ATCH 07 - Deliveries or Performances: Public Accountant Contract Audit Program Installation Audits

This document is a Statement of Deliverables and Performance Schedule for a federal contract audit program covering financial statement audits and performance audits of Non-Appropriated Fund Instrumentalities (NAFI) activities, including Morale, Welfare, and Recreation (MWR) and Lodging operations at military installations. The contract establishes a twelve-month base period with four optional years, requiring weekly status meetings and comprehensive audit services with defined deliverables for each engagement.

Section A—Financial Statement Audit Deliverables require the contractor to deliver detailed audit plans within ten business days of kick-off meetings, with fieldwork not exceeding four weeks conducted during regular operating hours. Key deliverables include: Provided by Client (PBC) document lists submitted fifteen calendar days before on-site work; audit in-brief and out-brief presentations; preliminary draft audit reports within four weeks of fieldwork completion; draft audit reports within ten business days of receiving government comments; and final audit reports within ten business days of draft approval. Additionally, contractors must provide weekly and monthly status reports identifying completed tasks, planned activities, risks, and systemic weaknesses identified during audits. All delays must be reported to the Contracting Officer's Representative (COR) within one business day with proposed resolutions submitted by 1600 Central Standard Time the same day; contractor-caused delays require revised schedules for COR approval within two workdays. Section B—Performance Audit Deliverables follow an identical timeline and reporting structure but require performance audit reports that include detailed operational findings, root-cause analyses, quantified impacts, and actionable recommendations to improve economy and efficiency. Fieldwork must be performed at respective installation sites where records are maintained, with all deliverables delivered to and approved by the COR.

View the file

Other files

File Type Posted
ATCH 01 Instructions to Contractors 12 Nov 2026.pdf PDF
AMENDMENT 01 RFQ F41999-27-Q-0006 USAFE PACA AUDIT.pdf PDF
ATCH 11 NPA Agreement template 10 Nov 2026.pdf PDF
QA - PACA USAFE Installation Audits 12Nov2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI)12 Nov 2026.pdf PDF
ATCH 08 Contract Administration Data 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 10 Nov 2026.pdf PDF
ATCH 07 Deliveries or Performances 12 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 08 Contract Admin Data 4 Nov 2026.pdf PDF
ATCH 11 NPA Agreement template 23 Oct 2026.pdf PDF
ATCH 03 Special Provisions 2 Nov 2026.pdf PDF
ATCH 09 Reps and Certs 30 Jul 2026.pdf PDF
ATCH 07 Deliveries or Performances 23 Oct 26.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 01 Instructions to Contractors PACA Region 2 USAFE 2Nov26.pdf PDF
ATCH 06 Evaluation Factors - LPTA 2 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 22 Oct 2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI) 2 Nov 2026.pdf PDF
RFQ - PACA Installation Audits (USAFE Region) F41999-27-Q-0006.pdf PDF
ATCH 02 NAF Standard Clauses 30 May 2025.pdf PDF
ATCH 12 PACA Installation Audits USAFE Region Breakout 21 Sept 2026.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATCH 07 - DELIVERIES OR PERFORMANCES

Public Accountant Contract Audit Program Installation Audits

23 OCT 2026

DELIVERIES OR PERFORMANCES

1. Period of Performance (twelve months after receipt of award).

1.1. The NAFI requires delivery to be made according to the following schedule:

DELIVERY SCHEDULE

Public Accountant Contract Audit Program Installation Audits

SECTION A: FINANCIAL STATEMENT AUDIT DELIVERABLES

(Priced per Individual Fund – MWR or Lodging)

CLIN Description NAFI Proposed

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

0001 4.2.2. Audit Plan: The Contractor will provide a detailed audit plan within ten

(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members

(indicating the on-site team lead for each installation), and any projected days

Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.

4.2.2.1. Audit plan will include, but is not limited to, the following:

planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit

Within ten (10) business days of kick-off meeting

CLIN Description NAFI Proposed

Delivery Schedule

Contractor

Proposed

Delivery

Schedule reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.

4.2.2.2. The Contractor will

provide a realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of

Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting

Officer’s Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.2.2.3 All forecasted or

unexpected delays to the schedule must be reported to the

Contracting Officer’s

Representative (COR) within one

(1) business day of discovery. The

Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s

Representative (COR) no later than

1600 Central Standard Time (CST) the same day.

4.2.2.4 If a delay occurs and is the

result of Contractor error, the

Contractor will submit a revised schedule to the Contracting

Officer’s Representative (COR) for review and approval within two workdays of recognition or delay.

