ATCH 07 Deliveries or Performances 12 Nov 2026.pdf

PDF 334 KB Posted

Attached to
Public Accountant Contract Audits (PACA) Installation Audits (USAFE region)
Solicitation number
F41999-27-Q-0006
Issued by

About this file

This is a Statement of Deliverables and Performances for the Public Accountant Contract Audit Program (PACA) Installation Audits contract administered by the Air Force Services Center (AFSVC). The contract encompasses a 12-month base period plus four optional 12-month periods, with all deliverables requiring written approval from the Contracting Officer's Representative (COR) and designated AFSVC representatives prior to acceptance and invoice authorization. All deliverables must be provided in Microsoft Office and Adobe Acrobat Pro formats, with electronic files and one bound hard copy delivered to the audited activity Point of Contact and AFSVC COR.

The contract includes two primary audit service categories: Financial Statement Audits (CLINs 0001-0012) and Performance Audits (CLINs 0013-0024), each applicable across all ordering periods. Financial Statement Audit deliverables apply to individual fund audit engagements (MWR or Lodging Funds), while Performance Audit deliverables apply to consolidated audit engagements covering one to ten designated activities during a single site visit. Key Financial Statement Audit deliverables include detailed audit plans (due within 10 business days of kick-off), preliminary draft reports (within 4 weeks of fieldwork completion), draft reports (within 10 business days of government comments), and final audit reports (within 10 business days of approval), with fieldwork duration capped at four weeks per engagement. Performance Audit deliverables follow similar timelines and requirements. Supporting deliverables for both audit types include weekly status reports, monthly contract progress reports, and monthly interim summary reports with cross-feed matrices identifying systemic weaknesses. Contract administration includes a kick-off meeting within 15 business days of award and weekly status meetings throughout performance, with travel costs reimbursed pursuant to Federal Travel Regulation rates.

View the file

Other files

File Type Posted
ATCH 01 Instructions to Contractors 12 Nov 2026.pdf PDF
AMENDMENT 01 RFQ F41999-27-Q-0006 USAFE PACA AUDIT.pdf PDF
ATCH 11 NPA Agreement template 10 Nov 2026.pdf PDF
QA - PACA USAFE Installation Audits 12Nov2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI)12 Nov 2026.pdf PDF
ATCH 08 Contract Administration Data 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 10 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 12 Nov 2026.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 07 Deliveries or Performances 23 Oct 26.pdf PDF
ATCH 08 Contract Admin Data 4 Nov 2026.pdf PDF
ATCH 11 NPA Agreement template 23 Oct 2026.pdf PDF
ATCH 03 Special Provisions 2 Nov 2026.pdf PDF
ATCH 09 Reps and Certs 30 Jul 2026.pdf PDF
ATCH 07 Deliveries or Performances 23 Oct 26.pdf PDF
ATCH 04 SOO - PACA Installation Audits 22 Oct 2026.pdf PDF
ATCH 01 Instructions to Contractors PACA Region 2 USAFE 2Nov26.pdf PDF
ATCH 06 Evaluation Factors - LPTA 2 Nov 2026.pdf PDF
ATCH 05 Supplies Services and Prices 22 Oct 2026.pdf PDF
ATCH 10 Contractor Past Performance Information (PPI) 2 Nov 2026.pdf PDF
RFQ - PACA Installation Audits (USAFE Region) F41999-27-Q-0006.pdf PDF
ATCH 02 NAF Standard Clauses 30 May 2025.pdf PDF
ATCH 12 PACA Installation Audits USAFE Region Breakout 21 Sept 2026.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATCH 07 - DELIVERIES OR PERFORMANCES

Public Accountant Contract Audit Program Installation Audits 12 Nov 2026

ATTACHMENT 07 – DELIVERIES OR PERFORMANCES

Public Accountant Contract Audit Program (PACA) –

Installation Audits

Air Force Services Center (AFSVC)

1. Period of Performance

The Period of Performance shall encompass twelve (12) months after receipt of award (Base Period), plus four (4) individual 12-month option periods.

2. Delivery Schedule Requirements

The Non-Appropriated Fund Instrumentality (NAFI) requires delivery to be made strictly according to the schedules detailed in the sections below.

• The Contractor must annotate in the proposal schedule if the timeline for any deliverable is concurrent with another deliverable.

• The NAFI will furnish the Contractor an award or notice of award no later than the day the award is dated. Therefore, the Contractor should compute the time available for performance beginning with the actual date of the award.

3. Deliverables, Milestone Schedule, and Acceptance Criteria

The Contractor will provide deliverables in formats fully compatible with Microsoft

Office and Adobe Acrobat Pro (.pdf). All reports will be provided in electronic file format in addition to one bound hard copy of the final audit report delivered to the audited activity Point of Contact (POC) and the AFSVC Contracting Officer's

Representative (COR). All deliverables must receive written approval from the COR and designated AFSVC representative prior to acceptance and invoice authorization.

A comprehensive audit plan outlining methodology, approach, and timeline will be submitted prior to beginning any audit engagement. Regular and recurring updates on audit progress, findings, and issues will be provided. The preliminary draft report will outline initial findings, recommendations, and management concerns.

The final audit report will incorporate verified management feedback and present complete findings, recommendations, and conclusions. Formal in-brief and out-brief presentations will be afforded to audited activity leadership.

4. Applicability of Deliverables

The deliverables outlined below apply to both Financial Statement Audits and

Performance Audits across all ordering periods:

• Financial Statement Audits: Each individual deliverable bundle applies to an individual fund audit engagement (Morale, Welfare, and Recreation [MWR] Fund or Lodging Fund).

• Performance Audits: Each individual deliverable bundle applies to a consolidated audit engagement encompassing one (1) to ten (10) designated activities on an installation during a single site visit.

5. Financial Statement Audit Deliverables

CLINs 0001 through 0012 (Applicable to Base Year & Option Years 1–4)

Auditing Designated Historical Fiscal Year(s), up to a Dual-Year, as defined in individual Task/Delivery Orders

Deliverable Description NAFI Proposed Task Order Delivery Schedule

Contractor Proposed Schedule

0001 4.2.2 / 4.2.2.1 Audit Plan: Within ten (10) business days following the formal kick-off meeting, the Contractor shall provide a detailed audit plan. The plan shall include a preliminary itinerary showing approximate fieldwork dates, a list of audit team members (indicating the on-site team lead

Within ten (10) business days following the kick-off meeting.

Fieldwork duration shall not exceed four (4) weeks per engagement.

for each location), and any projected blackout dates or days Contractor resources will be unavailable.

Fieldwork duration shall not exceed four

(4) weeks per engagement and will be performed during regular operating hours of the audited activity. The plan must detail the nature, timing, and extent of audit procedures, obtaining financials and other information, communicating with personnel, performing specific procedures on-site, and report delivery schedules. Fieldwork must be performed at the respective sites where records are maintained.

0002 4.2.2.2 Detailed Project Plan: The Contractor shall provide a realistic, detailed master project work breakdown structure outlining tasks and subtasks for both the Air Force and the Contractor based on the deliverables and

Submitted with the Audit Plan;

once approved by the COR, delivery must follow the approved schedule.

requirements listed in the Statement of Objectives (SOO).

Once approved by the COR, delivery must follow the approved schedule.

0003 4.2.2.3 Delay Reporting: All forecasted or unexpected schedule delays must be reported to the COR in writing within one

(1) business day of discovery, including reasons for the delay and proposed corrective actions submitted no later than 1600 Central Standard Time (CST) the same day.

Within one (1) business day of discovery, submitted no later than 1600 Central Standard Time (CST) the same day.

0004 4.2.2.4 Contractor Error Delays: If a delay occurs and is the result of Contractor error or staffing issues, the Contractor shall submit a revised operational schedule to the COR for review and approval within two (2) workdays of discovery/recognition of delay.

Within two (2) workdays of discovery.

0005 4.2.3 Provided by Client (PBC) List and Audit In-Brief: The

Initial PBC List:

No later than fifteen (15)

Contractor shall submit the initial Provided by Client (PBC) document request list to designated installation Points of Contact (POCs) no later than fifteen (15) calendar days prior to arriving on-site. The Contractor will prepare a brief presentation and conduct a formal on-site In-Brief meeting with designated installation POCs and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of PBC requests. Fieldwork begins on the day of or the business day immediately following the In-Brief.

calendar days prior to arriving on-site.

Audit In-Brief:

First day of on-site fieldwork (fieldwork begins on the day of or business day immediately following).

0006 4.2.4 Audit Out- Brief: All on-site fieldwork must be fully completed within four (4) weeks of the In-Brief. The Contractor shall prepare and conduct a formal on-site Out- Brief meeting with installation

On the final day of on-site fieldwork (all on-site fieldwork must be fully completed within four [4] weeks of the In- Brief).

leadership and designated POCs on the final day of on-site fieldwork. The briefing will present preliminary findings, identify immediate high-risk vulnerabilities, and ensure mutual understanding of the audit's initial outcomes before departing the installation.

0007 4.2.5 Preliminary Draft Audit Report:

Within four (4) weeks of completion of on-site audit fieldwork, the Contractor shall provide the COR and audited activity POC with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.

The package must include the draft Independent Auditor's Report, proposed adjustments, and a draft Management Letter detailing initial internal control findings. Submission initiates a thirty (30) calendar day

Within four (4) weeks of completion of on-site fieldwork (initiates a thirty [30] calendar day management review and comment cycle).

management review and comment cycle.

0008 4.2.6 Draft Audit Report: Within ten

(10) business days of receiving the government's initial review comments on the preliminary draft, the Contractor shall submit a formal draft financial audit report.

This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor's Report and updated draft Management Letter.

Delivered to the COR, audited activity POC, and other designated recipients.

Within ten (10) business days of receiving the government's written review comments on the preliminary draft.

0009 4.2.7 Final Audit Report Package:

Within ten (10) business days of the approved draft audit report, the Contractor shall issue the finalized audit report package. The package must include the signed, dated Independent Auditor's Report

Within ten (10) business days of receiving final government approval of the draft audit report.

(audit opinion) bound to the audited financial statements, and the final Management Letter detailing identified internal control deficiencies (provided in electronic file format plus one bound hard copy to the audited activity POC and the AFSVC

COR).

0010 4.2.8.1 Weekly Status Reports:

Submit weekly status reports (IAW Appendix 8.3 format) detailing tasks completed, percentage of completion of active tasks, upcoming planned activities for the following week, and identified project risks.

Weekly throughout active engagement performance.

0011 4.2.8.2 Monthly Contract Progress Reports: Submit monthly contract progress reports with monthly invoices (IAW Appendix 8.4 format), consistent with submitted and COR-approved weekly status reports.

Monthly, submitted concurrently with monthly invoices.

0012 4.2.8.3 Monthly Interim Summary Reports: Provide a monthly summary/interim progress report containing an executive summary of audit results and a cross-feed matrix reporting systemic weaknesses and deficiencies identified during the audits across audited entities.

Monthly throughout the ordering period.

6. Performance Audit Deliverables

CLINs 0013 through 0024 (Applicable to Base Year & Option Years 1–4)

Performance Audits: Ordered As-Needed across Base and Option Periods

Deliverable Description NAFI Proposed Task Order Delivery Schedule

Contractor Proposed Schedule

0013 4.7.1.1 / 4.7.1.1.1 Performance Audit Plan:

Within ten (10) business days of the kick-off meeting, the Contractor shall provide a detailed audit plan including preliminary itinerary showing approximate

Within ten (10) business days of the kick-off meeting.

Fieldwork duration shall not exceed four (4) weeks.

fieldwork dates, audit team roster (indicating the on-site lead for each installation), and projected resource availability.

Fieldwork duration will not exceed four (4) weeks and will be performed during regular operating hours of the activity being audited. The plan must detail the nature, timing, and extent of analytical and observational procedures on-site, and reporting timelines.

Fieldwork must be performed on-site at the respective location where the records and activities operate.

0014 4.7.1.1.2 Detailed Project Plan: The Contractor shall provide a realistic, detailed master project work breakdown structure outlining tasks and subtasks for both the Air Force and the Contractor based on SOO

Submitted with the Performance Audit Plan; once approved by the COR, delivery must follow the approved schedule.

requirements.

Once approved by the COR, delivery must follow the approved schedule.

0015 4.7.1.1.3 Delay Reporting:

Forecasted or unexpected delays to the schedule must be reported to the COR in writing within one

(1) business day of discovery, with written causes and proposed resolutions submitted no later than 1600 CST the same day.

Within one (1) business day of discovery, submitted no later than 1600 Central Standard Time (CST) the same day.

0016 4.7.1.1.4 Contractor Error Delays: If a delay occurs and is the result of Contractor error, the Contractor shall submit a revised schedule to the COR for review and approval within two (2) workdays of recognition or delay.

Within two (2) workdays of discovery.

0017 4.7.1.2 PBC List and Performance Audit In-Brief:

Initial PBC List: No later than fifteen

(15) calendar days

Submit the initial Provided by Client (PBC) document request list to designated installation POCs no later than fifteen (15) calendar days prior to arriving on-site. Prepare a brief presentation and conduct a formal on-site In- Brief meeting with designated installation POCs and leadership outlining scope, methodology, communication plan, and PBC status. Fieldwork begins on the day of or business day immediately following the In- Brief.

prior to arriving on-site.

Performance Audit In-Brief: First day of on-site visit (fieldwork begins day of or business day following).

0018 4.7.1.3 Performance Audit Out-Brief:

All on-site fieldwork will be fully completed within four (4) weeks of the In- Brief. Conduct a formal on-site Out- Brief meeting with installation leadership and designated POCs

On the final day of on-site fieldwork (all on-site fieldwork must be fully completed within four [4] weeks of the In- Brief).

on the final day of on-site fieldwork presenting preliminary findings, immediate operational risks, and initial outcomes prior to departing the installation.

0019 4.7.1.4 Preliminary Draft Performance Audit Report:

Within four (4) weeks of completion of audit fieldwork, provide the COR and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance.

Initiates the thirty

(30) calendar day management review and comment cycle.

Within four (4) weeks of fieldwork completion (initiates the thirty [30] calendar day management review and comment cycle).

0020 4.7.1.5 Draft Performance Audit Report:

Within ten (10) business days of receiving

Within ten (10) business days of receiving the government's initial review comments on the preliminary draft, submit a formal draft performance audit report incorporating accepted management feedback, clearly outlining findings, and presenting finalized actionable recommendations to optimize resources and improve operational performance, root causes, and quantified impacts.

government review comments.

0021 4.7.1.6 Final Performance Audit Report:

Within ten (10) business days of the approved draft audit report, the audit firm will issue the final performance audit report including a detailed breakdown of operational findings, root-

Within ten (10) business days of approved draft report acceptance.

cause analyses, quantified impacts, and specific actionable recommendations to improve economy and efficiency across audited activities (provided electronically plus one bound hard copy to installation POC and AFSVC COR).

0022 4.7.1.7.1 Weekly Status Reports:

Submit weekly status reports (IAW Appendix 8.3 format) detailing completed actions by contract resources, planned activities for the upcoming week, status updates, and risks.

Weekly throughout active engagement performance.

0023 4.7.1.7.2 Monthly Contract Progress Reports: Submit monthly contract progress reports with monthly invoices (IAW Appendix 8.4 format), consistent with submitted and COR-approved

Monthly, submitted concurrently with monthly invoices.

weekly status reports.

0024 4.7.1.7.3 Monthly Interim Summary Reports: Provide a monthly summary/interim progress report with an executive summary section of audit results and a cross-feed matrix reporting systemic weaknesses and deficiencies identified during the audits.

Monthly throughout the ordering period.

7. Contract Administration Meetings

(Incorporated into Technical Deliverable CLINs)

Item Meeting Description

Frequency / Milestone

Attendees

M-1 5.1.1 Kick-Off Meeting

Within fifteen (15) business days after contract award, held in person at AFSVC.

Discusses SOO, timelines, audit approach, scope, and team lead designation.

COR, Key Program Managers, Contracting Officer, Contractor Team Lead

M-2 5.1.4 Weekly Status Meetings

Weekly throughout contract performance;

frequency, day, and time determined by the COR and Contractor after contract award.

COR, Contractor Project Manager / Team Lead

8. Delivery Point & Acceptance Authority

All contract deliverables, reports, schedules, and documents will be delivered directly to and approved in writing by the Contracting Officer's Representative

(COR) and designated AFSVC representatives prior to formal acceptance and invoice authorization.

9. References & Appendices

• Federal Travel Regulation (FTR): Travel costs are reimbursed pursuant to

Clause 29 of the NAF Standard Clauses and applicable FTR/JTR rates (GSA

Federal Travel Regulation).

• SOO Appendix 8.3: Sample Weekly Status Report format.

• SOO Appendix 8.4: Sample Contract Progress Report format.

ATTACHMENT 07 – DELIVERIES OR PERFORMANCES
Public Accountant Contract Audit Program (PACA) – Installation Audits
Air Force Services Center (AFSVC)
1. Period of Performance
2. Delivery Schedule Requirements
3. Deliverables, Milestone Schedule, and Acceptance Criteria
4. Applicability of Deliverables
5. Financial Statement Audit Deliverables
6. Performance Audit Deliverables
7. Contract Administration Meetings
8. Delivery Point & Acceptance Authority
9. References & Appendices

File details come from the government source that posted it. Updated .