ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf
PDF 729 KB Posted
- Solicitation number
- F41999-27-Q-0006
About this file
This is a Statement of Objectives (SOO) for audit services under the Air Force Services Center (AFSVC) Public Accountant Contract Audit Program (PACA).
AFSVC seeks a licensed Certified Public Accountant (CPA) firm to conduct comprehensive financial statement audits and performance audits of Air Force Nonappropriated Fund Instrumentalities (NAFIs) and related services activities across installations worldwide. The contract structure includes a Base Year and four Option Years, with initial Base Year task orders requiring dual-year financial statement audits covering two distinct historical fiscal years (e.g., FY24 and FY25). The government reserves the unilateral right to request dual-year audits during Option Year 1. Performance audits will be conducted on an as-needed basis determined by annual risk assessment. The contractor must be a CPA firm in good standing with minimum six years of public accounting audit experience, including financial statement, performance, and compliance audits of hospitality, recreation, retail, or similar service-industry operations. All staff must possess at least a bachelor's degree in accounting, finance, or business administration with 24 semester hours in accounting, plus a minimum of two years of professional audit experience. The firm must maintain a passing rating on its most recent independent peer review under Generally Accepted Government Auditing Standards. The contractor must utilize DoD-compliant secure file repositories compliant with NIST SP 800-171 standards for handling Controlled Unclassified Information (CUI) and Personally Identifiable Information (PII). Subcontracting is strictly prohibited; all personnel must be direct employees of the prime firm.
Deliverables include detailed audit plans, preliminary and formal draft audit reports incorporating management feedback, final audit reports with signed Independent Auditor's Reports bound to financial statements and Management Letters, weekly and monthly status reports, and formal entrance and exit briefings. Fieldwork will not exceed four weeks per audit and must be conducted on-site at respective installations. Preliminary draft reports are due within four weeks of fieldwork completion, draft reports within ten business days of receiving government comments, and final reports within ten business days of approved drafts. The contractor must also conduct formal in-briefings and out-briefings with installation leadership and provide monthly contract progress reports with invoices. Audit work must comply with generally accepted auditing standards, Government Auditing Standards (GAGAs/Yellow Book), DoD 7000.14-R financial management regulations, DAFMAN 34-201, DAFI 34-101, and other applicable Air Force instructions. Travel must be coordinated and reimbursed by AFSVC in accordance with Federal Travel Regulations. Contractor personnel require appropriate cybersecurity certifications, background investigations (Tier 1 or Tier 3), and must obtain base access passes and REAL ID-compliant identification by May 7, 2025.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH 04 – Statement of Objectives
Public Accountant Contract Audit Program Installation Audits
22 Oct 2026
CUI
STATEMENT OF OBJECTIVES (SOO)
FOR
AIR FORCE SERVICES CENTER (AFSVC)
PUBLIC ACCOUNTANT CONTRACT
AUDIT PROGRAM (PACA)
AT
Air Force Services Center (AFSVC), Port San
Antonio, TX
Contents
SECTION I
1.0 DESCRIPTION OF SERVICES
1.1. General
1.2. Background
1.3 Scope
SECTION II
2.0 PROBLEM STATEMENT
2.1 Objective
2.2 Final Outcome
SECTION III
3.0 CONTRACTOR QUALIFICATIONS
3.1. Team Lead/Project Manager
3.2. Staff Education
3.3. Information Security and Data Handling
3.4. Subcontracting
SECTION IV
4.0 DELIVERABLES AND ACCEPTANCE CRITERIA
SECTION V
5.0. CONTRACT ADMINISTRATION
5.1 Meetings
SECTION VI
6.0. GENERAL INFORMATION
6.1. Contracting Officer’s Representative (COR) Responsibilities
6.2. Installation Point of Contact (POC) Responsibilities
6.3. Place of Performance
6.4. Travel
6.5. Privacy Act
6.6. Security Clearances
SECTION VII
7.0. SECURITY
7.1. Base Access
7.2. Non-Disclosure Agreement
7.3. Intellectual Property
7.4. Information Security
7.5. Personnel Security
7.6. Background Investigation
SECTION VIII
8.0 APPENDIX
8.1. Definitions & Abbreviations
8.2. Acronyms
8.3. Sample Weekly Status Reports or as agreed upon by COR
8.4. Sample Contract Progress Report
8.5. NAFI Observed Holidays
SECTION I
1.0 DESCRIPTION OF SERVICES
1.1. General.
The Air Force Services Center (AFSVC), headquartered at Joint Base San Antonio-
Lackland, Texas, delivers Services programs and activities to build and sustain ready and resilient Airmen, Guardians and families. Air Force Services Center supports the bases, major commands and air staff by providing technical assistance, new initiatives, developing programs and procedures and managing central support functions. Air Force Services
Center ensures successful operation of essential food, fitness, childcare, lodging and recreation opportunities for military members and their families. The Center’s responsibilities include preparing responses to high-level inquiries, providing technical assistance to the field and developing new programs that support major command and installation activities. The Financial Management Directorate (VF) manages the
Nonappropriated Fund Public Accountant Contract Audit program centrally which supports a worldwide mission providing an oversight of internal controls, cash management and financial information to installations at the enterprise level.
1.2. Background.
Nonappropriated Fund (NAF) installations provide support services and activities for military personnel, families and authorized patrons. Proper management and accountability of Nonappropriated Fund (NAF) resources are critical to ensuring continued service delivery and the protection of government interests. Regular audits are required to evaluate the financial status, internal controls, and operational effectiveness of Nonappropriated Fund
(NAF) operations. The Air Force Services Center Financial Management, Strategic Policy &
Financial Operations, AFSVC/VFSF manages and administers audit oversight to Central
Funds and the Public Accountant Contract Audit (PACA) Program to ensure compliance with annual audit requirements of financial statements audits of the NAFIs and that adequate audit coverage is provided Air Force wide for the Nonappropriated Fund Instrumentalities
(NAFIs) Services activities. The term (Activities) refers to the various operational organizations within the Force Support Squadron structure, such as bowling center and officers' club. An activity may be comprised of several sub-activities. These sub-activities refer to the specific functions within each operational organization, or activity, such as, lanes operation, snack bar, bar, dining room, gaming machines, ticket operations, etc. Also, it may refer to the operational functions of the activity with the accounting term cost center, which determines the level of accountability for financial transactions. Audit engagements include financial statement audits and performance audits in areas on accounting practices, internal control procedures, inventories, cash controls, fixed assets, food and beverage operations, Food 2.0 portfolios, installation closure procedures, gaming programs, central programs, agreed-upon procedures of specific activity programs, shared service center operations, lodging operations, and other related Nonappropriated Fund (NAF) Services activity areas.
The Air Force Nonappropriated Fund (NAF) Services activities are represented in the fund's accounting records with independent income statements and collectively in the fund's balance sheet.
The following selective list briefly describes some of the Services activities at the Air Force installations:
A. CLUB. Clubs provide customer-driven food, beverages, entertainment, and other membership programs to meet the social recreation needs of members and their authorized guests. There are multiple Air Force club configurations: officers’ club, enlisted club, collocated club, and consolidated club. Per approved May 2024 conversion package, installations transitioned to one of four options; continue to operate a Category C Club activity, transition to Category B Community Center with a
Category C food and Beverage operation, transition to a Category B Community
Center with no Food and Beverage operation or close the activity completely. Income is generated from food and beverage sales, catering, vending, amusement machines, concessions, bingo, special functions, and membership dues.
B. BOWLING CENTER. Bowling centers provide a comfortable environment for squadrons, Airmen, and their families to participate in competitive and recreational bowling in an environment that improves fitness, unit cohesion, Airmen trust, and readiness. Bowling centers offer services such as pro-shops, bowling instructional programs, food operations, special functions, arcades, and complementary programs.
C. GOLF COURSE. Golf programs provide a recreational outlet to enhance the mental and physical well-being of Airmen and their families. Golf courses offer lessons and clinics, tournaments and recreational golf which may allow for non-Department of
Defense (DoD) participation. Note: golf courses are required to obtain HAF/A1 approval for non- DoD participation. Once approval is obtained this will apply to all gold programs and is not limited to tournaments. 23 of 52 golf courses currently have a non-DoD waiver. Golf operations include driving range operations, pro shops, and snack bar operations. Some golf course bar operations are considered an annex to the club, and in some instances the club performs the operation of food and lounge operations.
D. COMMUNITY ACTIVITIES CENTERS. A comprehensive community center program includes the four core program areas to ensure consistency in program opportunities across the Air Force: (1) personal and professional development, (2) family and life skills, (3) performing arts, and (4) recreation and leisure.