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

0002 4.2.3. PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of

Contacts and installation leadership.

The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.

On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

Fifteen (15) calendar days prior to arriving on-site to activity being audited.

0003 4.2.4. Audit Out-Brief. All audit fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the

No Later than four

(4) weeks of In-

Brief

Delivery Schedule

Contractor

Proposed

Delivery

Schedule audit’s initial outcomes before the audit team departs the installation.

0004 4.2.5 Preliminary Draft Audit Report.

The Contractor will provide the

Contracting Officer’s Representative

(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

No Later than four

(4) weeks upon completion of audit fieldwork.

0005 4.2.6 Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report.

This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting Officer’s

Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).

No later than ten

(10) business days upon receipt of initial review comments on preliminary drafts.

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

0006 4.2.7 Final Audit Report: The final audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting

Officer’s Representative (COR), the

Installation Point of Contact, and other designated recipients (to be determined).

No later than ten

(10) business days of approved draft audit report.

4.2.8 Progress and Summary Reports (see

samples 8.2 and 8.3). The Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the Contracting Officer’s

Representative (COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.

4.2.8.1 Provide a list of planned

task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week

(See 8.2 Sample Weekly Status Report).

4.2.8.2. The Contractor will provide a

monthly contract progress report, with their monthly invoice, consistent with the submitted and Contracting Officer’s

Representative (COR) approved weekly status reports. (See 8.3 Contract Progress

Report)

4.1.7.1 Weekly

4.1.7.2. Monthly

4.1.7.3. Monthly

Delivery Schedule

Contractor

Proposed

4.2.8.3. The Contractor will provide a

monthly summary/interim progress report with an executive summary section with audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

0008 5.1.3 Weekly Status Meetings. The frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract award.

Weekly

OPTION YEAR ONE (1)

4.3.1. Audit Plan: The Contractor will

provide a detailed audit plan within ten

(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days the Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.

4.3.1.1 Audit plan will include but is not

limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

Fieldwork for this engagement must be performed at the respective sites where the records are maintained.

4.3.1.2. The Contractor will provide a

realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.3.1.3. All forecasted or unexpected

delays to the schedule must be reported to the Contracting Officer’s Representative

(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s

Representative (COR) no later than 1600

Central Standard Time (CST) the same day.

4.3.1.4. If a delay occurs and is the result

of Contractor error, the Contractor will submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

4.3.2. PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving

Fifteen (15) calendar days prior to arriving on-site

Delivery Schedule

Contractor

Proposed

Delivery

Schedule on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

4.3.3. Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

No Later than four

4.3.4. Preliminary Draft Audit Report:

The Contractor will provide the

Contracting Officer’s Representative

(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

No Later than four

(4) weeks upon

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

4.3.5. Draft Audit Report: Within ten (10)

business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.

The report will be provided to the

Contracting Officer’s Representative

(COR), the audited activity Point of

Contact, and other designated recipients

(to be determined).

No later than ten

(10) business days upon receipt of initial review

4.3.6. Final Audit Report: The final audit

report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting

Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).

No later than ten

(10) business days

4.3.7. Progress and Summary Reports

(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

4.3.7.1. Provide a list of planned

task/activities for the week in the status report. Subsequent status reports will

4.2.7.1 Weekly

4.2.7.2. Monthly

4.2.7.3. Monthly

Delivery Schedule

Contractor

Proposed

Delivery

Schedule include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week

(See 8.2 Sample Weekly Status Report).

4.3.7.2. The Contractor will provide a

monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s

Representative (COR) approved weekly status reports. (See 8.3 Contract Progress

Report)

4.3.7.3. The Contractor will provide a

monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

5.1.3 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

OPTION YEAR TWO (2)

4.4.1. Audit Plan: The Contractor will

provide a detailed audit plan within ten

(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.

4.4.1.1. Audit plan will include but is not

limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.

Fieldwork for this engagement must be performed at the respective sites where the records are maintained.

4.4.1.2 The Contractor will provide a

realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.4.1.3. All forecasted or unexpected

delays to the schedule must be reported to the Contracting Officer’s Representative

(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s

Representative (COR) no later than 1600

Central Standard Time (CST) the same day.

4.4.1.4. If a delay occurs and is the result

Delivery Schedule

Contractor

Proposed

Delivery

Schedule submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

4.4.2. PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

Fifteen (15) calendar days prior to arriving on-site

4.4.3. Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

No Later than four

4.4.4. Preliminary Draft Audit Report:

The Contractor will provide the

Contracting Officer’s Representative

(COR) and audited activity with a

No Later than four

(4) weeks upon

Delivery Schedule

Contractor

Proposed

Delivery

Schedule preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

4.4.5. Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.

The report will be provided to the

Contracting Officer’s Representative

(COR), the audited activity Point of

Contact, and other designated recipients

(to be determined).

No later than ten

(10) business days upon receipt of initial review

4.4.6. Final Audit Report: The final audit

report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting

Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).

No later than ten

(10) business days

4.4.7. Progress and Summary Reports

(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as

4.3.7.1 Weekly

4.3.7.2. Monthly

4.3.7.3. Monthly

Delivery Schedule

Contractor

Proposed

Delivery

Schedule any summary/interim progress report.

The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

4.4.7.1. Provide a list of planned

task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week

(See 8.2 Sample Weekly Status Report).

4.4.7.2. The Contractor will provide a

monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s

Representative (COR) approved weekly status reports. (See 8.3 Contract Progress

Report)

4.4.7.3. The Contractor will provide a

monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

5.1.3 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

OPTION YEAR THREE (3)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

4.5.1. Audit Plan: The Contractor will

provide a detailed audit plan within ten

(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.

4.5.1.1. Audit plan will include but is not

limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.

Fieldwork for this engagement must be performed at the respective sites where the records are maintained.

4.5.1.2. The Contractor will provide a

realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.5.1.3. All forecasted or unexpected

delays to the schedule must be reported to the Contracting Officer’s Representative

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s

Representative (COR) no later than 1600

Central Standard Time (CST) the same day.

4.5.1.4. If a delay occurs and is the result

of Contractor error, the Contractor will submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

4.5.2 PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

Fifteen (15) calendar days prior to arriving on-site

4.5.3. Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present

No Later than four

Delivery Schedule

Contractor

Proposed

Delivery

Schedule preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

4.5.4. Preliminary Draft Audit Report:

The Contractor will provide the

Contracting Officer’s Representative

(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

No Later than four

(4) weeks upon

4.5.5. Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.

The report will be provided to the

Contracting Officer’s Representative

(COR), the audited activity Point of

Contact, and other designated recipients

(to be determined).

No later than ten

(10) business days upon receipt of initial review

4.5.6. Final Audit Report: The final audit

report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting

Officer’s Representative (COR), the

No later than ten

(10) business days

Delivery Schedule

Contractor

Proposed

Delivery

Schedule installation Point of Contacts, and other designated recipients (to be determined).

4.5.7. Progress and Summary Reports

(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

4.5.7.1. Provide a list of planned

task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week

(See 8.2 Sample Weekly Status Report).

4.5.7.2. The Contractor will provide a

monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s

Representative (COR) approved weekly status reports. (See 8.3 Contract Progress

Report)

4.5.7.3. The Contractor will provide a

monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

4.4.7.1 Weekly

4.4.7.2. Monthly

4.4.7.3. Monthly

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

5.1.3 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

OPTION YEAR FOUR (4)

4.6.1. Audit Plan: The Contractor will

provide a detailed audit plan within ten

(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.

4.6.1.1. Audit plan will include but is not

limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.

Fieldwork for this engagement must be performed at the respective sites where the records are maintained.

4.6.1.2. The Contractor will provide a

realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.6.1.3. All forecasted or unexpected

delays to the schedule must be reported to the Contracting Officer’s Representative

(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s

Representative (COR) no later than 1600

Central Standard Time (CST) the same day.

4.6.1.4. If a delay occurs and is the result

of Contractor error, the Contractor will submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

4.6.2. PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin

Fifteen (15) calendar days prior to arriving on-site

Delivery Schedule

Contractor

Proposed

Delivery

Schedule on the day of, or the business day immediately following the in-brief.

4.6.3. Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

No Later than four

4.6.4. Preliminary Draft Audit Report:

The Contractor will provide the

Contracting Officer’s Representative

(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

No Later than four

(4) weeks upon

4.6.5. Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, No later than ten

(10) business days upon receipt of initial review

Delivery Schedule

Contractor

Proposed

Delivery

Schedule and areas of potential non-compliance.

The report will be provided to the

Contracting Officer’s Representative

(COR), the audited activity Point of

Contact, and other designated recipients

(to be determined).

4.6.6. Final Audit Report: The final audit

report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting

Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).

No later than ten

(10) business days

4.6.7. Progress and Summary Reports

(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

4.6.7.1. Provide a list of planned

task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week

(See 8.2 Sample Weekly Status Report).

4.6.7.2. The Contractor will provide a

monthly contract progress report, with their monthly invoice, consistent with the

4.5.7.1 Weekly

4.5.7.2. Monthly

4.5.7.3. Monthly

Delivery Schedule

Contractor

Proposed

Delivery

Schedule submitted Contracting Officer’s

Representative (COR) approved weekly status reports. (See 8.3 Contract Progress

Report)

4.6.7.3. The Contractor will

provide a monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

5.1.3 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

SECTION B: PERFORMANCE AUDIT DELIVERABLES

(Priced per Consolidated Audit Engagement)

CLIN Description NAFI Proposed

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

5001 4.7.1.1. Audit Plan: The Contractor will provide a detailed audit plan within ten

(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members

(indicating the on-site team lead for each installation), and any projected days

Contractor’s resources will be

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.

4.7.1.1.1 Audit plan will include, but is

not limited to, the following: planning to determine the nature, timing and extent of audit procedures, obtaining operational data and other information, communicating with appropriate personnel (in/out briefings), performing specific analytical and observational procedures on-site, and providing the performance audit reports. Fieldwork for this engagement must be performed on-site at the respective site where the activities operate.

4.7.1.1.2. The Contractor will provide a

realistic detailed project plan outlining the tasks and subtasks for both the Air

Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).

Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor will deliver in accordance with approved schedule.

4.1.1.3 All forecasted or unexpected

delays to the schedule must be reported to the Contracting Officer’s

Representative (COR) within one (1) business day of discovery. The

Contractor will provide reason for delay and proposed resolutions to the

Contracting Officer’s Representative

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

(COR) no later than 1600 Central

Standard Time (CST) the same day.

4.7.1.1.4 If a delay occurs and is the

result of Contractor error, the Contractor will submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

4.7.1.2 PBC List and Audit In-Brief.

The Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation

Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.

On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

Fifteen (15) calendar days prior to arriving on-site

4.7.1.3 Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the

No Later than four

Delivery Schedule

Contractor

Proposed

Delivery

Schedule audit’s initial outcomes before the audit team departs the installation.

4.7.1.4 Preliminary Draft Audit Report.

The Contractor will provide the

Contracting Officer’s Representative

(COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.

This report will be submitted within four

(4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

No Later than four

(4) weeks upon

4.7.1.5 Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance. The report will be provided to the Contracting

Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).

No later than ten

(10) business days upon receipt of initial review

4.7.1.6 Final Performance Audit Report:

The final performance audit report will be issued by the audit firm within ten

(10) business days of the approved draft audit report. The final report will

No later than ten

(10) business days

Delivery Schedule

Contractor

Proposed

Delivery

Schedule include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting Officer’s

Representative (COR), the Installation

Point of Contact, and other designated recipients (to be determined).

5007 4.7.1.7 Progress and Summary Reports

(see samples 8.2 and 8.3). The

Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the

Contracting Officer’s Representative

(COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.

4.7.1.7.1 Provide a list of planned

report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of

4.7.1.7.2. The Contractor will provide a

their monthly invoice, consistent with the submitted and Contracting Officer’s

Representative (COR) approved weekly

4.1.7.1 Weekly

4.1.7.2. Monthly

4.1.7.3. Monthly

Delivery Schedule

Contractor

Proposed

Delivery

Schedule status reports. (See 8.3 Contract

Progress Report)

4.7.7.3. The Contractor will provide a

monthly summary/interim progress report with an executive summary section with audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

5.1.4 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

OPTION YEAR ONE (1)

6001 4.8.1. Audit Plan: The Contractor will provide a detailed audit plan within ten

(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members

(indicating the on-site team lead for each installation), and any projected days

Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed

4.8.1.1. Audit plan will include, but is

determine the nature, timing and extent

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.

4.8.1.2. The Contractor will provide a

the tasks and subtasks for both the Air

Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).

Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor

4.8.1.3 All forecasted or unexpected

to the Contracting Officer’s

Representative (COR) within one (1) business day of discovery. The

Contractor will provide reason for delay and proposed resolutions to the

Contracting Officer’s Representative

4.8.1.4 If a delay occurs and is the result

submit a revised schedule to the

Contracting Officer’s Representative

(COR) for review and approval within two workdays of recognition or delay.

Delivery Schedule

Contractor

Proposed

4.8.2 PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation

Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.

On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

Fifteen (15) calendar days prior to arriving on-site

4.8.3 Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

No Later than four

4.8.4. Preliminary Draft Performance

Audit Report: The Contractor will provide the Contracting Officer’s

No Later than four

(4) weeks upon

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

Representative (COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.

This report will be submitted within four

(4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.

completion of audit fieldwork.

4.8.5. Draft Performance Audit Report:

Within ten (10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report.

This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting Officer’s

Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).

No later than ten

(10) business days upon receipt of initial review

4.8.6. Final Performance Audit Report:

The final performance audit report will be issued by the audit firm within ten

(10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across

No later than ten

(10) business days

Delivery Schedule

Contractor

Proposed

Delivery

Schedule the audited activities. The report will be provided to the Contracting Officer’s

Representative (COR), the installation

Point of Contacts, and other designated recipients (to be determined).

6007 4.8.7. Progress and Summary Reports

(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

4.8.7.1. Provide a list of planned

report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of

4.8.7.2. The Contractor will provide a

their monthly invoice, consistent with the submitted Contracting Officer’s

Representative (COR) approved weekly

4.8.7.3. The Contractor will provide a

report with an executive summary section of audit results and a cross feed

Delivery Schedule

Contractor

Proposed

Delivery

Schedule of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.

5.1.4 Weekly Status Meetings. The

frequency, day and time of status meetings will be determined by the

Contracting Officer’s Representative

(COR) and the Contractor after contract

OPTION YEAR TWO (2)

7001 4.9.1. Audit Plan: The Contractor will provide a detailed audit plan within ten

(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members

(indicating the on-site team lead for each installation), and any projected days

Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed

4.9.1.1. Audit plan will include, but is

determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the

Within ten (10)

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

4.9.1.2. The Contractor will provide a

the tasks and subtasks for both the Air

Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).

Once the submitted plan/schedule is approved by the Contracting Officer’s

Representative (COR), the Contractor

4.9.1.3 All forecasted or unexpected

to the Contracting Officer’s

Representative (COR) within one (1) business day of discovery. The

Contractor will provide reason for delay and proposed resolutions to the

Contracting Officer’s Representative

4.9.1.4 If a delay occurs and is the result

submit a revised schedule to the

Contracting Officer’s Representative

4.9.2 PBC List and Audit In-Brief. The

Contractor will submit the initial

Provided by Client (PBC) document request list to the designated installation

Points of Contact (POCs) no later than

Fifteen (15) calendar days prior to arriving on-site

Delivery Schedule

Contractor

Proposed

Delivery

Schedule fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation

Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.

On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.

4.9.3. Audit Out-Brief. All audit

fieldwork will be fully completed within four (4) weeks of the In-Brief. The

Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated

Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.

No Later than four

4.9.4. Preliminary Draft Performance

Audit Report: The Contractor will provide the Contracting Officer’s

Representative (COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate

No Later than four

(4) weeks upon

Delivery Schedule

Contractor

Proposed

Delivery

Schedule the initial management review and comment cycle.

4.9.5. Draft Audit Report: Within ten

(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting

Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).

No later than ten

(10) business days upon receipt of initial review

4.9.6. Final Performance Audit Report:

The final performance audit report will be issued by the audit firm within ten

(10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting Officer’s

Representative (COR), the installation

Point of Contacts, and other designated recipients (to be determined)

No later than ten

(10) business days

Delivery Schedule

Contractor

Proposed

Delivery

Schedule

7007 4.9.7. Progress and Summary Reports

(see sample 8.2 and 8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative

(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.

The status report must identify action and/or items completed by individual

4.9.7.1. Provide a list of planned

report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of

4.9.7.2. The Contractor will provide a

their monthly…