and reporting overhead into the firm-fixed prices of the technical deliverables.
3. Meetings & Administration:
• Attendance at kick-off meetings, entrance/in-briefs, exit/out-briefs, and weekly status meetings is incorporated into the technical deliverable CLIN pricing and will not be billed separately.
4. Travel Reimbursement:
• Travel will be ordered as authorized by the Contracting Officer or Contracting Officer's Representative (COR).
Contractor travel costs will be reimbursed at actual allowable cost consistent with FTR/JTR rates. Travel labor daily rates shall be quoted where indicated.
This form can be adjusted as needed by the contractor to reflect specific proposal pricing structures.
| ATTACHMENT 05 – SUPPLIES, SERVICES, AND PRICES |
| Public Accountant Contract Audit Program (PACA) – Installation Audits - USAFE |
| Air Force Services Center (AFSVC) |
| 1.0 CLIN STRUCTURE & MASTER PRICING TEMPLATE |
| FINANCIAL STATEMENT AUDIT – SECTION A |
| PERFORMANCE AUDITS – SECTION B |
| TOTAL EVALUATED PRICE SUMMARY ROLLUP |
| 2.0 PRICING INSTRUCTIONS & NOTES |
File details come from the government source that posted it. Updated .