(i) Food service program includes outlets for specialized, limited menu, fast-service operations, and limited cafeteria or snack bar operations and are normally run by the club.
(ii) Bingo may be an integral part of the recreation center program. Cash prizes and merchandise sales are involved in the bingo operations.
E. ARTS AND CRAFTS CENTERS. Arts and Crafts is an instructional program directed toward recreational and educational needs of Airmen to provide sufficient knowledge to pursue creative hobbies and increase competence in fine arts, crafts and industrial arts, an important part of resilience and readiness of Airmen and their families.
(i) The center may include programs such as concessionaires, resale operations, personal service contracts, and other instructional type programs.
(ii) Arts and crafts center activities may include framing, engraving, stained glass, ceramics, woodworking, jewelry making, pottery, photography, etc.
(iii) The Auto Hobby Shop offers instructional and self-help assistance for major overhaul, minor repairs, and maintenance of privately owned automobiles, motorcycles, bicycles, motor scooters, marine engines, hulls, or other components requiring a large, enclosed area where workable space for several large pieces of machinery is needed.
F. AERO CLUB OPERATIONS. This Morale, Welfare and Recreation (MWR) Services activity is a DoD-affiliated membership association formed as a recreational organization designed to give eligible aviation enthusiasts an opportunity to continue aviation education, maintain critical flying skills, or work towards a pilot’s license.
Individuals must comply with Department of the Air Force Policy Directive (DAFPD), Department of Air Force Instructions and Federal Aviation Administration regulations to ensure safety at the Aero Club remains the best in the industry.
G. FITNESS PROGRAM. DAF Fitness and Sports, world class athlete, and shooting programs provide military communities with resources, programs, and opportunities for active, healthy lifestyle choices. Active lifestyles increase productivity, optimize the health of Airmen and Guardians, and enhance the level of mission readiness. These opportunities support the physical and mental well-being of participants, buffering the negative effects of stress and fostering resilience in Airmen, Guardians, and their families. Program includes Sports Retail Stores and Fitness Center Snack Bars.
H. MEMBERSHIP PROGRAMS.
(i) Riding Clubs: Riding clubs foster interest in horseback riding, horse care, shows and competition, trail rides, and other activities involving horses. The club may provide stalls for stabling privately-owned horses to club members, club owned horses for rent and riding areas and trails.
(ii) Skin and Scuba Diving: Club with an interest in skin and scuba diving.
(iii) Sport Parachute Clubs: Club with interest in parachute jumping.
(iv) Motor Vehicle and Motorcycle Clubs: Clubs with interest in automobiles and/or motorcycles. Shows and rides are organized.
(v) Yacht Clubs: Clubs that foster participation and enjoyment of water - related activities such as sailing, yachting, racing and deep-sea fishing. Clubs may rent moorings, own and rent fishing or pleasure boats, keep and run dry-docking, repair facilities, and resale outlets, and manage clubhouse and snack bar facilities for members.
(vi) Tennis Clubs: Clubs with an interest in promoting tennis among its members.
I. MISCELLANEOUS MORALE AND WELFARE. Includes fund-raising events, dining hall support, health services support, special events, vehicle rental, taxi services and ride sharing services.
J. OTHER BASE SUPPORT. Includes education services, chaplain programs and family services program.
K. OUTDOOR RECREATION. On-base or off-base recreation lodging facilities under the outdoor recreation program include cabins, cottages, mobile homes, trailers, campers, and enclosed sleeping shelters. These facilities are available for rental to overnight users. Recreation lodging facilities will be distinguished from Family
Campgrounds (FAMCAMPS). FAMCAMPS are on or off-base campgrounds primarily developed for use by privately-owned trailers, motor homes, or other recreational vehicles. The outdoor recreation program may include a marina operation.
The marina operation may have Morale, Welfare, and Recreation (MWR) watercraft and the US Air Force watercraft. Morale, Welfare, and Recreation (MWR) watercraft are recreational boats used in support of MWR activities whereas US Air Force watercraft is vessels used for non-MWR official mission. Marinas will comply with federal, state, and local environment and pollution laws and regulations. Services
‘equipment rental’ consists of rental and servicing recreational equipment, including items such as recreational vehicles, motorboats, camping equipment, gardening tools, etc.
