This is a Bid Price Sheet (Exhibit G) for Volusia County, Florida's construction of the Tomoka Farms Road Landfill Southeast Area Construction Cell I project (ITB No. 26-B-51IF, Contract No. C-2071). The project encompasses the construction of a new Class I landfill expansion featuring Cell 1 (approximately 30 acres total), a lined leachate pond, composite geosynthetic liner systems with dual 60-mil textured HDPE geomembrane liners, leak detection and leachate collection infrastructure, berms and anchor trenches, an early landfill gas collection system, groundwater and landfill gas monitoring wells, HDPE dual-contained forcemain piping extending approximately 1.2 miles, and associated electrical and structural work for pump stations and loading facilities. The bid sheet contains 39 line items with quantities ranging from single lump-sum (LS) items to specific unit quantities, including 100 cubic yards of unsuitable soil excavation for Cell 1 and 21,000 cubic yards for the leachate pond, six landfill gas monitoring probes, seven groundwater monitoring well installations, and 31 well abandonments. Electronic bids must be submitted through the County's eProcurement Portal by 3:00 PM on April 2, 2026. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 11:00 AM with virtual Microsoft Teams attendance available, with a question submission deadline of March 19, 2026, at 11:59 PM. Substantial Completion is required within 244 days of Notice to Proceed, with Final Completion within 365 days total.
The estimated construction cost is $43,293,495.00, with all bid line items currently showing zero pricing awaiting contractor submission. Eligible bidders must possess a current State of Florida General Contractors license at bid submission. Required bonds include a Bid Bond of not less than five percent of the total bid amount valid for 120 days and a Payment and Performance Bond equal to 100 percent of the Contract price. Comprehensive insurance requirements include Workers' Compensation with Florida Statutory Coverage, Commercial General Liability of $1,000,000 per occurrence and $2,000,000 general aggregate, Commercial Auto Liability of $1,000,000 combined single limit, Excess Liability of $10,000,000 per occurrence and aggregate, and Contractors Pollution Liability of $5,000,000 per incident and aggregate, with Volusia County named as additional insured. Local preference up to 5 percent applies to bidders and subcontractors with documented business presence in Brevard, Lake, Orange, Osceola, Seminole, or Volusia County for at least six months prior to bid submission. Monthly progress payments will be made within 20 business days of invoice submission with a 5 percent retainage until final completion. Liquidated damages of $1,000 per day apply for failure to meet specified completion dates, and the County will award the contract to the single lowest responsive and responsible bidder meeting all conditions.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Exhibit G - Bid Price Sheet 26-B-51IF Tomoka Farms Road Landfill Southeast Area Landfill Construction Cell I Contractor Name:
| Item No. | Description | Unit | Qty | Unit Price($) | Amount ($) | |
| 1 | PROJECT Mobilization/Demobilization (not to exceed 5%) | LS | 1 | $ - 0 | $ - 0 | |
| 2 | PROJECT Survey | LS | 1 | $ - 0 | $ - 0 | |
| 3 | PROJECT Erosion and Sediment Control | LS | 1 | $ - 0 | $ - 0 | |
| 4 | PROJECT Site Clearing, Grubbing, and Stripping | LS | 1 | $ - 0 | $ - 0 | |
| 5 | PROJECT Dewatering | LS | 1 | $ - 0 | $ - 0 | |
| 6 | CELL 1 Unsuitable Soil Excavation and Disposal | CY | 100 | $ - 0 | $ - 0 | |
| 7 | CELL 1 Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 8 | CELL 1 Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 9 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 10 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 11 | CELL 1 Geocomposite (Primary) | LS | 1 | $ - 0 | $ - 0 | |
| 12 | CELL 1 Geocomposite (Secondary) | LS | 1 | $ - 0 | $ - 0 | |
| 13 | CELL 1 Geocomposite (Additional Layer in LCS Trench | |||||
| Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 14 | CELL 1 Leak Detection and Leachate Collection Trenches | |||||
| and Cleanouts (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 15 | CELL 1 Leachate Collection and Detection Sumps and Riser | |||||
| Pipes (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 16 | CELL 1 Drainage Sand Layer | LS | 1 | $ - 0 | $ - 0 | |
| 17 | CELL 1 Rain Tarp | LS | 1 | $ - 0 | $ - 0 | |
| 18 | CELL 1 Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 19 | CELL 1 Embankment Limerock Road | LS | 1 | $ - 0 | $ - 0 | |
| 20 | CELL 1 Limerock Access Ramp | LS | 1 | $ - 0 | $ - 0 | |
| 21 | CELL 1 Jetclean/Video Inspect and Record Installed Pipes | LS | 1 | $ - 0 | $ - 0 | |
| 22 | CELL 1 Early Landfill Collection System | LS | 1 | $ - 0 | $ - 0 | |
| 23 | LEACHATE POND Unsuitable Soil Excavation and Disposal | CY | 21,000 | $ - 0 | $ - 0 | |
| 24 | LEACHATE POND Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 25 | LEACHATE POND Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 26 | LEACHATE POND 60 mil Textured HDPE Geomembrane | |||||
| Liner (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 27 | LEACHATE POND Geocomposite | LS | 1 | $ - 0 | $ - 0 | |
| 28 | LEACHATE POND 80 mil Textured HDPE Geomembrane | |||||
| Liner (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 29 | LEACHATE POND Leachate Detection Sump and Riser Pipe | |||||
| (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 30 | LEACHATE POND Pump Stations, Piping, Valving, Electrical | |||||
| System and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 31 | LEACHATE POND Truck Loading Station | LS | 1 | $ - 0 | $ - 0 | |
| 32 | LEACHATE POND Dual Contained Forcemain Pipe | LS | 1 | $ - 0 | $ - 0 | |
| 33 | PROJECT Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 34 | PROJECT Electrical System Installation and Integration | LS | 1 | $ - 0 | $ - 0 | |
| 35 | PROJECT Sodding | SY | 1 | $ - 0 | $ - 0 | |
| 36 | PROJECT Seeding | SY | 1 | $ - 0 | $ - 0 | |
| 37 | PROJECT LFG Monitoring Probes | EA | 6 | $ - 0 | $ - 0 | |
| 38 | PROJECT Groundwater Monitoring Well Installation | EA | 7 | $ - 0 | $ - 0 | |
| 39 | PROJECT Groundwater Monitoring Well Abandonment | EA | 31 | $ - 0 | $ - 0 | |
| SUBTOTAL BID | $ - 0 | |||||
| PAYMENT AND PERFORMANCE BOND | $ - 0 | |||||
| TOTAL BID PRICE (inclusive of Payment and Performance Bond) | $ - 0 |