This Scope of Work document outlines the requirements for the Southeast Expansion Area (SEA) construction project at Volusia County's Tomoka Farms Road Landfill in Florida. The project involves the development of a new Class I landfill area designed to provide long-term solid waste disposal capacity exceeding 100 years. The primary work components include construction of Cell 1 in two phases—Cell 1 South (approximately 10 acres) and Cell 1 North (approximately 20 acres)—along with installation of composite geosynthetic liner systems, berms, leachate pump stations, early landfill gas collection systems, and associated grading and erosion control features. Additional work includes construction of a new lined leachate pond with associated forcemain and lift stations, load-out area, and electrical service installation. The contractor must also construct an access road from the landfill entrance to the expansion area and obtain all necessary permits. The work will be performed at an active landfill site where additional construction activities may be ongoing, and the contractor is responsible for protecting all existing stormwater management infrastructure and perimeter roads previously constructed.
The contractor shall furnish all machinery, tools, equipment, materials, and labor necessary to complete the work in a satisfactory and finished manner, with all incidental, minor, and miscellaneous items necessary for completion included without additional cost to the County. The document does not specify pricing terms, set-asides, response dates, or award dates, as this is a scope of work component rather than a complete solicitation document. The contractor must demonstrate awareness of site conditions and coordinate work activities with other ongoing construction efforts while maintaining the integrity of existing infrastructure.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUSIA COUNTY
SOUTHEAST EXPANSION AREA Scope of Work - 1 2/2/2026
Scope of Work for Contractors
Volusia County (County) intends to develop a new Class I landfill area within the existing Tomoka Farms Road Landfill property, referred to as the Southeast Expansion Area (SEA).
The SEA will provide the County with long-term (100+ years) Class I solid waste disposal capacity. The following Scope of Work outlines the general requirements and major work elements to be completed. It is not to be construed as a complete list. The Contractor is responsible for being aware that the work will occur at an active landfill, where additional construction activities, including roadway entrance improvements, may also be in progress.
The SEA already has a stormwater management system and perimeter road, both previously constructed by others, in place. The Contractor shall be responsible for protecting all existing infrastructure from damage throughout the performance of the Work.
Work to be performed is identified in the Contract Documents (i.e., Drawings, these Specifications, and other parts of the Project Manual). The Contractor shall furnish machinery, tools, equipment, material, and labor necessary for the performance of the Work in a satisfactory, complete, neat, and finished manner.
All incidental, minor, and miscellaneous labor, materials, and work items not specified or shown, but are necessary to complete the indicated Work and maintain and repair the Work, or which may be reasonably implied to include, shall be completed and furnished by the Contractor without additional cost to the County.
The following provides an overview of the various components of the project. This overview is not meant to be comprehensive.
Landfill Construction
• Construction of Cell 1 is to be constructed in 2 phases.
o Cell 1 South – approximately 10 acres – the first part of Cell 1 to be constructed and certified.
o Cell 1 North – approximately 20 acres - the second part of Cell 1 to be constructed and will be tied into Cell 1 South.
• Construction and installation of:
o Composite geosynthetic liner system with protective cover o Berms o Leachate pump stations o Early landfill gas collection system o Grading around the landfill footprint
VOLUSIA COUNTY
SOUTHEAST EXPANSION AREA Scope of Work - 2 2/2/2026 o Erosion and sediment control features o Temporary access road o Intercell separation berm
Leachate Pond Construction
• Construction of a new lined leachate pond, associated forcemain and lift stations, and load-out area.
• Installation of all required electrical service for leachate infrastructure.
• Connection of the existing leachate pond system to the new leachate pond
Ancillary Support
• Leachate lift station and forcemain from landfill to Leachate Pond
• Apply for and receive any and all permits necessary
• Installation of leachate lift stations and force main from the landfill to the new leachate pond.
• Installation of all required electrical service for support infrastructure.
• Construction of an access road from the entrance to the landfill expansion area