ATCH 05 Supplies Services and Prices 22 Oct 2026.pdf
PDF 346 KB Posted
- Solicitation number
- F41999-27-Q-0006
About this file
This document is a Supplies, Services and Prices (ATCH 05) attachment for a federal contract opportunity for Public Accountant Contract Audit Program Installation Audits, dated 22 October 2026. The contract covers a base year plus four option years and is organized into two main sections: Section A addresses Financial Statement Audit Deliverables (priced per individual fund—MWR or Lodging), and Section B addresses Performance Audit Deliverables (priced per consolidated audit engagement). All services are designated as "SV" (Services). Key deliverables across both sections include detailed audit plans due within ten business days of kick-off, Provided by Client (PBC) document request lists submitted 15 calendar days prior to on-site arrival, formal in-brief and out-brief meetings, preliminary draft audit reports within four weeks of fieldwork completion, draft audit reports within ten business days of receiving government comments, and final audit reports within ten business days of approved drafts. Weekly and monthly status reports are required and designated as Not Separately Priced (NSP), as are weekly status meetings whose frequency will be determined post-award by the Contracting Officer's Representative (COR) and Contractor.
Fieldwork is limited to four weeks and must be performed during regular operating hours at the respective installation sites where records are maintained. The audit plan must include preliminary itineraries, audit team member lists with designated on-site team leads, and any projected resource unavailability. All schedule delays must be reported to the COR within one business day of discovery with proposed resolutions by 1600 Central Standard Time the same day; contractor-caused delays require a revised schedule within two workdays. Travel costs are separately priced by labor category and daily cost for base years and option years and will be provided when requested by the Contracting Officer (CO) or COR, with reimbursement in accordance with the Federal Travel Regulation (FTR). The document structure repeats these deliverables across multiple Contract Line Item Numbers (CLINs) for the base year and four option years, with the note that the pricing form can be adjusted as needed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH 05 - SUPPLIES, SERVICES AND PRICES
Public Accountant Contract Audit Program Installation Audits
22 OCT 2026
SUPPLIES, SERVICES AND PRICES
1. GENERAL
The Contractor will provide the experience necessary to complete the task outlined in the
Statement of Objectives (SOO). The Contractor will utilize established policies, standards, and sound management principles in the performance of the SOO requirements and deliverables.
ACRNOYNMS
NSP: Not Separately Priced
SECTION A: FINANCIAL STATEMENT AUDIT DELIVERABLES
(Priced per Individual Fund – MWR or Lodging)
Description Unit Total Price
CLIN 0001
4.2.2. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and will be performed during the regular operating hours of activity being audited.
4.2.2.1. Audit plan will include, but is not limited to, the
following: planning to determine the nature, timing and extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this engagement must be performed at the respective site where the records are maintained.
4.2.2.2. The Contractor will provide a realistic detailed
project plan outlining the tasks and subtasks for both the Air
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
SV
(Services)
Contracting Officer’s Representative (COR), the Contractor will deliver in accordance with approved schedule.
4.2.2.3 All forecasted or unexpected delays to the schedule
must be reported to the Contracting Officer’s
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
Representative (COR) no later than 1600 Central Standard
Time (CST) the same day.
4.2.2.4 If a delay occurs and is the result of Contractor
error, the Contractor will submit a revised schedule to the
Contracting Officer’s Representative (COR) for review and approval within two workdays of recognition or delay.
CLIN 0002
4.2.3 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 0003
4.2.4 Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 0004
4.2.5 Preliminary Draft Audit Report. The Contractor will
provide the Contracting Officer’s Representative (COR) and audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft independent
Auditor’s Report, proposed adjustments, and a draft of the
Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
CLIN 0005
4.2.6 Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed audit adjustments, and include the updated draft of the Independent Auditor’s
Report and the updated draft Management letter.. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
SV
CLIN 0006
4.2.7 Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report
(audit opinion) bound to the audited financial statements, and the final Mangement Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the
Installation Point of Contact, and other designated recipients
(to be determined).
CLIN 0007
4.2.8 Progress and Summary Reports (see samples 8.2 and
8.3). The Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the
Contracting Officer’s Representative (COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.
4.2.8.1 Provide a list of planned task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample Weekly
Status Report).
4.2.8.2. The Contractor will provide a monthly contract
progress report, with their monthly invoice, consistent with the submitted and Contracting Officer’s Representative
SV NSP
(COR) approved weekly status reports. (See 8.3 Contract
Progress Report)
4.2.8.3. The Contractor will provide a monthly
summary/interim progress report with an executive summary section with audit results and cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
CLIN 0008
5.1.4 Weekly Status Meetings. The frequency, day and
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR ONE (1)
CLIN 1001
4.3.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.3.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.3.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.3.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.3.1.4 If a delay occurs and is the result of Contractor
Contracting Officer’s Representative (COR) for review and approval within two workdays of recognition or delay.
CLIN 1002
4.3.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
CLIN 1003
4.3.3 Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 1004
4.3.4. Preliminary Draft Audit Report: The Contractor will
provide the Contracting Officer’s Representative (COR) and audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft Independent
Auditor’s Report, proposed adjustments, and a draft of the
Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
CLIN 1005
4.3.5. Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor’s
Report and the updated draft Management Letter. e. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
SV
CLIN 1006
4.3.6. Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report
(audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
SV
CLIN 1007
4.3.7. Progress and Summary Reports (see sample 8.2 and
8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.3.7.1. Provide a list of planned task/activities for the week the completed percentage of completion of the previous week’s planned task/activities and a new list of planned
4.3.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR) approved weekly status reports. (See 8.3 Contract Progress
Report)
4.3.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
CLIN 1008
5.1.4 Weekly Status Meetings. The frequency, day and
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR TWO (2)
CLIN 2001
4.4.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.4.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.4.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.4.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.4.1.4 If a delay occurs and is the result of Contractor
CLIN 2002
4.4.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 2003
4.4.3. Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 2004
4.4.4. Preliminary Draft Audit Report: The Contractor will
provide the Contracting Officer’s Representative (COR) and the audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft
Independent Auditor’s Report, proposed adjustments, and a draft of the Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 2005
4.4.5. Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor’s
Report and the updated draft Management Letter.. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 2006
4.4.6. Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report
(audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined)
SV
CLIN 2007
4.4.7. Progress and Summary Reports (see sample 8.2 and
8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual
4.4.7.1. Provide a list of planned task/activities for the week the completed percentage of completion of the previous week’s planned task/activities and a new list of planned
4.4.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR)
4.4.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic weaknesses and deficiencies identified during the audit.
CLIN 2008
5.1.4 Weekly Status Meetings. The frequency, day and
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR THREE (3)
CLIN 3001
4.5.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.5.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.5.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.5.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.5.1.4 If a delay occurs and is the result of Contractor
CLIN 3002
4.5.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 3003
4.5.3. Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 3004
4.5.4. Preliminary Draft Audit Report: The Contractor will
provide the Contracting Officer’s Representative (COR) and the audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft
Independent Auditor’s Report, proposed adjustments, and a draft of the Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 3005
4.5.5. Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor’s
Report and the updated draft Management Letter. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 3006
4.5.6. Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report
(audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
SV
CLIN 3007
4.5.7. Progress and Summary Reports (see sample 8.2 and
8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.5.7.1. Provide a list of planned task/activities for the week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned
4.5.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR)
4.5.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic
CLIN 3008
5.1.4 Weekly Status Meetings. The frequency, day and
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR FOUR (4)
CLIN 4001
4.6.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.6.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.6.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.6.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.6.1.4 If a delay occurs and is the result of Contractor
CLIN 4002
4.6.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 4003
4.6.3. Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 4004
4.6.4. Preliminary Draft Audit Report: The Contractor will
provide the Contracting Officer’s Representative (COR) and the audited installation Point of Contact with a preliminary draft audit report within four (4) weeks of completion of audit fieldwork. The draft will include the draft
Independent Auditor’s Report, proposed adjustments, and a draft of the Management Letter detailing initial internal control findings. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 4005
4.6.5. Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft financial audit report. This report will incorporate accepted management feedback, resolve proposed adjustments, and include the updated draft of the Independent Auditor’s
Report and the updated draft Management Letter. The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 4006
4.6.6. Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report package will include the signed, finalized Independent Auditor’s Report
(audit opinion) bound to the audited financial statements, and the final Management Letter detailing any identified internal control deficiencies. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
SV
CLIN 4007
4.6.7. Progress and Summary Reports (see sample 8.2 and
8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual
4.6.7.1. Provide a list of planned task/activities for the week the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample Weekly
Status Report).
4.6.7.2. The Contractor will provide a monthly contract
progress report, with their monthly invoice, consistent with the submitted Contracting Officer’s Representative (COR)
4.6.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic
CLIN 4008
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
Travel (Labor Category and Daily Cost) SV
Travel (Base Years and Option Years) SV
Travel will be provided by
Contractor when requested by the CO or the COR
SECTION B: PERFORMANCE AUDIT DELIVERABLES
(Priced per Consolidated Audit Engagement)
Description Unit Total Price
CLIN 5001
4.7.1.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.7.1.1.1 Audit plan will include, but is not limited to, the extent of audit procedures, obtaining operational data and other information, communicating with appropriate personnel (in/out briefings), performing specific analytical and observational procedures on-site, and providing the performance audit reports. Fieldwork for this engagement must be performed on-site at the respective site where the activities operate.
4.7.1.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.1.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.7.1.1.4 If a delay occurs and is the result of Contractor
(Services)
CLIN 5002
4.7.1.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 5003
4.7.1.3 Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 5004
4.7.1.4 Preliminary Draft Audit Report. The Contractor will
provide the Contracting Officer’s Representative (COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 5005
4.7.1.5 Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance.
The report will be provided to the Contracting Officer’s
Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 5006
4.7.1.6 Final Performance Audit Report: The final
performance audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting
Officer’s Representative (COR), the Installation Point of
Contact, and other designated recipients (to be determined).
CLIN 5007
4.7.1.7 Progress and Summary Reports (see samples 8.2 and
8.3). The Contractor will provide weekly and monthly status reports and/or other updates as needed to provide the
Contracting Officer’s Representative (COR). Updates will include the status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by the individual contract resources, planned task/activities, risks, and status updates.
4.7.1.7.1 Provide a list of planned task/activities for the
week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample
Weekly Status Report).
4.7.1.7.2. The Contractor will provide a monthly contract
the submitted and Contracting Officer’s Representative
(COR) approved weekly status reports. (See 8.3 Contract
Progress Report)
4.7.7.3. The Contractor will provide a monthly
summary section with audit results and cross feed of audit result information in a matrix format to report systemic
CLIN 5008
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR ONE (1)
CLIN 6001
4.8.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.8.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.8.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.8.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.8.1.4 If a delay occurs and is the result of Contractor
CLIN 6002
4.8.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
CLIN 6003
4.8.3 Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 6004
4.8.4. Preliminary Draft Performance Audit Report: The
Contractor will provide the Contracting Officer’s
Representative (COR) and audited activity with a preliminary draft audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 6005
4.8.5. Draft Performance Audit Report: Within ten (10)
business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting Officer’s Representative
(COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 6006
4.8.6. Final Performance Audit Report: The final
performance audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting
Officer’s Representative (COR), the installation Point of
Contacts, and other designated recipients (to be determined).
SV
CLIN 6007
4.8.7. Progress and Summary Reports (see sample 8.2 and
8.3); The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual
4.8.7.1. Provide a list of planned task/activities for the week the completed percentage of completion of the previous week’s planned task/activities and a new list of planned
4.8.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR)
4.8.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic
CLIN 6008
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR TWO (2)
CLIN 7001
4.9.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.9.1.1. Audit plan will include, but is not limited to, the
extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.9.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.9.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.9.1.4 If a delay occurs and is the result of Contractor
CLIN 7002
4.9.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 7003
4.9.3. Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 7004
4.9.4. Preliminary Draft Performance Audit Report: The
Contractor will provide the Contracting Officer’s
Representative (COR) and designated installation POC with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 7005
4.9.5. Draft Audit Report: Within ten (10) business days of
receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve operational performance, root causes, quantified impacts, and areas of potential non-compliance. The report will be provided to the Contracting
Officer’s Representative (COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 7006
4.9.6. Final Performance Audit Report: The final
performance audit report will be issued by the audit firm within ten (10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting
Officer’s Representative (COR), the installation Point of
Contacts, and other designated recipients (to be determined)
SV
CLIN 7007
4.9.7. Progress and Summary Reports (see sample 8.2 and
8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual
4.9.7.1. Provide a list of planned task/activities for the week the completed percentage of completion of the previous week’s planned task/activities and a new list of planned
4.9.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR)
4.9.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic
CLIN 7008
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR THREE (3)
CLIN 8001
4.10.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.10.1.1. Audit plan will include, but is not limited to, the extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.10.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.10.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.10.1.4 If a delay occurs and is the result of Contractor
CLIN 8002
4.10.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the designated installation Points of Contact
(POCs) no later than fifteen (15) calendar days prior to arriving on-site. The contractor will then prepare a brief presentation and conduct a formal in-brief meeting on-site with the designated installation Points of Contacts and installation leadership. The in-brief will explicitly outline the audit schedule, methodology, communication plan, and status of the previously requested PBC documents. On-site fieldwork will begin on the day of, or the business day immediately following the in-brief.
SV
CLIN 8003
4.10.3. Audit Out-Brief. All audit fieldwork will be fully
completed within four (4) weeks of the In-Brief. The
Contractor will prepare and conduct a formal on-site out-brief meeting with installation leadership and designated
Points of Contacts on the final day of on-site fieldwork.
The briefing will present preliminary findings, identify any immediate high-risk vulnerabilities, and ensure mutual understanding of the audit’s initial outcomes before the audit team departs the installation.
SV
CLIN 8004
4.10.4. Preliminary Draft Performance Audit Report: The
Contractor will provide the Contracting Officer’s
Representative (COR) and audited activity with a preliminary draft performance audit report outlining preliminary findings from the audit, including areas of potential concern or non-compliance. This report will be submitted within four (4) weeks of the completion of audit fieldwork. This preliminary draft is intended to initiate the initial management review and comment cycle.
SV
CLIN 8005
4.10.5. Draft Performance Audit Report: Within ten (10)
business days of receiving the government’s initial review comments on the preliminary draft, the Contractor will submit a formal draft performance audit report. This report will incorporate accepted management feedback and clearly outline findings, and present finalized actionable recommendations to optimize resources and improve
(COR), the audited activity Point of Contact, and other designated recipients (to be determined).
CLIN 8006
4.10.6. Final Audit Report: The final audit report will be
issued by the audit firm within ten (10) business days of the approved draft audit report. The final report will include a detailed breakdown of operational findings, root-cause analyses, quantified impacts, and specific, actionable recommendations to improve economy and efficiency across the audited activities. The report will be provided to the Contracting Officer’s Representative (COR), the installation Point of Contacts, and other designated recipients (to be determined).
SV
CLIN 8007
4.10.7. Progress and Summary Reports (see sample 8.2 and
8.3): The Contractor will provide weekly and monthly status reports and/or other updates as needed to the
Contracting Officer’s Representative (COR). Updates will include status of tasks completed and planned as well as any summary/interim progress report. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.
4.10.7.1. Provide a list of planned task/activities for the
week in the status report. Subsequent status reports will include the completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week (See 8.2 Sample
Weekly Status Report).
4.10.7.2. The Contractor will provide a monthly contract
the submitted Contracting Officer’s Representative (COR)
4.10.7.3. The Contractor will provide a monthly
summary section of audit results and a cross feed of audit result information in a matrix format to report systemic
CLIN 8008
time of status meetings will be determined by the
Contracting Officer’s Representative (COR) and the
Contractor after contract award.
SV NSP
OPTION YEAR FOUR (4)
CLIN 9001
4.11.1. Audit Plan: The Contractor will provide a detailed
audit plan within ten (10) business days of the kick-off meeting to include preliminary itinerary showing the approximate fieldwork dates, list of audit team members
(indicating the on-site team lead for each installation), and any projected days Contractor’s resources will be unavailable. Fieldwork will not exceed four (4) weeks and
4.11.1.1. Audit plan will include, but is not limited to, the extent of audit procedures, obtaining financials and other information, communicating with appropriate personnel
(in/out briefings), performing specific procedures on-site and providing the audit reports. Fieldwork for this
4.11.1.2. The Contractor will provide a realistic detailed
Force and the Contractor based on the deliverables and requirements listed in this Statement of Objectives (SOO).
Once the submitted plan/schedule is approved by the
4.11.1.3 All forecasted or unexpected delays to the schedule
Representative (COR) within one (1) business day of discovery. The Contractor will provide reason for delay and proposed resolutions to the Contracting Officer’s
4.11.1.4 If a delay occurs and is the result of Contractor
CLIN 9002
4.11.2 PBC List and Audit In-Brief. The Contractor will
submit the initial Provided by Client (PBC) document request list to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .