Exhibit_B_-_Prime_Sub_Contractor_Form_26-B-51IF.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-51IF
- Issued by
- Volusia County, Florida
About this file
This is an Exhibit B Prime/Subcontractor Form for Volusia County, Florida's Tomoka Farms Road Landfill Southeast Area Construction Cell I project (Contract No. C-2071, ITB No. 26-B-51IF). The form requires bidders to list all proposed subcontractors and detail the scope of work each entity will perform. Anticipated subcontractor disciplines include Electrical, Plumbing, Liner Installer, Survey, and Silt Fence Installation, though additional subcontractors may be added as needed. Prime contractors may elect to self-perform work, which should be documented on the form. The County retains the right to seek clarification regarding subcontractor qualifications and requires that all subcontractors maintain appropriate licenses. Any changes to proposed subcontractors during project execution require prior written approval from the County Project Manager, though such changes may not alter the total base bid pricing.
Bidders must complete all green-shaded cells on the form, designating dollar values and work percentages for both the prime contractor and all proposed subcontractors, with the total allocation required to equal 100 percent. The total bid amount submitted on this form must correspond exactly with the Total Bid Price listed on Exhibit G - Bid Price Sheet, including any performance or payment bonds if applicable. This form will also be used to determine local bid preference eligibility in accordance with Section 2.8(D) of the solicitation. Failure to complete and return the Prime/Subcontractor Form may result in the bid being deemed non-responsive.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2071 | ITB No. 26-B-51IF | ||||
| EXHIBIT B - PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Electrical | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| Liner Installer | $ - 0 | 0.00% | |
| Survey | $ - 0 | 0.00% | |
| Silt Fence Installation | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .