ATCH 07 - Deliveries or Performances: Public Accountant Contract Audit Program Installation Audits
This document is a Statement of Deliverables and Performance Schedule for a federal contract audit program covering financial statement audits and performance audits of Non-Appropriated Fund Instrumentalities (NAFI) activities, including Morale, Welfare, and Recreation (MWR) and Lodging operations at military installations. The contract establishes a twelve-month base period with four optional years, requiring weekly status meetings and comprehensive audit services with defined deliverables for each engagement.
Section A—Financial Statement Audit Deliverables require the contractor to deliver detailed audit plans within ten business days of kick-off meetings, with fieldwork not exceeding four weeks conducted during regular operating hours. Key deliverables include: Provided by Client (PBC) document lists submitted fifteen calendar days before on-site work; audit in-brief and out-brief presentations; preliminary draft audit reports within four weeks of fieldwork completion; draft audit reports within ten business days of receiving government comments; and final audit reports within ten business days of draft approval. Additionally, contractors must provide weekly and monthly status reports identifying completed tasks, planned activities, risks, and systemic weaknesses identified during audits. All delays must be reported to the Contracting Officer's Representative (COR) within one business day with proposed resolutions submitted by 1600 Central Standard Time the same day; contractor-caused delays require revised schedules for COR approval within two workdays. Section B—Performance Audit Deliverables follow an identical timeline and reporting structure but require performance audit reports that include detailed operational findings, root-cause analyses, quantified impacts, and actionable recommendations to improve economy and efficiency. Fieldwork must be performed at respective installation sites where records are maintained, with all deliverables delivered to and approved by the COR.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH 07 - DELIVERIES OR PERFORMANCES
Public Accountant Contract Audit Program Installation Audits
23 OCT 2026
DELIVERIES OR PERFORMANCES
1. Period of Performance (twelve months after receipt of award).
1.1. The NAFI requires delivery to be made according to the following schedule:
DELIVERY SCHEDULE
Public Accountant Contract Audit Program Installation Audits
SECTION A: FINANCIAL STATEMENT AUDIT DELIVERABLES
(Priced per Individual Fund – MWR or Lodging)
CLIN Description NAFI Proposed
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
0001 4.2.2. Audit Plan: The Contractor will provide a detailed audit plan within ten
(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days
Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.
4.2.2.1. Audit plan will include, but is not limited to, the following:
planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit
Within ten (10) business days of kick-off meeting
CLIN Description NAFI Proposed
Delivery Schedule
Contractor
Proposed
Delivery
Schedule reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.
4.2.2.2. The Contractor will
provide a realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of
Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting
Officer’s Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.2.2.3 All forecasted or
unexpected delays to the schedule must be reported to the
Contracting Officer’s
Representative (COR) within one
(1) business day of discovery. The
Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than
1600 Central Standard Time (CST) the same day.
4.2.2.4 If a delay occurs and is the
result of Contractor error, the
Contractor will submit a revised schedule to the Contracting
Officer’s Representative (COR) for review and approval within two workdays of recognition or delay.
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
0002 4.2.3. PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of
Contacts and installation leadership.
The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.
On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
Fifteen (15) calendar days prior to arriving on-site to activity being audited.
0003 4.2.4. Audit Out-Brief. All audit fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the
No Later than four
(4) weeks of In-
Brief
Delivery Schedule
Contractor
Proposed
Delivery
Schedule audit’s initial outcomes before the audit team departs the installation.
0004 4.2.5 Preliminary Draft Audit Report.
The Contractor will provide the
Contracting Officer’s Representative
(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
No Later than four
(4) weeks upon completion of audit fieldwork.
0005 4.2.6 Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report.
This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
No later than ten
(10) business days upon receipt of initial review comments on preliminary drafts.
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
0006 4.2.7 Final Audit Report: The final audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting
Officer’s Representative (COR), the
Installation Point of Contact, and other designated recipients (to be determined).
No later than ten
(10) business days of approved draft audit report.
4.2.8 Progress and Summary Reports (see
samples 8.2 and 8.3). The Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the Contracting Officer’s
Representative (COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.
4.2.8.1 Provide a list of planned
task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week
(See 8.2 Sample Weekly Status Report).
4.2.8.2. The Contractor will provide a
monthly contract progress report, with their monthly invoice, consistent with the submitted and Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.1.7.1 Weekly
4.1.7.2. Monthly
4.1.7.3. Monthly
Delivery Schedule
Contractor
Proposed
4.2.8.3. The Contractor will provide a
monthly summary/interim progress report with an executive summary section with audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
0008 5.1.3 Weekly Status Meetings. The frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract award.
Weekly
OPTION YEAR ONE (1)
4.3.1. Audit Plan: The Contractor will
provide a detailed audit plan within ten
(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days the Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.3.1.1 Audit plan will include but is not
limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.3.1.2. The Contractor will provide a
realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.3.1.3. All forecasted or unexpected
delays to the schedule must be reported to the Contracting Officer’s Representative
(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than 1600
Central Standard Time (CST) the same day.
4.3.1.4. If a delay occurs and is the result
of Contractor error, the Contractor will submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.3.2. PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving
Fifteen (15) calendar days prior to arriving on-site
Delivery Schedule
Contractor
Proposed
Delivery
Schedule on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.3.3. Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
No Later than four
4.3.4. Preliminary Draft Audit Report:
The Contractor will provide the
Contracting Officer’s Representative
(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
No Later than four
(4) weeks upon
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
4.3.5. Draft Audit Report: Within ten (10)
business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.
The report will be provided to the
Contracting Officer’s Representative
(COR), the audited activity Point of
Contact, and other designated recipients
(to be determined).
No later than ten
(10) business days upon receipt of initial review
4.3.6. Final Audit Report: The final audit
report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting
Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
No later than ten
(10) business days
4.3.7. Progress and Summary Reports
(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.3.7.1. Provide a list of planned
task/activities for the week in the status report. Subsequent status reports will
4.2.7.1 Weekly
4.2.7.2. Monthly
4.2.7.3. Monthly
Delivery Schedule
Contractor
Proposed
Delivery
Schedule include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week
(See 8.2 Sample Weekly Status Report).
4.3.7.2. The Contractor will provide a
monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.3.7.3. The Contractor will provide a
monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
5.1.3 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
OPTION YEAR TWO (2)
4.4.1. Audit Plan: The Contractor will
provide a detailed audit plan within ten
(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.4.1.1. Audit plan will include but is not
limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.
Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.4.1.2 The Contractor will provide a
realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.4.1.3. All forecasted or unexpected
delays to the schedule must be reported to the Contracting Officer’s Representative
(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than 1600
Central Standard Time (CST) the same day.
4.4.1.4. If a delay occurs and is the result
Delivery Schedule
Contractor
Proposed
Delivery
Schedule submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.4.2. PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
Fifteen (15) calendar days prior to arriving on-site
4.4.3. Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
No Later than four
4.4.4. Preliminary Draft Audit Report:
The Contractor will provide the
Contracting Officer’s Representative
(COR) and audited activity with a
No Later than four
(4) weeks upon
Delivery Schedule
Contractor
Proposed
Delivery
Schedule preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
4.4.5. Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.
The report will be provided to the
Contracting Officer’s Representative
(COR), the audited activity Point of
Contact, and other designated recipients
(to be determined).
No later than ten
(10) business days upon receipt of initial review
4.4.6. Final Audit Report: The final audit
report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting
Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
No later than ten
(10) business days
4.4.7. Progress and Summary Reports
(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as
4.3.7.1 Weekly
4.3.7.2. Monthly
4.3.7.3. Monthly
Delivery Schedule
Contractor
Proposed
Delivery
Schedule any summary/interim progress report.
The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.4.7.1. Provide a list of planned
task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week
(See 8.2 Sample Weekly Status Report).
4.4.7.2. The Contractor will provide a
monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.4.7.3. The Contractor will provide a
monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
5.1.3 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
OPTION YEAR THREE (3)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
4.5.1. Audit Plan: The Contractor will
provide a detailed audit plan within ten
(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.5.1.1. Audit plan will include but is not
limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.
Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.5.1.2. The Contractor will provide a
realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.5.1.3. All forecasted or unexpected
delays to the schedule must be reported to the Contracting Officer’s Representative
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than 1600
Central Standard Time (CST) the same day.
4.5.1.4. If a delay occurs and is the result
of Contractor error, the Contractor will submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.5.2 PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
Fifteen (15) calendar days prior to arriving on-site
4.5.3. Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present
No Later than four
Delivery Schedule
Contractor
Proposed
Delivery
Schedule preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
4.5.4. Preliminary Draft Audit Report:
The Contractor will provide the
Contracting Officer’s Representative
(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
No Later than four
(4) weeks upon
4.5.5. Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, and areas of potential non-compliance.
The report will be provided to the
Contracting Officer’s Representative
(COR), the audited activity Point of
Contact, and other designated recipients
(to be determined).
No later than ten
(10) business days upon receipt of initial review
4.5.6. Final Audit Report: The final audit
report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting
Officer’s Representative (COR), the
No later than ten
(10) business days
Delivery Schedule
Contractor
Proposed
Delivery
Schedule installation Point of Contacts, and other designated recipients (to be determined).
4.5.7. Progress and Summary Reports
(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.5.7.1. Provide a list of planned
task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week
(See 8.2 Sample Weekly Status Report).
4.5.7.2. The Contractor will provide a
monthly contract progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.5.7.3. The Contractor will provide a
monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
4.4.7.1 Weekly
4.4.7.2. Monthly
4.4.7.3. Monthly
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
5.1.3 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
OPTION YEAR FOUR (4)
4.6.1. Audit Plan: The Contractor will
provide a detailed audit plan within ten
(10) business days of the kickoff meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members (indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of the activity being audited.
4.6.1.1. Audit plan will include but is not
limited to the following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports.
Fieldwork for this engagement must be performed at the respective sites where the records are maintained.
4.6.1.2. The Contractor will provide a
realistic detailed project plan outlining the tasks and subtasks for both the Air Force and the Contractor based on the deliverables and requirements listed in
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule this Statement of Objectives (SOO). Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.6.1.3. All forecasted or unexpected
delays to the schedule must be reported to the Contracting Officer’s Representative
(COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than 1600
Central Standard Time (CST) the same day.
4.6.1.4. If a delay occurs and is the result
of Contractor error, the Contractor will submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.6.2. PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin
Fifteen (15) calendar days prior to arriving on-site
Delivery Schedule
Contractor
Proposed
Delivery
Schedule on the day of, or the business day immediately following the in-brief.
4.6.3. Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
No Later than four
4.6.4. Preliminary Draft Audit Report:
The Contractor will provide the
Contracting Officer’s Representative
(COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
No Later than four
(4) weeks upon
4.6.5. Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft audit report. This report will incorporate accepted management feedback and clearly outline findings, root causes, quantified impacts, No later than ten
(10) business days upon receipt of initial review
Delivery Schedule
Contractor
Proposed
Delivery
Schedule and areas of potential non-compliance.
The report will be provided to the
Contracting Officer’s Representative
(COR), the audited activity Point of
Contact, and other designated recipients
(to be determined).
4.6.6. Final Audit Report: The final audit
report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The report will be provided to the Contracting
Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
No later than ten
(10) business days
4.6.7. Progress and Summary Reports
(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.6.7.1. Provide a list of planned
task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week
(See 8.2 Sample Weekly Status Report).
4.6.7.2. The Contractor will provide a
monthly contract progress report, with their monthly invoice, consistent with the
4.5.7.1 Weekly
4.5.7.2. Monthly
4.5.7.3. Monthly
Delivery Schedule
Contractor
Proposed
Delivery
Schedule submitted Contracting Officer’s
Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.6.7.3. The Contractor will
provide a monthly summary/interim progress report with an executive summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
5.1.3 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
SECTION B: PERFORMANCE AUDIT DELIVERABLES
(Priced per Consolidated Audit Engagement)
CLIN Description NAFI Proposed
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
5001 4.7.1.1. Audit Plan: The Contractor will provide a detailed audit plan within ten
(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days
Contractor’s resources will be
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.
4.7.1.1.1 Audit plan will include, but is
not limited to, the following: planning to determine the nature, timing and extent of audit procedures, obtaining operational data and other information, communicating with appropriate personnel (in/out briefings), performing specific analytical and observational procedures on-site, and providing the performance audit reports. Fieldwork for this engagement must be performed on-site at the respective site where the activities operate.
4.7.1.1.2. The Contractor will provide a
realistic detailed project plan outlining the tasks and subtasks for both the Air
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.1.1.3 All forecasted or unexpected
delays to the schedule must be reported to the Contracting Officer’s
Representative (COR) within one (1) business day of discovery. The
Contractor will provide reason for delay and proposed resolutions to the
Contracting Officer’s Representative
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
(COR) no later than 1600 Central
Standard Time (CST) the same day.
4.7.1.1.4 If a delay occurs and is the
result of Contractor error, the Contractor will submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
4.7.1.2 PBC List and Audit In-Brief.
The Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation
Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.
On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
Fifteen (15) calendar days prior to arriving on-site
4.7.1.3 Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the
No Later than four
Delivery Schedule
Contractor
Proposed
Delivery
Schedule audit’s initial outcomes before the audit team departs the installation.
4.7.1.4 Preliminary Draft Audit Report.
The Contractor will provide the
Contracting Officer’s Representative
(COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.
This report will be submitted within four
(4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
No Later than four
(4) weeks upon
4.7.1.5 Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance. The report will be provided to the Contracting
Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
No later than ten
(10) business days upon receipt of initial review
4.7.1.6 Final Performance Audit Report:
The final performance audit report will be issued by the audit firm within ten
(10) business days of the approved draft audit report. The final report will
No later than ten
(10) business days
Delivery Schedule
Contractor
Proposed
Delivery
Schedule include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting Officer’s
Representative (COR), the Installation
Point of Contact, and other designated recipients (to be determined).
5007 4.7.1.7 Progress and Summary Reports
(see samples 8.2 and 8.3). The
Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the
Contracting Officer’s Representative
(COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.
4.7.1.7.1 Provide a list of planned
report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of
4.7.1.7.2. The Contractor will provide a
their monthly invoice, consistent with the submitted and Contracting Officer’s
Representative (COR) approved weekly
4.1.7.1 Weekly
4.1.7.2. Monthly
4.1.7.3. Monthly
Delivery Schedule
Contractor
Proposed
Delivery
Schedule status reports. (See 8.3 Contract
Progress Report)
4.7.7.3. The Contractor will provide a
monthly summary/interim progress report with an executive summary section with audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
5.1.4 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
OPTION YEAR ONE (1)
6001 4.8.1. Audit Plan: The Contractor will provide a detailed audit plan within ten
(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days
Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed
4.8.1.1. Audit plan will include, but is
determine the nature, timing and extent
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.
4.8.1.2. The Contractor will provide a
the tasks and subtasks for both the Air
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor
4.8.1.3 All forecasted or unexpected
to the Contracting Officer’s
Representative (COR) within one (1) business day of discovery. The
Contractor will provide reason for delay and proposed resolutions to the
Contracting Officer’s Representative
4.8.1.4 If a delay occurs and is the result
submit a revised schedule to the
Contracting Officer’s Representative
(COR) for review and approval within two workdays of recognition or delay.
Delivery Schedule
Contractor
Proposed
4.8.2 PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation
Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.
On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
Fifteen (15) calendar days prior to arriving on-site
4.8.3 Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
No Later than four
4.8.4. Preliminary Draft Performance
Audit Report: The Contractor will provide the Contracting Officer’s
No Later than four
(4) weeks upon
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
Representative (COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.
This report will be submitted within four
(4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
completion of audit fieldwork.
4.8.5. Draft Performance Audit Report:
Within ten (10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report.
This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
No later than ten
(10) business days upon receipt of initial review
4.8.6. Final Performance Audit Report:
The final performance audit report will be issued by the audit firm within ten
(10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across
No later than ten
(10) business days
Delivery Schedule
Contractor
Proposed
Delivery
Schedule the audited activities. The report will be provided to the Contracting Officer’s
Representative (COR), the installation
Point of Contacts, and other designated recipients (to be determined).
6007 4.8.7. Progress and Summary Reports
(see sample 8.2 and 8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.8.7.1. Provide a list of planned
report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of
4.8.7.2. The Contractor will provide a
their monthly invoice, consistent with the submitted Contracting Officer’s
Representative (COR) approved weekly
4.8.7.3. The Contractor will provide a
report with an executive summary section of audit results and a cross feed
Delivery Schedule
Contractor
Proposed
Delivery
Schedule of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
5.1.4 Weekly Status Meetings. The
frequency, day and time of status meetings will be determined by the
Contracting Officer’s Representative
(COR) and the Contractor after contract
OPTION YEAR TWO (2)
7001 4.9.1. Audit Plan: The Contractor will provide a detailed audit plan within ten
(10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days
Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed
4.9.1.1. Audit plan will include, but is
determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel (in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the
Within ten (10)
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
4.9.1.2. The Contractor will provide a
the tasks and subtasks for both the Air
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the Contracting Officer’s
Representative (COR), the Contractor
4.9.1.3 All forecasted or unexpected
to the Contracting Officer’s
Representative (COR) within one (1) business day of discovery. The
Contractor will provide reason for delay and proposed resolutions to the
Contracting Officer’s Representative
4.9.1.4 If a delay occurs and is the result
submit a revised schedule to the
Contracting Officer’s Representative
4.9.2 PBC List and Audit In-Brief. The
Contractor will submit the initial
Provided by Client (PBC) document request list to the designated installation
Points of Contact (POCs) no later than
Fifteen (15) calendar days prior to arriving on-site
Delivery Schedule
Contractor
Proposed
Delivery
Schedule fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation
Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents.
On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
4.9.3. Audit Out-Brief. All audit
fieldwork will be fully completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork. The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
No Later than four
4.9.4. Preliminary Draft Performance
Audit Report: The Contractor will provide the Contracting Officer’s
Representative (COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate
No Later than four
(4) weeks upon
Delivery Schedule
Contractor
Proposed
Delivery
Schedule the initial management review and comment cycle.
4.9.5. Draft Audit Report: Within ten
(10) business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting
Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
No later than ten
(10) business days upon receipt of initial review
4.9.6. Final Performance Audit Report:
The final performance audit report will be issued by the audit firm within ten
(10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting Officer’s
Representative (COR), the installation
Point of Contacts, and other designated recipients (to be determined)
No later than ten
(10) business days
Delivery Schedule
Contractor
Proposed
Delivery
Schedule
7007 4.9.7. Progress and Summary Reports
(see sample 8.2 and 8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the Contracting Officer’s Representative
(COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report.
The status report must identify action and/or items completed by individual
4.9.7.1. Provide a list of planned
report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of
4.9.7.2. The Contractor will provide a
their monthly…
This is the start of the file's text. The full file is on GovTribe.