L. FUND OVERHEAD. Nonappropriated Fund Instrumentalities (NAFIs) are provided oversight through the Nonappropriated Fund (NAF) Oversight Program as a responsibility of the Comptroller as outlined in Air Force Instruction 65-107, Nonappropriated Funds Financial Management Oversight Responsibilities. The
Nonappropriated Fund Accounting Office (NAF AO) is charged with providing centralized accounting and financial management services to all Services cost centers established within the installation Morale, Welfare, and Recreation Fund (MWRF) and certain other Nonappropriated Funds (NAFs). The Resource Manager, as the custodian of the Morale, Welfare, and Recreation Fund (MWRF), is responsible for implementing adequate internal control systems for the installation Services activities.
The activity manager is responsible for the daily operation and management of the
Services activity. The oversight function of the NAF AO is monitored by the
Nonappropriated Fund Financial Analyst (NAFFA) of the Comptroller.
M. YOUTH PROGRAMS. Youth programs provide opportunities for children to develop their physical, social, emotional, and cognitive abilities including opportunities for achievement, leadership, and recognition. These opportunities may include before and after school programs, and summer and holiday day camps during school vacations.
N. CHILD DEVELOPMENT PROGRAMS. Child Development Centers have programs that provide care and educational activities to children 0 to 12 years of age in child development centers, family day care homes, preschools, before and after school programs, and alternative childcare settings.
O. INFORMATION, TICKETS AND TRAVEL. Information, Tickets and Travel (ITT) serves as a central point for information about amusement and entertainment tickets.
This activity works closely with all major theme parks and offers discounted tickets for
Military, Civilians and their dependents. American Forces Travel offer extensive travel planning. Some of the information, tickets, and travel locations may expand to offer vacation planning along with offering tours to local events and cultural exhibits.
P. LODGING. Air Force Lodging is the largest lodging operation in the Department of
Defense spanning across 76 properties. Nonappropriated Fund (NAF) recreational and lodging operations are self-sustaining and provide affordable and quality lodging for
Airmen and their families. These operations may be considered high risk due to the large volume of transactions and diverse customer base. These facilities may be prone to fraud and operational inefficiencies.
1.3 Scope.
1.3.1 Air Force Services Center requires audit services of licensed Certified Public
Accountants (CPAs) or CPA firms, to perform financial statement audits of the Air
Force Nonappropriated Fund Instrumentalities (NAFIs) financial statements and performance audit of the Nonappropirated Fund Instrumentality (NAFI) Services activities with particular emphasis on high-risk areas identified through a preliminary risk assessment and annual selection matrix.
SECTION II
2.0 PROBLEM STATEMENT
2.1 Objectives
The primary objectives of this contract are as follows:
2.1.1 The Contractor shall conduct comprehensive audits of the financial statements, transactions, internal controls, and performance of Nonappropriated Fund (NAF) installations and activities. AFSVC is seeking to contract an audit firm for a 5-year period, structured with a Base Year and four (4) subsequent Option Years. AFSVC intends to issue initial Base Year task orders requiring dual-year financial statement audits encompassing two distinct historical fiscal years as designated in the individual task orders (e.g., FY24 and FY25). Additionally, the Government reserves the unilateral right to request a dual-year financial statement audit encompassing up to two (2) historical fiscal years during Option Year 1. While financial statement audits will examine specific, historical fiscal years, performance audits will be conducted on an as-needed basis determined by an annual risk assessment, with the specific scope defined in individual task orders.
2.1.2 Identify discrepancies, inefficiencies and non-compliance with relevant regulations
2.1.3 Assess the adequacy of internal controls within Nonappropriated Fund (NAF) operations, identify weaknesses and provide recommendations to improve internal controls, financial management and operational processes.
2.1.4 Ensure that Nonappropriated Fund (NAF) installations are compliant with all applicable Department of Defense policies, guidelines and regulatory framework.
2.1.5 Air Force Services Center (AFSVC) requires a comprehensive assessment of the financial and operational integrity of the Nonappropriated Fund (NAF) installations to ensure strict compliance with applicable policies, regulations, internal controls, and best practices for the stewardship of funds. Specific audit areas, installations, and regions will be defined in individual Task Orders. To achieve this objective, the
Contractor will evaluate key operational areas to include:
2.1.5.1 Financial Audits: Conduct audits of financial statements, including balance sheets, income statements, and cash flow statements. Review financial transactions for accuracy and compliance with Nonappropriated Fund (NAF) policies. Identify and document any irregularities, fraud, or potential mismanagement of funds, and review financial transactions in high-risk areas (area or irregular transactions, unapproved disbursements and cash flow reports). Auditors conduct detailed internal control testing and issue an official opinion related to financial statements and accounts.
2.1.5.2 Performance and Operational Audits: Conduct performance audits in accordance with Government Auditing Standards (GAGAS) to assess whether
Nonappropriated Fund (NAF) activities are achieving economy, efficiency, and effectiveness. These audits will include an evaluation of day-to-day operational processes, resource allocation, staffing levels, and service delivery methods.
Conduct root-cause analyses and issue a final performance audit report with actionable recommendations to optimize resources and improve operational performance.
2.1.5.3 Internal Control Evaluation: Evaluate the design and operational effectiveness of internal controls specifically established to safeguard
Nonappropriated Fund (NAF) assets and prevent fraud, waste, and abuse.
Evaluation will focus on key transactional guardrails, including the segregation of duties, management approval thresholds, physical security of inventory and cash, and system access rights. Contractor will identify control gaps and recommend specific, practical enhancements to strengthen the installation’s protective control environment.
2.1.5.4 Compliance Review: Evaluate the Nonappropriated Fund (NAF) installation's compliance with Department of Defense (DoD) instructions, local policies, and applicable financial regulations. Ensure compliance with applicable Nonappropriated Fund (NAF) accounting standards and reporting requirements.
2.1.5.5 Reporting: Prepare detailed, evidence-based audit reports that provide clear, actionable insights to relevant stakeholders. Identify root cause and quantify operational or financial impact of each vulnerability. Provide management with specific, practical corrective actions that installations can realistically implement.
Present findings and risk-mitigation strategies to relevant stakeholders.
2.1.5.6 Technology Systems: As part of the general financial and performance audit scope (and not as a standalone IT system audit), evaluate the effectiveness and efficiency of currently utilized information technology resources. Evaluation will focus on identifying internal control weaknesses related to system access, physical and logical security measures protecting Shared Services Center (SSC) systems, standard security policies, and emergency contingency and backup recovery operations. 2.1.5.7 Prior
Audit Resolution: Review prior Public Accountant Contract Audit (PACA) reports to evaluate and verify through independent testing whether previously identified weaknesses and recommendations have been appropriately remediated and closed.
The Contractor will document the status of all prior findings in the draft and final audit reports. Any unresolved, recurring, or unmitigated “repeat findings” must be explicitly highlighted in the report.
2.2 Final Outcome
2.2.1 Air Force Services Center needs to assess the financial and operational integrity of the Nonappropriated Fund (NAF) installations, ensuring compliance with applicable policies, regulations and best practices for the stewardship of funds. Department of
Air Force Manual (DAFMAN) 34-201, section 2.9. illustrates the necessity to use
Public Accountant firms periodically to review and audit Nonappropriated Fund
Instrumentality (NAFI) according to Air Force Instruction 65-301, Audit Reporting
Procedures, and Air Force Instruction 65-403, Follow-up on Internal Air Force Audit
Reports. This supports Department of Defense Instruction (DODI) 7600.06 Audit of
Nonappropriated Fund Instrumentalities and related activities. Audits must be conducted and reported in accordance with generally accepted auditing standards in the United States of America and the standards contained in the latest version of the
Government Auditing Standards, issued by the Comptroller General of the United
States and follow Government Auditing Standards. Department of Defense (DoD)
7000.14-R Compliance: Ensure adherence to the Department of Defense Financial
Management Regulation (DoD 7000.14-R), which governs Nonappropriated Fund
(NAF) operations. This includes confirming that financial activities, reporting, and resource allocation align with DoD and Air Force guidelines. Air Force Manual
AFMAN 34-209 & DAFI 34-101: Review compliance with Air Force Instructions
(AFIs), particularly DAFMAN 34-201 Use of Nonappropriated Funds (NAFs) &
DAFI 34-101 Morale, Welfare, and Recreation (MWR) Programs and Use Eligibility, DAFMAN 34-151 Gaming Operating Procedures, particularly AFMAN 34-209 Non-
Appropriated Fund Financial Management and Accounting and AFMAN 34-202
Procedures for Protecting Nonappropriated Funds Assets. Ensure that NAF operations, including accounting, procurement, and cash handling, meet Air Force standards. Regulatory Adherence: Verify that all Nonappropriated Fund (NAF) activities (including slot machines, procurement, and payroll) comply with applicable federal, state, and local laws. This may include gaming regulations and tax reporting requirements (e.g., IRS Form W-2G for slot machine winnings).
2.2.2 This document is not intended to be a comprehensive manual of audit procedures, nor is it intended to replace the auditor’s professional judgment as to the work required to accomplish their audit objectives. In the audits, the Contractor will provide all services, travel, and project supervision, as required in connection with this Statement of Objective (SOO).
2.2.3. Express an opinion on whether the consolidated financial statements for the fiscal year ending 30 September fairly represent the financial position, results of operations, and the sources and uses of funds are in conformity with generally accepted accounting principles for the prior twelve-month period. The audit will include a review of both historical financial data and current operational practices.
2.2.4. Express an opinion on compliance with policies, policy letters, regulations, laws, and directives that may have a material effect on the financial statements.
2.2.5. Audit personnel gather evidence to obtain reasonable assurance and express an opinion on whether the subject matter is presented in accordance with established criteria.
2.2.6. Thoroughly review general controls surrounding financial data processing systems to determine whether:
2.2.7. Controls have been designated according to management direction and known legal requirements.
2.2.8. Controls are operating effectively to provide reliability of and security over the data being processed.
2.2.9. Determine whether cash investments exceed normal working capital requirements and are in accordance with applicable regulations and sound financial management practices.
2.2.10. Determine whether cash and other assets are fairly presented, adequately managed, and controlled.
2.2.11. Determine whether transactions with related parties and interrelationships of
Nonappropriated Fund (NAF) funds is proper.
2.2.12. Determine whether the accounting treatment for assets, liabilities, expenses, and revenues is proper.
2.2.13. Determine whether revenues and receivables are properly recorded and adequately controlled.
2.2.14. Determine whether expenses are adequately controlled, properly classified, and are reasonable in amount as compared with budget estimates, prior years, and revenues of the current audit year.
2.2.15. Determine whether fixed assets are adequately controlled and are properly valued and depreciated based on reasonableness.
2.2.16. Determine whether liabilities are recorded and properly stated.
2.2.17. Determine whether equity accounts are properly presented.
2.2.18. Determine whether inventories are properly valued and are adequately controlled and presented.
2.2.19. Determine the status of contracts or agreements for supplies and services to ascertain whether they accurately portray the supplies and/or services expected and required, and whether payment was made in accordance with contract or agreement terms.
2.2.20. Determine whether the internal control structure can be relied upon to safeguard and account for cash, investments, and all other assets.
2.2.21. The audit must be conducted with a focus on ensuring the reliability and integrity of financial data and internal controls.
SECTION III
3.0 CONTRACTOR QUALIFICATIONS
The Contractor must provide a team of qualified personnel possessing the collective professional expertise, education, and security capabilities required to successfully execute the objectives outlined in this Statement of Objectives (SOO).
3.1 Team Lead/Project Manager. The Team lead will be a licensed Certified Public Accountant (CPA) in good standing, possessing a minimum of six (6) years of public accounting audit experience.
This experience must include conducting financial statement, performance, and compliance audits for activities similar in nature to Air Force Nonappropriated Fund Instrumentalities (NAFIs) (e.g., food and beverage, hospitality, recreation, retail, or service-industry operations)
3.2. Staff Education. All staff assigned to perform the audit will possess, at a minimum, a Bachelor’s degree in Accounting, Finance, or Business Administration from an accredited institution, to include at least twenty-four (24) semester hours in accounting coursework.3.3 Staff Experience.
Audit staff assigned to the contract will possess a minimum of two (2) years of professional audit experience. Collectively, the audit team must demonstrate experience auditing hospitality, retail, or recreational activities similar to those described in the background of this Statement of Objective
(SOO).3.4 Audit Standards & Peer Review. The contracting firm will be a licensed Certified
Public Accountant (CPA) firm in good standing with their respective State Board of Public
Accountancy. The firm will have received a passing rating on its most recent independent peer review conducted in accordance with Generally Accepted Government Auditing Standards
(GAGAs/Yellow Book)
3.3 Information Security and Data Handling. The Contractor will utilize secure, DoD compliant file repository and transfer protocol capable of securing Controlled Unclassified Information (CUI) and
Personally Identifiable Information (PII) in accordance with NIST SP 800-171 standards.
3.4 Subcontracting is strictly prohibited. All proposed personnel must be direct employees of the Prime
CPA firm.
4.0 DELIVERABLES, MILESTONE SCHEDULE, AND ACCEPTANCE CRITERIA
The Contractor will provide deliverable(s) in a format that all reports are compatible with
Microsoft Office, and Adobe Acrobat Pro .pdf. All reports will be provided in electronic file format in addition to a hard copy of the final audit report to the audited installation POC and
AFSVC COR. They must be approved by the Contracting Officer’s Representative
(COR) and designated representative from Air Force Services Center prior to acceptance and must be capable of obtaining a viable assessment and authorization. (See paragraph 6)
A comprehensive audit plan that outlines the methodology, approach, and timeline for performing the audit will be provided to the Contracting Officer’s Representative (COR) prior to any audit engagement. Regular and recurring updates on audit progress, findings, and any issues encountered during the audit progress will be addressed in a timely manner. The draft report will outline findings, recommendations, and areas of concern. The final audit report will be a finalized audit report incorporating any feedback from the draft with a clear presentation of findings, recommendations, and conclusions. A formal presentation/briefing will be afforded to the installation’s senior leadership.
4.1 Applicability of Deliverables: The deliverables outlined in the sections below apply to both
Financial Statement Audits and Performance Audits. Because the scope and operational effort vary, the Contractor will perform and invoice these services as separate, individual deliverables in accordance with the contract pricing schedule for each audit type.
4.1.1 For Financial Statement Audits, each individual deliverable applies to a single, individual fund audit (MWR or Lodging).
4.1.2. For Performance Audits, each individual deliverable applies to a consolidated audit engagement encompassing one (1) to ten (10) designated activities on a single installation during a single site visit.
4.2 Deliverables for Financial Statement Audits
4.2.1 Base Year Deliverables (Auditing Designated Fiscal Year(s), up to a Dual-Year, as defined in individual Task Orders):
4.2.2. Audit Plan: The Contractor will provide a detailed audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days the Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.
4.2.2.1. Audit plan will include, but is not limited to, the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.
4.2.2.2. The Contractor will provide a realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of
Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.2.2.3 All forecasted or unexpected delays to the schedule must be reported to the Contracting Officer’s Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s Representative (COR) no later than 1600 Central Standard Time (CST) the same day.
4.2.2.4 If a delay occurs and is the result of Contractor error, the Contractor will submit a revised schedule to the Contracting Officer’s
Representative (COR) for review and approval within two workdays of recognition or delay.
4.2.3 PBC List and Audit In-Brief. The Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.2.4 Audit Out-Brief. All audit fieldwork will be fully completed within four
(4) weeks of the In-Brief. The Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
4.2.5 Preliminary Draft Audit Report. The Contractor will provide the
Contracting Officer’s Representative (COR) and audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft independent Auditor’s Report, proposed adjustments, and a draft of the Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
4.2.6 Draft Audit Report: Within ten (10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed audit adjustments, and include the updated draft of the Independent Auditor’s Report and the updated draft Management Letter. The report will be provided to the Contracting Officer’s Representative (COR), the
Installation Point of Contact, and other designated recipients (to be determined).
4.2.7 Final Audit Report: The final audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report (audit opinion) bound to the audited financial statements, and the final Management
Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s
Representative (COR), the Installation Point of Contact, and other designated recipients (to be determined).
4.2.8 Progress and Summary Reports (see samples 8.2 and 8.3). The
Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the Contracting Officer’s
Representative (COR) with the status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.
4.2.8.1 Provide a list of planned task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2
Sample Weekly Status Report).
4.2.8.2. The Contractor will provide a monthly contract
progress report, with their monthly invoice, consistent with the submitted and Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress Report)
4.2.8.3. The Contractor will provide a monthly
summary/interim progress report with an executive summary section, including audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
4.3. Option Year 1 Deliverables (Auditing Designated Fiscal Year(s) as defined in individual Task Orders):
4.3.1. Audit Plan: The Contractor will provide a detailed audit plan within ten (10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days the Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.3.1.1. Audit plan will include but is not limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.3.1.2. The Contractor will provide a realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.3.1.3. All forecasted or unexpected delays to the schedule must be reported to the
Contracting Officer’s Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s Representative (COR) no later than
1600 Central Standard Time (CST) the same day.
4.3.1.4. If a delay occurs and is the result of Contractor error, the Contractor will submit a revised schedule to the Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.3.2. PBC List and Audit In-Brief. The Contractor will submit the initial Provided by Client
(PBC) document request list to the designated installation Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.3.3. Audit Out-Brief. All audit fieldwork will be fully completed within four (4) weeks of the
In-Brief. The Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
4.3.4. Preliminary Draft Audit Report: The Contractor will provide the Contracting Officer’s
Representative (COR) and installation Point of Contact with a preliminary draft audit report within four (4) weeks of the completion of audit fieldwork. The draft will include the draft Independent Auditor’s Report, proposed adjustments, and a draft of the
Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
4.3.5. Draft Audit Report: Within ten (10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent
Auditor’s Report and the updated draft Management Letter. The report will be provided to the Contracting Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
4.3.6. Final Audit Report: The final audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report (audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s
Representative (COR), the installation Point of Contacts, and other designated recipients
(to be determined).
4.3.7. Progress and Summary Reports (see sample 8.2 and 8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting
Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.3.7.1. Provide a list of planned task/activities for the week in the status report.
Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample Weekly Status Report).
4.3.7.2. The Contractor will provide a monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract
Progress Report)
4.3.7.3. The Contractor will provide a monthly summary/interim progress report with an executive summary section, including audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
4.4. Option Year 2 Deliverables (Auditing Designated Fiscal Year(s) as defined in individual Task
Orders):
4.4.1. Audit Plan: The Contractor will provide a detailed audit plan within ten (10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.4.1.1. Audit plan will include but is not limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.4.1.2. The Contractor will provide a realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s Representative (COR), the
Contractor will deliver in accordance with approved schedule.
4.4.1.3. All forecasted or unexpected delays to the schedule must be reported to the discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s Representative (COR) no later than 1600 Central
Standard Time (CST) the same day.
4.4.1.4. If a delay occurs and is the result of Contractor error, the Contractor will submit a revised schedule to the Contracting Officer’s Representative (COR) for review and approval within two workdays of recognition or delay.
4.4.2. PBC List and Audit In-Brief. The Contractor will submit the initial Provided by Client
(PBC) document request list to the designated installation Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of
Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.
On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.4.3. Audit Out-Brief. All audit fieldwork will be fully completed within four (4) weeks of the In-
Brief. The Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
4.4.4. Preliminary Draft Audit Report: The Contractor will provide the Contracting Officer’s
Representative (COR) and the audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft Independent Auditor’s Report, proposed adjustments, and a draft of the
Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
4.4.5. Draft Audit Report: Within ten (10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor’s Report and the updated draft Management Letter. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients
4.4.6. Final Audit Report: The final audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report (audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
4.4.7. Progress and Summary Reports (see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s
Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.4.7.1. Provide a list of planned task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample Weekly Status Report).
4.4.7.2. The Contractor will provide a monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s Representative (COR) approved weekly status reports. (See 8.3 Contract Progress Report)
4.4.7.3. The Contractor will provide a monthly summary/interim progress report with an executive summary section, including audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
4.5. Option Year 3 Deliverables (Financial Audits: Auditing Designated Fiscal Year(s) as defined in individual Task Orders):
4.5.1. Audit Plan: The Contractor will provide a detailed audit plan within ten (10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.5.1.1. Audit plan will include but is not limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.5.1.2. The Contractor will provide a realistic detailed project plan outlining the tasks and requirements listed in this Statement of Objectives (SOO). Once the submitted
4.5.1.3. All forecasted or unexpected delays to the schedule must be reported to the discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s Representative (COR) no later than 1600 Central
Standard Time (CST) the same day.
4.5.1.4. If a delay occurs and is the result of Contractor error, the Contractor will submit a
4.5.2. PBC List and Audit In-Brief. The Contractor will submit the initial Provided by Client later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.5.3. Audit Out-Brief. All audit fieldwork will be fully completed within four (4) weeks of the
In-Brief. The Contractor will prepare…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .