Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf

PDF 2 MB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

This is an exhibit location map file for Volusia County, Florida's Department of Public Works, Road & Bridge Division, prepared in support of an open channel debris and sediment removal and bank stabilization project related to Hurricane Milton damages. The map identifies four primary work locations requiring contractor attention: Location A-10 (Open Channel) encompassing approximately 2.75 miles of debris removal in Ormond Beach; Location B-19 (Sweetwater Creek) in Port Orange requiring removal of approximately 300 cubic yards of sediment from the Grover Canal Box Culvert Bridge #794072 on N. Tymber Creek Road over Groover Creek, along with approximately 250 linear feet of riprap for erosion control; Location C-36 (Samsula Canal) in New Smyrna Beach requiring approximately 250 feet of riprap for erosion control; and Bridge #794072 itself requiring approximately 900 feet of riprap for erosion control and debris removal. The bid submission deadline is October 30, 2025, at 3:01 p.m., with the contract performance period comprising 120 days total (90 days for substantial completion and 30 days for final completion).

The total estimated construction cost for this federally-funded project is $625,350.00, with full funding provided through a U.S. Department of Agriculture Natural Resources Conservation Services (NRCS) Emergency Watershed Protection Project cooperative agreement and no local cost-sharing requirement from Volusia County. Insurance requirements include Commercial General Liability coverage of $1,000,000, Auto Liability of $1,000,000, and Contractors Pollution Liability of $500,000. The contract shall be awarded to the lowest responsive and responsible bidder, with evaluation criteria including bidder experience, financial stability, subcontractor qualifications, and performance history. Contractors must be licensed in the State of Florida, provide performance and payment bonds, and comply with federal contract provisions including E-Verify requirements and human trafficking attestation. Liquidated damages are assessed at $1,685 per day for project delays.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls XLS spreadsheet
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LKoontz Callout Approx. 900 feet of riprap for erosion control and debris removal

Bridge #794072 on N. Tymber Creek Road over Groover Creek

Volusia County Property Appraiser

Bridges

Road Maintenance

County Maint, Thoroughfare

In City Limits, Local Rd

County Boundary

2024 Aerial

Red: Band_1

Green: Band_2

Blue: Band_3

7/11/2025, 9:16:41 AM

0 0.01 0.030.01 mi

0 0.03 0.060.01 km

1:1,127

Public Works Portal

Volusia GIS | VCPA | Volusia County Property Appraiser |

Robert Falk Callout

GROVER CANAL BOX CULVERT BRIDGE NO. 794072

REMOVE APPROX. 300 CY OF SEDIMENT

Sweetwater Creek bwalter Line bwalter

Approx. 250 feet of riprap for erosion control

Samsula Canal

LKoontz

Approx. 2.75 miles of debris removal

Location Map_A-10 Open Channel.pdf
Location Map_B-19 Sweetwater Creek.pdf
Location Map_C-36 Samsula Canal.pdf

File details come from the government source that posted it. Updated .